LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT

PT. Satyagraha Dinamika Unggul


PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, June 15, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 1 Apartemen 1 Wednesday, July 8, 2020 23
Unit Milestone 1 Apartemen 2 Wednesday, July 8, 2020 23
Unit Milestone 1 Tower Oficce Thursday, April 30, 2020 0
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah
Bekisting LMR APT 2, Cor ex TC2 Lt 13 s/d 17
2. PT. NUSA KONSTRUKSI Cor pedestal lift HZ office 52
ENJINIRING (STRUKTUR) Pembersihan STP B4 , test rendam GWT office
APARTEMENT 1

Pekerjaan ( Pasang Habel,Plestera, Acian , Stick On Wall Dll ) lt 6,7,8, 9,12,13, 14,16,20, 21, 22,23,24, 25,26,30,31,36, 37 60

APARTEMENT 2
- PT. NUSA KONSTRUKSI Pekerjaan ( Pasang Habel,Plestera, Acian , Stick On Wall Dll ) lt 6,7,8,9,10,11, 12,14,15,17,18,19,20, 21,22,23,24, 25,26, 27, 28 ,30,
122
ENJINIRING (ARSITEKTUR) 31,32,33,34,35,36, 37
OFFICE

Pekerjaan ( Pasang Habel,Plestera, Acian , Stick On Wall Dll ) lantai GF,2,3,4,6,7,11,12, 15,16,17,18,19,20, 21,23,27,28, 31,33,34,35 61

Total 295
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK
Penambahan kabel line lampu emergency lt 18 koridor, instal kabel data lt 22, , 20
Pasang inbowdus lt 21 all unit, repair Inbowdus dan ganti kabel peretak saklar lt 15
Piping elektronik lt 34 dan wiring lt 34
Plumbing
Pemasangan Apur lt 25, instal AB lt 25 , instal AB, ABK lt 25, persiapan test tekan PPR/moxing lt 117 dan 18 , 28
Instal support shaft utama RWP lt 6 s/d 10, Penitikan Sink lt 20 all unit , Repair gantungan support lt 34
3. PT. MITRA INTI Fire fighiting
ELEKTRINDO Instal dropper lt 19 dan lt 21, Test lt 17 dan lt 18 , Pengelasan main line koridor lt 24 , Pengelasan riser hydrant lt 14 37
Pengerlasan main line sprinkler lt 25, Instal cabang lt 19, instal Tek wel drat lt 19 s/d 30
Instal support korisor lt 27 s/d lt 30 , repair cabang koridor lt 23 s/d lt 30 , Pengecatan pipa cabang lt 21
MVAC
Marking dan bobok shaft neck shaft tangga 8, 9 lt 22 s/d lt 24 , repair ducting sealant tangga 8
14
Repair lt 19 , Instal pipa refrigerant lt 23 /sd lt 24
Total 99
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, June 15, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO Repair Support pipa lt 21 dan lt 22, Instalasi air kotor dan repair lt 23 dan lt 24 38
PRIMATAMA Instal air bersih lt 25 s/d 27, Bobok dinding unit instal air bersih lt 27,Test tekan pipa air bersih lt 21 s/d lt 23
Elektronik
Repair Unit lt 21 s/d lt 24, Repair Area koridor lt 22, repair unit dan koridor lt 25 dan lt 26 9
Elektrikal
Repair instalasi lt 21 s/d lt 24, Instal area koridor lt 23 dan lt 24, Instal ruang powerhouse lt 9, 23
Piping dan wiring lt 6 , Wiring instalasi AC lt 7
HVAC
Repair pipa Refrigerant lt 22 dan lt 23 , Repair exhaust lt 24 s/d lt 29, Repair pipa refrigerant lt 19 23
Instal ducting shaft lt 5 s/d 10.
Fire Fighting
Instal dropper lt 20, repair support lt 25 , repair instalasi area koridor lt 25 , instal cabar sprinkler lt 8 25
instal pipa gas lt 17 dan lt 18 , instal fire stop lt 21 , 8
Total 126
MEP OFFICE TOWER
Elektrikal
Pekerjaan elektrikal lantai 12,14,15,24,30,31,32 22
Fire Fighting
Pekerjaan Fire Fighting lantai 21,31,32 15
Ducting
5. PT. SINAR ARTA MULIA
Pekerjaan Instalsi Ducting lantai 18,21,31,32 29
Plumbing
Pekerjaan Instalasi Plumbing Lantai 20 dan lt 25 6
Ac
harian logistik 6
Total 78
FACADE OFFICE
Pemasang panel unitized lantai lt 30 s/d 32
6. PT. PELITA MAJU 28
Pasang grill , Pasang Curtain wall lt GF, Pemasangan Firestop, Pasang rangka window stool lt 17-30
MULTISWAKARSA
Pasang rangka Window stool Lt 17 - lt 30 , Sealant CW GF, Pasang Panel sudutan lt 17 s/d 22
Total 28
FACADE APARTEMENT 1
Pasang Kusen lantai 18,20,24,33
Pasang karet lantai 19
42
Pasang Acp Tampak selatan , barat, dan timur
7. PT. PANGKAL Sealan lantai 21,22, Pabrikasi ACP , Pasang rangka ACP lt 36
MULTIKARYA FACADE APARTEMENT 2
Pasang kusen lantai 19,22,33,34
Pekerjaan sealant lantai 17 s/d 22 29
Pasang ACP Tampak selatan lantai 14 s/d 33, lansir material , pabrikasi dan banding ACP
Total 71
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE
Pekerjaan rangka plafond lt 20,21,22,23,dan lt 24
pekerjaan tutup gypsum area outstanding lt 18 , dan 19 , Pekerjaan kompon partisi lt 18 dan lt 24
8. CV. CITRA PRATAMA Pekerjaan CNP lt 19 dan 20 , Pekerjaaan tutup gypsum 1 sisi lt 30
30

Pekerjaan Pasang Rod penggantung rangka lt 26


Total 30
SCREED/PARQUET APARTEMENT 1
Screed lantai 24 APT 1
7
9. PT. BIRU INTERNATIONAL Lansir material lt 24
SCREED/PARQUET APARTEMENT 2
Total 7
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
bongkar palet marmer lt 20, Instal marmer lt 20
10. Megantara Agung Repair railling lt 14 20
Persada pekerjaan Finish marmer lt 14 s/d lt 19
Total 20
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, June 15, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI Pemasangan Marmer lt 17,lt 18 , dan lt 19
35
(SAB) lansir material 18 Serah terima material dengen Supplayer
Total 35
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT
Pekerjaan HZ : Drop dan instalasi pintu, Instal master rail Lp 6
Pekerjaan LZ: Pemasangan braket lp 02 dan rail cut, tim Support instalasi
13. PT. Berca Schindler Lift APT1 : Pemasangan rail lp 02, Instal rail lp 04 35
APT 2 : instalasi tanplate lp 01 , Instal rail lp 04
Total 35
RAILLING BALKON APARTEMENT 2
Repair Railing balkon Lt 17
14. Gema Karya Abadi 4
Lansir material ke lantai 18
Total 4
Garbage chute APARTEMENT 1

