Cost Effective Tidal Energy: Turnkey Complete Solution Modular Scalable Reliable

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Cost effective tidal energy

> Turnkey complete solution > Scalable


> Modular > Reliable

hydrowing.tech
Turnkey solution

> Tocardo tidal turbines, > Installation & O&M operations


50% owned by HydroWing using Inyanga’s owned vessel
> Standardised in-house Inyanga Entsha
foundation design > Commercially scalable for site
and customer needs

3xT2 75-250kW 6xT2 75-250kW 6xT3 225-375kW 8xT3 – 225-375kW


Configuration
Turbines Turbines Turbines Turbines

Peak Output (kW) 225 - 750 450 - 1500 1350 - 2250 1800 - 3000
Annual Yield Upto 2.6 Upto 5.3 Upto 7.9 Upto 10.5
(GWh/yr)*
*Dependent on site conditions

Simplified Reduced Risk


Modularity & scalability
Operations

> Variable number of wings and > Low & Modular weight lifts
turbines > Wet mate connection reduces
> Flexible Tocardo turbine capacity cable handling
(40-375kW) > Retrievable wing for
> Standard / off-the-shelf materials, maintenance with dedicated
components and construction methods launch and recovery tool
> Global accessibility - all > No requirement for ROV
components transportable in > Centralised turbine controls
standard ISO containers in the wing enables offshore
maintenance
> Spare turbines / critical
components allow quick
replacement
> All HydroWing operations
performed by our DP2 Inyanga
Entsha Vessel (left)
> Distributed loading enables
extended fatigue life >25years
Higher reliability
Turbines range
tidal energy

> Multiple turbines – production > T1: Demonstration & community-


continued in case of single scale – 40-100 kW
turbine failure > T2: Community-scale & commercial
> Simple, robust and off-the-shelf arrays - 100-250 kW
turbine design - no gearbox, yaw > T3: Utility scale commercial
or active pitch systems arrays – 250-375kW
> World’s most proven tidal > TLF – Under development for low
turbines: velocity Sites - 75kW @ 1.7m/s
- Over 45 years combined
operations
- OTP project : 5xT2-250 kW,
in operation since 2016
- 2900MWh cumulative production
- Remote monitoring, control and
command
HydroWing Ltd
Jubilee Wharf
Penryn Cornwall
TR10 8FG UK

| support@hydrowing.tech | hydrowing.tech

Conference materials have been part funded through the ENCORE project. The ENCORE project
receives funding from the Interreg 2 Seas program 2014-2020, co-funded by the European Regional
Development Fund under subsidy contract No 2S08-004.

You might also like