Download as pdf
Download as pdf
You are on page 1of 3
Addendum for “EMERGENCY MANAGEMENT PLAN” SAF-WP-IMS-003 REVISION 5 DATED 20-11-2014 e Following are the changes to the procedure: 1. Change in FCC Location (Page # 26) 2. Change in RCC location (Page # 27) © PREPARED BY REVIEWED BY APPROVED BY Tadeom Shang Mai Ur Rab Fark igbal Oureah 201-14 Boat ° Boat @ DOCUMENT CODE | SAF-WP-IMS-003 [REV.#] 05 | REV. DATE [20-11-14 | PAGE| 26 0f 118 6.6.4. Formation and Location of Emergency Control Center 6.6.4.1 Front Control Center (FCC) Front Control Centre comprises of the following 1. Production Manager (FCC Leader) 2. Training Manager 3. Unit Manager HSE 4, Coordination Engineer (works as ESL) 5. Concerned Shift Engineer (works as ESL till Coordination Engr. arrives) 6 Unit Manager Ammonia 7. Unit Manager Utiities 8 Unit Manager Nitric Acid 8 Unit Manager Urea eS 10. Unit Manager CAN © 41. Unit Manager NP ORIGINAL 12, Unit Manger PH & S ENERED: | 13. Unit Manager L.CO, 6.6.4.2 FCC Locations availabilty of these offices during off duty hours. Following are the preferable locations for establishing Front Control Centre 1. Uhde Building (APM Office) In case of wind direction from NAST to Ammonia plant, FCC will be established in Unde Building (APM Office) 2, Ammonia Conference Room (Beside Coordination Engineer Office) In case of wind direction from NAST to Admin, Building. CAN plant or Colony Jamia mosque, FCC will be established in Ammonia Conference Room (Beside Coordination Engineer Office) NOTE: FCC leader has the authority to relocate FCC if warranted by conditions at that time. FCC may be reestablished at any suitable location near declared emergency area on FCC. Leader disposal as required by the situation after reaching dedicated FCC locations FCC leader may call additional work force / crew on the declared emergency site from nearest assembly point to assist the ERT members engaged in rescue and evacuation operation. In case of major fire / heavy release of toxic gases and chemicals, UM HSE and the respective section UM / SH may rush to the declared emergency site if possible for immediate assistance to ERT team leader in emergency handling. RCC leader may contact them in the field through Walkie Talkie or by visiting the site accordingly. FCC dedicated offices keys will be placed in Key box provided at the entrance doors to ensure ROUTE ED BY IMS REFERENCE PREPARED BY Re Nees ee ‘Wat Ur Rab DOCUMENT CODE | sAF-w-ims-003 [REV. #] 05 | REV. DATE [20-11-14 | PAGE | 27 0f 110 6.6.5 Rear Control Center (RCC) The members of RCC are: General Manager Manufacturing (Leader) General Manager Admin General Manager Projects Technical Services Manager E&I Manager Maintenance Manager Manager Civil Colony Projects Staff Engineer Safety Senior Executive Administration Senior Executive Security Chief Medical Officer (stationed at Clinic) \ “ORIGINAL NRED. SS ecevogsens 6.6.5.1 RCC Locations Preferable locations are given as under depending upon location of emergency and wind direction; L.CO2 Plant (UM Office) In case of wind direction from NAST to Admin building, RCC will be established in L.CO2 Plant UM Office, Admin Conference Room No-1 (Opposite DO's Office) In case of wind direction from NAST to Colony Jamia mosque, CAN plant or Ammonia plant, RCC wil be established in Admin Conference Room No-1 ‘NOTE: RCC leader has the authority to relocate RCC if warranted by conditions at that time. In case of more man power / work force deployment is required at the declared emergency site; RCC leader may call the required crew from the nearest assembly point in coordination with senior executive administration or nearest control room of operating units. RCC dedicated offices keys will be placed in Key box provided at the entrance doors to ensure availabilty of these offices during off duty hours ROUTE Tame PREPARED BY REVIEWED BY | ‘APPR IMS REFERENCE Radeem Shahid Wat Ur Rab. Farukh i

You might also like