CHECK LIST FOR

PRE-COMMISSIONING / COMMISSIONING ACTIVITY


To, Date:
Customer Support Request Department
INEL Gas Controls Pvt. Ltd.
Vadodara, Gujarat

Reference: Our P.O. no. Dated:


Your Invoice no. Dated:
Our SKID I/D no.:

We have received the SKID as per our above referred PO. along with the Invoice as mentioned above.
According to us, the SKID is ready for commissioning. We have verified the current site status as under.

YES NO

1. Material received is as per packing list.


If not, please specify the missing material.

2. Is there any damage or misplacement of items in the skid During Transit?


If Yes, Please specify.

3. All vents supplied loose for safe transportation are properly mounted as
per P&ID/GAD.

4. All instruments items like PG, TG etc supplied loose for safe transportation,
are available and installed.

5. Instrument earthing is connected to skid.

6. Foundation of skid is complete.

7. Utility like a) Power supply, b) Air/Nitrogen supply is available for purging/


Pressure Testing

8. In case you intend to use Nitrogen cylinder, Do you have hose for Connecting Cylinder
to skid? (at skid end ½” NPT (M) connection is needed)

9. Inlet connection hook – up of skid is completed. If No, when it is expected.

10. Outlet connection hook – up of skid is completed. If No, when it is expected

11. Natural Gas available for commissioning (Charging). If NO, when it is expected.

H:\JOBS\Pre-Commissioning Checklist_R0 (J10603).doc Page 1 of 2


CHECK LIST FOR
PRE-COMMISSIONING / COMMISSIONING ACTIVITY

12. Adequate Manpower available (for Assistance)

13. RPD meter oil received with loose material.

Please provide us contact details of your site engineer,

Site
Address:______________________________________________________________________________________
___

__________________________________________________________________________________________

__________________________________________________________________________________________

Name: _________________________________________________ Designation: _______________________

Mobile: _________________________Telephone: ______________________Fax No. ____________________

Email ID: ____________________________________

Note: Kindly arrange for the Gate Pass for our engineer and make it available to us/ him during the visit
for SKID commissioning.

Thanking you,

_______________________________

Name:
Designation:

H:\JOBS\Pre-Commissioning Checklist_R0 (J10603).doc Page 2 of 2