9591-102-102-PVM-F-010-03 Cold Air

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

LAYOUTS 

REPLY FOR CUSTOMER COMMENTS 
Contract : TELANGANA, STAGE‐II, UNIT‐01&02, 1( 2 X 800MW), Cust. No. 1819 & 1820 
Reference : NTPC Transmittal No. 102:10208 Dated 20.02.2018 
 
Drg. No. 0‐00‐020‐77123 Rev.02 (GEN. ARRG'T DUCT LAYOUT COLD PRI. AIR DUCTING) 
NTPC DRG. No. : 9591‐102‐102‐PVM‐F‐010 SH 01 OF 02‐ Rev.02 (LAYOUT OF COLD AIR DUCTING 
(ELEVATION & PLAN) 

S.No.  NTPC Comments  BHEL Reply 


1  Elevation not indicated for all ADs. Elevation is indicated for all the ADs. 
2  Drains shall be provided at lower most  Drain location is revised 
point.         
                                                                             
3   Proper Approach/Platform shall be  Approach / Platforms are already provided for 
provided for all Access Doors.  all Access Doors and shown in respective floor 
plan drgs.  
 

Drg. No. 0‐00‐020‐77124 Rev.02 (GEN. ARRG'T DUCT LAYOUT COLD SEC. AIR DUCTING) 
NTPC DRG. No. : 9591‐102‐102‐PVM‐F‐010 SH 02 OF 02‐ Rev.02 (LAYOUT OF COLD AIR DUCTING 
(ELEVATION & PLAN) 

S.No.  NTPC Comments  BHEL Reply 


1  Mismatch in orientation if compared with  Isometric view is updated. 
isometric view. 
 

Digitally signed
Signature Not Verified
by deepak jindal
Date: 2018.12.17
15:42:57 IST
Reason: CAT I
Location:
NTPCEOC
S23L S28L
S18L S19L S20L S21L S22L

S1L S32L S39L

S2L S3L S4L S5L S6L S27L S43L


L4L La4L M4L

LC1 LC2

S31L
S38L S42L

S37L
S36L

Ka2L Kb2L
S7L S8L S9L S10L S11L S12L L3L La3L M3L

S26L S30L

L2L La2L M2L

S44L S41L
S13L S14L S15L S16L S25L
L1L La1L
M1L
Ka1L Kb1L

S17 S24 S35L


S29
S34L

S33
S40
S35R
S34R

Ka1R Kb1R
L1R La1R
M1R

S13R S14R S15R S16R

S44R
S41R

M2R
L2R La2R

S26R S30R

Ka2R Kb2R
S7R S8R S9R S10R S11R S12R
M3R
L3R La3R

S36R S37R

S38R S42R
S31R

LC3 LC4

M4R

S2R S3R S4R S5R S6R


L4R
S27R La4R

S32R S39R S43R


S1R

S18R

S28R

S45R

NTPC DRG NO

CUSTOMER

PROJECT
TELANGANA SUPER THERMAL POWER PROJECT
PHASE-1 (2X800MW)-UNIT NO.01& 02
STEAM GENERATOR ISLAND PACKAGE
CONTRACTOR

ALL DIMENSIONS IN MILLIMETERS


PROJECTION
SCALE

GE POWER
TELANGANA SUPER THERMAL POWER PROJECT
PHASE-1 (2X800MW)-UNIT NO.01& 02
STEAM GENERATOR ISLAND PACKAGE

ALL DIMENSIONS IN MILLIMETERS


PROJECTION
SCALE

GE POWER