PREVENTIVE MAINTENANCE US PULOGADUNG MARCH 2022

Nomor Mar-22
No. Nama Mesin Type
Mesin Minggu Note
PRODUKSI 1 2 3 4 5 Rencana Realisasi
I. Hot in Cream
1 PG.A.155 Vacuum Mixing Emulsifying #1 ZJR-650 ● 01-Mar-22
2 PG.A.164 Lobe Pump 5 ZB3A-36 ● 01-Mar-22
3 PG.A.081 Homogenizer (Portable) Multimix HSM-402 ● 01-Mar-22
4 PG.A.256 Tangki Pendinginan 1000L ● 01-Mar-22
5 PG.A.080 Water Bath Kecil FXJ6050A ● 02-Mar-22
6 PG.A.206 Mesin Filling Tube B CFNY-60A-C ● 07-Mar-22
7 PG.A.166 Lobe pump 7 ZB3A-36 ● 07-Mar-22
8 PG.A.116 Automatic Ointment Filling #1 CSH-FA ● 14-Mar-22
9 PG.A.167 Lobe Pump 8 ZB3A-12 ● 14-Mar-22
10 PG.A.117 Automatic Capping 2 (AC80) #1 AC-80 ● 14-Mar-22
11 PB.A.147 Shrink Tunnel 6 (CST-400/200) CST-400/200 ● 17-Mar-22
12 PB.A.168 Pengemasan 5 (Kosky 2800) KY-2800 ● 17-Mar-22
13 PB.A.157 Shrink Tunnel 8 (BS-4535LA) BS-4535LA ● 17-Mar-22
14 PG.A.418 Vacuum Mixing Emulsifying 1000L ● 28-Mar-22
15 Lobe Pump ● 28-Mar-22
II. Balsem & Snowflake
16 Water Bath Double Jacket ● 09-Mar-22
17 PG.A.083 Water Bath Besar 2 (Balsem) ● 09-Mar-22
18 PG.A.313 Water Bath Balsem Telon ● 10-Mar-22
19 PG.A.324 Mixer Balsem Telon ● 10-Mar-22
20 PB.A.023 Coding 5 (Daichi) ● 15-Mar-22
21 PB.A.108 Shrink Tunnel 5 (CAP SEALER) ● 15-Mar-22
III. Press & Relax
24 PG.A.150 Turbo Mixer 1 (DEV) ● 23-Mar-22
22 PB.A251 Pengemasan 7 (Kosky 3800) Kosky 3800 ● 29-Mar-22
23 PB.A.249 Carton Sealer 23 (Power Pack) FXJ6050A ● 29-Mar-22

Disetujui oleh:

Engineering Produksi

Rudy Indra Purnama Khe Liang


PREVENTIVE UTILITY US PULOGADUNG MARCH 2022

Mar-22
No. Nomor Mesin Nama Mesin Merk Nama Ruangan Minggu Note
1 2 3 4 5 Rencana Realisasi
PULOBUARAN
1 AC.S.018 AC Split LG G. Dingin COL - Pagi ● 01-Mar-22
2 AC.S.019 AC Split LG G. Dingin COL - Malam ● 01-Mar-22
3 AC.S.030_A AC Split Panasonic R. Server - Pagi ● 01-Mar-22
4 AC.S.031_A AC Split Panasonic R. Server - Malam ● 01-Mar-22
5 AC.S.082 AC Split Panasonic R. Pertinggal Lantai 2 ● 02-Mar-22
6 AC.S.083 AC Split Panasonic R.Bahan Baku Lantai 2 ● 02-Mar-22
7 AC.S.084 AC Split Daikin R.Bahan Baku Lantai 2 ● 02-Mar-22
8 AC.C.011 AC Cassette Panasonic G. Dingin Bahan Baku ● 04-Mar-22
9 AC.C.066 AC Cassette Panasonic G. Dingin Bahan Baku ● 04-Mar-22
10 AC.S.089 AC Cassette Panasonic R. Sortir Botol - Produksi ● 04-Mar-22
11 AC.S.090 AC Cassette Panasonic R. Sortir Botol - Produksi ● 04-Mar-22
12 E.A.085 Compressor KAESER CSG 55-2 KAESER R. Kompresor ● 11-Mar-22
13 E.A.086 Air Drier KAESER SECOTEC TE 102 KAESER R. Kompresor ● 11-Mar-22
14 AHU 5 AHU Lokal R. AHU 5 (Staff Gudang) ● 18-Mar-22
15 AHU 6 AHU Split Duct Lokal R. AHU ● 18-Mar-22
16 AHU 1 AHU Lokal R. AHU ● 19-Mar-22
17 AHU 3 AHU Lokal R. AHU ● 19-Mar-22
18 AHU 4 AHU Lokal R. AHU ● 19-Mar-22
19 CHILLER 1 CHILLER 10PK VICOT Area luar CU ● 19-Mar-22
20 CHILLER 2 CHILLER 10PK VICOT Area luar CU ● 19-Mar-22
21 CHILLER 3 CHILLER 20PK Aicool Area luar CU ● 19-Mar-22
22 E.A.006 Boiler EH-500F MIURA R. Boiler ● 21-Mar-22
23 E.A.052 Boiler TU-500S SAMSON R. Boiler ● 22-Mar-22
24 Sanitasi Looping RO 4000 Tirta Amertha R. Water Treatment (lantai 2) ● 23-Mar-22
25 E.A.036 Water Treatment 2 Reverse Osmosis R. Water Treatment (lantai 2) ● 23-Mar-22
Generator Set (500KVA)
26 E.A.035 Genset 500KVA R. Genset ● 25-Mar-22
Perkins/Stamford
GUDANG PBR
27 Chain Hoice Lift Lokal Gudang Lt. 1 ● 07-Mar-22
28 Reach Truck 1 Reach Truck BT Gudang Lt. 2 ● 07-Mar-22
GUDANG PKB
29 Fork Lift 2.5Ton Forklift 2.5 Ton Toyota Fork Lift Electric ● 14-Mar-22
30 Fork Lift 3 Ton Forklift 3 Ton Toyota Gudang Lt. 1 ● 14-Mar-22
31 Reach Truck 2 Reach Truck Toyota Reach Truck 2 ● 14-Mar-22
32 AC.S.042_A AC Split Daikin R. COL ● 15-Mar-22
33 AC.S.041_A AC Split Panasonic R. COL ● 15-Mar-22
34 AC.S.043 AC Split Daikin R. COD 2 ● 15-Mar-22
35 AC.S.077_A AC Split Panasonic R. COD 2 ● 15-Mar-22
36 AC.S.078 AC Split Daikin R. Admin Gudang ● 16-Mar-22
37 AC.S.079 AC Split Daikin R. Supervisor Gudang ● 16-Mar-22
38 AC.S.080 AC Split LG R. Server ● 16-Mar-22
GUDANG RUG
39 AHU 1 AHU Mcquay CoolRoom ● 08-Mar-22
40 AHU 2 AHU Mcquay CoolRoom ● 08-Mar-22
41 AC 1PK AC Split Panasonic Ruang Staff & Admin Lt. 1 ● 09-Mar-22
42 AC 1PK AC Split Panasonic Ruang Staff & Admin Lt. 1 ● 09-Mar-22
43 AC.S.093 AC Split Panasonic Ruang Marketing ● 09-Mar-22
44 AC 1PK AC Split Panasonic R. Kantin ● 09-Mar-22
45 Reach Truck Reach Truck BT Reach Truck ● 17-Mar-22
46 Fork Lift 2.5Ton Forklift 2.5 Ton Toyota Fork Lift Electric ● 17-Mar-22

Disetujui oleh :

Engineering : Produksi : Gudang :

Rudy Indra Purnama Khe Liang Netty Herawati