Sulstaton No 3038 (ROA) Main Ci Activities Remaining ated :04.08-16 [_s.No_[BUNDING ACTIVES Star.Date | Finish date Remarks 1_[seupper erates sjosraxs | 30/00/2016 2 [stakeare and canopy dain ert ivesrie | _syos/noxe 3 [ces ners fing oyoer20x6 | 20/08/2036 1 [na coat of pat on per swuctare ‘yszpieie | 10/32/2016 |pased on 00 clearance 5 [Bors and oor ames ing wvoa/no16 | 5/04/2016 ad al ing none | 10/10/2036 7_ [sak ne ng wononos | _20/.0r0.6 [erating with iin of Samp ‘voa/2016 | 0/08/06 3 _[Evony of oor basement 2evonpaeis | 30/0/2016 [aved on 00 carne 10 [Poor canopy waterproofing ‘yos/ro16 | 5/08/2016 1 [Fan of pe and dome for eanonie onra0i6 | 33/08/2016 _[baed on mechanical clearaen 12 [Panton copper ain ibe none | 15/10/2036 13 [Completion of upper dae pps with acon 33/0/2036 | 38/00/2036 _ [Raed on Mechanical clearance 14 [Rcorconting and alr oor ares and step ionee | 30/10/2016 15 [Watway round bung wth lah locks soe | snes 36 [snd bsg for precast wal panel ways | 1/06 17 [erating in supp rain inion ofbatement doors | oe/aaxe | 30/00/2016 ‘Start Date Finish date : smyaons | ayes 3 preeoaenegf eer weapons | ~mpanoas 2 feces area el annie | rane ———— ‘armas | arene [inden 0 ceo i encsaeoenaan sree | —s07nrane +s ag aennroas | avnanone 7 atone vara] ane 1 eeraanamesiaone ra ET 1 hess arene seams | ees bamaieonnoe oF peomdennprmnr nie ‘psn | sean Sng pean sonar no ‘eaten | sami” etna 2a ston pe di pe shrine —| nore eeeaecn cies | ame | pues ~jmmmmcammnna cette eee ‘afin | svnarene Saher eels case isds canes | sows fooler aoe Sana al ata aaa | ae 2 rr [erent reo ‘syn | sore 7 _otiaieeeaaecloo svat | arurens = aaevaaeroar enamine [warms | syeraes cesar hy k wrt Amr Ro oo ——- wy Kone Fa En Kaveom St ee Gul oy She Epzines “Manager Egy Pr: Rehan mee? By fo K Reghavendaw Loordanas Mechanica Grype Sutstaton No 9036 (ROA) ‘Main Cv Activites Remaining Dated :08-06-16 1_[seupper drain vest zzjor/aoi6 | 5/08/2016 2__[Starcase and Canopy drain test 20/00/2036 | 25/00/2016 [access laces fing internal & enteral) zopar/rois | _ 25/07/2016 [rina coat of paint on superstructure wizpois | 10/32/2016 5 [Doors and door frames xing xyos/anie | 30/09/2016 © [Hand Rat tang yarns | s/o 7_[saienose fing rojxjanie | 20/33/2016 [Grating with rshing of Sump pit ‘yos/a0is | 10/09/2016 > [Evonvof oor basement 15/10/2016 | 25/30/2016 _ [Based on FOD clearance 10 [Waterproofing roof store room and tal cases ‘yos/20i6 | 15/09/2016 15 _[Fcing of drain pipes and domes for canopies 10/09/2036 | 20/09/2016 _ [bared on Mecha clearance 12 [Waterprooing of oor canopies ajos/20i6 | 20/09/2016 13 [Panton sevpper drain pipes wyiojanis | 15/s0/2006 14 [Completion of supper drain pipes with section 21/09/2016 | _ 29/08/2016 _|Baved on Mechanical cewrance 15 [Walkway around building with splash