Pile Cap Design

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 104

PILECAP DESIGN CALCULATIONS

Definitions:
1. α = Coefficient of Thermal Expansion
2. ρact = Percentage steel provided
3. A1 = Area of Base for Load Transfer
4. A2 = Area of Bearing under column
5. AsfrPrv = Area of face reinforcement provided in Sqmm
6. AsfrReq = Area of face reinforcement required in Sqmm
7. AstPrv = Area of tensile reinforcement provided in Sqmm
8. AstReq = Area of tensile reinforcement required in Sqmm
9. AsvPrv = Area of shear reinforcement provided in Sqmm
10. AsvReq = Area of shear reinforcement required in Sqmm
11. Av = Location of section of shear-check from Pile Center
12. Beff = Effective Width for design for bending and shear in mm
13. Beffsfr = Effective Width for design for Face Reinforcement in mm
14. BMux = Factored Design Bending Moment for pile-cap along column D in
KN-m
15. BMuy = Factored Design Bending Moment for pile-cap along column B in
KN-m
16. Cx = Width of column in mm
17. Cy = Length of column in mm
18. D = Depth of Pilecap in mm
19. Deff = Effective Depth of Pilecap in mm
20. DfCol = Distance of Pile center to face of column in mm
21. Icr = Moment of Inertia of concrete crack section
22. Mcr = Cracking Moment
23. Mx = Bending Moment in column along Column D (from analysis) in KN-
m
24. My = Bending Moment in column along Column B (from analysis) in KN-
m
25. P = Axial load in pile due to Ptotal in kN
26. Pcomb = Axial load in column for a load combination in kN
27. Ppile = Axial Load on pile in kN
28. Ptotal = Total vertical load on pile-cap for a load combination in kN
29. Pmx = Axial load on pile due to moment Mx in kN
30. Pmy = Axial load on pile due to moment My in kN
31. sp = Spacing Between bars at outer most layer in mm
32. Temp1 = Peak Hydration temperature in Degree
33. Temp2 = Seasonal Temperature Variations in Degree
34. Vc = Nominal shear strength provided by concrete in kN
35. Vs Capacity = Shear strength capacity of provided shear reinforcement kN
36. Vu = Design shear force in kN
37. Vus = Design shear force for stirrups in kN
38. Vs = Nominal shear strength provided by shear reinforcement, in kN
39. Vx = Shear in Column along major axis (from analysis) in kN
40. Vy = Shear in Column along minor axis (from analysis) in kN
41. y = Neutral axis depth.
42. φ = Strength reduction factor in shear
43. φ1 = Strength reduction factor in concrete bearing
44. Φ1Pnb = Bearing strength of column in kN

Code References:
ACI 318M - 2011
1. Ptmax : 10.3.5
2. Ptmin : 7.12.2.1/10.5.4
3. Pt : 10.3
4. Vc : 11.11.2.1
5. Vcper : 11.2.2
6. AvReq : 11.4.7
7. Min Shear Reinf : 11.4.6
8. Max Stirrup Spacing : 11.4.5
9. One Way Shear Criteria : 15.5
10. Load transfer : 10.14
11. fs,perm : 10.6.4
12. fc,perm : 10.2.7.1
13. Wcr : Eq 4.2(a)

BS 8007 (For Early / Initial Thermal Cracking)


1. Surface Zone for : Figure A.1
suspended slab
2. Surface Zone for ground : Figure A.2
slab
3. Factors for the : Table A.1
calculation of minimum
reinforcement

Design Code : ACI 318M -


2011
Pilecap No : PC1
Column No : C1 (550mm X 550mm)
Member Ref. No : 100

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 638.26 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 748.51 kN
Mx = 6.23 kNm
My = -165.56 kNm
P = Ptotal/ No. of Piles
= 187.13 kN
Pmx = 2.08 kN
Pmy = 55.19 kN

Maximum load on pile = 244.39 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 483.18 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 593.43 kN
Mx = -4.98 kNm
My = -3.47 kNm

