Professional Documents
Culture Documents
Gamker Gedung Marabuntha Overall
Gamker Gedung Marabuntha Overall
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
133 PRODUCTION
STRG
K1 B K1 B K1 B M5
K1 B K1 A
K1 C
142 15
160 8 M9 M9 M9 M9
M9
WC MALE 7 M9
K3 K3 K3
65 P1 K3 K3 K3
K3 K3
K3 K3 K3 K3 M4 129
1
P4 59
K2 A 96
M6 M6 M6 M6 M6 M6 M6 M6 M6 M6
WC FEMALE M6 M6
K8 K8 K8 K8 K8 K8
K8 K8 K8 K8 K8 K8
ramp
195
P2
K7 K7 K7 K7
K7 K7 M8 M8 K4 K4
K6 F
M8 K7 K7 K7 K7
K7 K7 K5 M7 K5
K6
E
K6 BAR G
K4 K4 GUEST
K7 K7 K7 K7 M2
DANCE FLOOR 4 K6
B M3 M1 P2
K7
M8
K7 K7
M8
K7 K6
600
K4 K4 K6 2
K7 K7
K7 K7 K7 K7
K5 M7 K5
K6 1764 2441
M8
K7 K7
M8 M8 K4 K4
D P2
K7 K7 K7 K7
KITCHEN 40 SQM K8 K8 K8 K8 K8 K8 K8 K8 K8 K8 K8 K8
229
M6 M6 C
M6 M6 M6 M6 M6 M6 M6 M6 M6 M6
K2
85
K3 K3
storage 22 SQM K3 K3
K3 K3
3
K3 K3
K3 K3
M9
98
K3 K3
P3 K3 K3
M9
M9
M9
M9
M9
K1 A
131 15
M9
K1 C K1 B
K1 B K1 B
K1 B K1 B
OFFICE 48
50 SQM 39
3939
3939 39 39
3939 3939 3939 465
WC
3678
DENAH LANTAI 1
SKALA 1:150 THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DENAH GEDUNG MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:150 12 Februari 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
418
FOLDING DOOR
899
134
18 341
RUAMG 18 378
VIP 1 10
GANTI 323
226 55
41
STORAGE 125
642 20 M2
44 VIP 2
181
WC
214 279
0
24 98
BALCONY
FIX WINDOW
112
DOOR SWING
25
DOOR SWING
2532
DENAH LANTAI 2
SKALA 1:100
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE
INSTALLATION
DENAH LT. 2 GEDUNG MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated.
- do not scale dimensions directly from drawings. scale: date: revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:100 12 Februari 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
3 NOTE DIMENSI YANG DI GAMBAR
NOTE DIMENSI YANG DI GAMBAR
KEMUNGKINAN TIDAK AKURAT
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
NOTE : UKURAN JENDELA KEMUNGKINAN TIDAK AKURAT CONTRACTOR HARUS UKUR ULANG
DAN MEMBAGI ULANG LAGI
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
BERBEDA2 KARENA BIDANG KARENA TEMBOK LENGKUNG JIKA ADA YANG BERBEDA HARSP DI
KONSULKAN KE DESAINER DULU
PRODUCTION
CONTRACTOR HARUS UKUR JANGAN DI PUTUSI SENDIRI
DINDING LENGKUNG ULANG DAN MEMBAGI ULANG LAGI
CONTRACTOR PERLU CEK DI CROWN CAT GAMA PAINT
LAPANGAN DAHULU PROFIL CAT GOLD PROFIL CAT GOLD MENYERUPAI BATU
ADA LED DI ATAS CROWN
CROWN CAT GOLD KOLOM CAT GAMA PAINT
CROWN CAT GAMA PAINT CROWN CAT GAMA PAINT MENYERUPAI BATU
KOLOM CAT GAMA PAINT KOLOM CAT GAMA PAINT
MENYERUPAI BATU MENYERUPAI BATU
MENYERUPAI BATU MENYERUPAI BATU
ADA LED DI ATAS CROWN ADA LED DI ATAS CROWN
A VENEER MENYERUPAI
PROFIL CAT GAMA PAINT HPL TACO TH 212 AA
CAT GOLD DUCO MENYERUPAI BATU B AC CAT KARAT WARNA TEMBAGA CROWN CAT GAMA PAINT
MENYERUPAI BATU
DETAIL P1 DETAIL BLOW UP
JENDELA
C PROFIL
PROFIL CAT ADA LED DI ATAS CROWN
KOLOM DUCO GOLD
CAT GOLD DUCO
9 27
97 AC AC 70
10 42
350 547
300
CERMIN ANTIQUE
BEVEL 1cm
(PENDING)
78 80
20 20
2294
DETAIL PINTU VINTAGE MIRROR VENEER MENYERUPAI PROFIL CAT GOLD DUCO
MENGIKUTI BEVEL 1cm KOLOM CAT GAMA PAINT
HPL TACO TH 212 AA
EXISTING TETAPI VENEER MENYERUPAI MENYERUPAI BATU
RAISED FLOOR 20 CM VINTAGE MIRROR
KACA PATRI DIGANTI
ANTIQUE
MIRROR BEVEL LIS BESI FIN. CAT HITAM
BEVEL 1cm
LIS BESI FIN. CAT HITAM
1
HPL TACO TH 212 AA
ELEVASI
1 CM DAN ADA LIS BESI FIN. CAT HITAM SKALA 1:75
FRAME TAMBAHAN PROFIL CAT GOLD DUCO THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:75 08 JULI 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
6
BEVEL 1CM
MUST BE RE - CHECKED
MIRROR
CAT GOLD
BY CONTRACTOR BEFORE
2
HPL TACO TH 212 AA
PROFIL
PRODUCTION
DUCO
3
CAT GOLD
4
PROFIL
BLOW UP JENDELA
DUCO
5
3
3
204
51
34
10
13
3
3
5
PROFIL CAT GOLD DUCO
5
3
VENEER MENYERUPAI
80
20
80
LAPANGAN DAHULU
DINDING LENGKUNG
5
SKALA 1:20
3
CAT GOLD
DUCO
PROFIL
FRAME BESI
CAT HITAM
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
CAT GOLD DUCO
10
10
16
4
8
MUST BE RE - CHECKED
VENEER MENYERUPAI
BY CONTRACTOR BEFORE
RAISED
FLOOR
CAT GOLD DUCO
PRODUCTION
PROFIL
2
VENEER MENYERUPAI
SECTION B
HPL TACO TH 212 AA
MENYERUPAI BATU
CAT GOLD DUCO
CAT GAMA PAINT
ADA LED DI ATAS CROWN
CROWN CAT GAMA PAINT
220
27
37
38
34
98
10
10
10
8
9
MENYERUPAI BATU
16
4
4
547
CAT GOLD DUCO
MENYERUPAI BATU
27
FLOOR
RAISED
4
VENEER MENYERUPAI
PROFIL
24
10
10
8
SECTION
CONTRACTOR PERLU CEK DI
BERBEDA2 KARENA BIDANG
MENYERUPAI BATU
SECTION A
LAPANGAN DAHULU
DINDING LENGKUNG
MENYERUPAI BATU
SKALA 1:25
220
27
37
32
34
98
10
10
8
547
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
VENEER MENYERUPAI
CAT GOLD DUCO
BY CONTRACTOR BEFORE
HPL TACO TH 212 AA
PRODUCTION
2 3
PROFIL
4
5
3
RAISED FLOOR
LAPANGAN DAHULU
DINDING LENGKUNG
