Escenario 1 - CC Sistema Viejo

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

Project: PROPUESTA DE GENERACION

ETAP Page: 1
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: DB1 MOTORES

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV ( 0.480 kV)


= 100.00 % of base kV ( 0.480 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DB1 MOTORES Total 0.00 15.872 0.00 90.08 87.57 20.589 20.589 1.20E+002 7.48E+002 2.26E+001 2.41E+002

DB1 TRANSF DB1 MOTORES 24.72 12.305 60.04 99.74 56.81 17.513 20.589 * 1.53E+002 9.65E+002 2.26E+001 2.41E+002

Mtr91 DB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.342 0.000 4.96E+003 2.99E+004

Mtr92 DB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.342 0.000 4.96E+003 2.99E+004

Mtr93 DB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.342 0.000 4.96E+003 2.99E+004

Mtr94 DB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.342 0.000 4.96E+003 2.99E+004

Mtr95 DB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.342 0.000 4.96E+003 2.99E+004

Mtr96 DB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.342 0.000 4.96E+003 2.99E+004

Mtr97 DB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.342 0.000 4.96E+003 2.99E+004

Mtr98 DB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.342 0.000 4.96E+003 2.99E+004

Mtr99 DB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.342 0.000 4.96E+003 2.99E+004

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 2
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: DB1 TRANSF

Prefault voltage = 34.500 kV = 100.00 % of nominal bus kV ( 34.500 kV)


= 100.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DB1 TRANSF Total 0.00 0.274 0.00 114.29 115.30 0.204 0.204 1.06E+002 6.02E+002 2.49E+002 1.21E+003

DB1 MOTORES DB1 TRANSF 6.69 0.046 68.32 68.08 99.83 0.023 0.000 5.74E+002 3.57E+003

TERNA 2.B Bus31 4.75 0.227 3.80 114.22 115.08 0.181 0.204 1.30E+002 7.25E+002 2.49E+002 1.21E+003

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 3
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: DB2 MOTORES

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV ( 0.480 kV)


= 100.00 % of base kV ( 0.480 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DB2 MOTORES Total 0.00 16.639 0.00 90.28 87.78 21.441 21.441 1.12E+002 7.14E+002 2.26E+001 2.41E+002

DB2 TRANSF DB2 MOTORES 23.87 11.883 59.81 99.74 56.77 17.367 21.441 * 1.54E+002 1.00E+003 2.26E+001 2.41E+002

Mtr37 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

Mtr38 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

Mtr39 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

Mtr40 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

Mtr41 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

Mtr42 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

Mtr43 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

Mtr62 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

Mtr63 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

Mtr64 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

Mtr65 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

Mtr66 DB2 MOTORES 104.35 0.396 104.35 104.35 104.35 0.340 0.000 4.96E+003 2.99E+004

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 4
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: DB2 TRANSF

Prefault voltage = 34.500 kV = 100.00 % of nominal bus kV ( 34.500 kV)


= 100.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DB2 TRANSF Total 0.00 0.277 0.00 114.37 115.54 0.207 0.207 1.01E+002 5.95E+002 2.43E+002 1.20E+003

DB2 MOTORES DB2 TRANSF 8.72 0.060 69.00 68.77 99.83 0.030 0.000 4.36E+002 2.74E+003

TERNA 2.B Bus18 3.19 0.217 2.60 114.30 115.34 0.177 0.207 1.31E+002 7.60E+002 2.43E+002 1.20E+003

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 5
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: DC1 MOTORES

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV ( 0.480 kV)


= 100.00 % of base kV ( 0.480 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DC1 MOTORES Total 0.00 14.171 0.00 89.40 87.37 18.659 18.659 1.26E+002 8.39E+002 2.26E+001 2.41E+002

DC1 TRANSF DC1 MOTORES 28.47 14.171 61.00 99.74 57.98 18.659 18.659 * 1.26E+002 8.39E+002 2.26E+001 2.41E+002

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 6
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: DC1 TRANSF