Maximum load on pile group = 593.43 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 638.26 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 748.51 kN
Mx = 6.23 kNm
My = -165.56 kNm
Vx = 61.46 kNm
Vy = -1.5 kNm
Maximum shear on pile group = sqrt(61.462 + -1.52)
= 61.48 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 407
Critical Load Combination : [128] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) -(LOAD 2: EZ)
P = 750.11 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC2
Column No : C2 (550mm X 550mm)
Member Ref. No : 103

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 791.61 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 901.86 kN
Mx = 12.03 kNm
My = -154.33 kNm
P = Ptotal/ No. of Piles
= 225.46 kN
Pmx = 4.01 kN
Pmy = 51.44 kN

Maximum load on pile = 280.92 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 635.85 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 746.1 kN
Mx = -0.53 kNm
My = -3.52 kNm

Maximum load on pile group = 746.1 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 791.61 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 901.86 kN
Mx = 12.03 kNm
My = -154.33 kNm
Vx = 56.99 kNm
Vy = 6.13 kNm
Maximum shear on pile group = sqrt(56.992 + 6.132)
= 57.32 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 407
Critical Load Combination : [128] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) -(LOAD 2: EZ)
P = 914.26 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC3
Column No : C3 (550mm X 550mm)
Member Ref. No : 106

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 781.07 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 891.32 kN
Mx = 11.85 kNm
My = -143.49 kNm
P = Ptotal/ No. of Piles
= 222.83 kN
Pmx = 3.95 kN
Pmy = 47.83 kN

Maximum load on pile = 274.61 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 635.82 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 746.07 kN
Mx = -0.66 kNm
My = -3.7 kNm

Maximum load on pile group = 746.07 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 311
Critical Load Combination : [53] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 1: EX)
Pcomb = 639.36 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 749.61 kN
Mx = -121.09 kNm
My = -7.5 kNm
Vx = 7.41 kNm
Vy = -53.33 kNm
Maximum shear on pile group = sqrt(7.412 + -53.332)
= 53.84 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 407
Critical Load Combination : [128] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) -(LOAD 2: EZ)
P = 899.24 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC4
Column No : C4 (550mm X 550mm)
Member Ref. No : 109

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 772 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 882.25 kN
Mx = 11.8 kNm
My = -132.6 kNm
P = Ptotal/ No. of Piles
= 220.56 kN
Pmx = 3.93 kN
Pmy = 44.2 kN

Maximum load on pile = 268.69 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 636.81 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 747.06 kN
Mx = -0.71 kNm
My = -3.83 kNm

Maximum load on pile group = 747.06 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 311
Critical Load Combination : [53] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 1: EX)
Pcomb = 636.8 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 747.05 kN
Mx = -121.17 kNm
My = -3.82 kNm
Vx = 5.9 kNm
Vy = -53.43 kNm
Maximum shear on pile group = sqrt(5.92 + -53.432)
= 53.75 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
Location of critical section is at d/2 from face of column
Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 407
Critical Load Combination : [128] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) -(LOAD 2: EZ)
P = 886.22 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC5
Column No : C5 (550mm X 550mm)
Member Ref. No : 112

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 742.4 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 852.65 kN
Mx = 11.87 kNm
My = -117.74 kNm
P = Ptotal/ No. of Piles
= 213.16 kN
Pmx = 3.96 kN
Pmy = 39.25 kN

Maximum load on pile = 256.36 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 617.3 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 727.55 kN
Mx = -0.64 kNm
My = 0.03 kNm

Maximum load on pile group = 727.55 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 310
Critical Load Combination : [52] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 6: LL2) +(LOAD 5: LL1) +0.71 (LOAD 1: EX)
Pcomb = 620.88 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 731.13 kN
Mx = 119.79 kNm
My = -3.78 kNm
Vx = 1.86 kNm
Vy = 53.49 kNm
Maximum shear on pile group = sqrt(1.862 + 53.492)
= 53.52 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN
Check for Uplift Load on Pile:
No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 407
Critical Load Combination : [128] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) -(LOAD 2: EZ)
P = 848.53 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.
Design Code : ACI 318M -
2011
Pilecap No : PC6
Column No : C6 (550mm X 550mm)
Member Ref. No : 115

