CAPSULE PROPOSAL FORM

Date Submitted: Semester: Duration of the Project:


October 10, 2020 1st Trimester 2020-2021 Six (6) months
Team Leader:
Dr. Warlito M. Galita
Contact Number: Email address:
09171554567 dr.warlito.galita@bulsu.edu.ph

College/Campus: Department:
Graduate School MITM
Project Title:
Generating electricity through thermal induced pressure in compressed air energy storage using
Tesla turbine generator

Funding Source: Total Project Amount:


University Research Fund Php 50,065.00
Collaborators/Co-Authors: College/Department/Agency:
Mr. James Diok Chiq Graduate School/MITM Dept.

   
Agenda:
/ Climate Change and Diagnosis and Prevention Restructuring Society and
adaptation of Human Diseases and Understanding Culture
Health Status of Vulnerable towards Inclusive Nation
Groups Building
Biodiversity and the Industry Assistance Emerging Technology and
management of the Natural towards Efficient Production Applications to Inclusive
Environment and Achieving Global Nation Building
Standards
Food Safety and Security Cultural Heritage and Education and the
Conservation Pedagogy for the Filipino
Learners
Rationale:
Electricity has been the primary need of the human race since the beginning of its discovery
and development. But our dependence never ceases, and the effort of sustain it has become
a global technology war over the years. As a consequence, global warming apperas imminent
and our move to renewable energy resources in order to protect the future. The utilization of
these commodities was not stable, and the invention of energy storages became the start of
the technological race. Moreoften, the current energy storages were mainly made up of
hazardous chemicals, which eventually turned-out to be the environmental issue for its
production and disposal. It is also susceptible to heat and detoriation. Such problems can be
helped by the use of thermal induced pressure in CAES usiing Tesla Turbine will aid these
concerns.
Objectives:
The major objective of this undertaking is to design and develop a Thermal Induced Pressure
Compressed Air Energy Strage using Tesla turbine as the prime mover. Specifically, it aims to
ascertain the following objectives:

1. Design a thermal-induced pressure CAES with Tesla turbine electric generator


BulSU-OP-URO-01F1
Revision: 0
Page 1 of 5
that is suitable for the needs of the project.

2. Develop an appropriate hybrid solar photovotaic-thermal collector and medium-


to- high-pressure heat exchanger tank needed for the operation of the project.

3. Design a suitable controls and instrumentation.

4. To test and evaluate the system in terms of the following criteria:

4.1 Operational Features;

4.2 Cost;

4.3 Usability; and

4.4 Maintainability.

The study seeks to answer the need for a thermal-assisted compressed air energy storage
system and the development of the Tesla turbine generator for more reliable and clean
energy of the future.
Research method:
The study will utilize the Hardware Configuration Item (HWCI) Development Life Cycle and
Failure Mode and Element Analysis (FMEA) to design and develop the proposed project.
HWCI is comprised of the following phases, namely; (1) planning and data gathering, (2)
hardware requirement analysis, (3) design phase, (4) fabrication and (5) qualification and
test phase
Expected Output of Research Project:
The expected output of this research project is the complete and functional thermal induced
pressure CAES with Tesla turbine generator
Summary of Budgetary Requirements
Personal Services            
Details: Team Leader: Dr Warlito M.
Galita – 6 units deloading
Co-Author: Mr. James Diok
Chiq – P8,000/month
Project Staff: Dr. Allen N.
Maroma – P4,800/month

 
 
Estimated Cost: P28,800 (For
project staff only)  
Maintenance and other Operating Expenses        
Details: See attached sheet  
   
Estimated Cost:          
Others (Specify):        
Details: See attached sheet
 
BulSU-OP-URO-01F1
Revision: 0
Page 2 of 5
   
Estimated Cost:            
Grand Total:        
   
Php [….]Php 78,865.00 + 6 units
deloading for faculty researchers          

Note: Please use the Sample Budgetary Requirements in Excel

Work Plan / Gantt Chart


Activities / MONTH
Objectives Expected Output
Work plan 1 2 3 4 5 6 7 8 9 10 11 12
1. Preparation of Block diagram, Drawings and                        
detailed work calculations and diagrams for the
plans for the fabrication project will be
project drawings of the prepared
project

2. Canvassing and Parts and supplies


purchase of Canvass/quotations will be purchased
needed spare parts and purchase and be made
and supplies for request for supplies available for start
the project and materials of fabrication
process

BulSU-OP-URO-01F1
Revision: 0
Page 3 of 5
3. Fabrication of
Tesla Turbine Completed Tesla
Turbine generator, Metal works using
generator, high-
high-pressure tank, cnc laser cutting,
pressure tank,
panel frame and lathe machining,
panel frame and
solar thermal surface grinding,
solar thermal
system. welding and other
system.
necesssary
procedure

4. Assembly of
mechanical and Completed Mechanical ad
circuit sub- modules for the electronic assembly
assembly of the functional of the circuit sub-
project operation of the assemblies and
system modules of the
project

5. Wiring assembly
of the different Finished wiring Interconnection
modules of the procedure to and hardwiring of
project interconnect each each sub-circuit
circuit sub- assembly will be
assembly/module done
of the project
6. Testing and
Continuous testing
troubleshooting of of the project on
the completed Fully functional
various set of
project project that is free
parameters
from defects and
problems

                             

                             

                             

                             

                             
BulSU-OP-URO-01F1
Revision: 0
Page 4 of 5
                             

                             

                             

                             

                           

___________________ ANALIZA A. VILLACORTE, PhD RICHARD F. CLEMENTE, PhD


Team Leader Asst Director, Research Program Director, Research
Management Management Office

BulSU-OP-URO-01F1
Revision: 0
Page 5 of 5

You might also like