KARNATAKA POWER TRANSMISSION CORPORATION LIMITED

DAILY MAINTENANCE CARRIED OUT DETAIL(S) OF CHANNARAYAPATNA 66/11KV


SUBSTATION FOR THE MONTH OF JULY-2022 OF THE FINANCIAL YEAR 2022-23
SL
ACTIVITY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO
1 Inspection of battery charger
Visual Inspection of Oil level in bushings, OLTC, Silica
2
gel in Breathers
Recording number of OLTC operations in a day and
3
recording cumulative number of operations
Observing abnormal change in Transformer humming
4
sound
General cleaning of C&R Panel(s) , Battery chargers
5
and Other equipments in Control Room
6 Cleaning of Outdoor yard, Earth electrode pits
inspection of ODY for Arcing/Oil leakages (Day & Night
7
peak hours)
8 Review of Log books/ reports of Shift Engineers
Check functionality of the cooling fans (Day & Night
9
peak hours)

1 of 3
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
WEEKLY MAINTENANCE CARRIED OUT DETAIL(S) OF CHANNARAYAPATNA 66/11KV
SUBSTATION FOR THE MONTH OF JULY-2022 OF THE FINANCIAL YEAR 2022-23
WEEK NO-14 ( 04-JUL-2022 TO 10- WEEK NO-15 ( 11-JUL-2022 TO 17- WEEK NO-16 ( 18-JUL-2022 TO 24-
SL
ACTIVITY JUL-2022 )( WORK CARRIED OUT JUL-2022 )( WORK CARRIED OUT JUL-2022 )( WORK CARRIED OUT ON
NO
ON 8th ) ON 14th ) 20th )
Inspection of electrolyte level in batteries and topping
1
up with distilled water (if necessary)
Inspection of Oil level and Condition of oil in Air
2
Compressors
Draining of condensed water in Air receiver tanks of
3
Breakers
Checking of Auto-start/stop of Compressors/Pumps of
4
Breakers
5 Checking of Alarm & Lock out of Air/Gas in Breakers

2 of 3
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
MONTHLY MAINTENANCE CARRIED OUT DETAIL(S) OF CHANNARAYAPATNA 66/11KV
SUBSTATION FOR THE MONTH OF JULY-2022 OF THE FINANCIAL YEAR 2022-23
SL
ACTIVITY MAINTENANCE CARRIED OUT ON 14th
NO
1 Cleaning & applying petroleum jelly to Battery terminals

3 of 3