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 733.59 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 843.84 kN
Mx = 11.86 kNm
My = -106.99 kNm
P = Ptotal/ No. of Piles
= 210.96 kN
Pmx = 3.95 kN
Pmy = 35.66 kN

Maximum load on pile = 250.58 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 619.25 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 729.5 kN
Mx = -0.7 kNm
My = -0.22 kNm

Maximum load on pile group = 729.5 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 310
Critical Load Combination : [52] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 6: LL2) +(LOAD 5: LL1) +0.71 (LOAD 1: EX)
Pcomb = 621.09 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 731.34 kN
Mx = 120.23 kNm
My = -7.82 kNm
Vx = 3.22 kNm
Vy = 54.07 kNm
Maximum shear on pile group = sqrt(3.222 + 54.072)
= 54.16 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 407
Critical Load Combination : [128] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) -(LOAD 2: EZ)
P = 835.82 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC7
Column No : C7 (550mm X 550mm)
Member Ref. No : 118
Concrete Grade : C20
Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 310
Critical Load Combination : [52] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 6: LL2) +(LOAD 5: LL1) +0.71 (LOAD 1: EX)
Pcomb = 601.69 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 711.94 kN
Mx = 111.18 kNm
My = -15.96 kNm
P = Ptotal/ No. of Piles
= 177.98 kN
Pmx = 37.06 kN
Pmy = 5.32 kN
Maximum load on pile = 220.37 kN
Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 482.64 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 592.89 kN
Mx = 3.88 kNm
My = -4.47 kNm

Maximum load on pile group = 592.89 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 310
Critical Load Combination : [52] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 6: LL2) +(LOAD 5: LL1) +0.71 (LOAD 1: EX)
Pcomb = 601.69 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 711.94 kN
Mx = 111.18 kNm
My = -15.96 kNm
Vx = 9.97 kNm
Vy = 42.14 kNm
Maximum shear on pile group = sqrt(9.972 + 42.142)
= 43.31 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 404
Critical Load Combination : [125] : 1.2 (LOAD 4: DL2) +1.2 (LOAD 3: DL1) +0.5 (LOAD 5:
LL1) +(LOAD 6: LL2) +0.5 (LOAD 7: LLR) +(LOAD 1: EX)
P = 698.8 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC8
Column No : C8 (550mm X 550mm)
Member Ref. No : 101

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m
Density of Soil = 16 kN/cum
Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 311
Critical Load Combination : [53] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 1: EX)
Pcomb = 804.85 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 915.1 kN
Mx = -116.78 kNm
My = -11.63 kNm
P = Ptotal/ No. of Piles
= 228.78 kN
Pmx = 38.93 kN
Pmy = 3.88 kN

Maximum load on pile = 271.58 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 691.01 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 801.26 kN
Mx = -5.66 kNm
My = 1.3 kNm

Maximum load on pile group = 801.26 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 718.23 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 828.48 kN
Mx = -6.06 kNm
My = -181.51 kNm
Vx = 82.46 kNm
Vy = -7.38 kNm
Maximum shear on pile group = sqrt(82.462 + -7.382)
= 82.79 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 405
Critical Load Combination : [126] : 1.2 (LOAD 4: DL2) +1.2 (LOAD 3: DL1) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) -(LOAD 1: EX)
P = 916.22 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC9
Column No : C9 (550mm X 550mm)
Member Ref. No : 104

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 312
Critical Load Combination : [54] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 6: LL2)
+(LOAD 5: LL1) +(LOAD 7: LLR) +0.71 (LOAD 2: EZ)
Pcomb = 765.46 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 875.71 kN
Mx = 3.23 kNm
My = 171.53 kNm
P = Ptotal/ No. of Piles
= 218.93 kN
Pmx = 1.08 kN
Pmy = 57.18 kN

