Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

SAP ERP Production Planning and Manufacturing (PP)


Certifications Practice Exam - Mini

You got 0 of 39 possible points.


Your score: 0 %

Question Results

Question: Score 0 of 1
(skipped)
A finished material is to be planned in a controlled manner in the SAP
ECC system in the context of requirements planning. The planned orders are
scheduled using what is known as basic date scheduling (not lead-time
scheduling).

Which of the following statements is true for the resulting dependent


requirements?
Please choose the correct answer.

Response:

When a customer order is created for the finished product, the dependent
requirements are automatically triggered for the components in the bill of material
without a planning run.

In multi-level backward scheduling, dependent requirements are triggered at the start


date for the higher-level assembly.

In multi-level backward scheduling, dependent requirements are triggered at the start


date for the higher-level assembly planned order.

If individual material components are explicitly assigned to operations during BOM and
routing maintenance, the requirement dates of the dependent requirements for these
components are scheduled at each of the operation start dates.

Question: Score 0 of 1
(skipped)
Which object in customizing controls the determination of planned
total overhead process costs for production orders?
Please choose the correct answer.

Response:

Accounting type

Costing variant

Settlement profile

Cost log

https://www.erpprep.com/node/873/take 1/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Question: Score 0 of 1
(skipped)
Which one of the following scheduling types cannot be assigned as
default to an order type (production order)?
Please choose the correct answer.

Response:

Midpoint

Forward

Only capacity requirements

Backward

Question: Score 0 of 1
(skipped)
Which option for selecting a routing exists when you create a
production order?
Please choose the correct answer.

Response:

Automatic selection of a reference operation set

Manual selection based on settings in the order type-dependent parameters

Automatic selection based on the selection ID in the material master

Manual selection based on the list of routings maintained in the material master

Question: Score 0 of 1
(skipped)
Which information is contained in production versions for selecting
routings and bills of material?
Please choose the correct answer.

Response:

The plant for which the routing and BOM have to be created

All the control parameters for selecting routings and bills of material

The routing and BOM alternatives to be used for production

The explosion date on which the validity of the routing and bill of material is checked

Question: Score 0 of 1
(skipped)
What can you use to organize material staging for production orders?
There are 3 correct answers to this question.

https://www.erpprep.com/node/873/take 2/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Response:

Material documents

Transfer orders

KANBAN

Pull list

Logistics Information System (LIS)

Question: Score 0 of 1
(skipped)
You want to use production/resource tools in your manufacturing
process. Which production type do you use?

Please choose the correct answer.

Response:

Repetitive manufacturing

Production order

Process order

KANBAN

Question: Score 0 of 1
(skipped)
Which production order function can no longer be carried out after the
order is released?
Please choose the correct answer.

Response:

Read PP master data.

Switching sequences.

Posting a goods issue from stock to the production order.

Posting a goods receipt from production to stock.

Question: Score 0 of 1
(skipped)
Which of the following statements best defines SAP ERP?
Please choose the correct answer.

Response:

SAP ERP is an application that supports all processes involving direct customer contact
https://www.erpprep.com/node/873/take 3/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

throughout the entire customer relationship life cycle.

SAP ERP is an application that a company can use to manage its business processes
efficiently.

SAP ERP is a system in which advanced planning and optimization processes can be
mapped.

SAP ERP is a system hardware that includes components such as Purchasing, Sales
and Distribution, Materials Management, and Production.

Question: Score 0 of 1
(skipped)
The company you advise wants to carry out the material availability
check automatically in the production order at various points in time.

Which of the following options would you recommend?


There are 2 correct answers to this question.

Response:

Goods receipt for the product produced with the order

Creation of the production order

Confirmation of the operation that the materials being checked are assigned to

Release of the production order

Goods receipt for a missing part

Question: Score 0 of 1
(skipped)
Which of the following scheduling types can only be used in capacity
planning?
Please choose the correct answer.

Response:

Midpoint

Forward

Only capacity requirements

Backward

Question: Score 0 of 1
(skipped)
Which activities lead to a reduction of the capacity requirements for
an operation?
There are 3 correct answers to this question.

https://www.erpprep.com/node/873/take 4/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Response:

Rescheduling the operation

Posting the goods receipt for the production order

Confirming the operation

Setting the status technically complete (TECO)

Reducing the order quantity

Question: Score 0 of 1
(skipped)
What data can be posted directly via the Plant Data Collection (PP-
PDC) interface?
Please choose the correct answer.

Response:

Goods receipts

Maintenance notifications

Confirmations

Goods issues

Question: Score 0 of 1
(skipped)
A project team member analyzes the following situation in SAP ECC in
the stock/requirements list for a finished product: there is only one customer order
and one fixed planned order with a similar quantity amount.

The customer order and the planned order both have deadlines on work days but
not on the same work day; the planned order has a later deadline.

