Kurva - S Joglo
Kurva - S Joglo
Kurva - S Joglo
Proyek :
Lokasi :
Bagian :
A PONDASI FOOTPLATE
1 Galian Foot Plate
2 Pemadatan Tanah
3 Pasir Urug t=5cm
4 Lantai Kerja t=5cm
5 Volume Beton:
a Foot Plate
b Pedestal
c T-Beam 20/30
FORM : BT- 001
No. Lbr :
Jml.Lbr :
Terhitung Pek.
Sat
m3
m2
m3
m3
m3
m3
m3
ANALISA VOLUME PEKERJAAN
Proyek :
Lokasi :
Bagian :
No. Lbr :
Jml.Lbr :
Terhitung Pek.
Sat
m3
m'
ANALISA VOLUME PEKERJAAN
Proyek :
Lokasi :
Bagian :
92.00
58.50
44.50
19.50
FORM : BT- 001
No. Lbr :
Jml.Lbr :
Terhitung Pek.
Un/L Volume Sat
4.00 m3
2.00 m3
2.34 m3
92.00 m'
58.50 m'
44.50 m'
19.50 m'
ANALISA VOLUME PEKERJAAN
Proyek :
Lokasi :
Bagian :
Plat Lt
Wm M6-150 t= 13cm
Rabat Beton t=20cm
Plastik Membran / Plastik Layer t=0,2mm
Joint Sealent
FORM : BT- 001
No. Lbr :
Jml.Lbr :
Terhitung Pek.
Sat
m3
m3
m2
m'
ANALISA VOLUME PEKERJAAN
Proyek :
Lokasi :
Bagian :
No. Lbr :
Jml.Lbr :
Variabel
Uraian Bagian
L p l t Un/L
No. Lbr :
Jml.Lbr :
Terhitung Pek.
Volume Sat
167.92 m2
85.80 m2
169.00 m2
ANALISA VOLUME PEKERJAAN
Proyek :
Lokasi :
Bagian :
No. Lbr :
Jml.Lbr :
Terhitung Pek.
Sat
m2
m2
m2
ANALISA VOLUME PEKERJAAN
Proyek :
Lokasi :
Bagian :
PLESTERAN + ACIAN
2 Sponengan Kolom
FORM : BT- 001
No. Lbr :
Jml.Lbr :
46.08
3.20 48 153.60
: BT- 001
Terhitung Pek.
Sat
m2
m2
m'
ANALISA VOLUME PEKERJAAN
Proyek :
Lokasi :
Bagian :
No. Lbr :
Jml.Lbr :
Variabel
Uraian Bagian
L p l t Un/L
47.60 116.48
15.20
1.70
52.00
FORM : BT- 001
No. Lbr :
Jml.Lbr :
Terhitung Pek.
Volume Sat
116.48 m2
116.48 m2
15.20 m'
1.70 m'
52.00 m'
Sloof
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn+Alt
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00
kg Besi Ulir Rp 7,000.00 Rp 25,000.00 Rp 32,000.00
m2 Bekisting Sloof Rp 150,000.00
Balok
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00
kg Besi Ulir Rp 7,000.00 Rp 25,000.00 Rp 32,000.00
m2 Bekisting Rp 150,000.00
Kolom STUKUR
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00
kg Besi Ulir Rp 7,000.00 Rp 25,000.00 Rp 32,000.00
m2 Bekisting Rp 150,000.00
Plat
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00
kg Besi Ulir Rp 2,000.00 Rp 9,000.00 Rp 11,000.00
m2 Bekisting Rp 150,000.00
FOOTPLAT
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00
kg Besi Ulir Rp 2,000.00 Rp 9,000.00 Rp 11,000.00
m2 Bekisting Rp 150,000.00
Harga Beton
Harga Terhitung
Rp 1,110,000.00 Beton Tenaga Bahan
Rp - K175 Rp 900,000.00
Rp - K225
Rp 1,110,000.00 K250 Rp 975,000.00
K275 Rp 1,000,000.00
K300 Rp 150,000.00 Rp 1,025,000.00
K325 Rp 1,050,000.00
Harga Terhitung K350 Rp 1,075,000.00
Rp 1,110,000.00
Rp - By Extra untuk Penjagaan Polisi,dll
Rp - 150000
Rp 1,110,000.00
Harga Terhitung
Rp 1,110,000.00
Rp -
Rp -
Rp 1,110,000.00
Harga Terhitung
Rp 1,110,000.00
Rp -
Rp -
Rp 1,110,000.00
Harga Terhitung
Rp 1,110,000.00
Rp -
Rp -
Rp 1,110,000.00
Total
Rp 900,000.00
Rp -
Rp 975,000.00
Rp 1,000,000.00
Rp 1,175,000.00
Rp 1,050,000.00
Rp 1,075,000.00
Analisa Netto Harga Satuan Beton
LANTAI 1
A FootPlat
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn+Alt Harga Terhitung
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00 Rp 1,110,000.00