Maximum load on pile = 277.18 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 765.33 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 875.58 kN
Mx = 3.29 kNm
My = 0.94 kNm

Maximum load on pile group = 875.58 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 765.2 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 875.45 kN
Mx = 3.35 kNm
My = -169.65 kNm
Vx = 77.16 kNm
Vy = 5.02 kNm
Maximum shear on pile group = sqrt(77.162 + 5.022)
= 77.32 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 402
Critical Load Combination : [123] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +1.6 (LOAD 6:
LL2) +1.6 (LOAD 5: LL1) +0.5 (LOAD 7: LLR)
P = 936.23 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC10
Column No : C10 (550mm X 550mm)
Member Ref. No : 107

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %
Consider Capacity Design : Yes
Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 312
Critical Load Combination : [54] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 6: LL2)
+(LOAD 5: LL1) +(LOAD 7: LLR) +0.71 (LOAD 2: EZ)
Pcomb = 743.01 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 853.26 kN
Mx = -0.41 kNm
My = 158.95 kNm
P = Ptotal/ No. of Piles
= 213.32 kN
Pmx = 0.14 kN
Pmy = 52.98 kN

Maximum load on pile = 266.44 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 743 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 853.25 kN
Mx = -0.41 kNm
My = 0.79 kNm

Maximum load on pile group = 853.25 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN
Check for Maximum shear on Pile Group:
Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 742.98 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 853.23 kN
Mx = -0.41 kNm
My = -157.38 kNm
Vx = 71.32 kNm
Vy = 0.07 kNm
Maximum shear on pile group = sqrt(71.322 + 0.072)
= 71.32 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 402
Critical Load Combination : [123] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +1.6 (LOAD 6:
LL2) +1.6 (LOAD 5: LL1) +0.5 (LOAD 7: LLR)
P = 909.56 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC11
Column No : C11 (550mm X 550mm)
Member Ref. No : 110

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 312
Critical Load Combination : [54] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 6: LL2)
+(LOAD 5: LL1) +(LOAD 7: LLR) +0.71 (LOAD 2: EZ)
Pcomb = 764.48 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 874.73 kN
Mx = -3.93 kNm
My = 146.2 kNm
P = Ptotal/ No. of Piles
= 218.68 kN
Pmx = 1.31 kN
Pmy = 48.73 kN

Maximum load on pile = 268.73 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 764.48 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 874.73 kN
Mx = -3.92 kNm
My = 0.46 kNm

Maximum load on pile group = 874.73 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 764.48 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 874.73 kN
Mx = -3.91 kNm
My = -145.28 kNm
Vx = 65.7 kNm
Vy = -4.55 kNm
Maximum shear on pile group = sqrt(65.72 + -4.552)
= 65.86 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 402
Critical Load Combination : [123] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +1.6 (LOAD 6:
LL2) +1.6 (LOAD 5: LL1) +0.5 (LOAD 7: LLR)
P = 935.32 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC12
Column No : C12 (550mm X 550mm)
Member Ref. No : 113

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 781.63 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 891.88 kN
Mx = -0.46 kNm
My = -136.81 kNm
P = Ptotal/ No. of Piles
= 222.97 kN
Pmx = 0.15 kN
Pmy = 45.6 kN

Maximum load on pile = 268.72 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 781.56 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 891.81 kN
Mx = -0.46 kNm
My = -3.51 kNm

Maximum load on pile group = 891.81 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 781.63 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 891.88 kN
Mx = -0.46 kNm
My = -136.81 kNm
Vx = 64.87 kNm
Vy = 0 kNm
Maximum shear on pile group = sqrt(64.872 + 0 2)
= 64.87 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
Location of critical section is at d/2 from face of column
Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 402
Critical Load Combination : [123] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +1.6 (LOAD 6:
LL2) +1.6 (LOAD 5: LL1) +0.5 (LOAD 7: LLR)
P = 955.75 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC13
Column No : C13 (550mm X 550mm)
Member Ref. No : 116