ADA LED DI ATAS CROWN
CROWN CAT GAMA PAINT
MENYERUPAI BATU
MENYERUPAI BATU
SECTION C
SECTION
220
123
27
37
98
8
SKALA 1:25
547
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
RAISED FLOOR
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
3
BY CONTRACTOR BEFORE
8
PRODUCTION
527
4
2
420
55
14
10
6
7
SECTION A
KOLOM CAT GAMA PAINT
30
MENYERUPAI BATU
MENYERUPAI BATU
MENYERUPAI BATU
MENYERUPAI BATU
CAT GAMA PAINT
MENYERUPAI BATU
MENYERUPAI BATU
MENYERUPAI BATU
RAISED FLOOR
CROWN CAT
PROFIL CEKLONG
BLOW UP KOLOM
KE DALAM
3
408
61
27
10
9
8
1
2
A 2
7
75
SKALA 1:20
7
2
2 THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
DETAIL CONTOH PINTU EKSISTING
4
6
6
3
4
6
3
6
6
30
70
49
48
48
27
27
27
10
10
10
10
3
3
10
26 6 46 26 6 1010 6 26 6 46 26 6 10 6
3
31
3 3
10
BEVEL 1 CM
KACA ANTIQUE
MIRROR
3 3
236
128
3 3
10
PINTU DI FIN ULANG
MENYERUPAI HPL
TACO TH 212 AA
DETAIL P1
3 3
31
3
6 10 6
SKALA 1:20
10
228
100
90
17
6
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
62
8
10
20
1766
PROFIL CAT GAMA PAINT RAISED FLOOR PINTU EKSISTING FIN. JENDELA EXSITING DI FIN ULANG PROFIL CAT GAMA PAINT
MENYERUPAI BATU VENEER MENYERUPAI MIRPP DENGAN PANEL MENYERUPAI BATU
HPL TACO TH 212 AA
2 ELEVASI
SKALA 1:75
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:75 08 JULI 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
10
17
SECTION A
SKALA 1:20
466
153
10
17
646
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
ADA LED DI ATAS CROWN
CROWN CAT GAMA PAINT
MUST BE RE - CHECKED
PROFIL CAT GAMA PAINT
AND ADJUST TO THE SITE
MENYERUPAI BATU
MENYERUPAI BATU
BY CONTRACTOR BEFORE
MENYERUPAI BATU
PRODUCTION
27
4
8
MENYERUPAI BATU
SKIRTING KAYU
2
2
4
8
10
4
8
8
2
DINDING CAT GAMA PAINT
ADA RAISED FL
MENYERUPAI BATU
SECTION B
SKALA 1:20
153
153
153
27
20
10
8
8
547
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
CROWN CAT GAMA PANIT
490
27
30
PRODUCTION
4
18
84
84
84
2
2
133
133
133
20
10
8
8
8
2
2
FRAME CAT GOLD
272
CROWN CAT GAMA
80
BATU ADA LED DI
ATAS CROWN
4
PAINT MENYERUPAI
80
KOLOM CAT GAMA
SKIRTING KAYU
30
BATU
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:30 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
NOTE DIMENSI YANG DI GAMBAR
KEMUNGKINAN TIDAK AKURAT NOTE DIMENSI YANG DI GAMBAR AND ADJUST TO THE SITE
CONTRACTOR HARUS UKUR ULANG BY CONTRACTOR BEFORE
DAN MEMBAGI ULANG LAGI KEMUNGKINAN TIDAK AKURAT PRODUCTION
FRAME CAT GOLD JIKA ADA YANG BERBEDA HARSP DI
KONSULKAN KE DESAINER DULU KARENA TEMBOK LENGKUNG
JANGAN DI PUTUSI SENDIRI
CONTRACTOR HARUS UKUR
ULANG DAN MEMBAGI ULANG LAGI CROWN CAT GAMA PAINT
CROWN CAT GAMA PAINT CROWN CAT GAMA PAINT MENYERUPAI BATU
FRAME BESI FIN. CAT HITAM
MENYERUPAI BATU MENYERUPAI BATU ADSA LED DI ADA LED DI ATAS CROWN
ADA LED DI ATAS CROWN ATAS CROWN KACA BEVEL 1 CM
DINDING CAT GAMA PAINT FRAME CAT GOLD
CROWN CAT GAMA PANIT
KOLOM CAT GAMA PAINT CROWN CAT GAMA PANIT PINTU MENYERUPAI BATU
MENYERUPAI BATU
MENYERUPAI BATU MENYERUPAI BATU EKSISTING ADA LED DI ATAS CROWN
DINDING CAT GAMA PAINT
MENYERUPAI BATU
244
PROFIL CAT GAMA PANIT
MENYERUPAI BATU
646
PROFIL CAT GAMA PANIT
MENYERUPAI BATU
402
SKIRTING KAYU
PROFIL CAT GAMA PAINT RAISED FLOOR PROFIL CAT GAMA PAINT
NOTE DIMENSI YANG DI GAMBAR
MENYERUPAI BATU KEMUNGKINAN TIDAK AKURAT MENYERUPAI BATU
CONTRACTOR HARUS UKUR
2
ELEVASI DENGAN BACKDROP
ULANG DAN MEMBAGI ULANG LAGI
SKALA 1:75
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:75 08 JULI 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
20
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
145 153
4 85 4 85 4 85 4 85 4 85 4 85 4 85 4 85 4 85 4 85 4 85 4 85 4 85 4
1165
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:35 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
TAMPAK DEPAN SECTION A
TAMPAK
SAMPING
FRAME BESI CAT HITAM
A FRAME BESI CAT HITAM
KACA 8
BEVEL 1 CM
4 4
27 27
2 2
27 27
2 2
27 27
KACA BEVEL 1 CM
2 2
27 27
4 4
4 4
4 20 20 20 20 4
8
2 2 2
FRAME BESI CAT HITAM
93
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PROFIL CAT GOLD DUCO PRODUCTION
CEKLONGAN VENEER CROWN CAT GAMMA MENYERUPAI
MENYERUPAI HPL TACO BATU DI ATAS ADA LED
PROFIL CAT GAMA PAINT
TH 212 AA
KOLOM CAT GAMA PAINT MENYERUPAI BATU
MENYERUPAI BATU A
VENEER MENYERUPAI
JENDELA EXISTING B HPL TACO TH 212 AA PROFIL CAT GAMA PAINT
MENYERUPAI BATU
FIN. ULANG CAT GOLD DUCO
VENEER C PROFIL
AC CAT KARAT TEMBAGA
MENYERUPAI HPL DETAIL P3 CAT GOLD DUCO
TACO TH 212 AA
AC AC 97
PROFIL CAT
GOLD DUCO
KORDEN 547
BIRU TUA
430
20
2294
VENEER MENYERUPAI PROFIL CAT GOLD JENDELA EKSISTING FIN. ULANG PROFIL CAT GOLD
MENYERUPAI HPL TACO TH 212 AA VENEER MENYERUPAI
HPL TACO TH 212 AA
HPL TACO TH 212 AA
PINTU EKSISTING FIN.