Lansir material Flor to floor MS1 APT 1 lt 6 s/d lt 12 4


15. PT Harvest Indonesia

Total 4

Pabrikasi Material di workshop


16. PT. ISKABA PRATAMA
Total 0

17. PT. Kopertare Mitra Repair instalasi CCTV lt 21,22 dan 24


7
Indonesia
Total 7

Pemasangan Kusen Pintu Besi APT 2 lt 20


18. PT. Lion Metal Pemasangan kusen office lt 23 7
Pemasangan Kusen Pintu Besi APT 2 lt 16
Total 7

19. PT. Airindo Sakti Pemasangan Spindle Pin ( Glasswool ) APT 1 , APT 2 12
12

Perapihan material lt 12
20. PT. Dongseo 4
checklist opening office, Checklis Opening lt 17 dan lt 18 APT 1, Checklis Opening lt 17 dan lt 18 APT 2
Total 4

sortir marmer dan Serah terima marmer ke instaleler 3


21. PT. CITATAH
Total 3
Pemasangan Pintu Tenant Office
Pesang box floor hinges tenant 3,4,5,6,7,8 lt 18 4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 869

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit Power bond 879 480 sak Maufler genset 3 set
Kompresor 1 set Indokon 250 sak PIpa PVC (D) ɸ 6 70 btg
Habel Pipa PVC (AW) ɸ 6
Bar bending 4 set 44 Mᶟ 70 btg
Thinbond Pipa Ts end 2x4 292 btg
Bar cutter 4 set 300 sak
Bucket cor 3 set Pipa (TS end) putih Aw 6x4m 60 btg
Concrete pump 1 unit Pipa (TS end) putih Aw 3x4m 60 btg
Genset 1 unit Pipa (TS end) putih Aw 2x4m 115 btg
Forklift 1 unit Pipa (TS end ) abu 2x1/2x4 96 Btg
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, June 15, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit Panel sudutan
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL Monday, June 15, 2020 TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 1, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -22
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -22
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -22
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 37
wiring + perapihan kabel elektrikal / elektronik di koridor Lt.11,12,35, test nyala + test magger Lt.34-35, pemasangan smoke, sound, Lp
koridor Lt.23-24, pemasangan Lp, smoke, bell alarm Lt.23,24, wiring Lp + STK Lt.11, pemasangan saklar + STK + bell alarm Lt.23,
perapihan kabel feeder di shaft elektrikal Lt.20, pemasangan cable cage di koridor Lt.6-7, terminasi / grounding Lt.7, penarikan
grounding Lt.21m wiring alarm gas Lt.11

Plumbing 36
instalasi pemasangan valve water meter Lt.24, pabrikasi valve water meter Lt.12, penyisiran FD, FCO, repair Lt.14-24, pemasangan
suport + transisi dan pipa Lt.B2, pemasangan suport transfer AB,AP Lt.B2, transfer pipa + pabrikasi suport untuk riser GF AK,ABK Lt.B2,
perapihan mainline koridor AB,AR Lt.6, pemasangan riser pipa SW,WW Lt.GF, perapihan AB Lt.35, konek riser ABK Lt.34, close test
kitchen Lt.33, instalasi AB Lt.6, instalasi AK,ABK Lt.8, instalasi apur kitchen Lt.9,
3. PT. MITRA INTI
ELEKTRINDO
Fire fighiting 28
instalasi pipa riser Lt.5, perapihan droper Lt.12, instalasi droper Lt.25,28,33, perapihan gantungan Lt.26, pabrikasi droper Lt.11,
pengelasan pipa riser Lt.5-GF, pabrikasi Lt.29, instalasi suport unit koridor Lt.38, pengelasan instalasi pipa hydrant lending 2 1/2 Lt.36,
instalasi pipa hydrant 1 1/2 Lt.37
MVAC 17
pabrikasi ducting PU Lt.GF, pemasangan volume dumper dan neck grill fresh air koridor + pabrikasi Lt.35, perapihan instalasi Lt.33,
perapihan instalasi drain pemasangan TWAY riser drain dan terminasi Lt.31-32/C6-C11, pemasangan fan unit toilet Lt.14-17/C1-C6,
pemasangan pipa refrigent + terminasi ke unit Lt.GF
Sipil 6
perapihan bobokan Lt.30,34,35

Total 124
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 1, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 1, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 128

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 1, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL Tuesday, September 1, 2020 TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 2, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -23
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -23
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -23
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 40
wiring bell alarm unit / melubangi box hydrant untuk tarikan FRC Lt.33, test nyala + test magger Lt.34/35, pemasangan Lp + smoke + bell
alarm Lt.23-24, pemasangan saklar + STK + bell alarm Lt.23, wiring + perapihan kabel elektrikal / elektronik di koridor Lt.11, marking Lp +
melubangi Lt.25-30, wiring Lp + STK Lt.11/C7,B8, pemasangan kabel cage area panel elektrikal Lt.12, bobok + sparingan pipa STK koridor
Lt.6-10, penarikan kabel tupur di area koridor Lt.12, terminasi Lt.21, penarikan kabel ke box hagger Lt.12.

Plumbing 36
instalasi header water meter Lt.26, pemasangan FD balkon Lt.25, pabrikasi suport transisi RWP Lt.B2, instalasi AK,ABK,GF Lt.B2,
pengedopan persiapan test Lt.12, pabrikasi suport shaft plumbing Lt.B3, pemasangan pipa transfer Lt.B2, pabrikasi suport shower Lt.25,
konekting riser bekas test Lt.34, persiapan test AK,ABK Lt.8, penitikan AB Lt.11, instalasi apur kitchen Lt.8, instalasi AB Lt.6, gelontor test
AK,ABK dan penyambungan kitchen
3. PT. MITRA INTI
ELEKTRINDO
Fire fighiting 28
instalasi pipa riser Lt.5, instalasi droper Lt.10,11,28,30,31,33, pengelasan pipa riser Lt.5, pemasangan gantungan droperan Lt.12,
pemasangan tutup box hydrant Lt.6-12, instalasi drain pipa springkler Lt.17-30, pengelasan instalasi pipa hydrant lending Lt.38-39.

MVAC 18
pabrikasi dan pemasngan plenum ducting PU Lt.GF, pabrikasi neck volume dumper dan neck elbow grill fresh air Lt.12, pemasangan riser
drain Lt.6-8/C7, pabrikasi dan pemasangan pipa refrigent dan isolasi drain Lt.11, perapihan instalasi Lt.35,34/B2,B3,B8,B9,B10,
pemasangan fan unit toilet maid bathroom Lt.18/C7,B8,B5,B9
Sipil 6
perapihan bobokan Lt.31,32,33

Total 128
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 2, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 2, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 132

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 2, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL ### TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 3, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -24
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -24
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -24
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 35
repair bell alarm Lt.33, marking Lp + melubangi Lt.26,30, pemasangan Lp + smoke + bell alarm Lt.15-24, wiring + perapihan kabel
elektrikal / elektronik di koridor Lt.11, wiring kabel AC Lt.11, wiring Lp + STK Lt.11, wiring Lp + STK di lobby GF Lt.GF, pemasangan leadder
di lobby GF, piping FAN Lt.7, pemasangan sparing pipa Lt.44, wiring GF Lt.GF,

Plumbing 41
pemasangan riser SW,WW,KD Lt.GF, pabrikasi suport transisi jalur 5 Lt.B2, instalasi AK,ABK lobby GF Lt.B2, joint pipa transfer AB,AR
Lt.B2, persiapan test instalasi PPR Lt.34, instalasi AB,AR lobby GF, instalasi header water meter Lt.28, pemasangan FD balkon Lt.14-25,
konekting riser Lt.34, pemasangan shower suport Lt.25, test rendam Lt.34,35, test AK,ABK Lt.12, penitikan AB Lt.11, instalasi kitchen Lt.8,
repair akustik Lt.33, instalasi AB Lt.6, perapihan instalasi Lt.30, perapihan gantungan Lt.32, instalasi AB Lt.36, instalasi riser ABK Lt.32