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 311
Critical Load Combination : [53] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 1: EX)
Pcomb = 818.37 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 928.62 kN
Mx = -124.9 kNm
My = 5.13 kNm
P = Ptotal/ No. of Piles
= 232.16 kN
Pmx = 41.63 kN
Pmy = 1.71 kN

Maximum load on pile = 275.5 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 804.88 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 915.13 kN
Mx = 0.11 kNm
My = -3.45 kNm

Maximum load on pile group = 915.13 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 812.07 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 922.32 kN
Mx = 0.12 kNm
My = -124.13 kNm
Vx = 58.48 kNm
Vy = 0.76 kNm
Maximum shear on pile group = sqrt(58.482 + 0.762)
= 58.48 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN
Check for Uplift Load on Pile:
No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 402
Critical Load Combination : [123] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +1.6 (LOAD 6:
LL2) +1.6 (LOAD 5: LL1) +0.5 (LOAD 7: LLR)
P = 983.7 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.
Design Code : ACI 318M -
2011
Pilecap No : PC14
Column No : C14 (550mm X 550mm)
Member Ref. No : 119

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 310
Critical Load Combination : [52] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 6: LL2) +(LOAD 5: LL1) +0.71 (LOAD 1: EX)
Pcomb = 743.15 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 853.4 kN
Mx = 114.83 kNm
My = -13.54 kNm
P = Ptotal/ No. of Piles
= 213.35 kN
Pmx = 38.28 kN
Pmy = 4.51 kN

Maximum load on pile = 256.14 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 621.21 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 731.46 kN
Mx = 3.81 kNm
My = -0.7 kNm

Maximum load on pile group = 731.46 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 313
Critical Load Combination : [55] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 2: EZ)
Pcomb = 622.4 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 732.65 kN
Mx = 3.8 kNm
My = -108.8 kNm
Vx = 48.6 kNm
Vy = 5.6 kNm
Maximum shear on pile group = sqrt(48.62 + 5.62)
= 48.92 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 404
Critical Load Combination : [125] : 1.2 (LOAD 4: DL2) +1.2 (LOAD 3: DL1) +0.5 (LOAD 5:
LL1) +(LOAD 6: LL2) +0.5 (LOAD 7: LLR) +(LOAD 1: EX)
P = 865.19 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC15
Column No : C15 (550mm X 550mm)
Member Ref. No : 102
Concrete Grade : C20
Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 312
Critical Load Combination : [54] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 6: LL2)
+(LOAD 5: LL1) +(LOAD 7: LLR) +0.71 (LOAD 2: EZ)
Pcomb = 1009.59 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 1119.84 kN
Mx = 4.36 kNm
My = 167.5 kNm
P = Ptotal/ No. of Piles
= 279.96 kN
Pmx = 1.45 kN
Pmy = 55.83 kN
Maximum load on pile = 337.25 kN
Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 828.86 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 939.11 kN
Mx = -6.32 kNm
My = 7.17 kNm

Maximum load on pile group = 939.11 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 312
Critical Load Combination : [54] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 6: LL2)
+(LOAD 5: LL1) +(LOAD 7: LLR) +0.71 (LOAD 2: EZ)
Pcomb = 1009.59 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 1119.84 kN
Mx = 4.36 kNm
My = 167.5 kNm
Vx = -60.39 kNm
Vy = -4.58 kNm
Maximum shear on pile group = sqrt(-60.392 + -4.582)
= 60.56 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 406
Critical Load Combination : [127] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) +(LOAD 2: EZ)
P = 1164.14 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC16
Column No : C16 (550mm X 550mm)
Member Ref. No : 105

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m
Density of Soil = 16 kN/cum
Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 312
Critical Load Combination : [54] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 6: LL2)
+(LOAD 5: LL1) +(LOAD 7: LLR) +0.71 (LOAD 2: EZ)
Pcomb = 850.95 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 961.2 kN
Mx = 12.54 kNm
My = 156.71 kNm
P = Ptotal/ No. of Piles
= 240.3 kN
Pmx = 4.18 kN
Pmy = 52.24 kN