VENEER MENYERUPAI
HPL TACO TH 212 AA
NOTE : UKURAN JENDELA
BERBEDA2 KARENA BIDANG
3 NOTE DIMENSI YANG DI GAMBAR
KEMUNGKINAN TIDAK AKURAT
DINDING LENGKUNG
CONTRACTOR PERLU CEK DI
KARENA TEMBOK LENGKUNG
CONTRACTOR HARUS UKUR
ELEVASI
LAPANGAN DAHULU ULANG DAN MEMBAGI ULANG LAGI SKALA 1:75
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:75 08 JULI 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
MENYERUPAI HPL
VENEER MENYERUPAI
NOTE - ALL DIMENSIONS
CAT GOLD
DUCO
PROFIL
TACO TH 212 AA
MUST BE RE - CHECKED
4
JENDELA EKSISTING
5
TACO TH 212 AA
2
3
14 3
34
13
PROFIL CAT GOLD
DUCO
3
5
18
PROFIL CAT GOLD DUCO
JENDELA EKSISTING
5
3
MENYERUPAI HPL
3
TACO TH 212 AA
76
FIN. ULANG
15
20
81
LAPANGAN DAHULU
DINDING LENGKUNG
KORDEN BIRU TUA
HPL TACO TH 212 AA
14
SKALA 1:20
5
3
CAT GOLD
DUCO
CAT GOLD
DUCO
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
CEKLONGAN MENYERUPAI
HPL TACO TH 212 AA
MUST BE RE - CHECKED
20
10
14
10
16
CAT GOLD
BY CONTRACTOR BEFORE
PRODUCTION
DUCO
JENDELA EKSISTING
RAISED FLOOR
PROFIL CAT GAMA PAINT
MENYERUPAI BATU
LAPANGAN DAHULU
DINDING LENGKUNG
296
27
37
98
10
14
10
8
24
10
10
MENYERUPAI BATU
MENYERUPAI BATU
4
8
8
DINDING CAT GAMA PAINT
PROFIL CAT GAMA PAINT
20
MENYERUPAI BATU
MENYERUPAI BATU
27
4
8
MENYERUPAI HPL
TACO TH 212 AA
SECTION
RAISED FLOOR
SKALA 1:25
SECTION A
294
27
37
98
10
10
8
8
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
CAT GOLD DUCO
MENYERUPAI HPL
TACO TH 212 AA
2
4
5
PROFIL
CROWN CAT GAMA PAINT
20
MENYERUPAI BATU
MENYERUPAI BATU
MENYERUPAI BATU
RAISED FLOOR
SECTION C
4
SECTION
220
123
27
37
98
8
8
9
9
4
SKALA 1:25
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
397
TACO TH 212 AA
30
10
3
SKALA 1:20
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
VENEER MENYERUPAI
NOTE DIMENSI YANG DI GAMBAR NOTE - ALL DIMENSIONS
HPL TACO TH 212 AA KEMUNGKINAN TIDAK AKURAT MUST BE RE - CHECKED
CONTRACTOR HARUS UKUR ULANG
HANDRAIL BALCONY CEMBUNG CAT GOLD
AND ADJUST TO THE SITE
DAN MEMBAGI ULANG LAGI
VENEER BY CONTRACTOR BEFORE
JIKA ADA YANG BERBEDA HARSP DI
VENEER MENYERUPAI PRODUCTION
MENYERUPAI KONSULKAN KE DESAINER DULU LASERCUT CAT GOLD
HPL TACO TH 212 AA JANGAN DI PUTUSI SENDIRI DETAIL KOLOM
HPL TACO TH ADA LED DIATAS DA DIBAWAH LASERCUT
212 AA B SWING DOOR
28 400 BESI FIN. CAT GOLD 887 410
ADA KACA NYA
A
LASERCUT 99
CAT GOLD 167
ADA LED
DI DALAM 68
DETAIL 5
VENEER
MENYERUPAI 646
HPL TACO TH DETAIL 3
DETAIL 2 VENEER MENYERUPAI DETAIL 4 88
212 AA LASERCUT HPL TACO TH 212 AA
221 CAT GOLD
ADA LED PINTU WC
DI DALAM
230
CURTAIN BIRU GOLD
BLOW UP A
107
10
295 55 125 1697
739 125 72 147 9 88 42
1726
KOLOM VENEER MENYERUPAI VENEER
PROFIL DINDING
HPL TACO TH 212 AA MENYERUPAI
VENEER MENYERUPAI LANTAI KAYU EKSISTING VENEER
HPL TACO TH
HPL TACO TH 212 AA MENYERUPAI HPL
TUNDAN GRANIT HITAM 212 AA
LUBANG KELUAR MAKANAN 4 TACO TH 212 AA
VENEER MENYERUPAI
HPL TACO TH 212 AA
KOLOM EKSISTING
NOTE DIMENSI YANG DI GAMBAR
KEMUNGKINAN TIDAK AKURAT
CONTRACTOR HARUS UKUR
PANGGUNG KAYU
ELEVASI
ULANG DAN MEMBAGI ULANG LAGI MENYERUPAI LANTAI EKSISTING SKALA 1:60
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:60 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
8 8 MUST BE RE - CHECKED
AND ADJUST TO THE SITE
4 8 BY CONTRACTOR BEFORE
2 PRODUCTION
VENEER MENYERUPAI
HPL TACO TH 212 AA
177
145
328
2 8 4
4
MEJA GRANIT HITAM
43 40
3
4 8 4
2
VENEER MENYERUPAI
58 82
HPL TACO TH 212 AA
2 8
4 8 8
10 10
8 8 45 8 8 45 8 8 45 8 8 45 8 8
2 2 2 2 2 2 2 2
4 4 4 4 4
295
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
SKIRTING VENEER MENYERUPAI
PROFIL VENEER MENYERUPAI
PRODUCTION
HPL TACO TH 212 AA
10
8
8
VENEER MENYERUPAI
HPL TACO TH 212 AA
BALKON
MAKAN
AREA
SECTION A
10
15
DAPUR
25
SKALA 1:15
181
40
86
10
8
3
107
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
VENEER MENYERUPAI
PRODUCTION
HPL TACO TH 212 AA
DAN BAWAH
BAWAH
LED DIATAS
GOLD DUCO
LASERCUT
DUCO
2
2
21
21
20
76
5
SECTION B
MENYERUPAI
HPL TACO TH
SKALA 1:10
VENEER
212 AA
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
287 MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
8 8
4 8
2
76
182
PINTU WC
328
2 222
8
4 8
2
68
2 DINDING
8 VENEER MENYERUPAI
4 8 8 HPL TACO TH 212 AA
10 10
8 4 60 4 60 8 9 88 34 8
147 139
BLOW UP B
SKALA 1:20
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
CLASSIC
BY CONTRACTOR BEFORE
HANDLE
PRODUCTION
PINTU
240
MENYERUPAI
DETAIL PINTU WC HPL TACO TH
2
2
3
VENEER
135
20
57
10
212 AA
3
2
12
88
58
12
SKALA 1:10
3
137
103
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
70 76
3
3 1046 3
1052
DETAIL 4 DETAIL 5
3 3
NOTE DIMENSI YANG DI GAMBAR
KEMUNGKINAN TIDAK AKURAT
70 76 70 76 CONTRACTOR HARUS UKUR ULANG
DAN MEMBAGI ULANG LAGI
JIKA ADA YANG BERBEDA HARSP DI
3 3 KONSULKAN KE DESAINER DULU
3 132 3 3 160 3 JANGAN DI PUTUSI SENDIRI
138 166
LASERCUT CAT GOLD
ADA LED DIATAS DA
DETAIL LASERCUT
DIBAWAH LASERCUT SKALA 1 : 30
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL LASERCUT MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:30 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF
SKALA 1:15
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
GAMMA PAINT
NOTE - ALL DIMENSIONS
MENYERUPAI
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
EXISTING
