Royal HaskoningDHV

presentation
HSE Consultancy Services
Offshore Oil & Gas

December 2016
Our Profile
Independent international engineering and project management consultancy

Consultants, engineers, project managers, designers, environmental and


technical professionals

Expertise and experience of more than 6 000 colleagues in over 150


countries

Top 50 engineering companies worldwide

Turnover approx. € 650 million

Leadership in sustainability and innovation

Combining global expertise with local knowledge to deliver a multidisciplinary


range of consultancy services for the entire living environment

2 Enhancing Society Together | 2016


Where we are in the world
Consultancy, Engineering &
Project Management

Workforce of over
6,000 in more than
150 countries

One of the top independently


owned engineering companies

3 Enhancing Society Together | 2016


Our Organisation
Aviation

Buildings

Energy

Industry

Infrastructure

Maritime

Mining

Rural Development

Urban Development

Water

4 Enhancing Society Together | 2016


Key Figures

5 Enhancing Society Together | 2016


Our HSE services for oil & gas industry
Policy and strategy Compliance
Development of Environment & Safety Policy Environmental impact assessment
Stakeholder Analysis Environmental permitting
Due Diligence Safety Report, QRA
Carbon Capture and Storage Fire Report
REACH and GHS Emission studies
Corporate Social Responsibility IPPC studies
Carbon Trading
Policy on the Prevention of Major Accidents HSE Engineering & Studies
Safety Cases & RIGG Documents
Organization and processes HAZID and HAZOP
HSE Management Systems ENVID
Interim HSE Management Fire Protection Analyses
Training and Coaching QRA, IRPA
Environmental and Sustainability Reporting Technical Safety Review
Process Safety Management Process Hazard Analysis
Hazard Consequence Modeling (including CFD)
Culture Asset integrity studies (SIL, IPF and LOPA)
SHWE growth model (based on Hearts and Minds) FME(C)A studies
Safety culture scan BowTie Risk Analyses
6
Incident analysis (TRIPOD)
Enhancing Society Together | 2016
Escape, Evacuation & Rescue Analysis (EERA)
Management system and compliance audits
Safety & Environmental support for
new offshore platforms (NL)

Description
Development of new offshore production platforms
Operational support with respect to safety and environment

Royal HaskoningDHV involvement


Environmental Impact Assessments and Environmental
Permit Applications
Environmental Studies
Engineering studies: HAZID & HAZOP reviews, SIL
Assessments, Vent-Plume Studies
Safety Studies: Fire & Explosion Hazard Assessments,
Escape, Evacuation & Rescue Assessments, Ship Collision
Assessments, Quantitative Risk Assessments (QRA)
CFD Analysis: Explosion Overpressure Assessments, Smoke
Flow & Dispersion Analysis
Development and preparation of Health & Safety Documents

Timeline
2004 - present

7 Enhancing Society Together | 2016


TEPNL operations (NL)
Description
HSE Consultancy Services for Total E&P
Nederland in The Netherlands

Royal HaskoningDHV involvement


Annual Environmental Reports
Chemical Risk Reduction Plan, Chemical
Permitting, REACH support
RI&E of all 20 platforms
HAZOP’s
Occupational Health & Safety Plans
Fire fighting & rescue plans for all 4
production platforms
Offshore Contingency Plans (OCP)
CO2 and NOx monitoring plans
Environmental management system

Timeline
< 2000 - present

8 Enhancing Society Together | 2016


Borwin Alpha project

Description
For Tennet the transformer-Alpha platform
Borwin realized by Heerema and ABB. The
transmission capacity is 400 MW. This HVDC
platform was the first of its kind to alternating
current (AC) of the wind turbines to transform
high voltage direct current (HVDC) power.

Royal HaskoningDHV involvement


Safety Case including all supporting studies

Timeline
2011

9 Enhancing Society Together | 2016


Environmental Impact Assessment
& Permitting support (NL)

Description
License to operate new developments
Q10 development offshore IJmuiden NL /
onshore treatment
Terschelling development
Hemrik / Donkerbroek Friesland

Royal HaskoningDHV involvement


EIA
Permitting and authorities affairs
Studies into nature, safety and environment

Timeline
2010 - present

10 Enhancing Society Together | 2016


Abandonment & Removal
K12-A Platform (NL)

Description
HSE Support for Abandonment and Removal of the
K12-A offshore platform

Royal HaskoningDHV involvement


Health & Safety Document Abandonment &
Removal
Audit Waste Management Yard
Declaration Independent Expert Removal Plan

Timeline
2006

11 Enhancing Society Together | 2016


Leviathan development
(Israel)

Description
Development of major deep-water gas field
535 BCM
Concept selection of production and treatment

Royal HaskoningDHV involvement


Assistance in EIA
HAZID / ENVID
BAT Assessment
Environmental Management and Monitoring plan
Reliability and availability assessment

Timeline
2012 - 2014

12 Enhancing Society Together | 2016


Sakhalin II (Russia)
Description
Construction of a second production platform
at Piltun-Astokhskoye field
New platform on the Lunskoye field
Onshore processing facility for gas / crude oil
Two 800 km of onshore oil and gas pipelines
Oil export facility - year-round operation
LNG plant
Island infrastructure upgrades.