Maximum load on pile = 296.71 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 693.57 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 803.82 kN
Mx = -0.04 kNm
My = 5.97 kNm

Maximum load on pile group = 803.82 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 310
Critical Load Combination : [52] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 6: LL2) +(LOAD 5: LL1) +0.71 (LOAD 1: EX)
Pcomb = 724.41 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 834.66 kN
Mx = 129.29 kNm
My = 13.85 kNm
Vx = -9.44 kNm
Vy = 58.06 kNm
Maximum shear on pile group = sqrt(-9.442 + 58.062)
= 58.82 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 406
Critical Load Combination : [127] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) +(LOAD 2: EZ)
P = 980.15 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC17
Column No : C17 (550mm X 550mm)
Member Ref. No : 108

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 312
Critical Load Combination : [54] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 6: LL2)
+(LOAD 5: LL1) +(LOAD 7: LLR) +0.71 (LOAD 2: EZ)
Pcomb = 789.76 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 900.01 kN
Mx = 12.39 kNm
My = 144.73 kNm
P = Ptotal/ No. of Piles
= 225 kN
Pmx = 4.13 kN
Pmy = 48.24 kN

Maximum load on pile = 277.38 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 644.53 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 754.78 kN
Mx = -0.1 kNm
My = 4.94 kNm

Maximum load on pile group = 754.78 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 310
Critical Load Combination : [52] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 6: LL2) +(LOAD 5: LL1) +0.71 (LOAD 1: EX)
Pcomb = 647.65 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 757.9 kN
Mx = 128.99 kNm
My = 8.76 kNm
Vx = -6.7 kNm
Vy = 57.66 kNm
Maximum shear on pile group = sqrt(-6.72 + 57.662)
= 58.05 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 406
Critical Load Combination : [127] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) +(LOAD 2: EZ)
P = 909.03 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC18
Column No : C18 (550mm X 550mm)
Member Ref. No : 111

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %
Consider Capacity Design : Yes
Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 312
Critical Load Combination : [54] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 6: LL2)
+(LOAD 5: LL1) +(LOAD 7: LLR) +0.71 (LOAD 2: EZ)
Pcomb = 778.95 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 889.2 kN
Mx = 12.27 kNm
My = 133.52 kNm
P = Ptotal/ No. of Piles
= 222.3 kN
Pmx = 4.09 kN
Pmy = 44.51 kN

Maximum load on pile = 270.89 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 643.77 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 754.02 kN
Mx = -0.23 kNm
My = 4.74 kNm

Maximum load on pile group = 754.02 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN
Check for Maximum shear on Pile Group:
Critical Analysis Load Combination : 311
Critical Load Combination : [53] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 1: EX)
Pcomb = 643.8 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 754.05 kN
Mx = -129.3 kNm
My = 4.74 kNm
Vx = -5.38 kNm
Vy = -57.47 kNm
Maximum shear on pile group = sqrt(-5.382 + -57.472)
= 57.72 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 406
Critical Load Combination : [127] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) +(LOAD 2: EZ)
P = 894 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC19
Column No : C19 (550mm X 550mm)
Member Ref. No : 114

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 312
Critical Load Combination : [54] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 6: LL2)
+(LOAD 5: LL1) +(LOAD 7: LLR) +0.71 (LOAD 2: EZ)
Pcomb = 768.78 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 879.03 kN
Mx = 12.39 kNm
My = 122.51 kNm
P = Ptotal/ No. of Piles
= 219.76 kN
Pmx = 4.13 kN
Pmy = 40.84 kN

Maximum load on pile = 264.73 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 643.62 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 753.87 kN
Mx = -0.09 kNm
My = 4.75 kNm

Maximum load on pile group = 753.87 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 310
Critical Load Combination : [52] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 6: LL2) +(LOAD 5: LL1) +0.71 (LOAD 1: EX)
Pcomb = 640.67 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 750.92 kN
Mx = 128.98 kNm
My = 0.95 kNm
Vx = -4.37 kNm
Vy = 57.65 kNm
Maximum shear on pile group = sqrt(-4.372 + 57.652)
= 57.82 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok
Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 406
Critical Load Combination : [127] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) +(LOAD 2: EZ)
P = 879.86 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC20
Column No : C20 (550mm X 550mm)
Member Ref. No : 117