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 27
instalasi pipa riser Lt.GF, instalasi droper Lt.10,11,28,30,31,33, pengelasan pipa riser Lt.GF, pemasangan gantungan droperan Lt.12-11,
dop pipa springkler Lt.38, pengelasan instalasi pipa springkler BCV Lt.34, instalasi box hydrant

MVAC 18
pemasangan neck volume dumper neck grill fresh air koridor Lt.11-12, pabrikasi ducting PU Lt.GF, pemasangan ducting PU Lt.GF,
perapihan instalasi pemasangan TWAY + konek riser Lt.35, perapihan instalasi pemasangan TWAY + konek Lt.34, instalasi drain Lt.10,
pabrikasi dan pemasangan pipa refrigent Lt.11

Sipil 3
perapihan bobokan Lt.31,32

Total 124
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 3, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 3, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 128

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 3, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL ### TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 4, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -25
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -25
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -25
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 33
marking box MK Lt.36-37, test nyala + test magger Lt.35, marking Lp / melubangi Lt.26, pemasangan Lp + smoke + bell alarm Lt.18, wiring
+ perapihan kabel elektrikal / elektronik di koridor Lt.11, wiring kabel AC + alarm Lt.11, wiring gas Lt.11, wiring alarm, kabel data, di
lobby GF, pemasangan kabel leadder di lobby GF, pemasangan STK,Saklar,Bell Alarm Lt.18, penarikan kabel feeder Lt.10, terminasi
grounding Lt.7, perapihan grounding Lt.7-21, pemasangan leadder area GF Lt.GF,

Plumbing 37
instalasi air hujan balkon Lt.33, pabrikasi suport water meter Lt.12, pabrikasi suport TEWAY riser SW,WW,KD Lt.GF-5, pemasangan FD
Lt.18-25, pengetesan pipa PPR Lt.34, pemasangan riser AK,ABK Lt.B2, penyisiran koringan area balkon Lt.27-35, pabrikasi suport Lt.26,
konekting riser Lt.34, test kitchen Lt.34, persiapan / pengedopan untuk AK,ABK Lt.10,11,12, instalasi apur kitchen Lt.7, penitikan AB
Lt.10, instalasi AB Lt.6, pengetesan AK,ABK Lt.11

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 28
instalasi pipa riser Lt.GF,12-14, instalasi droper Lt.10,11,28,31,32, pengelasan pipa riser Lt.GF, pemasangan gantungan droperan Lt.33,
test instalasi BCV Lt.27, pengelasan instalasi pipa springkler BCV Lt.27, instalasi box hydrant Lt.6-20

MVAC 18
pabrikasi dan pemasangan plenum ducting PU Lt.GF, pemasangan neck volume dumper dan neck grill fresh air koridor Lt.11,
pemasangan instalasi drain AC Lt.10, perapihan instalasi dan penyambungan refrigent Lt.35, perapihan instalais Lt.34/C6,C7, pabrikasi
dan pemasangan pipa refrigent Lt.11-10

Sipil 4
perapihan bobokan Lt.31,32

Total 120
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 4, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 4, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 124

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 4, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL Friday, September 4, 2020 TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 5, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -26
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -26
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -26
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 32
penarikan kabel 300 power house Lt.7-38, pemasangan kabel leadder GF, marking box mk Lt.38, repair bes alarm Lt.14, marking Lp +
melubangi Lt.26, pemasangan Lp + saklar + STK + smoke + bell alarm Lt.18, wiring + perapihan kabel elelktrikal / elektronik di koridor
Lt.11, pengonekan Lp + STK Lt.11, wiring alarm + gas Lt.11, pemasangan leadder di lobby GF Lt.GF, wiring kabel telpon + alarm Lt.GF,
pemasangan saklar + STK Lt.24

Plumbing 40
pabrikasi suport water meter untuk lantai 30 - 34 Lt.12, pemasangan water meter Lt.17, joint pipa transfer AB,AR Lt.B2, langsir UNP /
pabrikasi suport transisi Lt.5, ngoring toilet untuk bathroom Lt.9/B8, pemasangan instalasi air hujan balkon Lt.27/B3,B9,B10, perapihan
lobby GF instalasi AB,Apur joint pipa vent Lt.GF, close test tekan PPR unit / test rendam kitchen Lt.34, repair AK,ABK Lt.34, instalasi
balkon air hujan Lt.30, instalasi apur kitchen & repair Lt.7-12, instalasi AB Lt.6, repair Lt.7-12, instalasi AB Lt.6, repair AB & penitikan AB
Lt.33-9, dop kitchen Lt.10-9, instalasi AK,ABK Lt.8, pemasangan sparing AK,ABK Lt.6, perapihan gantungan vent Lt.32, instalasi AB
Lt.36/B5,C7, instalasi ABK Lt.37/B5
3. PT. MITRA INTI
ELEKTRINDO
Fire fighiting 28
instalasi pipa riser Lt.GF,12-14, pengelasan pipa riser Lt.GF, instalasi droper Lt.10,28,31,32, pabrikasi droper Lt.11, pemasangan
gantungan Lt.11, instalasi pipa springkler BCV Lt.13, las instalasi BCV springkler Lt.27, persiapan test riser springkler Lt.5-12

MVAC 18
pemasangan bak drain pemasangan PU Lt.GF, pabrikasi dan pemasangan neck volume dumper dan neck grill fresh air koridor Lt.9-10,
instalasi drain AC Lt.10/C11,B10, penambahan pipa refrigent Lt.35/B10, perapihan instalasi Lt.34, perapihan instalasi exhaust Lt.25-30

Sipil 6
perapihan bobokan Lt.33,32, perapihan shaft / penutupan bekas test riser

Total 124
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 5, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 5, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 128

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 5, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL Saturday, September 5, 2020 TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 6, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -27
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -27
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -27
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 26
bobok + sparingan pipa mk , repair bell alarm unit Lt.31, pemasangan MCB + pemasangan bell alarm + smoke Lt.18, repair alarm + gas
Lt.11, terminasi Lp + stk Lt.11, wiring + perapihan kabel elektrikal / elektronik Lt.11, bobok + sparingan pipa + mk Lt.GF, pemasangan
leader di loby GF Lt.GF, penarikan kabel 300 Lt.7-38, pemasangan panel Lt.15-17

Plumbing 25
pemasangan FD balkon / sisir Lt.18-19, perapihan instalasi AB,ABK Lt,GF, persiapan test tekan Lt.35, pabrikasi suport transisi Lt.5, langsir
material / pipa untuk transisi Lt.12-5, instalasi air hujan balkon Lt.29/B10,B2, repair AK,ABK Lt.34, pabrikasi suport shower Lt.26,
penitikan AB Lt.9, instalasi apur washtafel Lt.7, instalasi AK,ABK Lt.8, test AK,ABK Lt.12, bobok untuk AB Lt.6

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 24
instalasi droper Lt.10,11,28,31,33, transfer pipa Lt.B2, pengelasan ruang pompa air bersih, pengelasan riser Lt.GF, pengelasan instalasi
pipa springkler BCV Lt.12, dop instalasi pipa springkler Lt.39, test riser pipa springkler Lt.12-6

