CONCRETE MIXER INSPECTION

Client :
Project :
Contract No :

Condition
NO Description NO. Description
Good Bad N/A

Proper Equipment Standard


1 FUEL TANK - Muffler / Rain Cap
- Fuel Tank / Drain / Cap
- Fuel Filter
- Injection Pump
- Fuel Perssure Gauge
- Engine Mounting
2 LUBRICANT SYSTEM
- Oil Pump
- Cracnkshaft Seal
- Oil Cooler
- Oil Pressure Gauge
3 COOLING SYSTEM
- Radiator / Cap
- Hose Upper / Lower
- Water Pump
- Water Temperatur Gauge
4 INDUCTION SYSTEM
- Intake / Exhaust Manifold
- Turbo Charger
- Air Cleaner
Safety standard
1 Emergency Shut Down 8
2 Exhaust Insulation 9
3 Spark Arrestor 10
4 Secondary Containment
5 Moving Part Protection
6
7
Others
1 Travel System 4
2 5
3 6
Recommendation :

Inspected by,

(..................................)
Apabila ada Penggantian/Perbaikan harap Dicatat di Log Book Equipment Dept.