KOLOM
BATU
CAT
547
5
7
8
387
40
60
15
10
10
DETAIL KOLOM
61
SKALA 1:20
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
34 36
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
DETAIL PINTU 2
316 98 311 203 90
DETAIL SWING DOOR
142
237
90
10
2213
DETAIL PANEL A DETAIL PANEL B DETAIL SWING DOOR DETAIL PANEL C DETAIL PANEL D
DETAIL PANEL E
DETAIL PANEL B PROFIL
DETAIL PINTU 1 VENEER MENYERUPAI
HPL TACO TH 212 AA
ELEVASI LANTAI 2
SKALA 1:50
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
PROFIL MUST BE RE - CHECKED
AND ADJUST TO THE SITE
A VENEER MENYERUPAI
HPL TACO TH 212 AA
BY CONTRACTOR BEFORE
PRODUCTION
8
4
8
2
242
2
8
4
8
2
45
2
8
4
8
10
8 8 51 8 48 51 8 44 8 51 8 48 51 8 48
2 2 2 2 2 2 2 2
VENEER
MENYERUPAI HPL
DETAIL PANEL A
316
SKALA 1:15
TACO TH 212 AA
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
PROFIL VENEER MENYERUPAI NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
VENEER MENYERUPAI HPL TACO TH 212 AA AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
HPL TACO TH 212 AA PRODUCTION
8
4
8
2
PROFIL
VENEER MENYERUPAI
HPL TACO TH 212 AA 121
242
2
8
4
8
2
45
2
8
4
8
10
84 8 50 8 4 8 50 8 4 8 50 8 48 50 8 48
2 2 2 2 2 2 2 2
311
DETAIL PANEL B
SKALA 1:15
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
PROFIL VENEER MENYERUPAI NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
VENEER MENYERUPAI HPL TACO TH 212 AA AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
HPL TACO TH 212 AA PRODUCTION
8
4
8
2
PROFIL
VENEER MENYERUPAI
HPL TACO TH 212 AA 121
242
2
8
4
8
2
45
2
8
4
8
10
8 4 8 38 8 4 8 38 8 4 8 38 8 48
2 2 2 2 2 2
203
DETAIL PANEL C
SKALA 1:15
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
PROFIL VENEER MENYERUPAI
VENEER MENYERUPAI
VENEER MENYERUPAI HPL TACO TH 212 AA
HPL TACO TH 212 AA
HPL TACO TH 212 AA
8 8
4 4
8 8
2 2
PROFIL
VENEER MENYERUPAI
HPL TACO TH 212 AA
PROFIL
121 121
VENEER MENYERUPAI
HPL TACO TH 212 AA
242 242
2 2
8 8
4 4
8 8
2 2
45 45
2 2
8 8
4 4
8 8
10 10
848
2
40
2
8 4 8
2
40
2
8 48
DETAIL
8
4
8
2
44
2
8 38
DETAIL
147
PANEL D 88 PANEL E
SKALA 1:15
SKALA 1:15
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
2
10
4
8
4
8
8
4
8
2
2
SECTION PANEL A
242
2
121
45
10
4
4
8
8
2
SKALA 1:10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
MENYERUPAI
HPL TACO TH
232
2
3
VENEER
129
57
10
18
212 AA
7
3
2
DETAIL PINTU 1
91
98
3
SKALA 1:10
CLASSIC
HANDLE
PINTU
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
MENYERUPAI HPL
AND ADJUST TO THE SITE
TACO TH 212 AA
BY CONTRACTOR BEFORE
PRODUCTION
VENEER
234
3
1
131
20
59
10
3
1
9
1
DETAIL PINTU 2
51
77
1
9
SKALA 1:10
3
CLASSIC
HANDLE
PINTU
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
7
4
1
218 242
41
7
44 57 44 57 44 57 44 57 44 57 44 57 44 57 44 57 44 57 44 57 44 57 44 57 44 57 4
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
881
DETAIL
SKALA 1:25
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
FRAME BESI FIN. MUST BE RE - CHECKED
AND ADJUST TO THE SITE
4 CAT GOLD HAIRLINE BY CONTRACTOR BEFORE
PRODUCTION
1 ADA KACANYA 4
1
2 238
218 228
40 36
100
80 75
14 41
DETAIL LASERCUT
SKALA 1:15
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
MENYERUPAI
HPL TACO TH
328
PINTU WC
VENEER
4
2
4
2
212 AA
240
44
8
8
8
8
DINDING
8 48
2
6
44
88
2
8 48
8 4 18 4 8
5
42
ELEVASI
4
4
214
68
10
8
SKALA 1:15
4
4
4
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
328
4
2
4
2
2
4
2
198
10
52
8
8
8
8
8
8
MENYERUPAI HPL
TACO TH 212 AA
8 6 8 4 8 8 4 8 18 8 4 8 18 8 4 8
2
VENEER
DINDING
8
104
2 2
SKIRTING KAYU
848
2
2
30
2
2
4
848
2
7
88
181
30
2
848
ELEVASI
4
2
8 4 8 15 8
2
30
SKALA 1:20
MENYERUPAI
HPL TACO TH
PINTU WC
VENEER
212 AA
848
2
2
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
PROFIL CAT GOLD VENEER MENYERUPAI
HPL TACO TH 212 AA NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
15 BY CONTRACTOR BEFORE
PRODUCTION
VENEER MENYERUPAI
HPL TACO TH 212 AA
382
307
PROFIL VENEER MENYERUPAI
HPL TACO TH 212 AA
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE
INSTALLATION
ELEVASI GEDUNG MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated.
- do not scale dimensions directly from drawings. scale: date: revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
184 130 20 4 PRODUCTION
4 4
172 165
307
4
6
KACA
50 48
CORRUGATED
6
4
69 66
4 6
DETAIL P4
4 86 4 86 4 6 138 6 4
338
FRAME PINTU BESI CAT HITAM
FRAME BESI CAT HITAM SKALA 1:20
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
VENEER MENYERUPAI
NOTE - ALL DIMENSIONS
HPL TACO TH 212 AA CROWN VENEER MENYERUPAI MUST BE RE - CHECKED
HPL TACO TH 212 AA AND ADJUST TO THE SITE
ANTIQUE MIRROR BY CONTRACTOR BEFORE
CROWN VENEER MENYERUPAI
PRODUCTION
HPL TACO TH 212 AA PROFIL CAT GOLD
KORBEL SETENGAH
PROFIL CAT GOLD MASUK KE DALAM GOLD SETENGAH KAYU
15
35 LED DIBAWAH
TUNDAN
ADA COAKAN LED
FRAME FOTO CAT GOLD LED DIBAWAH TUNDAN
LED DIBAWAH TUNDAN LED DI BAWAH FRAME FOTO LED DIBAWAH TUNDAN
232
LED DIBAWAH TUNDAN 382
SKIRTING VENEER
820
PROFIL CAT GOLD MENYERUPAI HPL
TACO TH 212 AA
RAISED FLOOR
SPACE UNTUK ALAT
B RAISED FLOOR ELEVASI
SKALA 1 : 30
RAISED FLOOR THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE
INSTALLATION
ELEVASI GEDUNG MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated.