blocks waupzois | 10/31/2016, 16 [Send blasting for precest wall panels ro/snjenie | 20/33/2016 17 [Coating on floor star area nd steps wyioj2ois | 20/30/2006 18 [Sump pl ran fishing in 380 KV bulldng tunnels ayiojaois | _ 10/30/2006 19 | Exponsion joint waterproofing on oot ‘yos/20is | 15/09/2016 20__[Grating in Sump pit infront of tunnel doors ‘yos/a0is | 15/03/2016 'S.No_[BUILDING ACTIVITIES 1 |[seupper dain test 2ojos/zoie | 30/0/2016 2 _[Starease ae canopy drain west 25/00/2036 | _so/oa/20%6 3 [access les thing syos/aoi6 | 10/09/2016 44 [Final coatof paint on super structure a/izfaois | 10/32/2016 _|sased onFOD dearance 5 [Doors and dor frames tine ssjoa/zoie | _so/os/2016 5 [Mana Rat fing aojna/roie | _ 30/13/2016 7 _[Stair nose fina wizpois | 10/i2/2o6 1 [Grating with rshing of Sump pe 2ojos/zoi6 | _ 30/09/2036 9 [Eporyoffoor basement ‘/in/20is | 10/10/2016 _ [Based on FOD dearance 10 [Waterproofing roof aviock rooms of star ase wiop2ois | 20/30/2016 11 [Facing of eran pipes and dome for canopies 1/10/2016 | 8/10/2016 [based on Mechanica cance 12 _ [Waterproofing of door canopies ashore | 25/10/2016 13 [Paint onscupper drain pipes asorei6 | _19/s172016 14 [Completion of upper aran pipes with secon ‘9/10/2016 | 15/20/2036 [essed on Mechanical cearance 15 _|Watiway around building with splash bloks wonsarenis | 20/14/2006 16 [sandblasting for precast wall panels zonwpeoe | s0/sapeoie 117 _ [Coating on Moor star area and steps aysoraos | 15/10/2016 18 _ [Sump pit rain finishing in basement s/osrenis | _soyoa/2016 19 [Expansion join waterproofing on root s/os/eoie | 30/03/2016 20 [Grating n Sump pt infront of tunnel dors vyosraois | 10/09/2016 [ate ceting in conference room, tore rom, M200 com, Bathroom, ausilry room (patiatremaining) | “/08/2026 | 30/08/2016 _|Based on Mechanical clearance 722 [Rvlockrooms sealet, internal paint acre leveling | 4/08/2016 | 24/08/2016 [Based on FOD clearance knee Bere We — fp hel ; Me K —— Mo, wtb Peake. Reeeabasl ) Ee Substation No 9034 (IRA) Maia chi Actes Realning Dated 08-08-16 ‘StartDate | Fish date Remarks : ‘yosr2oie | 10/08/2016 2 aojonjzois | 30/os/2016 [Doors and Ooo frames fang ‘yosr2ois | 10/03/2016, 4 _[Parttion wall using Gypsum board ‘yoay2ois | 15/08/2016 [Based on FOD clearance 5 [Feary of Tanne oor Sioarzois | 30/08/2016 [P18 elastomeric coating on wall and Cling ssjosr2ois | s0/os/2016 7_[Sump pit drain fiihing ‘yosrzoe | 15/09/2016 [PUA & Pia steps finishing with Rand all aps | 10/6 9 [Rolain joing setent aysorois | 0/10/2006 10 [emergency ext covers yap | 1s/u/2016 11 _[Gratingin sumppt drain channel at free ise area asus [25/11/2006 'S.No_ [TUNNEL INDOOR ACTIVITIES Sa 1 _[eeatingof allopenings 0/os/20is | 20/08/2016 2 [stool grating & Sumit Gnishing xyospanie | 10/09/2016 3__[Doors and Door frames