Prefault voltage = 34.500 kV = 100.00 % of nominal bus kV ( 34.500 kV)


= 100.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DC1 TRANSF Total 0.00 0.275 0.00 114.22 115.10 0.206 0.206 1.04E+002 5.99E+002 2.40E+002 1.20E+003

DC1 MOTORES DC1 TRANSF 0.00 0.000 66.46 65.95 99.81 0.000 0.000

TERNA 2.B Bus35 3.11 0.275 2.33 114.22 115.10 0.206 0.206 1.04E+002 5.99E+002 2.40E+002 1.20E+003

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 7
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: EB1 MOTORES

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV ( 0.480 kV)


= 100.00 % of base kV ( 0.480 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

EB1 MOTORES Total 0.00 19.718 0.00 91.04 88.66 24.765 24.765 8.80E+001 6.04E+002 2.26E+001 2.41E+002

EB1 TRANSF EB1 MOTORES 27.68 13.775 61.89 99.67 59.26 19.805 24.765 * 1.19E+002 8.65E+002 2.26E+001 2.41E+002

Mtr1 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr3 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr4 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr5 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr6 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr7 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr14 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr15 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr16 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr17 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr18 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr19 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr20 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr21 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

Mtr22 EB1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.331 0.000 4.96E+003 2.99E+004

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 8
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: EB1 TRANSF

Prefault voltage = 34.500 kV = 100.00 % of nominal bus kV ( 34.500 kV)


= 100.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

EB1 TRANSF Total 0.00 0.339 0.00 107.32 108.70 0.290 0.290 7.56E+001 4.88E+002 1.42E+002 7.36E+002

EB1 MOTORES EB1 TRANSF 10.67 0.074 65.72 65.57 99.74 0.042 0.000 3.53E+002 2.24E+003

Bus8 Bus15 2.39 0.265 2.24 107.28 108.53 0.248 0.290 9.61E+001 6.24E+002 1.42E+002 7.36E+002

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 9
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: GG1 MOTORES

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV ( 0.480 kV)


= 100.00 % of base kV ( 0.480 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GG1 MOTORES Total 0.00 17.579 0.00 91.01 87.54 22.476 22.476 1.22E+002 6.73E+002 2.26E+001 2.41E+002

GG1 TRANSF GG1 MOTORES 25.77 12.824 61.52 99.74 56.98 18.435 22.476 * 1.72E+002 9.22E+002 2.26E+001 2.41E+002

Mtr44 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

Mtr45 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

Mtr46 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

Mtr47 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

Mtr48 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

Mtr49 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

Mtr50 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

Mtr51 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

Mtr52 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

Mtr53 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

Mtr54 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

Mtr55 GG1 MOTORES 104.35 0.396 104.35 104.35 104.35 0.337 0.000 4.96E+003 2.99E+004

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 10
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: GG1 TRANSF

Prefault voltage = 34.500 kV = 100.00 % of nominal bus kV ( 34.500 kV)


= 100.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GG1 TRANSF Total 0.00 0.300 0.00 107.46 108.83 0.256 0.256 1.13E+002 5.46E+002 2.02E+002 8.25E+002

GG1 MOTORES GG1 TRANSF 8.72 0.060 65.22 64.97 99.80 0.034 0.000 4.36E+002 2.74E+003

Bus8 Bus22 17.62 0.240 16.31 107.17 107.72 0.222 0.256 1.50E+002 6.81E+002 2.02E+002 8.25E+002

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 11
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: POWER HOUSE

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV ( 0.480 kV)


= 100.00 % of base kV ( 0.480 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

POWER HOUSE Total 0.00 41.308 0.00 90.88 91.51 49.638 49.638 2.58E+001 2.90E+002 2.19E+001 1.53E+002