Royal HaskoningDHV involvement


HSE Contractor Management;; Environmental Impact
Liaison with lenders; Assessments;
Legal Information System (LIS); Environmental
Environmental Monitoring; Monitoring;
Stellar Sea Eagle monitoring, River crossings;
Western Grey Whale Program Waste Management;
and Biodiversity Action Plan; HSE training;
Offshore pipeline routing; Offshore pipeline routing;
Hospital Facilities Upgrade; Safety Ranger Project.

Timeline: 2003 - 2012

13 Enhancing Society Together | 2016


Jacky Field Development (UK)

Description
Exploration, development and production assets
in the UK sector of the North Sea

Royal HaskoningDHV involvement


HSE support for basic and detailed
engineering phase of project.
Safety Design Philosophy
HSE plan
HAZOP / HAZID
SIL Classification
FERA , EERA
Dropped Object Study,
COSHH Report
ALARP Report
Development of Safety Critical Elements
and Performance Standards

Timeline
2009

14 Enhancing Society Together | 2016


L7-A Platform Abandonment
Hibernation Phase (NL)

Description
HSE Support during the preparation phase
for Hibernation of the L7-A platform

Royal HaskoningDHV involvement


Hazard Identification review (HAZID)
Development of Safety Concept

Timeline
2008-2009

15 Enhancing Society Together | 2016


Oseberg Unmanned Wellhead
Platform (Norway)
Description
Oseberg Unmanned Wellhead Platform

Royal HaskoningDHV involvement


HSE support during
Conceptual Design
FEED
EPC

Services include:
DAL Specification
Hazard Identification:
Working Environment Health Risk
HAZID, ENVID, HAZOP
Assessment (WEHRA)
Environmental Report
Failure Mode Effects Analysis
BAT assessment
(FMEA)
SIL Classification (LOPA)
Fire Load Response Study
Timeline
2015-2016

16 Enhancing Society Together | 2016


Decommissioning of three
offshore satellite platforms (NL)

Description
HSE and Project Management Support during the
planning and preparation phases for decommissioning
of three offshore satellite platforms

Royal HaskoningDHV involvement


Risk & Opportunity Workshops (pre-phase)
Consequence Analysis Workshops and update of
Health & Safety Documents with respect to
platform modifications
Review of Safety & Environmental Critical
Elements for modifications
Pre-Job HAZIDs for Rig intervention and pipeline
cleaning

Timeline
2015-present

17 Enhancing Society Together | 2016


Development and update of
Safety Cases in The Netherlands
Description
Royal HaskoningDHV has prepared and
updated numerous Safety Cases (Health &
Safety Documents) for various offshore
operators in The Netherland and UK. This
comprises Safety Cases for Design, Operation,
Abandonment and Simultaneous Activities.

Royal HaskoningDHV involvement


Safety Case Studies such as:
Dropped Objects study
Ship Collision study
Fire & Explosion Hazard Assessment
Smoke & Gas Ingress Assessment
Evacuation Escape & Rescue Assessment
Rescue at Sea study
QRA
Etc.
Safety Case Documents
Bow-tie development

Timeline
2000-present

18 Enhancing Society Together | 2016


Conwy platform (UK)
Description
Conwy field situated in East Irish Sea
Owned and operated by EOG
Resources
Drilled in 2009; 20 Mmbo capacity
Three new production wells and
several water injection wells to be
connected to new platform

Royal HaskoningDHV involvement


HSE support general
HAZID, HAZOP
SIL assessment
FERA, EERA, ASSA
ALARP demonstration
Explosion modeling
Safety Case development documents

Timeline
2012

19 Enhancing Society Together | 2016


Shtokman gas pipelines (Russia)

Description
Shtokman gas pipelines

Royal HaskoningDHV involvement


As part of the pre-FEED study, execution
of a high level comparative Risk
Assessment of the on- and offshore
facilities and the different options. The
primary focus was on safety for people
and the effect of the different options on
the risk level.

Timeline
2010

20 Enhancing Society Together | 2016


Dissoni project (Cameroon)
Description
HSE Engineering for the Dissoni project of
Cameroon

Royal HaskoningDHV involvement


General HSE support and several
studies
• HAZOP
• HAZID
• SIL classification and verification
Update of the safety studies for the basic
engineering
• Dropped objects study
• Fire & Explosion Risk Assessment
• Flare dispersion and radiation
• Noise study

Timeline
2010 - 2012

21 Enhancing Society Together | 2016


Self-installing platform F3-FA (NL)
Description
Self-installing platform (SIP) in the
North Sea in block F3FA
Gas production, treatment and
compression for export
SIP concept at this size is new to North
Sea
The platform was designed in
compliance with both Dutch and UK
regulations

Royal HaskoningDHV involvement


HSE advisor and consultant during the
entire engineering period
Safety and Health document
Design Review on H&S aspects
HAZID and HAZOP studies

Timeline
2008

22 Enhancing Society Together | 2016