Earthwork in Excavation in Foundation - Total Foundation - Total Substructure Brickwork With Cement Mortar
Earthwork in Excavation in Foundation - Total Foundation - Total Substructure Brickwork With Cement Mortar
Earthwork in Excavation in Foundation - Total Foundation - Total Substructure Brickwork With Cement Mortar
Dimensions
Item no Description of Work No. Length
0.9 1 69.862608 m3
69.862608 m3
0.9 0.3 20.9587824 m3
20.9587824 m3
0.4 0.72 m2
0.4 0.5 m2
0.4 0.468 m2
0.4 1.252 m2
29.510048
0.2 4 65.660096 m3
1 52.79976 m3
52.79976 m3
0.3 15.839928 m3
15.839928 m3
0.2 7.093968 m3
0.2 5.92664 m3
0.3 7.129968 m3
0.6 14.259936 m3
34.410512 m3
_ 23.76656 m2
1.04 m2
0.48 m2
0.468 m2
21.77856
4 71.47968 m3
1.8 1.404 m3
1.8 0.648 m3
1.8 0.6318 m3
1.3 0.507 m3
1.3 0.7605 m3
1.3 0.6084 m3
2.1 1.449 m3
65.47098 m3
Remarks
Total Centre lIne length =
60.0164
No. of Junctions :
300-300 Junction =3
total length = centre distance - 3*breadth/2
Net Quantity Required
S. No. Work Quantity Unit
2 Foundation 36.77 m3
4 D.P.C 51.28 m2