Rev - PRJ Elevator
Note: * The architectural visit will be given 2 only, if extra visit demanded by org. or owner
Charged @ 3000/- per call separately.
* The basic rate is provided for MRL lift unit by vendor if customization demanded
the cost variation may occur.
* No administrative expenses have enumerated for estimation; it will be additional.
* Shifting of Gas pipe line and drainage system shall be cost extra and any other works
executed beside the content of specification will be charged also.
[# CONDITION: The ground base must will be required for bearing of RCC Lift shaft and Elevator loads because hanging
pit could not bear the proposed loads and shall be considered unsafe. So, the Lift pit must will be constructed from Soil
Level in order to bear the proper load for safe load bearing.]