MVAC 18
pemasangan bak drain pemasangan PU Lt.GF, pabrikasi dan pemasangan neck volume dumper dan neck grill fresh air koridor Lt.9-10,
instalasi drain AC Lt.10/C11,B10, penambahan pipa refrigent Lt.35/B10, perapihan instalasi Lt.34, perapihan instalasi exhaust Lt.25-30

Sipil 5
perapihan bobokan Lt.32,33, perapihan shaft / penutupan bekas test riser Lt.34

Total 98
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 6, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 6, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 102

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 6, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL Sunday, September 6, 2020 TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 7, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -28
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -28
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -28
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 30
test kabel feeder area unit Lt.18, marking Lp + melubangi Lt.27, pemasangan MCB + nyalain Lp Lt.18, repair alarm + terminasi Lp + STK
Lt.11, piping kabel IHB ke box hydrant Lt.12-11, wiring kabel telephone di lobby GF Lt.GF, pemasangan leadder di lobby GF Lt.GF, bobok
+ sparing pipa + MK Lt.36, penarikan kabel feeder 300 Lt.7-38, pemasangan panel unit Lt.17-24,

Plumbing 38
pemasangan air hujan balkon Lt.30,31/C6,C7, ngoring titik balkon Lt.31/B5,B10,B2, pemasangan FD balkon / nyisir Lt.19-20, pemasangan
water meter Lt.20-21, pabrikasi suport transisi Lt.5, pengetesa AB,AP,AR Lt.35, pemasangan suport shower Lt.26, repair AK,ABK Lt.34,
repair guly trap Lt.33, instalasi apur washtafel Lt.7, penitikan AB Lt.9, perapihan vent Lt.31, instalasi AB Lt.6, closing test kitchen Lt.10-9,
perapihan instalasi vent Lt.30,32, instalasi AB Lt.36, instalasi AK,ABK,Vent Lt.37/C1

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 26
instalasi pipa riser Lt.GF, instalasi PRV Lt.14, pengelasan pipa riser Lt.GF, instalasi droper Lt.11,31,33,34, pabrikasi droper Lt.32,
pemasangan gantungan Lt.32, instalasi pipa springkler BCV Lt.35, pengelasan instalasi pipa springkler BCV Lt.13, dop instalasi pipa
springkler Lt.38,39
MVAC 11
instalasi drain AC Lt.9, pemasangan pipa refrigent Lt.10, pabrikasi dan pemasangan ducting shaft tanggab 8 Lt.5-3, pemasangan grill
tangga Lt.9, ngejas instalasi exhaust ke plenum Lt.30

Sipil 6
perapihan bobokan Lt.32,33, perapihan shaft / penutupan bekas test riser Lt.32,33,34

Total 111
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 7, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 7, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 115

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 7, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL Monday, September 7, 2020 TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 8, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -29
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -29
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -29
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 24
bobok + sparingan pipa + pemasangan box MK Lt.36/B2, test nyala + STK + pemasangan MCB Lt.18, terminasi Lp + STK Lt.11/C7, wiring +
perapihan kabel elektrikal / elektronik di koridor Lt.10, pemasangan kabel cage di ruang panel Lt.6-12, piping + terminasi area FCC Lt.GF,
pemasangan STK + saklar + LP + smoke + bell alarm nLt.18, penarikan kabel feeder 300 Lt.7-38, pemasangan panel unit Lt.17-24

Plumbing 35
pemasangan suport + pipa Lt.5, pabrikasi suport transisi Lt.5, instalasi air hujan balkon Lt.31,32/C6,B5, ngoring area balkon Lt.33-32,
instalasi water meter Lt.30, pemasangan water meter Lt.14-15, persiapan pengetesan mainline koridor Lt.12, penyisiran pemasangan FD
Lt.27-28, konekting kitchen bekas test Lt.34, penyambungan dop test Lt.33,11-10, instalasi apur washtafel Lt.7-6, test air bersih Lt.12-11,
penitikan AB Lt.8, persiapan test AB Lt.11-12, perapihan instalasi Lt.30-28, instalasi AB Lt.36, instalasi ABK Lt.37/C11,

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 26
instalasi ruang pompa Lt.B2, langsir pipa, instalasi droper Lt.11,34,32, instalasi IHB Lt.GF, pemasangan gantungan Lt.32, pengelesan pipa
riser Lt.GF, pemasangan tutup box hydrant Lt.5-9, test instalasi pipa springkler drain Lt.36, pengelasan instalasi pipa springkler BCV Lt.37,

MVAC 14
repair ducting tangga 8 shaft Lt.5, pabrikasi neck volume dumper koridor neck fresh air grill Lt.12, ngejas instalasi exhaust ke plenum
Lt.30/C1,B10,C11, perapihan instalasi drain / repair Lt.GF, instalasi refrigent Lt.10

Sipil 6
perapihan bobokan Lt.32,33,34

Total 105
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 8, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 8, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 109

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 8, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL Tuesday, September 8, 2020 TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 9, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -30
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -30
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -30
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 31
bobok + sparingan pipa + MK Lt.36/B3, pemasangan outlet data, TV, Smoke, Lp, Bell alarm Lt.19/C1,B2, test nyala + test magger Lt.12,
perapihan kabel tupur ke box hagger Lt.12, wiring + perapihan kabel elektrikal / elektronik di koridor Lt.10, bobok + sparingan pipa + box
MK Lt.GF, pemasangan outlet saklar + STK + smoke + bell alarm Lt.24, marking Lp + melubangi Lt.27, penarikan kabel feeder 300 Lt.7-38,
pemasangan panel .

Plumbing 37
instalasi air hujan balkon Lt.34/B2,B10,C11, transisi air hujan 5 jalur Lt.B2, pabrikasi + pemasangan suport transisi Lt.5, pemasangan gate
valve header water meter Lt.18-20, pemasangan FD balkon Lt.25, persiapan pengetesan mainline koridor Lt.10, repair gulytrap Lt.35/C7,
pemasangan suport shower Lt.26, persiapan dan test kitchen Lt.35, instalasi apur washtafel Lt.6, penitikan AB Lt.8, persiapan test Lt.9-
10, perapihan instalasi Lt.32, pemasangan gantungan Lt.36, instalasi AB Lt.37, instalasi AK Lt.37

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 27
instalasi droper Lt.11,31,32,34, pabrikasi Lt.35, pemasangan gantungan Lt.32, instalasi ruang pompa Lt.B2, transfer pipa, instalasi pipa
springkler BCV Lt.10, pengelasan instalasi pipa springkler Lt.11, persiapan test riser hydrant Lt.33-19

MVAC 14
pabrikasi dan pemasangan ducting shaft tangga 8 Lt.5, pemasangan neck volume dumper dan neck grill fresh air koridor Lt.8-9, instalasi
exhaust ngejas ke plenum Lt.31/B8,B9,B3, instalasi drain AC Lt.9, perapihan instalasi drain Lt.GG

Sipil 2
perapihan bobokan Lt.32,33,

Total 111
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 9, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 9, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 115

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 9, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL ### TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 10, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -31
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -31
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -31
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 29
bobok + sparingan pipa box MK area koridor Lt.36-37, marking + melubangi Lp area koridor Lt.28-29, pemasangan outlet sound + Lp area
koridor Lt.25-26, pemasangan outlet Lp + saklar + STK + bell alarm + smoke Lt.15, wiring + perapihan kabel elektrikal / elektronik di
koridor Lt.10, pemasangan kabel cage area shaft elektrikal Lt.11, test nyala / test meger Lt.9