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 312
Critical Load Combination : [54] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 6: LL2)
+(LOAD 5: LL1) +(LOAD 7: LLR) +0.71 (LOAD 2: EZ)
Pcomb = 736.22 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 846.47 kN
Mx = 11.97 kNm
My = 111.1 kNm
P = Ptotal/ No. of Piles
= 211.62 kN
Pmx = 3.99 kN
Pmy = 37.03 kN

Maximum load on pile = 252.64 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 614.02 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 724.27 kN
Mx = -0.61 kNm
My = 4.49 kNm

Maximum load on pile group = 724.27 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 311
Critical Load Combination : [53] : (LOAD 3: DL1) +(LOAD 4: DL2) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2) -0.71 (LOAD 1: EX)
Pcomb = 628.03 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 738.28 kN
Mx = -130 kNm
My = 12.06 kNm
Vx = -8.35 kNm
Vy = -58.39 kNm
Maximum shear on pile group = sqrt(-8.352 + -58.392)
= 58.98 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN

Check for Uplift Load on Pile:


No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500
Location of critical section is at d/2 from face of column
Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 406
Critical Load Combination : [127] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) +(LOAD 2: EZ)
P = 858.16 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

Design Code : ACI 318M -


2011
Pilecap No : PC21
Column No : C21 (550mm X 550mm)
Member Ref. No : 120

Concrete Grade : C20


Steel Grade : Fy276
Clear Cover : 75 mm
Top of pile-cap below ground : 0 m

Density of Soil = 16 kN/cum


Founding Depth = 1 m
Pile Capacity in Compression = 1000 kN
Pile Capacity in Tension = 100 kN
Pile Capacity in Shear = 800 kN
Pile Capacity Reduction = 0 %
Pile Overloading = 0 %
Pile Group Overloading = 0 %
Pile Capacity Increase for EQ = 33 %
Pile Capacity Increase for Wind = 25 %
Live Load Reduction = 0 %

Consider Capacity Design : Yes


Consider Overburden Pressure : No

No. of Piles = 4
Pile Diameter = 300 mm
Pile Spacing = 5 xØ
Alternate Pile Spacing = 5 xØ
Pilecap Size = 2100 X 2100 mm
Pilecap Depth = 1000 mm
Pilecap Offset = 150 mm
Pile-cap Wt. = 110.25 kN

Check for Maximum Load on One Pile:


Critical Analysis Load Combination : 310
Critical Load Combination : [52] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 6: LL2) +(LOAD 5: LL1) +0.71 (LOAD 1: EX)
Pcomb = 499.51 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 609.76 kN
Mx = 120.18 kNm
My = -6.44 kNm
P = Ptotal/ No. of Piles
= 152.44 kN
Pmx = 40.06 kN
Pmy = 2.15 kN

Maximum load on pile = 194.65 kN


Allowable load on pile = 1000 x 1.33
= 1330 kN

Check for Maximum Load on Pile Group:


Critical Analysis Load Combination : 301
Critical Load Combination : [43] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 5: LL1) +(LOAD 6: LL2)
Pcomb = 393.82 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 504.07 kN
Mx = 5.11 kNm
My = 5.03 kNm

Maximum load on pile group = 504.07 kN


Allowable load on pile group = 4 x 1000 x 1
= 4000 kN

Check for Maximum shear on Pile Group:


Critical Analysis Load Combination : 310
Critical Load Combination : [52] : (LOAD 4: DL2) +(LOAD 3: DL1) +(LOAD 7: LLR)
+(LOAD 6: LL2) +(LOAD 5: LL1) +0.71 (LOAD 1: EX)
Pcomb = 499.51 kN
Ptotal = Pcomb + (1 x Pilecap Wt.)
= 609.76 kN
Mx = 120.18 kNm
My = -6.44 kNm
Vx = -2.56 kNm
Vy = 46.05 kNm
Maximum shear on pile group = sqrt(-2.562 + 46.052)
= 46.12 kN
Shear capacity of pile group = 4 x 800 x 1 x 1.33
= 4256 kN
Check for Uplift Load on Pile:
No uplift in any pile

