SAUDI ARAMCO ID/PID - 24-Mar-2016 - REV. 2015.09.01 (Standards Cutoff - September 6, 2015) Rev. 2015.09.

01 6-Sep-15

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Re-instatement Checklist (Form) SATR-A-2011 24-Mar-16 MECH-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Fadhili Gas Sulfur Recovery Unit (Package 3) BI-10-01900-0004 PSAL / NSH
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT
SATIP-G-005-01 4.3 REQUIRED?
SAUDI ARAMCO INSPECTION LEVEL PSAL INSPECTION LEVEL NSH INSPECTION LEVEL
W H H
Notes:
1) This Form shall be used in conjunction with an applicable Reinstatement Procedure for all Test Packages (SAEP-1160).
2) "B" items from Pre-Test Checklist are cleared after testing during re-instatement to close & certify Test Pkgs.
3) Any items not completed during the re-instatement
shall be added to Mechanical Completion Punchlists and submitted to Saudi Aramco (FEIL). ETC = Estimated Time of Completion (Affects
lay-up selections)
Verified Certify Test
Item Description Reference
Origi- ETC
complete
Concur
Package
# (Use with applicable Re-Instatement Procedure) nator (Note 3) (PID)
by QC Complete
1 Seal weld threaded nipples from headers to root valves at Std drawing
locations (hydrocarbon service) AB-036521
Sht01 Rev 09
2 The free movement of unrestrained piping, both in axial and
lateral directions, shall be controlled and limited by properly
located guides and anchoring points to within acceptable bounds. SAES-L-310
Para 15.2.1

3 For all sizes NPS 4 inch and above, a turbulence-free minimum


distance of 5 pipe diameters upstream and 2 pipe diameters
downstream of every check valve shall be maintained. No pipe
fittings such as elbows, reducers, tees, etc., or flow restricting
devices such as orifices, control valves, etc., shall be installed in SAES-L-108
these zones unless Para 6.3.4
specifically approved by the Chairman of the Valves Standards
Committee.

4 Check valve is oriented in the wrong direction (flow arrow).


Reverse check valve to assure correct flow direction. SAES-L-108
(Note: Valve to be re-positioned after test.) Para 6.2.2.(e)

5 The minimum spacing between lines supported on sleepers or


pipe racks shall be as shown on Standard Drawing AB-036207. SAES-L-310
Para 12.2

All above items have been completed on Reinstatement per procedure and test package is
certified complete:
Remarks:

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection:
T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved:
T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

Page 1 of 4
SAUDI ARAMCO ID/PID - 24-Mar-2016 - REV. 2015.09.01 (Standards Cutoff - September 6, 2015) Rev. 2015.09.01 6-Sep-15

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Re-instatement Checklist (Form) SATR-A-2011 24-Mar-16 MECH-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Fadhili Gas Sulfur Recovery Unit (Package 3) BI-10-01900-0004 PSAL / NSH
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT
SATIP-G-005-01 4.3 REQUIRED?
SAUDI ARAMCO INSPECTION LEVEL PSAL INSPECTION LEVEL NSH INSPECTION LEVEL
Quality Record Approved:
W H H
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 4
SAUDI ARAMCO ID/PID - 24-Mar-2016 - REV. 2015.09.01 (Standards Cutoff - September 6, 2015) Rev. 2015.09.01 6-Sep-15

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Re-instatement Checklist (Form) SATR-A-2011 24-Mar-16 MECH


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Fadhili Gas Sulfur Recovery Unit (Package 3) BI-10-01900-0004 PSAL / NSH
EQUIPMENT ID NUMBER(S) / LINE NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT
SATIP-G-005-01 4.3 REQUIRED?
SAUDI ARAMCO INSPECTION LEVEL PSAL INSPECTION LEVEL NSH INSPECTION LEVEL
W H H

Item
Description A or B Origi- ETC
Verified
Concur
(Use with the applicable Pre-Test Punchlist Reference complete
# Item nator (Note 4) (PID Inspector)
Checklist) by QC

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection:
T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved:
T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

Page 3 of 4
SAUDI ARAMCO ID/PID - 24-Mar-2016 - REV. 2015.09.01 (Standards Cutoff - September 6, 2015) Rev. 2015.09.01 6-Sep-15

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Re-instatement Checklist (Form) SATR-A-2011 24-Mar-16 MECH


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Fadhili Gas Sulfur Recovery Unit (Package 3) BI-10-01900-0004 PSAL / NSH
EQUIPMENT ID NUMBER(S) / LINE NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT
SATIP-G-005-01 4.3 REQUIRED?
SAUDI ARAMCO INSPECTION LEVEL PSAL INSPECTION LEVEL NSH INSPECTION LEVEL
W H H

Item
Description A or B Origi- ETC
Verified
Concur
(Use with the applicable Pre-Test Punchlist Reference complete
# Item nator (Note 4) (PID Inspector)
Checklist)
Quality Record Approved: by QC
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 4 of 4