WMS - C&S - 046 - WMS For Level 19 Water Tank Leakages1
WMS - C&S - 046 - WMS For Level 19 Water Tank Leakages1
WMS - C&S - 046 - WMS For Level 19 Water Tank Leakages1
Ref:
TINGKAT (317 BILIK) DENGAN 2 TINGKAT BESMEN YANG MENGANDUNGI: i. 2 QP23 Form
TINGKAT LOBI DAN SERVIS (ARAS TANAH & ARAS 40) ii. 4 TINGKAT RUANG 01
MEKANIKAL DAN RUANG PEKERJA (ARAS 1 - ARAS 4) iii. 34 TINGKAT HOTEL
Effective
PENGINAPAN (ARAS 5 - ARAS 38) iv. 6 TINGKAT KEMUDAHAN REKREASI / Date :
KOLAM RENANG (ARAS 39 - ARAS 43, TERMASUK ARAS 40 MEZANIN) v. 1 01/07/17
TINGKAT RUANG MEKANIKAL LIF (ARAS 44) vi. TEMPAT LETAK KERETA
CREST BUILDER MEKANIKAL BERTINGKAT (ARAS TANAH - ARAS 18) DI ATAS LOT 790, 791, 792 & Issue: 1
SDN BHD 793, JALAN IMBI, SEKSYEN 67, KUALA LUMPUR, WILAYAH PERSEKUTUAN Rev : 0
UNTUK MEGA CAPITAL DEVELOPMENT SDN BHD
Document
Title
WMS for Level 19 Water Tank Leakages
Work
WMS Ref. No: CBSB/CAPRI/WMS/C&S/046
Package
Marcus
APPROVAL A B C
DATE
APPROVED FOR APPROVED REJECTED
CONSTRUCTION
WITH COMMENT
COMMENTS :
C. C To :
Architect Site -RE / RA / COW –
C & S Eng Site – SPM / PM --
M & E Eng HQ – Project --
QS HQ – Contract –
Others HQ – QAQC –
MAIN BUILDING WORKS FOR CADANGAN PEMBANGUNAN 1 BLOK HOTEL 44 TINGKAT (317
BILIK) DENGAN 2 TINGKAT BESMEN YANG MENGANDUNGI: i. 2 TINGKAT LOBI DAN SERVIS
(ARAS TANAH & ARAS 40) ii. 4 TINGKAT RUANG MEKANIKAL DAN RUANG PEKERJA (ARAS 1 -
ARAS 4) iii. 34 TINGKAT HOTEL PENGINAPAN (ARAS 5 - ARAS 38) iv. 6 TINGKAT KEMUDAHAN
REKREASI / KOLAM RENANG (ARAS 39 - ARAS 43, TERMASUK ARAS 40 MEZANIN) v. 1 TINGKAT
RUANG MEKANIKAL LIF (ARAS 44) vi. TEMPAT LETAK KERETA MEKANIKAL BERTINGKAT
Crest Builder (ARAS TANAH - ARAS 18) DI ATAS LOT 790, 791, 792 & 793, JALAN IMBI, SEKSYEN 67, KUALA
S/B LUMPUR, WILAYAH PERSEKUTUAN UNTUK MEGA CAPITAL DEVELOPMENT SDN BHD
Ref. No: CBSB/CAPRI/WMS/C&S/046 Rev: 0 Date: 15/02/2020
WORK METHOD STATEMENT FOR LEVEL 19 WATER TANK LEAKAGES
RECTIFICATION WORKS
1. OBJECTIVE
The main purpose of this method statement is to outline the rectification procedure for Level 19
water tank leakages.
2. Purpose
This method statement describes the procedure to be followed for the rectification works for
Level 19 water tank leakages. This is to ensure that all activities are in full compliance with
requirements as per manufacturer’s standard.
3. Materials
i. To ascertained water tank leakages area and details along with client / consultant’s
representative
ii. Drill the holes for the injector/packer with 150mm spacing c/c along the leakage area in
order to receive the application.
iii. To inject PENTENS PU300 into leakage area by using high pressure (refer to product data
sheet)
iv. Allow 1 hour for initial cure and remove the mechanical packer
v. To patch back the hole by using cementitious grout
7. Safety & Environment
Photo No. 1: Water leakages found at Level 19 water tank wall (interior)
Photo No. 2: Water leakages found at Level 19 water tank wall (interior)
Doc. Ref: QP-15 Form 03
Crest Builder Sdn Bhd
Effective. Date : 30 /05/14
SITE MEMO Rev : 0
PENTENS PU-300 Product Data Sheet
One Part Polyurethane