Professional Documents
Culture Documents
Pile Cap Design
Pile Cap Design
Pile Cap Design
Definitions:
1. α = Coefficient of Thermal Expansion
2. ρact = Percentage steel provided
3. A1 = Area of Base for Load Transfer
4. A2 = Area of Bearing under column
5. AsfrPrv = Area of face reinforcement provided in Sqmm
6. AsfrReq = Area of face reinforcement required in Sqmm
7. AstPrv = Area of tensile reinforcement provided in Sqmm
8. AstReq = Area of tensile reinforcement required in Sqmm
9. AsvPrv = Area of shear reinforcement provided in Sqmm
10. AsvReq = Area of shear reinforcement required in Sqmm
11. Av = Location of section of shear-check from Pile Center
12. Beff = Effective Width for design for bending and shear in mm
13. Beffsfr = Effective Width for design for Face Reinforcement in mm
14. BMux = Factored Design Bending Moment for pile-cap along column D in
KN-m
15. BMuy = Factored Design Bending Moment for pile-cap along column B in
KN-m
16. Cx = Width of column in mm
17. Cy = Length of column in mm
18. D = Depth of Pilecap in mm
19. Deff = Effective Depth of Pilecap in mm
20. DfCol = Distance of Pile center to face of column in mm
21. Icr = Moment of Inertia of concrete crack section
22. Mcr = Cracking Moment
23. Mx = Bending Moment in column along Column D (from analysis) in KN-
m
24. My = Bending Moment in column along Column B (from analysis) in KN-
m
25. P = Axial load in pile due to Ptotal in kN
26. Pcomb = Axial load in column for a load combination in kN
27. Ppile = Axial Load on pile in kN
28. Ptotal = Total vertical load on pile-cap for a load combination in kN
29. Pmx = Axial load on pile due to moment Mx in kN
30. Pmy = Axial load on pile due to moment My in kN
31. sp = Spacing Between bars at outer most layer in mm
32. Temp1 = Peak Hydration temperature in Degree
33. Temp2 = Seasonal Temperature Variations in Degree
34. Vc = Nominal shear strength provided by concrete in kN
35. Vs Capacity = Shear strength capacity of provided shear reinforcement kN
36. Vu = Design shear force in kN
37. Vus = Design shear force for stirrups in kN
38. Vs = Nominal shear strength provided by shear reinforcement, in kN
39. Vx = Shear in Column along major axis (from analysis) in kN
40. Vy = Shear in Column along minor axis (from analysis) in kN
41. y = Neutral axis depth.
42. φ = Strength reduction factor in shear
43. φ1 = Strength reduction factor in concrete bearing
44. Φ1Pnb = Bearing strength of column in kN
Code References:
ACI 318M - 2011
1. Ptmax : 10.3.5
2. Ptmin : 7.12.2.1/10.5.4
3. Pt : 10.3
4. Vc : 11.11.2.1
5. Vcper : 11.2.2
6. AvReq : 11.4.7
7. Min Shear Reinf : 11.4.6
8. Max Stirrup Spacing : 11.4.5
9. One Way Shear Criteria : 15.5
10. Load transfer : 10.14
11. fs,perm : 10.6.4
12. fc,perm : 10.2.7.1
13. Wcr : Eq 4.2(a)
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
Location of critical section is at d/2 from face of column
Section Location from column
= 722.5 mm
center
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
Location of critical section is at d/2 from face of column
Section Location from column
= 722.5 mm
center
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
Location of critical section is at d/2 from face of column
Section Location from column
= 722.5 mm
center
No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN
Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500