Accumulator Catalogue Accumulators3

You might also like

You are on page 1of 3
Bladder Vessel Concept The vessels can beinstalled either horizontally or vertaly The vessels ae treated internally with food quality epony paint for corosion protection and externally according to cent specifcation Inocet very the water lve inthe vessel tis normaly equipped witha level ndcatoras wala manometerto vey the inital pre-charge pressure. Wiis tyeravically required the vessel s equipped with aon retum valve ran incorporated bypass in order to rece the over pressure by consuming the energy ofthe flow reversal. Operation 1. Initally the pre-charge pressure must be adjusted tothe value resulting from the hydraulic analysis (pre-charge can be either compressed air or nitrogen) At this staga, the bladder contain no volume ata 2. When the gate valve is opened, the water will enter the vessel under static conditions and begin to compress the gas state presses alays higher than pre-charge pressure). 3. The water entering the vessel wl further compres the pre-charged ges untila balance between the quid and the compressed gasis reached 4 immediately after a pump tp the pressue in the line wl start to decrease and the elastic energy Inthe vesel wll cause the discharge of water rom the vessel nt the line. This prevents dangerous low pressure along the pipe 5. Asthe pressure may become very low, he low wl verse Water willhen ener into the vessel via a reduced diameter (ied ‘non return valve or bypass) if hydraulically required. Several oscillations may occur before static state is reached. 6. When the pump restarts the vessel wl continue oll unl dynamic steady tates reached and t's then ence again prepared snes _— ot ot uf p> 2 ‘3 Large vessel - 300010 35,0001 Large vessel swith food quality butyl bladder. PAINT Internal. Epoxy paint without solvents colour waite, thickness 100 microns, Excernal Polyurethane lacquer colour orange and anti corrosion polyurethane finishing thickness Sa microns. BLADDER Interchangeable food quality butyl WARRANTY Not including parts subject to ‘wear an tear and subject to use under normal conditions PACKING Cradales. 4.623, cH ervyvo Level ace easement (ee IARLATT! irs VAT GROUP 3000 1200 3800 5 1050 26 180 D5 1370 No. 2000) 7200 2100) a 1050 26 10 Fy 137 Ne 5000 150 3500) a 1300 26 150 v8 1690) Ne 3000 7500 B00 3 1300 26 150 78 1670 No 7000 7500 200) 3 1300 26 150 v8 1670 No 000 1500 5300 3 1500 26 180 17a 1670 No 3000) 1500 3800) 3 1300 2 150 v8 1670 No 70000 1940 00) 4 1700 26 150 V8 2070 Ye To000 7100 3800 a 7600 26 156. 76 2270 ve 7000 1900 5600) 4 1700 26 150 1 2070 Yes 1000 Ton a0 a 700 26 150 6 BD Ye 75000 1900 wr 4 1700 % 150 iz 2070 e 75000 2100 5300 4 7800 26 180 276 2 Yes Tso 7960 TaN) 4 1700 36 300 saa 2070 Ye 76000 Zio B10 4 7800 2 300 300 2270 es Bn000 1900 Bat) a 1700 36 300 30 2070 ve 20000 FT a0 4 7800 26 300 300 2270 ve 25000 1900 10400 4 1700 26 300 300 2070 es 75000 7100 3200 a 7600 2 300 30 2270) ve 25000 2500 on, 4 2000) 26 500 50 2670 Yes 25 smoot 70a 700 a 7800 36 300 30) BD ve 30000 2500 7200) 4 7000) 2 300 30) 2570 Ye 35000 3000 B10) 4 2380) 26 500 300) 370 Yes Contact us fr upper capacities. The dimensions shown are indicative and can be modified without warning, i

You might also like