Plumbing 38
instalasi AK,ABK Lt.5, joint transisi RWP Lt.B2, ngoring area balkon Lt.35, instalasi air hujan balkon Lt.34, penitikan AB garbage cut Lt.12-
10, pemasangan gate valve 1 1/2 Lt.19-24, pemasangan FD balkon Lt.26-28, repair guly trap Lt.37, pabrikasi suport shower Lt.34, repair
gantungan Lt.36, instalasi ABK Lt.37, instalasi AB Lt.37, transfer pipa PVC, penitikan AB Lt.8, instalasi apur washtafel Lt.6, penyambungan
dop Lt.11, pemasangan suport AK Lt.7-5, bongkar dop Lt.10-9,

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 27
pabrikasi droper koridor Lt.9-10, instalasi droper Lt.35,31,34,32, pemasangan gantungan Lt.32, pengelasan pipa riser Lt.GF, instalasi
ruang pompa Lt.B2, pabrikasi suport Lt.12, pengetesan pipa hydrant Lt.GF, instalasi pipa springkler BCV Lt.6, pemasangan box hydrant
Lt.12-6, pengelasan instalasi pipa springkler BCV Lt.7
MVAC 16
pemasangan box plenum Lt.33,34,35, pemasangan neck volume dumper neck grill fresh air Lt.9-8, instalasi pipa exhaust ke plenum Lt.31,
bobok untuk pemasangan box plenum Lt.12-11, perubahan jalur pipa refrigent Lt.GF, pabrikasi clem untuk drain refrigent Lt.12

Sipil 6
perapihan bobokan Lt.32,33,34

Total 116
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 10, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 10, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 120

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 10, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL ### TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 11, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -32
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -32
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -32
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 33
marking downlight Lt.33-34 koridor, pemasangan downlight + sound Lt.28 koridor , piping lampu + STK Lt.13/C11, test magger + test
nyala Lt.11, wiring + perapihan elektrikal / elektronik Lt.10 koridor, pemasangan accesoris Lt.15/B10,C11, penarikan kabel feeder 300
Lt.7-38, pemasangan panel .

Plumbing 39
instalasi AK,ABK transisi Lt.5, instalasi transisi RWP Lt.B2, instalasi air hujan balkon, pengetesan instalasi GF,AB,AR Lt.GF, instalasi unit ke
header Lt.30, nyisir FD balkon dan FCO, penitikan / pemasangan shower Lt.26, repair guly trap Lt.34, pemasangan gantungan Lt.34,
instalasi riser kitchen Lt.36, instalasi AB Lt.37/B2,C7, instalasi AK Lt.37/B5, pabrikasi suport Lt.31-33, persiapan test & penitikan Lt.7-8,
instalasi apur washtafel & kitchen Lt.6, dop & test Lt.8, instalasi vent & gantungan Lt.9-8.

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 26
pabrikasi dan instalasi Lt.35/C1, instalasi droper Lt.13,31,32,34, pabrikasi droper Lt.25-26, pemasangan gantungan Lt.35, pengelasan pipa
riser Lt.GF, instalais ruang pompa Lt.B2, pabrikasi baypas drain pipa springkler Lt.12, las dop instalasi pipa hydrant Lt.40, instalasi drain
pipa springkler Lt.37-36
MVAC 17
pemasangan flexible rounduct dan bobok untuk neck grill tangga 8,9 Lt.33,34,35, pemasangan neck volume dumper Lt.8 koridor, bobok
unrtuk pemasangan box plenum Lt.10,11/C7-C11, pemindahan jalur pipa refrigent Lt.GF, perapihan instalasi terminasi riser drain
Lt.34/B10, pemasangan fan unit toilet Lt.18.

Sipil 6
perapihan bobokan Lt.33,34,35

Total 121
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 11, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 11, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 125

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 11, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL Friday, September 11, 2020 TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 12, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -33
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -33
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -33
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 34
marking + melubangi LP + pemasangan outlet sound Lt.35,34, repair kabel gas Lt.12/C1 + tupur bobok + sparingan pipa buat box mk,
pemasangan Lp + outlet sound Lt.31, pemasangan outlet telephon, data Lt.17-18, wiring + perapihan kabel elektrikal / elektronik Lt.9,
test nyala + test magger Lt.11, pemasangan kabel cage di shaft elektrikal Lt.10-11

Plumbing 38
instalasi unit ke hedaer water meter Lt.33, pemasangan FCO Lt.27,28, instalasi AK,ABK Lt.5, langsir pipa galvanis Lt.B-5, pemasangan /
instalasi air hujan balkon Lt.35/B10.B8, pengetesan mainline koridor AB,AR Lt.8, repair gulytrap Lt.34/C7, pabrikasi suport shower Lt.34,
penyambungan riser AK,ABK Lt.31, pemasangan titik apur kitchen Lt.6, closing AB Lt.8, penitikan AB Lt.7,

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 22
instalasi droper Lt.8,31,32,34,35, pengelasan pompa air bersih Lt.B2, perapihan suport pompa Lt.B2, pengelasan riser Lt.4, pemasangan
gantungan Lt.34,

MVAC 16
bobok dan pemasangn neck grill shaft tangga 8 Lt.32,35, pemasangan neck volume dumper dan fresh air Lt.7, pemasangan fan unit toilet
Lt.18/B3,B9,B10, instalasi exhaust terminasi ke plenum Lt.32/B3,B9, perapihan instalasi pipa refrigent Lt.GF

Sipil 6
perapihan bobokan Lt.33,34,35, penutupan lubang shaft Lt.30

Total 116
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 12, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 12, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 120

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 12, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL ### TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 13, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -34
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -34
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -34
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 15
wiring + perapihan kabel elektrikal / elektronik di koridor Lt.9, pemasangan Lp + outlet sound area koridor Lt.30-31, pemasangan Lp +
outlet telpephone + data Lt.17, wiring kontrol AC Lt.GF, pemasangan kabel cage di shaft elektrikal Lt.9-10, bobok + sparingan untuk STK
koridor Lt.37-40

Plumbing 19
instalasi air hujan balkon Lt.35,36/C7,B3, pemasangan FCO Lt.30-31, instalasi water meter Lt.35, pemasangan air hujan balkon Lt.5,

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 22
instalasi droper Lt.8,31,32,34,35, pengelasan pompa air bersih Lt.B2, perapihan suport pompa Lt.B2, pengelasan riser Lt.4, pemasangan
gantungan Lt.34,

MVAC 14
pemasangan flexible exhaust Lt.12, pemasangan box grill koridor Lt.7, bobok box grill riser tangga Lt.26-27, instalasi pipa refrigent
Lt.10/B8,B9,B10, instalasi exhaust Lt.32

Sipil

Total 70
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 13, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 13, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 74

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 13, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL Sunday, September 13, 2020 TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 14, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -35
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -35
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -35
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 24
marking Lp + pemasangan outlet sound Lt.30-31, wiring + perapihan kabel elektrikal / elektronik di koridor Lt.9, pemasangan outlet
telephone data + TV Lt.17-18, pemasangan kabel cage di shaft elektrikal Lt.9-10, test nyala + test magger Lt.11-12, wiring sound + power
outdor Lt.GF, perapihan kabel tupur Lt.9-11,

