Professional Documents
Culture Documents
Final Project Vaishnvi Munde
Final Project Vaishnvi Munde
Final Project Vaishnvi Munde
On
Submitted by
MBA 1 semester
Batch 2018-2020
1
Acknowledgement
MBA I semester
Batch 2018-2020
2
Certificate
3
DECLARATION
4
INDEX
SR.NO CONTENTS S
1 CHAPTER I:
1.1 INTRODUCTION 6
1.2 OBJECTIVES OF THE STUDY 7
1.3 SCOPE OF THE STUDY 8
5 ANNEXURE 26-27
CHAPTER 1
INTRODUCTION
5
The Indian railway provides the principle mode of transportation for freight and
passengers.
Indian railways have been a vital component of the social, political and economic
life of the country. Indian railways transportation network has played a key role in
weaving India in to a nation. This network has not only integrated markets but also
people cross length and breadth of the country. It has bound the economic life of
the country and helped in accelerating the development of the industry.
Indian railway is one of the fast growing service sectors which operate trains in
and around different parts of the country. It offers various facilities to the
passengers and making sincere attempt to enrich and improve the infrastructure
arrangement in the respective railway junction. The benefits of new technology and
advancement of atomization have been taken into account for providing various
services to the Indian passengers.
The first railway proposals for India were made in Madras in 1932.The country’s
first train, Red Hill Railway.
This railway station comes under the Nanded division of the South Central
Railway zone and has train connectivity with major cities cities such as Hyderabad,
Delhi, Nizamabad, Nagpur, Nasik, Pune, Nanded and Latur Road.
Objectives of Study
6
The objectives of this project are:
To survey of passengers behavior towards Railway Satisfaction
To study the passenger satisfaction
To find out the reviews about Railway Services
7
To study of utilsation of services which is given by I
Limitations of study
8
CHAPTER 2
RESEARCH METHODOLOGY:
Sample Selection
The sample of the study is those who travel in Railway.
Primary Data:
• Primary data required information regarding the satisfaction level and expectations.
Secondary Data:
The secondary data is required to the conceptual fieldwork of beneficiary.
Instrument:
Schedule is an instrument used to collect the data.
Sampling:
Sample size:
For selecting the numbers of samples for the study Aurangabad region have selected to collect
data from 150 respondents through a questionnaire.
Data Analysis:
9
Data collected encoded, classified and then tabulated graphs further designed for the better
understanding of the data. Single factor analyses, done with the help of percentage, meaningful
interpretations were drawn based on the analyses.
CHAPTER 3
DATA ANALYSIS AND INTERPRETATION
Yes 92
No 58
10
t
Yes No
39%
61%
Interpretation: In the above pie diagram there 61% people are frequent
traveler and 39% are not frequent traveller.
11
Q.2) If yes how many times in a week you travel?
1- 64
3days/we
ek
Everyday 28
1-3days/week Everyday
30%
70%
Interpretation: In the above pie diagram 30% respondents are saying that they are travelling
everyday and 70% are said that they travel 1-3days/week.
12
Q.3) Which train type you generally prefer?
Express 102
Passeng 35
er
Superfas 13
t
Locals
9%
23%
68%
Interpretation: Most of the respondents 68% prefer Express, 23% prefer passenger and only
9% passengers prefer superfast.
13
Q.4) Which coach type you generally prefer?
1A 10
2A 20
FC 3
3A 31
CC 12
SL 15
2S 6
UR/GE 53
N
1A 2A FC 3A
CC SL 2S UR/GEN
7%
13%
35%
2%
21%
4%
10% 8%
14
Q.5) Who books your train tickets?
Self 118
Agent 32
Self Agent
21%
79%
15
Q.6) If own, which method you use for reservation ticket booking?
Online 69
Offline 49
Online Offline
42%
58%
Interpretation: Majority of the respondents 58% are saying that they use
online method for reservation ticket booking and 42% use offline method.
16
Q.7) If online do you use mobile app for reservation ticket booking?
Yes 45
No 24
Yes No
35%
65%
17
Interpretation: Most of the respondent passengers 65% are saying they use
mobile apps and 35% passengers don’t use aaps for ticket booking.Q.8) Do
you use mobile apps for checking train status and schedule?
Yes 84
No 66
Yes No
44%
56%
Interpretation: Majority of the respondent passengers 56% are saying yes they use
mobile apps for checking train status and schedule and 44% are saying no they
don’t use any app.
18
Q.9) Do trains arrive on schedule time?
Yes 78
Sometim 46
es
No 26
Yes Sometimes No
17%
52%
31%
Interpretation: Most of the passengers are saying 52% trains arrive on schedule
time, 31% are saying sometimes trains arrive on schedule time and17% saying
trains do not arrive on schedule time.
19
Q.10) Do you buy train food during your train journey?
Yes 112
No 38
Yes No
25%
75%
20
Q.11) Are you satisfied with train food services in train?
Yes 26
No 86
Yes No
23%
77%
Interpretation: 23% passengers are satisfied with train food services in train and 77%
passengers are not satisfied with the train food services in train.
21
Q.12) Do you use Wi-Fi facility on railway station?
Yes 85
No 65
Yes No
43%
57%
Interpretation: Majority of respondent passengers 57% use Wi-Fi facility on railway station
and 43% are saying they don’t use Wi-Fi facility on railway station.
22
Q.13) How was your experience about train services?
Bad 71
Good 117
Excellen 13
t
6%
35%
58%
Interpretation: Most of the respondent passengers 58% are saying their experience was good
about train services, 35% are saying their experience was bad about train services and 7% are
saying excellent.
23
CHAPTER 4
FINDING AND CONCLUSION
FINDING
CONCLUSION:
24
In the survey we came to know that the Railway facilities are satisfied. There are some changes
to be made in the food quality. People enjoy their railway journey.There are minimum people are
not satisfied with food facility,which is provided by railway.. There is good cleanness at the
railway station.
ANNEXTURE
25
“A Study on Utilisation Of Services Provided by Indian Railway to
Passenger at Aurangabad Railway Station.”
Questionnaire
Please spare a few minutes of your valuable time to answer this simple questionnaire
a) Yes b) No
a) 1-3days/week b) Everyday
a) 1A b) 2A c) FC d) CC e) SL f) 2S g) UR/GEN
a) Self b) Agent
a) Online b) Offline
a) Yes b) No
Q 8) Do you use mobile apps for checking train status and schedule?
a) Yes b) No
a) Yes b) No
26
a) Yes b) No
a) Yes b) No
a) Yes b) No
27