43.37 kg Besi Ulir Rp 7,000.00 Rp 25,000.00 Rp 32,000.00 Rp 1,387,903.41
0.46 m2 Bekisting Rp 200,000.00 Rp 92,165.90 Bekisting dpt dr hrga penawaran vendor bekisting jogja
Rp 2,590,069.31
B Balok T_Beam
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn+Alt Harga Terhitung
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00 Rp 1,110,000.00
152.39 kg Besi Ulir Rp 7,000.00 Rp 25,000.00 Rp 32,000.00 Rp 4,876,543.79
10.00 m2 Bekisting Rp - Rp - Rp 200,000.00 Rp 2,000,000.00
Rp 7,986,543.79
C Kolom Pedestal
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn+Alt Harga Terhitung
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00 Rp 1,110,000.00
737.21 kg Besi Ulir Rp 7,000.00 Rp 25,000.00 Rp 32,000.00 Rp 23,590,637.04
15.56 m2 Bekisting Rp - Rp - Rp 200,000.00 Rp 3,111,111.11
Rp 27,811,748.15
D Kolom Str K1
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn+Alt Harga Terhitung
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00 Rp 1,110,000.00
173.50 kg Besi Ulir Rp 7,000.00 Rp 25,000.00 Rp 32,000.00 Rp 5,551,869.63
11.11 m2 Bekisting Rp - Rp - Rp 200,000.00 Rp 2,222,222.22
Rp 8,884,091.85
E Balok B1
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn+Alt Harga Terhitung
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00 Rp 1,110,000.00
144.51 kg Besi Ulir Rp 7,000.00 Rp 25,000.00 Rp 32,000.00 Rp 4,624,213.33
8.50 m2 Bekisting Rp - Rp - Rp 200,000.00 Rp 1,700,000.00
Rp 7,434,213.33
F Balok B2
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn+Alt Harga Terhitung
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00 Rp 1,110,000.00
311.15 kg Besi Ulir Rp 7,000.00 Rp 25,000.00 Rp 32,000.00 Rp 9,956,821.33
10.00 m2 Bekisting Rp - Rp - Rp 200,000.00 Rp 2,000,000.00
Rp 13,066,821.33
G Balok B3
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn+Alt Harga Terhitung
1.00 m3 K175 Rp 150,000.00 Rp 960,000.00 Rp 1,110,000.00 Rp 1,110,000.00
176.27 kg Besi Ulir Rp 7,000.00 Rp 25,000.00 Rp 32,000.00 Rp 5,640,659.75
12.22 m2 Bekisting Rp - Rp - Rp 200,000.00 Rp 2,444,444.44
Rp 9,195,104.20
H Wm M6
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn Harga Terhitung
1.00 m3 K175 Rp 150,000.00 Rp 920,000.00 Rp 1,070,000.00 Rp 1,070,000.00
7.69 m2 wiremesh m6 Rp 15,000.00 Rp 30,000.00 Rp 45,000.00 Rp 346,153.85
6.76 m2 Bekisting Rp 45,000.00 Rp 304,200.00
Rp 1,720,353.85
H Rbt Betontebal 8cm
Vol Sat Uraian Tenaga Bahan Harga Teaga+Bhn Harga Terhitung
1.00 m3 K175 Rp 150,000.00 Rp 700,000.00 Rp 850,000.00 Rp 850,000.00
6.76 m2 Bekisting Rp 45,000.00 Rp 304,200.00
Rp 1,154,200.00
ANALISA VOLUME PEKERJAAN FORM : BT- 001
FOOTPLAT IGD
BESI 2 2 2
2 2 2
Besi Tul Pokok Atas 2 D-13 8.200 1.042 8.200 1.000 8.542 kg/spl
Tul Ekstra Atas Kiri 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kanan 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Pokok Bawah 2 D-13 7.000 1.042 7.000 1.000 7.292 kg/spl
Tul Ekstra Tengah 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kiri 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kanan 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Sengkang Tumpuan 150 D-10 0.160 0.260 0.160 0.260 0.100 0.624 0.940 0.150 13.000 7.627 kg/spl