Plumbing 31
instalasi AK,ABK dan transisi Lt.5, pemasangan header + joint untuk ke headder Lt.35, instalasi air hujan balkon Lt.5/C7-C11, Lt.36,B8,
pabrikasi long elbow galvanis Lt.B2, penyisiran / pemasangan head shower Lt.23, pemasangan gantungan Lt.36, instalasi akustik Lt.37,
instalasi AB Lt.37,36/B5,C11,B3, pengetesan AK Lt.6,7,8,9, penitikan AB Lt.6, penyambungan shaft riser 6 & 4 '' Lt.10,

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 20
instalasi droper Lt.8,31,32,34,35, pengelasan pompa air bersih Lt.B2, perapihan suport pompa Lt.B2, pengelasan riser Lt.4, pemasangan
gantungan Lt.34, repair lending hydrant test Lt.19-33

MVAC 14
pemasangan fan toilet Lt.22/B3,B9,B10, instalasi pipa exhaust terminasi ke plenum Lt.32-33/C6,C7, pemasangan grill koridor Lt.25-26,
perapihan instalasi refrigent dan pengelasan refnet Lt.GF, pabrikasi dan pemasangan refrigent Lt.10-9/C7,B10, bobok untuk neck FA grill
shaft tangga 9 Lt.28/30

Sipil 3
penutupan lubang shaft bekas test riser Lt.31, penutupan lubang - lubang jalur pipa Lt.30, perapihan bobokan Lt.33

Total 92
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 14, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 14, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 96

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 14, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL ### TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 15, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -36
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -36
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -36
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 30
pemasangan Lp + outlet sound di koridor Lt.32-33, pemasangan MCB, outlet data, telephone, Lp Lt.17, wiring + perapihan kabel
elektrikal / elektronik di koridor Lt.9, test nyala + test magger Lt.11-12, perapihan kabel tupur ke box hagger Lt.9-11, pemasangan kabel
cage di shaft elektrikal Lt.6-10, bobok + sparingan pipa untuk box mk di koridor Lt.38-39, transfer panel Lt.18

Plumbing 35
instalasi air hujan balkon Lt.37/B5,B10, ngoring + repair Lt.38, pabrikasi long elbow galvanis Lt.B2, instalasi AK,ABK / transisi Lt.5, langsir
+ instalasi koridor AB,AR Lt.36, pabrikasi headder water meter Lt.12, pengetesan mainline koridor Lt.7, pemasangan head shower
Lt.20,23, repair vent dan AK/ABK Lt.24-34, pemasangan suport shower + penitikan Lt.34, test AK,ABK Lt.6,7,8,9, test AB Lt.7, instalasi
apur kitchen Lt.6, repair bobokan Lt.31, pemasngan apur kitchen Lt.36, instalasi vent Lt.37, instalasi AB Lt.37,

3. PT. MITRA INTI


ELEKTRINDO
Fire fighiting 20
instalasi droper Lt.8,31,32,34,35, pengelasan pompa air bersih Lt.B2, perapihan suport pompa Lt.B2, pengelasan riser Lt.4, pemasangan
gantungan Lt.34, test riser instalasi hydrant Lt.19-33

MVAC 16
bobok untuk neck grill shaft tangga 9 Lt.31-35, perapihan silent ducting PU Lt.GF, instalasi pipa exhaust terminasi ke plenum Lt.33/C7,B8,
pemasangan fan toilet Lt.22-23/C1,B2,C11, repair instalasi pipa exhaust Lt.8/B9, pemasangan pipa refrigent Lt.GF

Sipil 5
perapihan bobokan Lt.12,33,34

Total 106
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 15, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 15, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 110

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Tuesday, September 15, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL ### TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 16, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -37
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -37
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -37
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 28
pemasangan Lp + outlet sound area koridor Lt.31, pemasangan MCB + nyala + Lp area balkon Lt.18, wiring + perapihan kabel elektrikal /
elektronik di koridor Lt.9, wiring kontrol AC + sound di GF Lt.GF, test nyala / test magger Lt.GF, pemasangan Lp + smoke Lt.25,transfer
panel Lt.18

Plumbing 35
transisi ABK/AK Lt.5, pabrikasi long elbow galvanis Lt.B2, persiapan test rendam AK,ABK / lobby Lt.GF, langsir material pipa pvc Lt.B-5,
pemindahan titik koring area mesin cuci Lt.6, pabrikasu suport mainline AR Lt.12, pabrikasi headder water meter Lt.12, penyisiran
pemasangan FD balkon Lt.26-27, repair AK Lt.24/B3, pabrikasi suport shower Lt.35, instalasi AK,ABK Lt.7/C11, penambahan kekurangan
air bersih & perapihan Lt.11-12, bobok untuk titik kitchen Lt.6, pabrikasi suport Ak,ABK Lt.7/C11, instalasi apur kitchen Lt.36, instalasi AB
Lt.37/B3, instalais vent Lt.37, instalasi AB Lt.37/B9.

3. PT. MITRA INTI


ELEKTRINDO Fire fighiting 20
instalasi droper Lt.8,31,32,34,35, pengelasan pompa air bersih Lt.B2, perapihan suport pompa Lt.B2, pengelasan riser Lt.4, pemasangan
gantungan Lt.34, test riser instalasi hydrant Lt.19-33

MVAC 23
pemasangan drain AC Lt.36/B5, pemasangan fan Lt.36/B5,B8, bobok jalur refrigent Lt.37, pemasangan grill koridor Lt.28,29, test drain Ac
Lt.32-35, perapihan bobokan Lt.25-30, instalasi drain Lt.9/C7,B8, pabrikasi suport outdor Lt.GF, pemasangan fan unit toilet
Lt.24/C7,B8,B5, bobok ducting untuk neck grill Lt.35,12,10 tangga 9,8, instalasi pipa exhaust terminasi ke box plenum Lt.33/C1,B10

Sipil 6
perapihan bobokan Lt.12,33,34, penutupan shaft bekas test Lt.31

Total 112
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 16, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 16, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 116

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Wednesday, September 16, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL ### TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 17, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -38
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -38
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -38
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 34
marking Lp + melubangi Lt.26, pemasangan Lp + smoke Lt.25, pemasangan MCB + nyala + Lp balkon Lt.18, wiring Lp + perapihan kabel
elektrikal / elektronik di koridor Lt.8, pemasangan panel JBFA / JBSS di ruang panel Lt.30-35, penambahan STK area GF Lt.GF,
pemasangan Lp + smoke + Lp balkon Lt.25, pemasangan inbowdus dan pipa conduit Lt.37

Plumbing 37
instalasi mainline koridor AB,AR Lt.36, instalasi air hujan balkon Lt.37/C11,B2, ngoring balkon Lt.37/B2,B3, joint PPR shaft Lt.13, instalasi
transisi ABK,AK Lt.5, pabrikasi long elbow galvanis Lt.5, flushing bekas test koridor ABK GF Lt.8-7, pabrikasi ball valve water meter untuk
Lt.28 di Lt.12, penyisiran pemasangan FD Lt.24,26, pemasangan suport dan penitikan shower Lt.35, repair ABK Lt.24/B3, instalasi AK,ABK
Lt.7/C11, repair FC Lt.6, instalasi kitchen Lt.6, bobok Lt.8,

