2 Healthcare Standards
4 Architectures
Link 150
Communication
gateway, Web Server
Modbus RS485
Magelis
O.T. Room display HRP
IFL12H
Insulation fault Locator
TT system means
T T I
Transformer Neutral is grounded (T)
Loads shielding are grounded (T)
TN system means
Transformer Neutral is grounded (T)
Loads shielding are to Neutral, (N)
3Ph 3Ph+N
IT system means
Transformer Neutral is Isolated from ground (I)
Loads shielding are grounded (T)
Load Load Load
T N T
Vigirex Vigilohm
Why an ungrounded network ? TT, TN, grounding arrangement
At 1st ground fault,
the current loop from the transformer, to the load,
then to the ground, back to the transformer
. The RCCB opens : Continuity of service
. Electrical shock is possible : Safety √
But if Continuity of Service & Safety remains even in case of fault, How do I know the issue ?
Compliant to Detection
. Low Voltage systems
. L versions dedicated to 24-48VDC power supplies
. H versions dedicated to Healthcare applications
. T versions dedicated to harsh environment, conformal coated
Localization
2 Healthcare Standards
4 Architectures
Anaesthetic room
Group 2: Medical location where medical electrical
equipment have to be used into the body. Isolated ground Operating theatre
system is mandatory
Operating preparation room
Group 1: Medical location where medical electrical have to Operating plaster room
be used as follows: externally or invasively to any part of the
body. A limited residual 30mA current device is mandatory Operating recovery room
Electric room
IT transformer +Vigilohm
Operating Theaters
HRP or Magelis OTD in each operating theater
Confidential Property of Schneider Electric 13
Healthcare Installation Standards
According to 2018 standard evolutions Maintenance team
Supervision system: PME, BMS
Electric room
is moving closer to
the O.T. room.
Max cable length
Operating Theaters <25m
IT Insulation Smart Panel
moves close/inside the O.T. room
Includes
. Ins transformer
. IM15H or IM20H
. HRP or Magelis
. IFL12H
. other
144 kΩ
2 Healthcare Standards
4 Architectures
24
Confidential Property of Schneider Electric | Page 24
Vigilohm, a complete solution for medical IT premises
EcoStruxure Power Monitoring Expert
EcoStruxure Building Operations
Monitoring and control
Monitoring & SCADA system
Ethernet
Communication Link 150
Modbus protocol
Gateway
OTD HRP
Operating Theater Display
Modbus
IT system local status & testing
IM20-H
Insulation Monitoring Devices
Monitoring of the global network insulation IM10-H & IM15H
Toroids Transformers
Confidential Property of Schneider Electric Used along with the Fault Single phase 25
Locators Three phase
Medical transformer
Single phase Three phase
Secondary voltage = 250 Vac max, acc to IEC Secondary voltage = 250 Vac max, acc to IEC
380 Vac on secondary of transformer is NOT allowed Output voltage is 230 Vac between phases. Neutral is not
distributed
Key advantages / drawbacks during operations Key advantages / drawbacks during operations
. Adv: Full power of the transformer available on the . Drw: Full power of the transformer is distributed over the 3
same 2 lines lines. 3,3 kVA per line on a 10kVA transformer
. Adv: The medical staff can plug equipment anywhere . Drw: The medical staff might plug too many equipment on the
same 2 lines, which lead to
. unbalanced power distribution
. potential TR overload on these 2 lines
. Potential undervoltage on these 2 lines
Confidential Property of Schneider Electric . Equipment mal-function due to non-availability of the 26
necessary power during the operation
Medical transformer Europ North Africa
Overload
Overload
Monitors the electrical network Injection
Overload
Monitors up to 12 feeders, individually Injection
Buzzer Acknowledgment
36
36
Insulation Monitors
IM10-H IM15-H IM20-H
Transformer monitoring:
CT
IM15-H / IM20-H
Only IM20H
Comments
The standard do not request any test on the transformer
Prevention of false alarm
F LED
IFL is power on & Detected toroids: Press to exit Device displays
detecting toroids 4-10-11-12 commisioning mode Summary screen
Display
MC/MCT
F LED
H LED
Failsafe Relay
Standard Relay
Network insulation is Active alarm on Active alarm on Fault eliminated
normal.No alarm on channel 4. Push ACK Channel 4 is No alarm state
any channel button acknowledged
Confidential Property of Schneider Electric 55
IFL12H Other Operation LED Status
2 Healthcare Standards
4 Architectures
59
Confidential Property of Schneider Electric | Page 59
Entry Local Monitoring
Value Propositions
60
Entry Local Monitoring
Value Propositions
61
Advanced Local Monitoring
Value Propositions
Modbus RS485
62
Advanced Local Monitoring
Value Propositions
Modbus RS485
4/ « Local Configuration » : IMD & IFL HMI
63
Remote Monitoring
Value Propositions Electrical Maintenance
Use-Case
1/ « Centralized real time Monitoring and Event Notification »
of all connected rooms
3/ « Remote configuration »
- Configuration of IFL/IMD device parameter
Modbus RS485
4/ Report Generation
- Generating reports on Data History, Event history,
Modbus RS485
Last User triggered self-test