TERNA 1.A POWER HOUSE 15.60 7.035 57.59 98.82 57.07 5.536 0.000 2.91E+002 1.68E+003

TERNA 2.A POWER HOUSE 12.18 5.495 56.36 98.78 55.98 4.324 0.000 3.77E+002 2.16E+003

Gen1 POWER HOUSE 100.00 14.420 100.00 100.00 100.00 19.902 24.819 4.38E+001 8.33E+002 4.38E+001 3.07E+002

Gen2 POWER HOUSE 100.00 14.420 100.00 100.00 100.00 19.902 24.819 4.38E+001 8.33E+002 4.38E+001 3.07E+002

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 12
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: TERNA 1.A

Prefault voltage = 34.500 kV = 100.00 % of nominal bus kV ( 34.500 kV)


= 100.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TERNA 1.A Total 0.00 0.387 0.00 93.19 93.04 0.447 0.447 5.34E+001 4.29E+002 3.72E+001 2.64E+002

Bus8 TERNA 1.A 11.87 0.116 9.05 94.78 95.21 0.088 0.000 2.53E+002 1.42E+003

POWER HOUSE TERNA 1.A 43.22 0.271 70.29 69.79 99.25 0.358 0.447 * 6.24E+001 6.14E+002 3.72E+001 2.64E+002

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 13
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: TERNA 1.B

Prefault voltage = 34.500 kV = 100.00 % of nominal bus kV ( 34.500 kV)


= 100.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TERNA 1.B Total 0.00 0.255 0.00 112.16 112.67 0.200 0.200 1.13E+002 6.47E+002 2.30E+002 1.18E+003

Bus30 TERNA 1.B 0.00 0.000 0.00 112.16 112.67 0.000 0.000

Bus19 TERNA 1.B 0.00 0.000 0.00 112.16 112.67 0.000 0.000

Bus34 TERNA 1.B 0.00 0.000 0.00 112.16 112.67 0.000 0.000

Bus8 TERNA 1.B 26.07 0.255 32.29 104.91 105.55 0.200 0.200 1.13E+002 6.47E+002 2.30E+002 1.18E+003

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 14
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: TERNA 2.A

Prefault voltage = 34.500 kV = 100.00 % of nominal bus kV ( 34.500 kV)


= 100.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TERNA 2.A Total 0.00 0.365 0.00 92.54 92.48 0.427 0.427 5.57E+001 4.55E+002 3.72E+001 2.64E+002

Bus7 TERNA 2.A 8.91 0.087 6.89 93.70 94.06 0.067 0.000 3.40E+002 1.89E+003

POWER HOUSE TERNA 2.A 44.30 0.278 70.42 69.95 99.26 0.360 0.427 * 6.26E+001 5.99E+002 3.72E+001 2.64E+002

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: PROPUESTA DE GENERACION
ETAP Page: 15
19.0.1C
Location: JUNIN 6 Date: 05-15-2022
Contract: SN:
Engineer: ENYERBER GUERRA Revision: Base
Study Case: CASO 1 CON
Filename: JUNIN6_PETROMIRANDA Config.: Normal

Fault at bus: TERNA 2.B

Prefault voltage = 34.500 kV = 100.00 % of nominal bus kV ( 34.500 kV)


= 100.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TERNA 2.B Total 0.00 0.283 0.00 114.39 115.65 0.211 0.211 9.33E+001 5.83E+002 2.30E+002 1.18E+003

Bus31 TERNA 2.B 0.96 0.046 0.47 114.47 115.87 0.023 0.000 5.93E+002 3.60E+003

Bus18 TERNA 2.B 0.88 0.060 0.44 114.46 115.85 0.030 0.000 4.50E+002 2.76E+003

Bus35 TERNA 2.B 0.00 0.000 0.00 114.39 115.65 0.000 0.000

Bus7 TERNA 2.B 18.18 0.178 28.74 105.10 106.10 0.159 0.211 1.47E+002 9.31E+002 2.30E+002 1.18E+003

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

You might also like