Tul Sengkang Lapangan 150 D-10 0.160 0.260 0.160 0.260 0.100 0.624 0.940 0.150 13.000 7.627 kg/spl
TOTAL BERAT BESI TULANGAN ULIR 152.392 KG
BEKISTING 0.200 0.200 0.200 0.600 3.400 1.000 2.040 m2/spl
10.000 M2
BESI Tul Pokok 8 D-13 17.040 1.040 17.040 1.000 17.722 kg/spl
Tul Sengkang Tumpuan 200 D-10 0.270 0.270 0.270 0.270 0.100 0.617 1.180 0.200 2.000 1.455 kg/spl
Tul Sengkang Lapangan 200 D10 0.270 0.270 0.270 0.270 0.100 0.617 1.180 0.200 1.000 0.728 kg/spl
TOTAL BERAT BESI K1-A 20X40 Besi Ulir 884.649 737.207 kg
BESI Tul Pokok 8 D-13 22.640 1.040 22.640 1.000 23.546 kg/spl
Tul Sengkang Tumpuan 200 D-10 0.270 0.570 0.270 0.570 0.100 0.617 1.780 0.200 4.000 4.391 kg/spl
Tul Sengkang Lapangan 200 D10 0.270 0.570 0.270 0.570 0.100 0.617 1.780 0.200 3.000 3.293 kg/spl
TOTAL BERAT BESI K1-A 20X40 Besi Ulir 208.195 173.496 kg
BESI 3 3 3
3 3 3
Besi Tul Pokok Atas 3 D-13 7.200 1.042 7.200 1.000 7.500 kg/spl
Tul Ekstra Atas Kiri 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kanan 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Pokok Bawah 3 D-13 4.800 1.042 4.800 1.000 5.000 kg/spl
Tul Ekstra Tengah 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kiri 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kanan 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Sengkang Tumpuan 150 D-10 0.210 0.360 0.210 0.360 0.100 0.617 1.240 0.150 6.000 4.588 kg/spl
Tul Sengkang Lapangan 150 D-10 0.210 0.360 0.210 0.360 0.100 0.617 1.240 0.150 6.000 4.588 kg/spl
TOTAL BERAT BESI TULANGAN ULIR 144.507 KG
BESI 5 5 5
4 4 4
Besi Tul Pokok Atas 5 D-16 22.250 1.583 22.250 1.000 35.229 kg/spl
Tul Ekstra Atas Kiri 0 D-16 0.000 1.583 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kanan 0 D-16 0.000 1.583 0.000 1.000 0.000 kg/spl
Tul Pokok Bawah 4 D-16 15.400 1.583 15.400 1.000 24.383 kg/spl
Tul Ekstra Tengah 0 D-16 0.000 1.583 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kiri 0 D-16 0.000 1.583 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kanan 0 D-16 0.000 1.583 0.000 1.000 0.000 kg/spl
Tul Sengkang Tumpuan 150 D-10 0.160 0.260 0.160 0.260 0.100 0.395 0.940 0.150 14.000 5.198 kg/spl
Tul Sengkang Lapangan 150 D-10 0.160 0.260 0.160 0.260 0.100 0.395 0.940 0.150 14.000 5.198 kg/spl
TOTAL BERAT BESI TULANGAN ULIR 311.151 KG
BESI 2 2 2
2 2 2
Besi Tul Pokok Atas 2 D-13 4.400 1.042 4.400 1.000 4.583 kg/spl
Tul Ekstra Atas Kiri 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kanan 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Pokok Bawah 2 D-13 3.200 1.042 3.200 1.000 3.333 kg/spl
Tul Ekstra Tengah 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kiri 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Ekstra Atas Kanan 0 D-13 0.000 1.042 0.000 1.000 0.000 kg/spl
Tul Sengkang Tumpuan 150 D-10 0.110 0.260 0.110 0.260 0.100 0.395 0.840 0.150 6.000 1.991 kg/spl
Tul Sengkang Lapangan 150 D-10 0.110 0.260 0.110 0.260 0.100 0.395 0.840 0.150 6.000 1.991 kg/spl
TOTAL BERAT BESI TULANGAN ULIR 176.271 KG
BEKISTING 0.150 0.200 0.200 0.550 1.500 1.000 0.825 m2/spl
12.222 M2
#NAME? #NAME?
B PEKERJAAN STRUKTUR
C. PEKERJAAN ARSITEKTUR
TOTAL #NAME?
#NAME? #NAME?
PEMBULATAN #NAME?