3. PT. MITRA INTI


ELEKTRINDO Fire fighiting 24
instalasi droper Lt.8,31,32,34,35, pengelasan pompa air bersih Lt.B2, perapihan suport pompa Lt.B2, pengelasan riser Lt.4, pemasangan
gantungan Lt.34, pemasangan tutup box hydrant Lt.36-39

MVAC 20
pemasangan grill koridor Lt.31,32,33, pemasangan spigot, flexible, Lt.GF, pabrikasi suport outdor Lt.GF, instalasi pipa exhaust Lt.GF, test
drain AC, joint untuk pengetesan refrigent Lt.12-10/C11,C7, instalasi exhaust terminasi ke plenum Lt.34/B2,B3,B9, joint untuk
pengetesan refrigent Lt.31,32, pemasangan fan toilet Lt.17/B2.B3

Sipil 3
perapihan bobokan Lt.31,33

Total 118
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 17, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 17, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 122

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Thursday, September 17, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL ### TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 18, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -39
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -39
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -39
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 31
pemasangan Lp unit Lt.26-27, wiring + perapihan kabel elektrikal / elektronik di koridor Lt.9, pemasangan panel JBFA / JBSS Lt.6-12,
penambahan STK + Lp di lobby GF Lt.GF, pabrikasi suport untuk ruang panel lobby GF Lt.12, pemasangan suport area shaft Lt.B1-7, bobok
untuk pipa conduit Lt.37.

Plumbing 29
instalasi air hujan balkon Lt.38/B8,C7, instalasi AB, janitor dan pemasangan suport main line AB,AR Lt.36-37, pemasangan ball valve
water meter Lt.25, joint ppr shaft utama Lt.13, instalasi AK, ABK / transisi Lt.5, pabrikasi long elbow Lt.5, pemasangan FD balkon Lt.25,
instalasi riser AK,ABK Lt.6,7,8, penyambungan bekas test AK,ABK & pemasangan suport shower Lt.31,7, bobok kekurangan washtafel
Lt.7,8,9,

3. PT. MITRA INTI


ELEKTRINDO Fire fighiting 22
instalasi droper Lt.GF, 14, 32, 34, 35, pemasangan gantungan dan perapihan Lt.25-35, instalasi ruang pump room Lt.B1, pengelasan
mainline Lt.B2, repair IHB Lt.GF, test instalasi springkler riser Lt.13-5

MVAC 18
pemasangan grill koridor Lt.33-34, perapihan dan pabrikasi pu plenum Lt.GF, jumper untuk pengetesan refrigent Lt.32, instalasi pipa
exhaust terminasi ke plenum Lt.34/C1,C6,C7, pabrikasi suport outdor, penyambungan pipa refrigent Lt.GF, instalasi pipa exhaust fan
Lt.GF, pemasangan fan toilet Lt.24

Sipil 4
perapihan bobokan Lt.12,33, penutupan lubang shaft Lt.32

Total 104
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 18, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 18, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 108

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Friday, September 18, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL Friday, September 18, 2020 TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 19, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -40
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -40
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -40
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 29
marking Lp + melubangi Lt.26-27, pemasangan Lp unit + Lp toilet Lt.26-27, penambahan STK area lobby GF, pemasangan saklar + STK + Lp
+ smoke + bell alarm Lt.14, wiring + perapihan kabel elektrikal / elektronik di koridor Lt.8, test nyala + test magger Lt.6-8, pemasangan
kabel cage di ruang panel elektrikal Lt.6-9, penambahan STK area lobby GF Lt.GF, terminasi panel di power di power house Lt.7,
penarikan kabel feeder Lt.8-45, bobok untuk pipa conduit Lt.37,

Plumbing 28
pemasangan suport koridor AB,AR Lt.37, instalasi air hujan balkon Lt.38/B3,B9, ngoring untuk balkon Lt.38/B3,B2, pemasangan ball valve
water meter Lt.27, pemasangan FD balkon Lt.28, pabrikasi long elbow galvanis Lt.5, instalasi AK,ABK transisi LT.5, joint pipa PPR area
shaft Lt.13, perapihan penitikan AB Lt.35, perapihan apur / gantungan , penitikan AB Lt.37, instalasi AB Lt.38, instalasi ABK Lt.37/B8

3. PT. MITRA INTI


ELEKTRINDO Fire fighiting 22
instalasi droper Lt.GF, 14, 32, 34, 35, pemasangan gantungan dan perapihan Lt.25-35, instalasi ruang pump room Lt.B1, pengelasan
mainline Lt.B2, repair IHB Lt.GF, buang air bekas test hydrant Lt.19-33,

MVAC 25
instalasi pipa exhaust terminasi ke plenum, pemasangan grill koridor Lt.35, pemasangan fan unit toilet Lt.25, pabrikasi ducting pu
plenum dan pemasangan Lt.GF, jumper untuk test tekan refrigent Lt.33, test tekan pipa refrigent Lt.GF, instalasi drain Lt.36, instalasi
exhaust fan Lt.36, bobok instalasi refrigent

Sipil 4
perapihan bobokan Lt.12,32,33,

Total 108
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 19, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 19, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 112

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Saturday, September 19, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL ### TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 20, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -41
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -41
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -41
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 21
pemasangan suport leadder di shaft elektronik Lt.6/B1, pemasangan Lp + nyala area koridor Lt.26,30,35, wiring + perapihan kabel
elektrikal / elektronik di koridor Lt.8, pemasangan kabel cage area panel Lt.8-6, penarikan kabel feeder area box hagger Lt.6-8, perapiha
kabel feeder di power house Lt.7, pemasangan MCB + nyala Lp Lt.14, bobok + sparingan pipa Lt.37

Plumbing 21
pemasangan suport koridor AB,AR Lt.37, pemasangan ball valve water meter Lt.28, pemasangan FD & FCO Lt.33-25, instalasi balkon air
hujan Lt.38/B9.B3, pabrikasi suport untuk pipa PPR Lt.12, instalasi AK,ABK transisi Lt.5/B8, repair riser ABK Lt.9, pemasanga suport
shower Lt.31, instalasi vent Lt.10-8, perapihan penitikan AB Lt.11-10, instalasi AK,ABK kitchen Lt.6

3. PT. MITRA INTI


ELEKTRINDO Fire fighiting 22
instalasi droper Lt.GF, 14, 32, 34, 35, pemasangan gantungan dan perapihan Lt.25-35, instalasi ruang pump room Lt.B1, pengelasan
mainline Lt.B2, repair IHB Lt.GF, buang air bekas test hydrant Lt.19-33,

MVAC 13
pabrikasi dan pemasngan plenum pu Lt.GF, instalasi pipa exhaust terminasi ke plenum Lt.35/B2,B3,B5, pabrikasi dan pemasngan
refrigent Lt.9, jumper untuk pengetesan refrigent Lt.33, test tekan refrigent pabrikasi suport out dor Lt.GF, pemasangan fan toilet Lt.25.

