Professional Documents
Culture Documents
Rekapitulasi Harga: Pekerjaan Baja Gudang
Rekapitulasi Harga: Pekerjaan Baja Gudang
Rekapitulasi Harga: Pekerjaan Baja Gudang
L-9-E Raya By Pass Bandara Baru 17 Pabean, Juanda. SIDOARJO - East Java - INDONESIA
Telp.+6231-70154-999/ Fax. +6231-867-0589
Jl.Teladan No. 24, Kedung Badak Baru, Bogor, West Java, Indonesia
Telp.+62251-8664 378; Fax.: +6231-867-0589
E-mail : levelnineeng@gmail.com
Prepared by : Andreas Bambang Soewidijo
Direct Phone : +6281-331-616363
REKAPITULASI HARGA
TANGGAL : 19 APRIL, 2016
PROYEK : PEKERJAAN KONTRUKSI BAJA NAV KARAOKE
OWNER :
LOKASI : KETINTANG - SURABAYA
PEKERJAAN KONSTRUKSI BAJA BANGUNAN 3 LANTAI - ATAP KR5.750.40
GAMBAR SESUAI discuss at Kepuh Permai at 12:00 - April 15, 2016
III. PEKERJAAN CIVIL - BOR PILE - PILE CAP - SLOOF - PEDESTAL 376,894,200
BAMBANG SOEWIDIJO
PRINCIPAL
0813 3161 6363
LEVELNINE ENGINEERING
1 Atap Zincallume KR5.750.40 m² 10.10 18.00 1.00 1.00 2.00 363.60 90,000.00 32,724,000.00
ex. Kepuh Kencana Arum
2 Nok Zincallume 0.40MM m' 18.00 1.00 1.00 1.00 1.00 18.00 90,000.00 1,620,000.00
ex. Kepuh Kencana Arum
3 Truss C80.30.75/ C80.30.100/ R30.45 m² 9.53 18.00 1.00 1.00 1.00 171.54 175,000.00
ex. Kepuh Kencana Arum
4 Talang tegak Ø 4" D m' 12.00 1.00 2.00 4.00 96.00 65,000.00 6,240,000.00
-ex. MASPION
5 Jorongan talang Ø 4" bh 1.00 1.00 2.00 4.00 8.00 25,000.00 200,000.00
- ex. Lokal
6 Talang datar galvalum 0,40MM m' 18.00 1.00 1.00 2.00 36.00 175,000.00 6,300,000.00
- ex. KEPUH KENCANA ARUM
7 Rangka talang L 40 40 3MM m' 18.00 2.76 1.00 2.00 99.36 75,000.00 7,452,000.00
- ex. SNI
54,536,000.00 25,348.84
Catatan :
- EXCLUDED CIVIL WORKS
- ECLUDED STROUSSE WORKS
- TIME FABRICATION & INSTALLATION STEEL CONSTRUCTION 60 DAYS
- Water & Electric Supply by owner
Bambang Soewidijo
Principal
0813-3161-6363
Levelnine Engineering
NO. URAIAN PEKERJAAN SAT.
1 Pembersihan m²
- lokal
2 Bouwplank m²
- lokal
3 Urugan Tanah( padat w/ doser ) m³
- lokal
4 Strousse - 28 Nos dia 400x17000 m'
- Bb dia 12-10/ dia 8/ K225
5 Pondasi Tapak - 4 Nos 2000x2000x400 m³
- K225/ Bb dia 19/ dia 12-100
6 Pondasi Tapak - 8 Nos 800x2000x400 m³
- K225/ Bb dia 19/ dia 12-100
7 Pedestal - 12 Nos 500x300x500 m³
- K225
8 Batu kali m³
- lokal
9 Sloof 200x400 m'
- K225/ dia 13-6/ dia 8-150
TOTAL PEKERJAAN
Catatan :
- EXCLUDED CIVIL WORKS
- ECLUDED STROUSSE WORKS
- TIME FABRICATION & INSTALLATION STEEL CONSTRUCTION 30 DAYS
- Water & Electric Supply by owner
Bambang Soewidijo
Principal
0813-3161-6363
Levelnine Engineering
Jml/ttk Jml.
P L T W /plong Yg sama VOLUME
(m') (m') (m') (Kg/m') @ (N)
2,500 399,000
60,000 5,304,000
95,000 -
473,000 270,177,600
4,500,000 34,560,000
4,500,000 27,648,000
4,500,000 4,860,000
725,000 -
320,000 33,945,600
376,894,200
376,894,200 -
Rupiahs US Dollar KG