fing 2o/0s72036 | _ 30/09/2016 “Portion wal using Gypsum Bours yropaoie | 30/10/2016 5 [Ebony of Tunnel floor s/os/2ois | _ 25/08/2016 6 _[Sumppit rain fniching syos/anie | 20/09/2016 7_ Steps finishing with hand yayaoe | 20/2016 8 _[lolated joint seatent 1s/03/20i6| 30/08/2016 9 [Emergency ent covers yaxpaoie | _15//206 30 [rating in sum 2ojosirois | _ 15/11/2016 ara 1 [coating fat openings 2ojosizo1s | _ 25/08/2036 2 _|[steetarating 2o/osjze1s | _ 25/08/2016 35 [Doors and door frames fin wynoranis | s0/i0/2016 Psosyos/zoxe | 30/os/2016 a so/oa/zois | 20/10/2016 44 rartion wall sing Gypsum board 5 [Fponyot Tunnel oor sroarzois | 15/08/2016 5 _[Sumppi rai sting 1a/os/20i6 | _30/os/z016 7__[stepsinishing with nan ait wus | is/i/zo16 1 [olated joint seatent ‘sfosraoie | _30/os/z016 9 _[emeraoncy ent covers wus | _1s/u1/2006 10 [Grating in sumppit ran channel at fee sl area o/osrzois | 30/09/2016 Bose ky SS: a2 6 Reghowendtas ko skna meer) me ay ew a | ee Be. Lar bt Substation No 9054 (IQA) Main Cv Actives Remaining Dated :04-06-16 'S.No_ [TUNNEL INDOOR ACTIVITIES ‘StartDate | Finish date Reman 1 __[eoatng oft openings ‘yosraexé | _ 5/08/2036 2 _|steeterating aojosreois | 25/03/2016 3 _[boors and Door frames fing anon | s0/s0/2016 _Parttion wal using Gypsum Board 1yos/2016 | 20/09/2016 _|sased on OD dearance 5 [Ebony ot Tunne toor xyosjaore | 10/08/2016 6 _[Sumppi rain fishing ojospeois | s0yos/2016 7 _ [Steps fishing with hand it yaya | 15/0/2016 8 [[sotated in seatent asjospzois | s0yos/2016 3 __[emerzency exit covers impor | 15/206 10 [rating in sumpit drain channel ate se area rojosraois | _s0/os/2016 'S.No_ [TUNNEL INDOOR ACTIVITIES ‘StartDate | Fish date Remarks [coating of al openings s/0a/20i6 | s6/o8/2016 ste grating asjospaoe | 1/10/2016 [boars and Door ram xing sopsor2ois | 20/10/2006 tition wall using Gypsum boa ‘ya0/20x6 | 20/10/2016 |Bated on FOD clearance [ebony of Tune loor ‘s/io/2nis | 25/10/2016 [Based onFOD clearance [sumppit drain fishing as/oe/2ois | _a0/oe/2016 [Grating in surmppt dain channel tre ine area ‘yos/20ie | 15/09/2016 [Tanne sa nishing (Paiting ingot) ways | _s/11/ao16 INNEL INDOOR ACTIVITIES ‘Start Date, Finish date _ __Remarks [conting ofa openings o/os/2ois | 15/08/2016 [tech grating asjosraore | 1/10/2016 [ooors and Door rames xing wofsorens | 20/10/2016 ton wall sing Gypsum board xyos/2016 | 20/09/2016 _|sasedon 00 clearance [ebony of Tune! oor xyos/zo16 | 10/09/2016 [sumppit drain fishing vyosr20i6 | 10/09/2016 [erating in surmpit dain channel te se area so/osr2nis | 3ofos/2016 [Tanne staking (with Rane all) yaaa | 15/10/2016 [emersency exit covers asiiarens | 25/13/2016 [sctted joint seatent s[osr2nis | _sofos/2016 [Mating new opening for emergency ext in eplacoment i eee syospaoie | 35/09/2016 Peo 8 P p KR epson