Fakultas Teknik Sipil Dan Lingkungan Tugas B1 - Menggambar Teknik
Fakultas Teknik Sipil Dan Lingkungan Tugas B1 - Menggambar Teknik
FWL +57.16
D 16 - 1000( X & Y )
O
R
IG
IN
AL
CONCRETE WALL
G
R
3830
O
CONCRETE COLLUMN t = 20 cm
U
CONCRETE COLLUMN
N
CONCRETE BEAM
TEMPORARY CUTTING LINE CONCRETE BEAM CONCRETE BEAM
250 X 450
8160 200 X 400 250 X 450
8160
+53.50
2:
1
400 X 400
CONCRETE BEAM 200 X 400
+48.50 STONE MASONRY (1:4)
DRAINAGE STONE MASONRY (1:4)
DRAINAGE
4000 4000
+47.00 SLAB 250 mm Thk
CONCRETE COLLUMN CONCRETE COLUMN
1000 250
400 X 400 500 400 X 400
EXISTING SOIL STONE MASONRY (1:4) 1000 1000
1000 200
DILATATION 20 mm
POTONGAN A-A
+58.16 +58.16
FWL + 57.16 4
+51.82
+51.32
R1500 +50.82
6500
REINFOREED CONCRETE CLASS A
SLAB 250 mm, Thk
STONE MASONRY (1:4)
+47.00
ORIGINAL GROUND LEVEL R5000 +45.90
250 1750 +45.00
STONE MASONRY (1:4)
2500 1000 1200
EXISTING SOIL EXISTING SOIL
+43.82
DILATATION 20 mm
20000 33421
POTONGAN B - B