Sipil 1
perapihan bobokan Lt.33

Total 78
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 20, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 20, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 82

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Sunday, September 20, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL Sunday, September 20, 2020 TTD. TTD.
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 21, 2020 DAYS :
Struktur TOPPING Apartement 1 Sunday, January 19, 2020 0
Struktur TOPPING Apartement 2 Friday, January 17, 2020 0
Unit Milestone 2 Apartemen 1 Monday, August 10, 2020 -42
Unit Milestone 2 Apartemen 2 Monday, August 10, 2020 -42
Unit Milestone 2 Tower Oficce Monday, August 10, 2020 -42
Kontraktor
Construction Management Personel In Charge [PIC] TOWER Man Power
APARTMENT 1 APARTMENT 2 OFFICE WFO WFH
Construction Manager √ √ √ 1
Project Planning Coordinator √ √ √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
Supervisor Finishing √ 1
1. PT. PROSYS BANGUN Supervisor Struktur √ √ √ 1
PERSADA Supervisor Struktur √ √ √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
Supervisor MEP √ 1
HSE √ √ √ 1
Admin Project √ √ √ 1
12 0
Total 12
Nama Kontraktor STRUKTUR
Jenis Pekerjaan Man Power
Jumlah

2. PT. NUSA KONSTRUKSI


ENJINIRING (STRUKTUR)
APARTEMENT 1

APARTEMENT 2
- PT. NUSA KONSTRUKSI
ENJINIRING (ARSITEKTUR)
OFFICE

Total 0
MEP APARTEMENT 1
ELEKTRIKAL/ELEKTRONIK 25
marking Lp + melubangi Lt.27/C7-C11, wiring + perapihan kabel elektrikal / elektronik di koridor Lt.7,8, pemasangan MCB + saklar + Lp +
STK + bell alarm Lt.14/C7,B8, pemasangan suport leader Lt.6/B1, pemasangan kabel cage di ruang panel elektrikal Lt.6-7, test nyala / test
magger area koridor Lt.6-9, perapihan kabel feeder ke box hagger Lt.6-8, perapihan kabel feeder + terminasi Lt.21, penarikan kabel
feeder Lt.26-39

Plumbing 29
instalasi mainline koridor AB,AR Lt.37, instalasi janitor ABK Lt.36-39, instalasi air hujan balkon Lt.39/C7, persiapan test koridor main line
AB,AR Lt.36, pemasanga aksesoris water meter Lt.28, instalasi AK,ABK transisi Lt.5, pabrikasi suport / untuk shaft Lt.13 Lt.12,
pemasangan suport shower Lt.31-33, instalasi AK,ABK,Akustik Lt.6-7, penyambungan vent Lt.6-8, perapihan titik AB Lt.10,11,12, pabrikasi
suport Lt.12, instalasi / perapihan Lt.36, penitikan AB Lt.37-38, instalasi AK Lt.37/B8,

3. PT. MITRA INTI


ELEKTRINDO Fire fighiting 22
instalasi droper Lt.GF, 14, 32, 34, 35, pemasangan gantungan dan perapihan Lt.25-35, instalasi ruang pump room Lt.B1, pengelasan
mainline Lt.B2, repair IHB Lt.GF, dop instalasi lending hydrant Lt.19-33

MVAC 22
instalasi pipa exhaust ke plenum dan pemasangan flexible rounduct Lt.35/C6,C1, pabrikasi plenum pu dan pemasnagan Lt.GF, jumper
untuk pengetesan Lt.33, instalasi drain AC Lt.9-8/C7-C11, pabrikasi refrigent dan pemasangan Lt.9, pabrikasi neck shaft tangga 8 Lt.12,
pabrikasi suport outdor Lt.GF, instalasi drain AC Lt.37, instalasi / bobok refrigent Lt.37-38, instalasi Fan

Sipil 3
perapihan bobokan Lt.12,33

Total 101
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 21, 2020 DAYS :
MEP APARTEMENT 2
Plumbing
4. PT. INDO MECO
PRIMATAMA
Elektronik

Elektrikal

HVAC

Fire Fighting

Total 0
MEP OFFICE TOWER
Elektrikal

Fire Fighting

Ducting
5. PT. SINAR ARTA MULIA

Plumbing

Ac

Total 0
FACADE OFFICE

6. PT. PELITA MAJU


MULTISWAKARSA
Total 0
FACADE APARTEMENT 1

7. PT. PANGKAL
MULTIKARYA FACADE APARTEMENT 2

Total 0
PARTISI GYPSUM DAN PLAFOND AKUSTIK OFFICE

8. CV. CITRA PRATAMA

Total 0
SCREED/PARQUET APARTEMENT 1

9. PT. BIRU INTERNATIONAL


SCREED/PARQUET APARTEMENT 2

Total 0
INSTAL MARMER APARTEMENT 1 & INSTAL RAILING BALKON APARTEMENT 1
10. Megantara Agung
Persada
Total 0
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 21, 2020 DAYS :
INSTAL MARMER
11. PT. SETIA JAYA ABADI
(SAB)
Total 0
AUDIOPHONE APARTEMENT 1

12. PT. EPCON AUDIOPHONE APARTEMENT 2

Total 0
INSTAL LIFT

13. PT. Berca Schindler Lift

Total 0
RAILLING BALKON APARTEMENT 2

14. Gema Karya Abadi


Total 0
Garbage chute APARTEMENT 1

15. PT Harvest Indonesia

Total 0
GWT

16. PT. ISKABA PRATAMA


Total 0
CCT
17. PT. Kopertare Mitra
Indonesia
Total 0
Door steel

18. PT. Lion Metal

Total 0
Genset
19. PT. Airindo Sakti
0
wood door

20. PT. Dongseo


Total 0
Supplay

21. PT. CITATAH


Total 0
Pemasangan Pintu Tenant Office
4
22. Pangkal Mall

Total 4
TOTAL PEKERJA 105

EQUIPMENT MATERIAL (IN)


Tower crane 4 unit STRUKTUR ARSITEKTUR MEP
Passenger hoist 10 unit
Kompresor 1 set
Bar bending 4 set
Bar cutter 4 set
Bucket cor 3 set
Concrete pump 1 unit
Genset 1 unit
Forklift 1 unit
Teodolit 1 set
Topcon 1 bh
Waterpass 40 unit
Siku 40 unit
LAPORAN HARIAN PEKERJAAN, TENAGA BAHAN DAN ALAT
PT. Satyagraha Dinamika Unggul
PROYEK HOLLAND VILLAGE
PT. PROSYS BANGUN PERSADA Jl. Letjen Suprapto , Cempaka Putih jakarta Pusat.
Kode Proyek: REMAINING
PR2002HLV DATE : Monday, September 21, 2020 DAYS :
Meteran 40 unit
Gegep 20 unit
Mixer Acian 16 unit
Bor 20 unit
Gerinda 10 unit
Gergaji Hebel 40 unit
Bor Duduk 2 unit
Mesin Coring 2 unit
Trafo Las 4 set
Katingwel 1 unit
Bor Beton 5 unit
Gerinda Tangan 10 unit MATERIAL (In)
Kabel Power 8 roll FAÇADE MEP
Mesin Ciping 4 unit
Bor Tangan 12 unit
Mesin
PompaSenal 2 set
dewatering
Pompa sumpit 4 unit
8 unit
Buldozer 0 unit
Excavator Galian 0 unit
Gondola 10 unit
Drill 2 unit
Banding Conduit 6 set
Note (overtime / problem / event) : WEATHER

Night Time
Day Time C C

SAFETY
Safe manhours Accumulative (jam) LTI & Fatality Note: CL : CLEAR; C : CLOUDY ; R : RAIN; HR : HEAVY RAIN
Work Affected : Duration
Affected :

DILAPORKAN OLEH : MENGETAHUI :


PT. PROSYS BANGUN
PERUSAHAAN PERSADA PT. Satyagraha Dinamika Unggul
NAMA Suseno Basuki AdiSubhagyo S.
JABATAN Project Manager
TANGGAL ### TTD. TTD.