Bladder Vessel Concept
The vessels can beinstalled either horizontally or vertaly
The vessels ae treated internally with food quality epony paint for corosion protection and externally according to cent
specifcation
Inocet very the water lve inthe vessel tis normaly equipped witha level ndcatoras wala manometerto vey the
inital pre-charge pressure.
Wiis tyeravically required the vessel s equipped with aon retum valve ran incorporated bypass in order to rece the over
pressure by consuming the energy ofthe flow reversal.
Operation
1. Initally the pre-charge pressure must be adjusted tothe value resulting from the hydraulic analysis (pre-charge can be either
compressed air or nitrogen) At this staga, the bladder contain no volume ata
2. When the gate valve is opened, the water will enter the vessel under static conditions and begin to compress the gas state
presses alays higher than pre-charge pressure).
3. The water entering the vessel wl further compres the pre-charged ges untila balance between the quid and the
compressed gasis reached
4 immediately after a pump tp the pressue in the line wl start to decrease and the elastic energy Inthe vesel wll cause the
discharge of water rom the vessel nt the line. This prevents dangerous low pressure along the pipe
5. Asthe pressure may become very low, he low wl verse Water willhen ener into the vessel via a reduced diameter (ied
‘non return valve or bypass) if hydraulically required. Several oscillations may occur before static state is reached.
6. When the pump restarts the vessel wl continue oll unl dynamic steady tates reached and t's then ence again prepared
snes
_— ot ot
uf p> 2 ‘3Large vessel - 300010 35,0001
Large vessel swith food quality butyl bladder.
PAINT
Internal. Epoxy paint without
solvents colour waite, thickness
100 microns,
Excernal Polyurethane lacquer
colour orange and anti corrosion
polyurethane finishing thickness
Sa microns.
BLADDER
Interchangeable
food quality butyl
WARRANTY
Not including parts subject to
‘wear an tear and subject to use
under normal conditions
PACKING
Cradales.
4.623,
cH
ervyvo
Level ace easement
(ee
IARLATT!
irs
VAT GROUP
3000 1200 3800 5 1050 26 180 D5 1370 No.
2000) 7200 2100) a 1050 26 10 Fy 137 Ne
5000 150 3500) a 1300 26 150 v8 1690) Ne
3000 7500 B00 3 1300 26 150 78 1670 No
7000 7500 200) 3 1300 26 150 v8 1670 No
000 1500 5300 3 1500 26 180 17a 1670 No
3000) 1500 3800) 3 1300 2 150 v8 1670 No
70000 1940 00) 4 1700 26 150 V8 2070 Ye
To000 7100 3800 a 7600 26 156. 76 2270 ve
7000 1900 5600) 4 1700 26 150 1 2070 Yes
1000 Ton a0 a 700 26 150 6 BD Ye
75000 1900 wr 4 1700 % 150 iz 2070 e
75000 2100 5300 4 7800 26 180 276 2 Yes
Tso 7960 TaN) 4 1700 36 300 saa 2070 Ye
76000 Zio B10 4 7800 2 300 300 2270 es
Bn000 1900 Bat) a 1700 36 300 30 2070 ve
20000 FT a0 4 7800 26 300 300 2270 ve
25000 1900 10400 4 1700 26 300 300 2070 es
75000 7100 3200 a 7600 2 300 30 2270) ve
25000 2500 on, 4 2000) 26 500 50 2670 Yes
25smoot 70a 700 a 7800 36 300 30) BD ve
30000 2500 7200) 4 7000) 2 300 30) 2570 Ye
35000 3000 B10) 4 2380) 26 500 300) 370 Yes
Contact us fr upper capacities. The dimensions shown are indicative and can be modified without warning,
i