- do not scale dimensions directly from drawings. scale: date: revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:30 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
CROWN VENEER MENYERUPAI
PROFIL CAT GOLD NOTE - ALL DIMENSIONS
HPL TACO TH 212 AA MUST BE RE - CHECKED
KORBEL SETENGAH AND ADJUST TO THE SITE
GOLD SETENGAH 15 BY CONTRACTOR BEFORE
PRODUCTION
KAYU
60
BLOW UP FRAME
VENEER MENYERUPAI
HPL TACO TH 212 AA
VENEER MENYERUPAI
HPL TACO TH 212 AA
382
307
PROFIL VENEER
MENYERUPAI HPL
TACO TH 212 AA KACA
CORRUGATED
RAISED FLOOR
35 4 107 4 107 4 107 4
10
383
SKIRTING VENEER
MENYERUPAI HPL
TACO TH 212 AA
VENEER MENYERUPAI
HPL TACO TH 212 AA
FRAME BESI FIN CAT HITAM
ELEVASI
GARIS PUTUS - PUTUS SKALA 1 : 30
BATAS DINDING BAR C THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
KACA NOTE - ALL DIMENSIONS
CORRUGATED FRAME BESI FIN CAT HITAM MUST BE RE - CHECKED
AND ADJUST TO THE SITE
4 BY CONTRACTOR BEFORE
PRODUCTION
172
5
307
50
69
338
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
4
4
8 2
24 60
2
8 4
4
44 8 2 79 2 8 444 8 2 79 2 8 444 8 2 79 2 8 44
338
VENEER MENYERUPAI
HPL TACO TH 212 AA
BLOW UP FRAME
SKALA 1:15
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF
SKALA 1:15
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
CROWN KAYU VENEER
CROWN KAYU CROWN KAYU NOTE - ALL DIMENSIONS
MENYERUPAI HPL TACO MUST BE RE - CHECKED
MENYERUPAI HPL MENYERUPAI HPL ACRYLIC MILKY WHITE TH 212 AA AND ADJUST TO THE SITE
TACO TH 212 AA TACO TH 212 AA FRAME CAT HITAM
VENEER MENYERUPAI BY CONTRACTOR BEFORE
ADA LED DI DALAM HANDLE PINTU PRODUCTION
HPL TACO TH 212 AA
ACRYLIC MILKY WHITE BESI CAT HTAM
ADA LED DI DALAM
CROWN KAYU
PLAFON ACRYLIC MILKY WHITE LOGO
MENYERUPAI HPL
KACA DAN FRAME HITAM ADA LED DI DALAM BESI FIN. CAT HITAM
TACO TH 212 AA
CORRUGATED
196 414 196 FRAME PINTU BESI CAT HTAM
FRAME BESI CAT HTAM
15 A 15
15
KACA
CORRUGATED
20
10
DETAIL FRAME
RAISED FLOOR
RAISED FLOOR
86 86 30 30 278 30 30 86 86 158 180
8 8 4 4 8 8
4 4
8 8
338 806 338
SKIRTING besiCAT RAMP
HITAM
D E F
NOTE DIMENSI YANG DI GAMBAR
KEMUNGKINAN TIDAK AKURAT NOTE DIMENSI YANG DI GAMBAR
CONTRACTOR HARUS UKUR ULANG
DAN MEMBAGI ULANG LAGI
JIKA ADA YANG BERBEDA HARSP DI
KEMUNGKINAN TIDAK AKURAT
CONTRACTOR HARUS UKUR
ULANG DAN MEMBAGI ULANG LAGI
ELEVASI
KONSULKAN KE DESAINER DULU
JANGAN DI PUTUSI SENDIRI SKALA 1:50
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:50 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
317
PRODUCTION
10
4
4
2
289
8
8
2
8
4
2
74
VENEER MENYERUPAI
2
4
HPL TACO TH 212 AA
196
8
DETAIL FRAME
4
2
74
2
4
SKALA 1:15
8
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
14
15
SECTION A
289
15
10
8
6
6
8
SKALA 1:15
342
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
4 4 4 4 4 4 4 4 4 4 4 4 4 NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
30 30 30 30 30 30 30 30 30 30 30 30 AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
4 4 PRODUCTION
27
4 ACRYLIC MILKY WHITE
FRAME CAT HITAM
90 27 ADA LED DI DALAM
4
27
4 4
15 ACRYLIC MILKY WHITE
27
FRAME CAT HITAM
4
28 ADA LED DI DALAM
27 LOGO
15 4
317 BESI FIN. CAT HITAM
4 (PENDING BENTUKNYA)
27
4
27
4
FRAME
153 27 BESI FIN. CAT HITAM
4
27
4
408 27
4 4
4 64 4 15 240 15 4 64 4
414
SKIRTING besi CAT HITAM DETAIL FRAME ACRYLIC DAN LOGO
SKALA 1:20
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
ADA LED DI DALAM DIAPIR DENGAN FRAME
CONTRACTOR HARUS UKUR ULANG
30
CROWN KAYU
30
BLOWUP FRAME
FRAME BESI CAT HITAM
4
CAT HITAM
15
ADA LED DI DALAM
FRAME CAT HITAM
308
338
323
5
G
SKALA 1:40
806 414
186
186
10
10
10
10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DENAH ENTRANCE MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:40 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
ACRYLIC MILKY WHITE
NOTE - ALL DIMENSIONS
4 26 4 26 4 26 4 26 4 26 4 26 4 26 4 26 4 26 4 26 415 FRAME CAT HITAM MUST BE RE - CHECKED
ADA LED DI DALAM AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
60
15
4
27
4
27
4
ACRYLIC MILKY WHITE
FRAME CAT HITAM 27
ADA LED DI DALAM 4
27
4 402
27
4
BACKDROP BAR 27
4
10
M1 ( ENTRANCE )
SECTION ENTRANCE ( G )
SKALA 1:25
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
BESI PEJAL KUNINGAN MUST BE RE - CHECKED
AND ADJUST TO THE SITE
KOLOM
VENEER MENYERUPAI HPL BY CONTRACTOR BEFORE
TACO TH 212 AA PRODUCTION
6
20
K1 A 50
BESI PEJAL
KUNINGAN BESI PEJAL KUNINGAN
80
KACA CORRUGATED
19 130 7
LEATHER CSL
COLLECTION : SOFIA
KACA CORRUGATED 23
COLOR : FES - 5114
LUBANG 2
TEMPAT UNTUK TANAMAN SISI KETUTUPAN
MEJA KASIR
113
81
157
23
2 LED DI BAWAH
42 KURSI SKRTING
113
81
21
27
7
19 253 45
NOTE: SOFA MINTA 1 MOCK
LED DI BAWAH KURSI
318 SKRTING UP UNTUK DI ACC KAN CLIENT
VENEER MENYERUPAI HPL
TACO TH 212 AA
TIAP 8CM NAT 0.5cm
COLOKAN
LEATHER CSL
COLLECTION : SOFIA
COLOR : FES - 5114
DETAIL K1A
( JARAK GARIS-GARIS KURANG LEBIH 8cm )
SKALA 1 : 25
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:30 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
VENEER MENYERUPAI HPL BY CONTRACTOR BEFORE
TACO TH 212 AA PRODUCTION
BESI PEJAL KUNINGAN
KOLOM
22
K1 B 6
25
46
37
5 132 20 KACA CORRUGATED
KACA CORRUGATED LUBANG TEMPAT
LEATHER CSL UNTUK TANAMAN
COLLECTION : SOFIA
23
COLOR : FES - 5114 2
113
81
pembagian kursi
kurang lebih 8 cm
LED DI BAWAH
256
301
COLOKAN
19
DETAIL K1B
KURSI SKRTING SKALA 1 : 30
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:30 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
VENEER MENYERUPAI HPL BESI PEJAL KUNINGAN AND ADJUST TO THE SITE
TACO TH 212 AA BY CONTRACTOR BEFORE
KOLOM PRODUCTION
BESI PEJAL
KUNINGAN
6
20
50
K1 C
BESI PEJAL KUNINGAN
80 KACA CORRUGATED
19 131 6
LEATHER CSL
COLLECTION : SOFIA 23
