ACTIVITY SHEET for COLUMNS / TOWERS

Height of Column 25 m
Diameter of Column 3.0 m
No. of Trays (Average) 28
No. of Manholes 6
COLUMN/TOWER MAINTENANCE WITH TRAYS (CLEANING & REPLACEMENT)

Original
Activity ID Phase Activity Description Duration
(HRs)
PRE-TRUNAROUND PHASE 38
CL-0001 PRE Shifting of Scaffolding Material to Site 6
CL-0005 PRE Scaffolding Erection for Access & Blind Installation 12
CL-0010 PRE Tagging of Blinds 2
CL-0015 PRE Shifting of Tools, Material & Blinds to Site 6
CL-0020 PRE Removal of Insulation at Manholes 12
TRUNAROUND PHASE 346
CL-0025 SD Obtain Work Permit 2
CL-0030 SD Blinding of Equipment 8
CL-0035 SD Removal of Associated Piping 4
CL-0040 SD Opening of Manholes 8
CL-0045 SD Ventillation / Installation of Air Ejector 11
CL-0050 SD Carryout LEL Test before Entry 2
CL-0055 SD Obtain Entry Permit 3
CL-0060 SD Install Internal Lights 3
CL-0065 SD Opening of All Tray Manways 18
CL-0070 SD Pre Inspection by Client 2
CL-0075 SD Erection of Internal Scaffolding 11
CL-0080 SD Inspection by Client 2
CL-0085 SD Removal of Internals Demister Pad 8
CL-0090 SD Removal of Internals Packing Layers 12
CL-0095 SD Removal of Internals Bubble Caps 12
CL-0100 SD Removal of Internals Distributor 10
CL-0105 SD Removal of Damaged / Bend Out Trays 18
CL-0110 SD Inspection by Client 2
CL-0115 SD Cleaning Inside Column / Power Brush Cleaning of Weld Seams 20
CL-0120 SD Cleaning of Trays & Internals 10
CL-0125 SD Inspection of Shell Lining 4
CL-0130 SD Repair / Replacement of Lining (If Req) 28
CL-0135 SD Inspection by Client 2
CL-0140 SD Repair / Replace Washers, Shell Clamps, etc. 4
CL-0145 SD Repair / Replace Internals Demister Pad, Packing, Downcomer and Trays 18
CL-0150 SD Inspection by Client 2
CL-0155 SD Bottom Cleaning 6
ACTIVITY SHEET for COLUMNS / TOWERS

COLUMN/TOWER MAINTENANCE WITH PAUL RINGS (CLEANING & REPLACEMENT)

Activity ID Phase

PRE-TRUNAROUND PHASE
CL-0001 PRE
CL-0005 PRE
CL-0010 PRE
CL-0015 PRE
CL-0020 PRE
CL-0025 PRE
TRUNAROUND PHASE
CL-0030 SD
CL-0035 SD
CL-0040 SD
CL-0045 SD
CL-0050 SD
CL-0055 SD
CL-0060 SD
CL-0065 SD
CL-0070 SD
CL-0075 SD
CL-0080 SD
CL-0085 SD
CL-0090 SD
CL-0095 SD
CL-0100 SD
CL-0105 SD
CL-0110 SD
CL-0115 SD
CL-0120 SD
CL-0125 SD
CL-0130 SD
CL-0135 SD
CL-0140 SD
CL-0145 SD
CL-0150 SD
CL-0155 SD
Height of Column 25 m
Diameter of Column 3.0 m
No. of Trays (Average) 12
No. of Manholes 6
No. of Beds of Paul Rings 3
NCE WITH PAUL RINGS (CLEANING & REPLACEMENT)

Original
Activity Description Duration
(HRs)
56
Shifting of Scaffolding Material to Site 6
Scaffolding Erection for Access & Blind Installation 12
Tagging of Blinds 2
Shifting of Tools, Material & Blinds to Site 6
Removal of Insulation at Manholes 12
Fabrication of Chute For Unloading / Loading of Paul Rings 18
453
Obtain Work Permit 2
Blinding of Equipment 8
Removal of Associated Piping 4
Opening of Manholes 9
Installation of Chute On Manway From Where Paul Rings Are To Be Unloaded 8
Ventillation / Installation of Air Ejector 11
Carryout LEL Test before Entry 2
Obtain Entry Permit 2
Install Internal Lights 3
Opening of All Tray Manways 18
Pre Inspection by Client 2
Erection of Internal Scaffolding 10
Inspection by Client 2
Removal of Internals Demister Pad 8
Removal of Internals Packing Layers 12
Removal of Internals Bubble Caps 12
Removal of Internals Distributor 10
Removal of Damaged / Bend Out Trays 18
Inspection by Client 2
Unloading of Paul Rings through Chute 40
Cleaning Inside Column / Power Brush Cleaning of Weld Seams 20
Cleaning of Trays & Internals 10
Cleaning / Segregation of Paul Rings 20
Inspection of Shell Lining 4
Repair / Replacement of Lining (If Req) 28
Inspection by Client 2