Design for Bending:


Bottom Reinforcement Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 915 mm
Beff = 600 mm
DfCol = 0.47 m
BMux = Ppile X DfCol
= 712.5 kNm
PtReq = 0.6 %
AstReq (BM) = 5492 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-D


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Bottom Reinforcement Along Column-B


Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Deff = 895 mm
Beff = 600 mm
DfCol = 0.47 m
BMuy = Ppile X DfCol
= 712.5 kNm
PtReq = 0.63 %
AstReq (BM) = 5629 sqmm/m
AstPrv = 2#20 @ 110 C/C
= 5712 sqmm/m

Top Reinforcement Along Column-B


D = 1000 mm
AstReq = Min Pt for Top Reinforcement X D X 1000
= 0.18% X 1000 X 1000
= 1800 sqmm/m
AstPrv = #20 @ 170 C/C
= 1848 sqmm/m

Design for One Way Shear:


Along Column-D
Ppile = Capacity of pile
= 1000 x 1.5
= 1500 kN

Location of critical section is at d/2 from face of column


Section Location from column
= 732.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 44.17 837.5
P2 1500 44.17 837.5
P3 1500 44.17 837.5
P4 1500 44.17 837.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P3, P2+P4)


= 1675 kN
Deff = 915 mm
Beff = 2100 mm
φVc = 1178.24 kN
Vu > φVc, Hence Provide Shear Reinforcement
Vs = 1216.32 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 2663 sqmm/m
AsvPrv = 8195.48 sqmm/m
= 3L-#20 @ 115 C/C
Vs Capacity = 2069.69 kN
Vu < φVc+Vs Hence Ok

Along Column-B
Ppile = Capacity of pile
= 1000 x 1.5
= 1500

Location of critical section is at d/2 from face of column


Section Location from column
= 722.5 mm
center

Data for Piles


Pile No Load (kN) % covered Shear (kN)
P1 1500 40.83 887.5
P2 1500 40.83 887.5
P3 1500 40.83 887.5
P4 1500 40.83 887.5

Design Shear Force (Vu) = Max. of (Shear due to P1+P2, P3+P4)


= 1775 kN
Deff = 895 mm
Beff = 2100 mm
φVc = 1159.36 kN
Vu > Tc, Hence Provide Shear Reinforcement
Vs = 1230.48 kN
AsvReq = 1000 X (Vs X 1000) / (fy X Deff)
= 3323 sqmm/m
AsvPrv = 8568 sqmm/m
= 3L-#20 @ 110 C/C
Vs Capacity = 2116.47 kN
Vu < φVc+Vs Hence Ok

Design of Face Reinforcement:


AsfrReq = SFR % X D X Beffsfr
= 0.05 X 1000 X 500 / 100
= 250 sqmm
Asfr Prv = 1-#20
= 314 sqmm

Check for Load Transfer from Column to PileCap


Critical Analysis Load Combination = 406
Critical Load Combination : [127] : 1.2 (LOAD 3: DL1) +1.2 (LOAD 4: DL2) +0.5 (LOAD 7:
LLR) +0.5 (LOAD 5: LL1) +(LOAD 6: LL2) +(LOAD 2: EZ)
P = 606.42 kN
A2 = 0.3 sqm
A1 = 4.41 sqm
Base Area = 4.41 sqm
A1 < Base Area
Modification Factor = SquareRoot(A1/A2) < = 2
SquareRoot(A1/A2) = 3.82
Thus, Modification Factor = 2
Φ1Pnb = Φ1 x 0.85 x Modification Factor x A2 x Fck x 1000
= 0.65 x 0.85 x 0.3 x 2 x 20 x 1000
= 6630 kN
Φ1Pnb > P, Hence Safe.

You might also like