apseee koe hnameer/L eal : (pm SEC) Vee ead ® USEC Crp 7 Substation No 9034 | ROA) Main Cv Actes Remaining pated : 0408-16 mr ro a etree san [rato lesen aera | safon peers a i peracetnaic oes ee ae sera | “setae oho rete area a oes Paar | aaa aaa arama aa > anne srawane sata ume etree | emarens = TD mee ae 3 footinsoniome seria | sar 7 oo ten at oes ‘arorie | ari 77 eawreaonon cer [ ano Se ci psmedreoaams enna eal anata eee mre [eer Shanon ecg "2305 gentoo a fas arene [hae eins ssn [ ST oO So Sra [ saat 2 oat Saar sume berets Taroom | eso Tomar aaron _[ ame —————— stares |e Remarks | ne erence oe {loner ‘ne | et 1a Deas —| sent ieee ee foes dome —| “ina SS a oe, 2 oe t [S[2VT ki Regheuendaw Mech Ey Substation No 9038 (ROA) sain Ci Actives Remaining Dated : 04-08-16 'S.No_[OUTDOOR ACTIVITIES ‘Start Date | Finish date Remarks [Power able duct bank 2070772016 | _ 30/08/20%6 2 [eoneot duct bank zofor/eo1s | _ 30/08/2036 3 [eommanization at bank zoror/zo.6 | 30/08/2036 [ire ydrant Trench 20f07/2o.6 | 15/05/2016 5 [ahting Pole & Ughting Mast 2srorfeei6 | 15/08/2016 {6 [Manhole & Handhotes with waterproofing as/oa/anie | 15/03/2016 'S.No_ [OUTDOOR ACTIVITIES ‘StartDate | Fish date Remarks 1 [Power cable duct bank as/ow/anis | 30/03/2016 2 [contol duct bank aojes/2nié | s/no/20.6 3 [tommuniation dct Bank 1yos/2016 | 20/08/2016 & [Pre Hydrant Tench 10/s072016 | 10/11/2016 [Based on FOO dearance 5 [ahting Pole & Ughting Mast vyos/aoie | 30/09/2016 6 [Mantes & Handholes wth water proofing syosjaoie | 30/09/2016 ‘S.No ACTIVITIES Start Date | Finish date Remarks 1 [Power cable duct bank as/os/znis | 30/0/2016 2 [eontot duct bank 1yos/20i6 | 10/09/2016 3__[eommuniation det bank 2ovosreois | _soos/2016 [Pre nyaranc Trench yfrofaoie | 15/10/2016 5 [ahi Poe a Lighting Mast ‘yosr2016 | 15/10/2016 6 [Mantes & Handholes with wate proof wfrofaore | 10/30/2016 S.No_[OUTDOOR ACTIVITIES Finish date Remarks 1 [Backing up ‘yosfanie | 30/09/2016 2___ [backing upto Asphat vel afaopaois | 1s/i0/2016 tet rah brier around ll emergency ext openings, 2 frac openings, PACU, Ausitar transformers ane ee 4 [Asphalt Road asnoras 25 asiiyaoi6 [Painting upstane concrete above Asphalt assoprois | s0/io/2016 ‘6 [Permanent fence for capacitor bank iofio/znis | sofio/z016 7___ [Sunshade for capacitor bank voor | r0/s0/2018 [lending Platform with i fishing years | 30/10/2016 8 [taining wal slope with fnshing and steps aoyosreois | _s0o9/2016 10 [eater ynpoe | 20//2016 11 [Parking ares zojapeois | 15/12/2016 12 [Embankment aopafaois | 15/12/2006 13 [Concrete Gutter or storm water drainage apo | 30/2016 18 [Substation sgn board wizpeoié | 30/12/2016 15 _[Fene around future SVC pant asmupos [30/11/2016 Phar ty Amt Wo “Se Se babel oie K Reg haved nce DE ker voar) jy, co — 0M seE <)

You might also like