Professional Documents
Culture Documents
OLSS & EOLSS Valves - S&F - A3 Size
OLSS & EOLSS Valves - S&F - A3 Size
Servo Valve
CTC - Kanchi
Central Training Centre - L&T Construction & Mining Machinery
Servo piston (EOLSS Pump)
Servo piston has different
If the large diameter end
diameters on both ends in the ratio
"Connects to Tank - Pump
of 1:2. The small diameter end is
HPV375+375 The servo piston is also in contact strokes" Pilot pressure or
Changes pump swash plate always connected to the output of Mechanical force to change
6 (PC800 & with the VC valve spool through CAM "Connects to shuttle valve Main pressure
angle to change pump flow the shuttle valve, while the swash plate angle
PC2000) to stabilise the pump flow output - Pump De strokes" from VC Valve
connections of the large diameter
"If blocked - Pump gives
end is dependent on the working of
steady flow"
the VC valve
Shuttle valve
Whichever is higher
Shuttle valve selects higher In "E OLSS(PC800/PC2000)" pump Pilot pressure between Pilot and Main
HPV375+375 Has a ball at centre which closes
pressure between "Pilot line swash plate is controlled by either from SPRV and pressure to
9 (PC800 & the low pressure input side and -
and Main pressure line" to give "Pilot pressure" or "Main pressure" Main working 1. Servo piston Small
PC2000) give only high pressure as output
input to VC valve whichever is higher pressure diameter
2. VC valve
CTC - Kanchi
Central Training Centre - L&T Construction & Mining Machinery
Jet sensor
It has two small orifices which
creates PT (Pressure take away) Jet sensor is mounted at the end of
and a bigger drain passage which neutral line(Not the return Tank line)
Neutral passage
creates PD (Pressure Drain) signal. of the control valve. If all the spools
line of the
"Jet sensor has two orifices facing are in neutral then the pump flow
It gives input regarding machine control valve
each other. A Jet is created in the passes through the neutral passage "Delta P" (PT-PD) signal
condition (Neutral or in (If Machine
first orifice and when it comes of the spools and go to tank after If Delta P is more - Indicates
Operation) to NC valve by control levers in
10 Control valve through the second orifice it forms passing through the jet sensor. - machine in neutral
creating "Delta P (PT-PD)" for Neutral delta P
the Jet Pressure( Pt). Pt is On PC2000- the output of jet sensor If Delta P is less - Indicates
increasing or reducing pump will be more and
connected to the NC valve goes to jet sensor differential machine in operation
flow if the lever is
Opposite to the spring. Part of the pressure sensor and the differential
operated delta P
flow that does not form the jet pressure is converted into an
will be less)
goes to tank creates Pd. This Pd electrical signal and fed to the pump
goes to the spring side of the NC controller as input
valve
Jet sensor Relief valve limits the It has a poppet reinforced with a
maximum pressure in the jet spring to limit the neutral line
sensor and the neutral line. It pressure. Poppet receives the It acts like the unload valve of CLSS Neutral passage
11 Jetsensor relief valve Control valve dumps the excess oil coming to neutral line pressure if the pressure machine only when the machine is in - line of the Drains the excess oil to tank
the jet sensor when the engine increases more than the spring neutral control valve
starts or an operation is pressure then the poppet lift up
stopped and drains the oil to tank
Main Pressure Relief valve (MPRV)
It has a poppet reinforced with a
spring. Poppet receives the working
MPRV limits the maximum pressure. If the pressure increases
During Heavy lift operation Spring
working pressure of the system. more than the spring pressure then
side of the MPRV receives additional
It drains the pump line to tank the poppet lift up and drains the oil Drains the pump delivery oil
pilot line from the heavy lift solenoid
when the working pressure to tank. Output from the heavy lift to tank when the actuator
to increase the force on spring side. Main pressure
12 Control valve reaches to set pressure. It is It has a relief valve and a dump solenoid when heavy lift is stooped moving due to
Due to this the opening pressure of line
mounted in the pump main line valve. Relief valve controls the selected and solenoid is ON heavy load or at the end of
the relief valve increases and
to safe guard pump. This valve pressure and the dump valve dump stroke
machine working pressure can be
need to handle more amount of huge amount of oil to tank by
increased to get higher force.
oil at high pressure creating bigger passage to tank.
This reduces heat generation in the
system during relief operations
CTC - Kanchi
Central Training Centre - L&T Construction & Mining Machinery
On PC1250: This valve throttles the supply to the bucket supply on the swing 4 spool control valve whenever swing is operated so that even if bucket is operated simultaneously, swing
will not be compromised.
15 Throttle valve Control valve
On PC2000- Throttle valve throttles the arm supply on L1 and R2 control valves and boom supply on R1 control valve during different set conditions to help in simultaneous operation.
The valve is a pilot operated check valve with an orifice on the sleeve of the check valve. When the sleeve is locked by working pressure, only the orifice passage is open for oil supply.
Control valve On PC1250 when swing PPC is operated and the pilot pressure becomes greater than 15Kg/cm2 the swing compensation selector valve gets actuated and then is connects the pump
16 Swing compensation selector valve
PC1250 pressure to the throttle valve on the bucket line, to ensure swing assurance function.
On PC1250 straight travel valve is mounted on the RH 4 spool control valve. It prevents any travel deviation if boom, arm or bucket is operated along with travel. It interconnects the
17 Straight travel valve Control valve left and right travel circuits so that same flow is available for both motors and straight travel is achieved.
On PC2000 this is achieved by PPC cut-off valve where during straight travel is operated by L1 and R1 control valve and boom , arm and bucket by L2 and R2 control valve.
Control valve PPC cut-off valve connects or drains certain PPC lines during straight travel and swing priority function based on the actuation of the respective solenoids. It has a spool inside the block
18 PPC cut-off valve
PC2000 which is operated by the solenoid and the connections are changed .
The suction selector valve is located in the cab base and is connected between the PPC and the control valve spools. When a spool is operated the oil from the other end has to return
19 Suction selector valve PC 2000 to tank quickly. A portion of the supply pressure from PPC pushes the spool in the suction selector valve connecting the return line from the other end to tank through the suction
selector valve. Similarly when the main spool returns to neutral oil trom tanks fill the spool cap through the tank line connections in the suction selector valve.
This valve is located in the return line from the control valve. This valve changes the back pressure in the return line from the control valve from a high value during swing or track
operation to a lower value when only attachment other than swing or track is operated. As the anti cavitation requirement is high during swing and travel, the back pressure is kept
20 Variable Back pressure Valve PC2000
high, During boom, arm and bucket operation the back pressure required is low, the variable back pressure valve maintains a lower value . This helps in reducing hydraulic loss and
improving fuel consumption.
CTC - Kanchi