The project team member cannot find a rescheduling message referring to this
deadline misalignment in the stock/requirements list. What reasons could there be
for the missing message?

There are 2 correct answers to this question.

Response:

Requirement planning has not yet been carried out to update the rescheduling
message.

The elements are linked to each other via fixed pegging.

The time misalignment falls within the tolerance window defined in Customizing.

The requirement coverage element is outside the rescheduling horizon.

https://www.erpprep.com/node/873/take 5/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Question: Score 0 of 1
(skipped)
In what sequence are the steps of material requirements planning
performed in SAP ECC?
Please choose the correct answer.

Response:

1. Net requirements calculation


2. Lot sizing
3. Determination of the procurement type
4. Scheduling

1. Calculation of safety stock


2. Lot sizing
3. Scheduling
4. Determination of the procurement type

1. Availability check
2. Lot sizing
3. Determination of the procurement type
4. Scheduling

1. Net requirements calculation


2. Lot sizing
3. Scheduling
4. Determination of the procurement type

Question: Score 0 of 1
(skipped)
An enterprise wants to absorb the uncertainty caused by fluctuating
demand for a finished product by means of a buffer variable in SAP ECC. They
suggest a dynamic safety stock.

What specifications are used to calculate the dynamic safety stock?


Please choose the correct answer.

Response:

The average daily demand and the desired days supply

The average daily demand and the safety time

The static safety stock per day and the safety time

The static safety stock and a material forecast

Question: Score 0 of 1
(skipped)
You want to procure your material components based on a forecast for
the finished material derived from historical sales. When customers order, you
produce the finished product and reserve it for that particular order.

Which is the appropriate planning strategy to use?


Please choose the correct answer.

Response:

https://www.erpprep.com/node/873/take 6/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Planning with final assembly (40)

Make-to-order production (20)

Planning without final assembly (50)

Production by lot size (30)

Question: Score 0 of 1
(skipped)
Which of the following functions are available in the SAP ECC system
for leveling overloads in individual work centers with the capacity planning tools?
There are 3 correct answers to this question.

Response:

Midpoint scheduling

Batch size optimization

Lot size optimization

Setup time reduction

Finite capacity scheduling

Question: Score 0 of 1
(skipped)
You want to use the function "Read PP master data" in the production
order. However, while calling the function you receive an error message. What
could be the reason?
Please choose the correct answer.

Response:

The material availability check has been performed.

Goods movements have been posted.

The production order has been released.

Order papers have been printed.

Question: Score 0 of 1
(skipped)
Which of the following structural elements does a process order have?
There are 3 correct answers to this question.

Response:

Item data

https://www.erpprep.com/node/873/take 7/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Parallel sequences

Relationships

Phases

Characteristic-based process instructions

Question: Score 0 of 1
(skipped)
What happens when a repetitive manufacturing planned order is
assigned to a production line in the planning table?
There are 2 correct answers to this question.

Response:

The planned order generates capacity requirements.

The planned order is converted to a production order.

The system status of the planned order changes.

The planned order type changes.

Question: Score 0 of 1
(skipped)
In production order processing, for which of the following objects can
you enter a confirmation?
There are 3 correct answers to this question.

Response:

Work Center

Individual Capacity

Order

Operation / Suboperation

Trigger Point

Question: Score 0 of 1
(skipped)
For a specific end product, you want to use a planning time fence and
fixing type 1 to ensure that the planning situation in SAP ECC calms down in a
short-term time window.

Two customer orders arrive at short notice and their receipts should really be
within the planning time fence, due to their date/time.

Which statement is true with this scenario?


Please choose the correct answer.

https://www.erpprep.com/node/873/take 8/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Response:

Within the planning time fence, the newly created planned orders are automatically
frozen by requirements planning (roll forward).

Newly created planned orders cannot be created by requirements planning before the
end of the planning time fence, at the earliest.

The MRP controller has no possibility of creating planned orders within the planning
time fence.

Requirements planning only examines changes that are relevant to scheduling within
the planning time fence; the customer orders are covered in time.

Question: Score 0 of 1
(skipped)
For which planning strategy does the reduction of planned
independent requirements always occur with the goods receipt?
Please choose the correct answer.

Response:

Planning with final assembly (40)

Planning without final assembly (50)

Net requirements planning (10)

Gross requirements planning (11)

Question: Score 0 of 1
(skipped)
Where can you define the default storage location for the material
component of a production order?
There are 3 correct answers to this question.

Response:

Routing

Production supply area of a work center

BOM header (product)

Production version (product)

Material master (component)

Question: Score 0 of 1
(skipped)
In which ways can you implement confirmations for production
orders?

https://www.erpprep.com/node/873/take 9/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

There are 2 correct answers to this question.