KACA CORRUGATED
COLOR : FES - 5114 2
LUBANG
TEMPAT UNTUK TANAMAN
113
81
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:30 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
KACA CORRUGATED
10 29 42 50 50 43 31 12
3
5
23 2 10
2 4
2 8 27 41 48 48 41 29 10
2 2 2 2 2 2 2 2
269
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
72 NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF K1
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE DIMENSI YANG DI GAMBAR NOTE - ALL DIMENSIONS
KEMUNGKINAN TIDAK AKURAT MUST BE RE - CHECKED
NOTE: SOFA MINTA 1 MOCK CONTRACTOR HARUS UKUR ULANG LUBANG
UP UNTUK DI ACC KAN CLIENT AND ADJUST TO THE SITE
DAN MEMBAGI ULANG LAGI TEMPAT UNTUK
JIKA ADA YANG BERBEDA HARSP DI BY CONTRACTOR BEFORE
TANAMAN
KONSULKAN KE DESAINER DULU PRODUCTION
JANGAN DI PUTUSI SENDIRI
75 75 75
75
75
75
208 208 75
75 208
208 208
208 179
K1 B
K1 A
K1 C
153
KACA
CORRUGATED
LEATHER CSL BESI PEJAL
KACA COLLECTION : SOFIA KUNINGAN
CORRUGATED COLOR : FES - 5114
KACA
CORRUGATED
pembagian kursi TEMPAT KASIR
BESI PEJAL kurang lebih 8 cm SISI KETUTUPAN
KUNINGAN MEJA KASIR
KACA
K1 C CORRUGATED K1 B K1 A
23 2
40
90 21
20
7
26 55 121 135 14 129 129 19 126 133 21 132 127 20 133 125 26 132 127 55 17
COLOKAN
1801
VENEER MENYERUPAI VENEER MENYERUPAI
LED DI BAWAH LEATHER CSL
HPL TACO TH 212 AA HPL TACO TH 212 AA
KURSI SKRTING COLLECTION : SOFIA
TIAP 8CM NAT 0.5cm TIAP 8CM NAT 0.5cm COLOR : FES - 5114
ELEVASI PEMASANGAN
1 SKALA 1 : 40
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:60 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
LUBANG MUST BE RE - CHECKED
TEMPAT UNTUK TANAMAN KACA CORRUGATED AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
LEATHER CSL PRODUCTION
COLLECTION : SOFIA
COLOR : FES - 5114
80
BESI PEJAL
KUNINGAN
50
K1 C
20 BESI PEJAL KUNINGAN
6 KACA CORRUGATED
6 131 19
VENEER MENYERUPAI HPL
TACO TH 212 AA KOLOM
23
BESI PEJAL KUNINGAN 2
113
81
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:30 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
LUBANG MUST BE RE - CHECKED
LEATHER CSL TEMPAT UNTUK TANAMAN AND ADJUST TO THE SITE
KACA CORRUGATED COLLECTION : SOFIA BY CONTRACTOR BEFORE
COLOR : FES - 5114 PRODUCTION
37
46
25
6
22
KOLOM
LED DI BAWAH
256
301
COLOKAN
19
DETAIL K1B
KURSI SKRTING SKALA 1 : 30
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:30 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
LUBANG MUST BE RE - CHECKED
KACA CORRUGATED TEMPAT UNTUK TANAMAN AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
LEATHER CSL PRODUCTION
COLLECTION : SOFIA
COLOR : FES - 5114
80
BESI PEJAL
KUNINGAN
K1 A 50
113
81
KACA CORRUGATED
7
BESI PEJAL KUNINGAN pembagian kursi
kurang lebih 8 cm 25 131
157
23
2 LED DI BAWAH
42 KURSI SKRTING
113
81
21
27
7
19 253 45
NOTE: SOFA MINTA 1 MOCK
LED DI BAWAH KURSI
318 SKRTING UP UNTUK DI ACC KAN CLIENT
VENEER MENYERUPAI HPL
TACO TH 212 AA
TIAP 8CM NAT 0.5cm
COLOKAN
LEATHER CSL
COLLECTION : SOFIA
COLOR : FES - 5114
DETAIL K1A
( JARAK GARIS-GARIS KURANG LEBIH 8cm )
SKALA 1 : 25
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:30 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE DIMENSI YANG DI GAMBAR NOTE - ALL DIMENSIONS
NOTE: SOFA MINTA 1 MOCK KEMUNGKINAN TIDAK AKURAT MUST BE RE - CHECKED
CONTRACTOR HARUS UKUR ULANG AND ADJUST TO THE SITE
UP UNTUK DI ACC KAN CLIENT DAN MEMBAGI ULANG LAGI
JIKA ADA YANG BERBEDA HARSP DI
BY CONTRACTOR BEFORE
KONSULKAN KE DESAINER DULU PRODUCTION
JANGAN DI PUTUSI SENDIRI
BESI PEJAL
KUNINGAN pembagian kursi
3
kurang lebih 8 cm
KACA K1 B KACA
CORRUGATED
K1 C CORRUGATED K1 B K1 A
23 2
40
113
90 21
20
7
24 55 122 134 14 128 129 19 127 131 21 132 126 20 135 123 26 134 123 19 134 119 45
COLOKAN
2043
VENEER MENYERUPAI VENEER MENYERUPAI
LED DI BAWAH LEATHER CSL
HPL TACO TH 212 AA HPL TACO TH 212 AA
KURSI SKRTING COLLECTION : SOFIA
TIAP 8CM NAT 0.5cm TIAP 8CM NAT 0.5cm COLOR : FES - 5114
KACA
KACA
CORRUGATED
CORRUGATED
LEATHER CSL
COLLECTION : SOFIA
BESI PEJAL COLOR : FES - 5114
KUNINGAN
K1 A
K1 C K1 B
K1 B K1 B
64
32
39 32
32 32 32 75
32
75 32 32 32 32
32 32
75 75
75 75 75
ELEVASI PEMASANGAN
SKALA 1 : 40
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:60 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
NOTE: SOFA MINTA 1 MOCK AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
UP UNTUK DI ACC KAN CLIENT BANTAL PRODUCTION
LUBANG TEMPAT TANAMAN
31
BANTAL
20
135
50
31
4
820 20 995 20 20 8
3 3
1105
1105
BANTAL
10 25 20 47 93 113 93 113 93 113 93 113 93 27 20 25 10
A
16 3
3
8
54 106
B 3 7
20
8 25 207 207 207 207 207 25 8 KAYU FIN. HPL TACO TH 357 H
SOFA LEATHER CSL ( TIAP 8CM NAT 0.5CM )
COLLECTION : SOFIA COLOKAN
BESI PEJAL LED DI BAWAH KURSI
KAYU FIN. HPL TACO TH 357 H COLOR : FES - 5114 KACA CORRUGATED KUNINGAN SKRTING
( KURANG LEBIH TIAP 8cm NAT 0.5cm ) ( JARAK GARIS-GARIS KURANG LEBIH 8cm )
16 3
2
56 106
2 2 7
4
1
20
42 15 38 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 38 15
2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2
1
4 1106
2
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:40 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
BESI PEJAL KUNINGAN PRODUCTION
10 1 16
3
2
3
2
54
4 106
1 90
3
7
20
135
TAMPAK SAMPING
DETAIL K2
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
135
LUBANG
TEMPAT 8 20 23 85
BESI PEJAL KUNINGAN
TANAMAN
16
KACA CORRUGATED
10
SOFA LEATHER CSL
COLLECTION : SOFIA
43
COLOR : FES - 5114
( JARAK GARIS-GARIS
106
KURANG LEBIH 8cm )
80
20
KAYU FIN. HPL TACO
KAYU FIN. HPL TH 357 H
TACO TH 357 H 20 ( KURANG LEBIH TIAP
8cm NAT 0.5cm )
7
LED DI BAWAH
KURSI SKRTING SECTION A
SECTION K2
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
