Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

sales schedule of the shops and other facilities.

s/no Description Location Size(m) Area No Unit price Vat/tax Total amount
(m2)
1 VEHICULAR ENTRANCE External - - - - - -

2 VEHICULAR EXIT External - - - - - -


3 PARKING LOTS Basement 156 - -
4 TRUCK PARKING Basement - -
5 TRAILER LOADING/OFFLOADING External - -
BAY
6 FIRE SERVICE TRUCK External 5x9.4 47 2 - -
PARKING
7 TAXI PARK External - -
8 GATE HOUSE External - -
9 PEDESTRIAN GATES External 1 - -
10 OVERHEAD WATER STORAGE External 1 - -
11 GROUND WATER STORAGE External 1 - -
12 POWER SUB-STATION Eternal - - 1 - -
13 WASTE DUMP/INCINERATOR Eternal - - 1 - -
14 TOILETS Basement 3 32,812,000 3,281,200 36,093,200
15 SHOWER Basement -
16 URINALS Basement “ ‘’ -
17 JANITORS ROOM Basement -
18 SEPTIC/ SOAK AWAY PITS Basement - - 1 - -
19 POLICE POST Basement 67.5 1 -
20 FIRE SERVICE STATION Basement 67.5 1 -
21 BANK Basement 56.25 2 35,650,000 3,565,000 39,215,000
22 MARKET SECURITY OFFICE Basement 67.5 1 - -
23 MARKET MANAGEMENT basement 56.25 1 - -
OFFICE
23b CLINCE Basement 56.25 1 35,650,000 3,565,000 39,215,000
24 LETTABLE OFFICES Basement 20.52 4 6,457,500 645,750 7,103,250
25 WARE HOUSE Basement - 1 14147 420,000/m2 42,000/m2 462,000
26 RESTAURANTS Ground flr 3 4,364,800 436,480 4,408,440

Block A
27 Shop 1 Grd/1st flr 23.04 12 8,184,000 818,400 9,002,400
28 Shop 1b 1st floor 23.04 12 7,560,000. 756,000 7,635,600
29 SHOP 2 Grd/1st flr 28.8 6 9,135,500 913,550 10,049,050
30 Shop 2b 1st floor 28.8 6 9,135,500 913,550 10,049,050
31 Shop 4 Grd/1st flr 12.96 6 4,433,000 443,300 4,876,300
32 Shop 4b 1st floor 12.96 6 4,095,000 409,500 4,504,500

Block B
33 Shop 3 Grd/1st flr 9 96 3,069,000 306,900 3,375,900
34 Shop 3b 1st floor 9 96 2,835,000 283,500 3,118,500

Shop C
35 Shop 6 Grd/1stflr 7.5 2 2.557,500 2.557,500 2813250
36 Shop 6b 1st floor 7.5 2 2,362,500 2,362,500 2,598,750
37 Shop 3 Grd/1st flr 9 120 3,069,000 3,069,000 3,375,900
38 Shop 3b 1st floor 9 120 2,835,000 2,835,000 3,118,500
Block D
39 Shop 5 (open shop wet/dry) Ground flr 2.4 240 818,400 8,1840 900,240
40 Shop 3 1st floor 9 72 2,835,000 283,500 3,118,500
41 Shop 8 1st floor 13.5 24 4,410,000 441,000 4,841,000
42 Cold room Ground fl 12 6 4,092,000 409,200 4,501,200
43 Abattoir/cold room Ground fl 162 1 55,242,000 5,524,200 60,766,200
TOTAL 2,300,299,000 230,039,900 2,530,328,900

You might also like