Response:

Through a SAP Manufacturing Intelligence and Integration (SAP MII) server

Through the Advanced Planning and Optimization (APO) component

Through the SAP Integrated Business Planning (SAP IBP) cloud solution

Through automatic process messages using SAP NetWeaver Process Integration (PI)

Question: Score 0 of 1
(skipped)
How can you limit the number of master data objects to be created
when the manufacturing process is the same for many different products?
Please choose the correct answer.

Response:

By creating routings with parallel sequences

By assigning the same production version to different materials

By creating routings with alternative sequences

By assigning different materials to the same routing

Question: Score 0 of 1
(skipped)
With which functions of the process order can you fulfill the
requirements of the Good Manufacturing Practices (GMP) standard?

There are 3 correct answers to this question.

Response:

Material identification and reconciliation

Availability check

Batch record

Resource selection

Digital signature

Question: Score 0 of 1
(skipped)
The master data for an in-house production process is to be set up in
the SAP ECC system. To do this, you should create a suitable routing that plans for
five operations in an initial sequence (10, 20, 30, 40, 50).

https://www.erpprep.com/node/873/take 10/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

There should be an option of relocating operations 30 and 40 to a second sequence


on other work centers if there are capacity bottlenecks.

What sequence type would you use to create the second sequence in the system?
Please choose the correct answer.

Response:

Substitute sequence

Alternative sequence

Parallel sequence

Standard sequence

Question: Score 0 of 1
(skipped)
Which types of objects can be changed with Engineering Change
Management (ECM)?
There are 3 correct answers to this question.

Response:

Task list

Work center

Production version

Bill of material

Material master

Question: Score 0 of 1
(skipped)
In the task list, there is the possibility to work with suboperations.
What can you do in more detail by using suboperations?
There are 2 correct answers to this question.

Response:

Material component allocation

Costing

Capacity planning

Scheduling

Question: Score 0 of 1
(skipped)

https://www.erpprep.com/node/873/take 11/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Which of the following are characteristics of ECC master production scheduling


(MPS)?
There are 3 correct answers to this question.

Response:

MPS items are planned in a standard MRP run.

The planning of MPS and non-MPS items is always carried out in one planning run.

Non-MPS items can be taken into consideration by an MPS run.

MPS items can be defined on plant level.

MPS items can be defined on MRP area level.

Question: Score 0 of 1
(skipped)
In your enterprise, a planning strategy is used in SAP ECC that
enables joint planning of all MRP scheduled assemblies for a finished product to
trigger procurement of these assemblies.

It is important to ensure that the finished product is only produced when there is a
customer order present.

When a customer order is received, production of the finished product should be


triggered in the form of make-to-order planning and production.

Which planning strategy covers this scenario?


Please choose the correct answer.

Response:

Planning with make-to-stock (strategy 10)

Planning at the assembly level (strategy 70)

Planning with final assembly (strategy 40)

Planning without final assembly (strategy 50)

Question: Score 0 of 1
(skipped)
Where can you maintain available capacities in an SAP ECC system?
There are 2 correct answers to this question.

Response:

Routing

Production supply area

Pooled capacity

Work center

https://www.erpprep.com/node/873/take 12/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Question: Score 0 of 1
(skipped)
During the processing of production orders planned and actual costs
are determined. On which of the following objects can you collect these costs?

There are 2 correct answers to this question.

Response:

Production order

Product cost collector

Work center

Planned order

Question: Score 0 of 1
(skipped)
Which of the following elements can be used in a process order?
There are 3 correct answers to this question.

Response:

Process instructions

Parallel sequences

Relationships

Suboperations

Phases

Question: Score 0 of 1
(skipped)
For which of the following objects can you enter a confirmation?
There are 2 correct answers to this question.

Response:

Production order

Production order operation

Trigger Point

Work Center

Question: Score 0 of 1
(skipped)
What repetitive manufacturing options can you use to carry out line
loading in the SAP ECC system and thus generate Run Schedule Quantities (RSQ)

https://www.erpprep.com/node/873/take 13/14
3/1/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

from normal planned orders?


There are 3 correct answers to this question.

Response:

Automatic selection of the production version in material requirements planning (MRP)


using Selection Methods setting.

Manual assignment of planned production quantities in a planning table.

Automatic selection of the production version by applying quota arrangement records


in material requirements planning (MRP).

Using a planning algorithm from capacity planning.

Selecting a suitable repetitive manufacturing profile that contains an option for


automatic line selection.

Question: Score 0 of 1
(skipped)
In SAP ECC, you calculate the standard available capacity for a work
center capacity using the following data:

- Start: 7:00:00 a.m.


- End: 3:00:00 p.m.
- Break duration: 1 hour
- Rate of utilization: 80%
- Overload: 110%
- Number of individual capacities: 1

How large is the standard available capacity?


Please choose the correct answer.

Response:

8 hours

5.6 hours

6.16 hours

7 hours

Money Back Guarantee Testimonial FAQs Privacy Policy Terms and Conditions About Us Join Us
Contact Us

https://www.erpprep.com/node/873/take 14/14

You might also like