81 NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
NOTE DIMENSI YANG DI GAMBAR NOTE: SOFA MINTA 1 MOCK
KEMUNGKINAN TIDAK AKURAT
CONTRACTOR HARUS UKUR UP UNTUK DI ACC KAN CLIENT
ULANG DAN MEMBAGI ULANG LAGI
SECTION B
39 40 39 39 39 39 39 39 39 39 40 39
40 40 40 40
2 40 40
40 40
40 40
40 40
42 42
42 42
39 39
SECTION K2
SKALA 1 : 35
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:35 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF K2
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
NOTE: KURSI MINTA 1 MOCK AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
LEATHER LEATHER CSL
COLLECTION : SOFIA
UP UNTUK DI ACC KAN CLIENT PRODUCTION
2
29
11 40 45
4
29 56 4
23
38 92 92
14 11
5 6 5
39
27 30
44 35 44
1 1
54
5 63 27 36 5 44 29 554
LEATHER LEATHER CSL
COLLECTION : SOFIA KAYU SOLID
COLOR : FES - 5114
WARNA MENYERUPAI
HPL TACO TH 846 J DETAIL K3
NOTE: KURSI MINTA 1 MOCK
SKALA 1 : 10
UP UNTUK DI ACC KAN CLIENT
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF K3
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
LEATHER CSL VINTAGE EDITION NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
COLLECTION : BELLAGIO AND ADJUST TO THE SITE
COLOR : SCM - 5115 26 10 21 BY CONTRACTOR BEFORE
60 PRODUCTION
9
60 LEATHER CSL VINTAGE EDITION
COLLECTION : BELLAGIO
40 40 COLOR : SCM - 5115
31
10
22 81 6
18 18
TALI AIR KAKI GOLD
11 KUNINGAN
58 41
48
36 23 23
2 8 34 8 2 10 31 8 2
55 2
55
RODA KUNINGAN
58
TAMPAK ATAS TAMPAK DEPAN
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 18 April 2019
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF K4
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
22
42 40
16
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
LEATHER CSL VINTAGE EDITION MUST BE RE - CHECKED
46 COLLECTION ; DIEGO LEATHER CSL VINTAGE EDITION AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
COLOR : FWC - 5111 3 COLLECTION ; DIEGO PRODUCTION
ADA TALI AIR DI SEKITAR COLOR : FWC - 5111
3 5 5 5 10 5 5 5 3 34 15
4 4 14
8 8
1 1 4
55
119 119 37
51 51
91
3 40 3
3 3
25 25 46
55
NOTE: KURSI MINTA 1 MOCK DETAIL K6
UP UNTUK DI ACC KAN CLIENT KAKI DUCO
HITAM GLOSS SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 20 Juli 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF K6
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
NOTE: KURSI MINTA 1 MOCK AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
LEATHER CSL VINTAGE EDITION UP UNTUK DI ACC KAN CLIENT PRODUCTION
COLLECTION ; DIEGO
COLOR : FWC - 5111
KANCING KUNINGAN
KAYU SOLID
WARNA MENYERUPAI
2 2
15 6 29 5 13
HPL TACO TH 846 J 3 3 427
27 43 3
3 8 29 8 3
2
26
9
40 40
7 4
14 54 23 1 1
9 38 88 88
11 4 11
5
4 5
39
27 30
4 10 29 10 4
55
5 63 27 36 5 44 39 4
LEATHER CSL VINTAGE EDITION
COLLECTION ; DIEGO KAYU SOLID
COLOR : FWC - 5111
WARNA MENYERUPAI
HPL TACO TH 846 J DETAIL K7
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF K7
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
VELVET BLUDRU MEREK PRODUCTION
VELVET BLUDRU MEREK PLUSH WARNA PUTIH
PLUSH WARNA HITAM
60
3 9 23 9 3 10 4 30 15 3 9 22 9 3
5 5 5
10
27
34 35
61
13 34
5 87 5 87
9 9
11
14 14
47
1
4 11 23 11 4
1
18 18 52
2 4 5 28 5 4 2 4 41 3 3
52
TALI AIR 0.5cm
BESI EMAS KUNINGAN
KAKI DUCO
HITAM GLOSS
DETAIL K8
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project
project: interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 20 Juli 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF K8
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
SECTION A NOTE - ALL DIMENSIONS
4 16 150 16 4 MUST BE RE - CHECKED
AND ADJUST TO THE SITE
3 3 BY CONTRACTOR BEFORE
PRODUCTION
44 44
68
3 3
18 18
18 47 3 47 3 47 18
3 3 LED WARM WHITE
DIBAWAH TOP TABLE
190
TOP TABLE
TAMPAK DEPAN MARMER HITAM
VENEER MENYERUPAI
HPL TACO TH 212 AA
87
110
14
DETAIL M1
20 3 47 3 47 3 47 3 20
PROFIL VENEER MENYERUPAI SKALA 1 : 10
HPL TACO TH 212 AA
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
TOP NOTE - ALL DIMENSIONS
TAMPAK ATAS MUST BE RE - CHECKED
MARMER HITAM
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
48
73
TAMPAK SAMPING
TOP TABLE
25 73 MARMER HITAM
BLOW UP 1
63 10
3
25 150 25 TOP
MARMER HITAM 3 11
200
VENEER MENYERUPAI
53 HPL TACO TH 212 AA PROFIL VENEER
MENYERUPAI HPL
BLOW UP 2 TACO TH 212 AA
14
7
4 45 2 105 3 27 4
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
BLOW UP 1
BLOW UP 2
3
3 1
8
8 2 2
1 3
14
BLOW UP PROFIL
SKALA 1 : 5
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:5 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
VENEER MENYERUPAI
BY CONTRACTOR BEFORE
VENEER MENYERUPAI
PRODUCTION
32
53
13
4
25
16
SECTION B
13
DIBAWAH TOP TABLE
LED WARM WHITE
73
SECTION M1
48
35
VENEER MENYERUPAI
HPL TACO TH 212 AA
SKALA 1 : 10
MARMER HITAM
TOP
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF M1
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
TAMPAK B
D
393
100
87
87
87
13
13
13
13
13
13
TAMPAK A
235
MEJA BAR
LED DIDALAM
TOP TABLE BAR
ONYX NYALA, ADA
M2
85
SKALA 1:25
A B
490
60
25
25
60
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE MEJA BAR G. MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 27 JULI 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
DIDALAM
GARIS PUTUS-PUTUS
MENYERUPAI HPL
VENEER
TACO TH 212 AA
11
WORKING
AREA
160
203
C
SECTION 1
SECTION 1
11
SETENGAH KAYU
SETENGAH GOLD
KORBEL
SETENGAH KAYU
SETENGAH GOLD
KORBEL
68
M2
7
SKALA 1:25
4
A B
465
110
110
64
64
4
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
REFF IMAGE
SKALA 1:30
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE
INSTALLATION
REFF IMAGE GEDUNG MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated.
