PBH Phase 2 LTB: Discussion on terms of reference & Pre-Q

Lawas -9 nos of bridges

Limbang-18 nos of bridges

Miri – to check

LPC01 - Miri

1. HOP - To check on the Woodville contract & scope. To confirm with MIPD
2. HOP - Scope & Inventory for LTB need to check at site.
3. Mr Lau mentioned do we need to upgrade the roundabout.
4. HOP – length for Miri LTB Scope to check on the interchange due to the Woodville asean
bridge decision by MIPD (to maintain under state. Reason that the state still want to collect
toll from Brunei)
5. Hjh Rose – to mentioned the numbers of “simpang sedia ada” in the scoping of LTB Miri
6. To put note for definition of LPC??
7. TMP & EIA to add in the scope

TOR for LPC – Miri

1.0 Item 2.0 ……“nearly 1 million users” to check with immigration on the users before pandemic
2.0 Item 2.1. to check on the statement connect to sabah. Should be connect to brunei.
Statement follow phase 1 – upgrading
3.0 Item 2.2.1 this statement can link to 2.1.
4.0 Item 3.1 – to suit phase 1 pan borneo. Current statement still following SSLR1.
5.0 Item 3.2 – to add to cut short travel time
6.0 Item 4.2.1 – Latest ATJ
7.0 For road lighting, to light up on the whole stretch due to near border
8.0 To check on the phase 1 contract.
9.0 Item 4.2.17 - To check Penarafan Hijau
10.0 Item 4.2.28 – to check or if not required to delete.
11.0 Item 4.2.31 – to check lay-bys & bus lay-bys
12.0 Item 4.2.32 – to add ERT
13.0 Item 4.2.22 - To check on the relocation works latest circular
14.0 Item 5.1.14 (d) - 20 years (confirmed by Mr Lau Road Branch)
15.0 Item 5.1.33 (ii) – to check with B&W for design specs
Pre-Q – Items:-