JUMLAH HARGA SUBTOTAL HARGA Proc
NO URAIAN PEKERJAAN
(Rp) (Rp) Pek
Pekerjaan : Persiapan
Kota : Cilacap
Sat. Agustus September Oktober
No. Uraian Pekerjaan VOL Bobot
Pek. M1 M2 M3 M4 M5 M1 M2 M3 M4 M5 M1 M2
Chart Title
A PRELIMINARY
1 Uitzet ( Pengukuran ) 1.00 ls 0.20% 0.20%
2 Bowplank 60.00 m' 1.79% 1.79%
3 Pek. Pagar Pengaman - m'
4 Gudang Bahan & Material 20.00 m2 5.34% 2.67% 2.67%
5 Pek. Papan Nama Proyek 120 x 90 cm 1.00 bh 0.12% 0.12%
6 Pembersihan Lapangan Awal 169.00 m2 0.34% 0.34%
7 Pembersihan Lapangan Akhir 169.00 m2 0.34% 0.17% 0.17%
8 Listrik Kerja (Penerangan, Mesin, Pompa air) 2.00 bln 0.28% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
9 Keamanan Proyek 2.00 bln 0.41% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%
B STRUKTUR
B.1. PEKERJAAN PONDASI
Pekerjaan Foot Plate
25.47% 5.09% 5.09% 5.09% 5.09% 5.09%
ok
B.2. PEKERJAAN BAJA DAN BETON
Kolom Struktur
1 K2 (HB200x200x8X12) 38.40 m'
15.75% 3.15% 3.15% 3.15% 3.15% 3.15%
Ring Balok
1 WF 150x75x5x7 92.00 m' 6.96% 6.96%
2 WF 200x100x5,5x8 58.50 m' 7.45% 3.72% 3.72%
3 WF 250x125x6x9 44.50 m' 11.77% 5.89% 5.89%
C ARSITEKTURAL
C.2. PEKERJAAN ATAP GENTENG
23.78% 5.94% 5.94% 5.94% 5.94%
REKAP TOTAL 100%
Bobot Total 5.18% 7.82% 8.30% 8.30% 8.30% 8.30% 13.89% 15.61% 11.89% 6.00% 6.17% 0.23%
Bobot Akumulatif 5.18% 13.00% 21.30% 29.60% 37.90% 46.20% 60.09% 75.71% 87.60% 93.60% 99.77% 100.00%
ESTIMASI RENCANA ANGGARAN BIAYA
JOGLO GEREJA CILACAP
Pekerjaan : Struktur
Kota : Cilacap
B STRUKTUR
6 Pasir Urug t=60cm (untuk menaikkan level lantai utama) 60.00 m³ Rp. 309,100.00 Rp. 18,546,000.00 9.86%
ok
Kolom Struktur
ok
Sat. Harga Sat Harga Terhitung Jumlah Proc
No. Uraian Pekerjaan VOL
Pek. Pekerjaan Upah&Bahan Terhitung Pek
Ring Balok
ok
Plat Lantai
ok
Pekerjaan : Arsitektural
Kota : Cilacap
:
Sat. Harga Sat Harga Terhitung Jumlah Proc
No. Uraian Pekerjaan VOL
Pek. Pekerjaan Upah&Bahan Terhitung Pek
C ARSITEKTURAL
4 Tumpukan Bata untuk teras dan trap tangga 69.00 m² Rp. 137,280.40 Rp. 9,472,347.60 11.96%
ok
1 Penutup atap spandek pasir tebal 0.03mm 116.48 m² Rp. 95,000.00 Rp. 11,065,600.00 13.97%
3 Usuk Reng (Baja Ringan) 116.48 m² Rp. 125,000.00 Rp. 14,560,000.00 18.38%
4 Listplank Kayu (uk. 200x18 mm), inc. Cat 52.00 m' Rp. 55,000.00 Rp. 2,860,000.00 3.61%
ok
Pekerjaan : Elektrikal
Kota : Cilacap
D ELEKTRIKAL
1 Lampu LED downlight 9 watt (daylight) 9.00 unit Rp. 150,000.00 Rp. 1,350,000.00 8.66%
2 Outdoor Wall Lamp, LED 9 watt (warm white) 8.00 unit Rp. 350,000.00 Rp. 2,800,000.00 17.97%
3 Instalasi Stop kontak single 13A 1PH (200W) 5.00 unit Rp. 150,000.00 Rp. 750,000.00 4.81%
4 Instalasi lampu NYM 3 x 2,5 mm2 9.00 unit Rp. 150,000.00 Rp. 1,350,000.00 8.66%
7 Stop Kontak Single 5.00 unit Rp. 20,000.00 Rp. 100,000.00 0.64%
ok
1 Instalasi Pipa Air Bersih (asumsi sumber air PDAM) 1.00 ls Rp. 250,000.00 Rp. 250,000.00 1.60%
2 Instalasi Pipa Air Bekas 1.00 ls Rp. 500,000.00 Rp. 500,000.00 3.21%
3 Pembuatan Gutter dan Tutup beton (di sekitar Joglo) 58.00 m' Rp. 135,000.00 Rp. 7,830,000.00 50.26%
ok