How To Pumping Bulk: in Time Bulk Nearly Finish
How To Pumping Bulk: in Time Bulk Nearly Finish
If tank nearly finish pressure become fast to coming down 15 psi/10 psi and check on rig side ventilation
become straight fast.
In time bulk nearly finish
Close discharging valve control and open air filling
Close purging valve
Open and close filling valve for make bulk going down ( min 2 time )
Open purging valve until full
Open discharging valve control for discharging bulk( cement )
Reduce purging valve ( close and open )
If ready finish close disc valve control and filling valve control, open purging valve control for cleaning the
line
Close air filing valve from main comp and disengage compressor and stop
Close all valve ( purging, air filling for control valve, discharging valve )
Change tank
Note:
Before discharging bulk (cement) make sure if valve already open and full open the purging line (blow) and
look air vent in rig side if coming air, line is ready for start discharging.
Discharge time for bulk :
Bentonite 20 m3 every 30 min
Cement 20 m3 every 45 min – 1 hour
Barite 20 m3 every 1 hour