- do not scale dimensions directly from drawings. scale: date: revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:30 01 JuLi 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
TAMPAK DEPAN ( dengan besi ) NOTE - ALL DIMENSIONS
KORBEL SETENGAH KORBEL SETENGAH KORBEL SETENGAH
TOP TABLE BAR MUST BE RE - CHECKED
GOLD SETENGAH GOLD SETENGAH GOLD SETENGAH ONYX NYALA, ADA LED DIDALAM
KAYU KAYU KAYU AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
660 PRODUCTION
10
A 92
120 B
18
BLOW UP A BLOW UP C
BLOW UP B
660
10
10
1
7
PROFIL CAT GOLD
72 120
1 7
11 2
85 490 85
VENEER MENYERUPAI PROFIL VENEER
PROFIL
HPL TACO TH 212 AA VENEER MENYERUPAI VENEER MENYERUPAI MENYERUPAI HPL
CAT EMAS CEKLONGAN
HPL TACO TH 212 AA HPL TACO TH 212 AA TACO TH 212 AA
CAT GOLD
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
KORBEL SETENGAH KORBEL SETENGAH
14 GOLD SETENGAH GOLD SETENGAH
15
2 11 2 KAYU KAYU
7
5 5
23 23
1
1 CEKLONG
PROFIL VENEER
MENYERUPAI HPL DI CAT GOLD
TACO TH 212 AA
110 110
67 67
CEKLONGAN
CAT GOLD
PROFIL VENEER
MENYERUPAI HPL
TACO TH 212 AA
2 2
PROFIL VENEER
MENYERUPAI HPL 12 11
TACO TH 212 AA 1 1
8 0.5
2 7 2 1 1
1 1
PROFIL VENEER
MENYERUPAI HPL
1
TACO TH 212 AA
BLOW UP A
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
6 127 6
140
VENEER MENYERUPAI
HPL TACO TH 212 AA
6 4
8
2 2
85 44 8
2
8 4
6 4
140
BLOW UP B
SKALA 1 : 15
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
6 55 6
68
68 VENEER MENYERUPAI
HPL TACO TH 212 AA
A
6 4
8
2
2
85
2
8
8 4
6 4
6 8 27 8 6
PROFIL CAT GOLD
4 2 2 4
BLOW UP C
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
6 42 6
55
A
55 VENEER MENYERUPAI
HPL TACO TH 212 AA
6 4
8
2
2
85
8
44
2 4
8
6 4
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
109 KORBEL SETENGAH
GOLD SETENGAH
KAYU
320
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
64 19 4 6 11 6 147 6 11 6 55 6 7 23
10 10
10 10
1 6 1 7
4
48
120
72
6
2 11
7
2 11
40 195 85
PROFIL
CAT EMAS
CEKLONGAN CAT GOLD
VENEER MENYERUPAI
PROFIL VENEER HPL TACO TH 212 AA
MENYERUPAI HPL
TACO TH 212 AA DETAIL A ( tanpa besi )
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
KORBEL SETENGAH
GOLD SETENGAH
KAYU
110 TOP TABLE BAR
ONYX NYALA, ADA LED DIDALAM
VENEER MENYERUPAI
HPL TACO TH 212 AA
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
320
24 7 6 55 6 11 6 91 6 11 55 64 19 46
10 10
10 10
1 7 1 6
4
48
120
72
6
2 11
7
2 11
PROFIL
PROFILVENEER
MENYERUPAI HPL DETAIL B ( tanpa besi )
CAT EMAS TACO TH 212 AA
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
10
92
120
18
15 156 88
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
10
92
120
18
88 104 15
KAKI BESI
PIJAKAN KUNINGAN PROFIL
PROFIL VENEER
CAT EMAS VENEER MENYERUPAI
MENYERUPAI HPL CEKLONGAN CAT GOLD HPL TACO TH 212 AA
TACO TH 212 AA
PINTU KOBOI
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
78 9 104 15
3
17
1
KAKI BESI
PIJAKAN KUNINGAN
DETAIL BESI
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
3
17
1
KAKI BESI KAKI BESI
PIJAKAN KUNINGAN PIJAKAN KUNINGAN
DETAIL BESI
SKALA 1:20
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
77 BY CONTRACTOR BEFORE
PRODUCTION
4
TOP TABLE BAR
43 30 ONYX NYALA,
ADA LED DIDALAM
10
BLOW UP 1
10
AREA DALAM 7
AREA LUAR
8
VENEER MENYERUPAI
HPL TACO TH 212 AA
44 120
BLOW UP 2
7
11
ALAT BAR
PROFIL CAT EMAS
SECTION M2
SECTION A SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
BLOW UP 2 PRODUCTION
1
4 2
4
8 8
4
2
6
2
PROFIL CAT EMAS
BLOW UP M2
SKALA 1 : 5
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:5 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
KORBEL SETENGAH
GOLD SETENGAH
KAYU
5
19
4 1
2
CEKLONGAN
CAT GOLD
BLOW UP M2
SKALA 1 : 5
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:5 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
KORBEL SETENGAH MUST BE RE - CHECKED
GOLD SETENGAH SECTION B AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
KAYU PRODUCTION
77
TOP TABLE BAR
ONYX NYALA, ADA LED DIDALAM
47 16 23
10
BLOW UP 3
AREA DALAM
28
VENEER MENYERUPAI
HPL TACO TH 212 AA 1
AREA LUAR
120
ALAT BAR
67
CEKLONGAN
CAT GOLD
2
11
VENEER MENYERUPAI
SECTION M2
HPL TACO TH 212 AA SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
60 BY CONTRACTOR BEFORE
PRODUCTION
4
TOP TABLE BAR
ONYX NYALA, 30 26
ADA LED DIDALAM
10
AREA LUAR 10 BLOW UP 1
7
8
VENEER MENYERUPAI AREA DALAM
HPL TACO TH 212 AA
120 44
BLOW UP 2
7
11
SECTION C SECTION M2
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
RAK LEMARI ATAS
30
ALAT BAR
90
42 33
SECTION M2
SECTION D SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF M2
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
kayu shelving atas PRODUCTION
bar SECTION A
TOP TABLE BAR
ONYX NYALA, ADA
LED DIDALAM
10
VENEER MENYERUPAI
HPL TACO TH 212 AA
98 120
11
23 601 23
646
TEMPAT ALAT
FIN STEINLESS?
60 540 60
A
32
75
43
20 13 87 13 393 13 87 13 20
660
TERKENA RAK LEMARI ATAS
TERKENA RAK LEMARI ATAS TERKENA RAK LEMARI ATAS
TERKENA RAK LEMARI ATAS
DETAIL M3
SKALA 1 : 20
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:25 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
KORBEL SETENGAH CROWN VENEER
VINTAGE MIRROR FRAME CAT GOLD NOTE - ALL DIMENSIONS
GOLD SETENGAH B MENYERUPAI HPL TACO
BEVEL 1CM MUST BE RE - CHECKED
KAYU A TH 212 AA AND ADJUST TO THE SITE
13 67 20 114 10 373 10 114 20 67 13 BY CONTRACTOR BEFORE
PROFIL CAT GOLD PRODUCTION
15 KORBEL SETENGAH
GOLD SETENGAH
35
KAYU
KORBEL SETENGAH
ADA LED 56 GOLD SETENGAH
50 10 KAYU
CEKLONGAN
3 CEKLONGAN
CAT GOLD 15
CAT GOLD 56
35
4
3 2
LED DIBAWAH TUNDAN 56 382
TUNDAN KAYU 56
FIN. VENEER
MENYERUPAI HPL TACO 220
TH 212 AA 10 4 6
W LED
BESI BETON 1 382
KAYU 3CM 6
PROFIL VENEER CAT GOLD VENEER MENYERUPAI
MENYERUPAI HPL 55
HPL TACO TH 212 AA
TACO TH 212 AA
4 2
11
LEMARI BOTOL 20 2 4
10
13 97 3 87 13 126 126 126 13 86 97 13 2 4
4 4 4 4 4 64
820 PROFIL CAT GOLD
PROFIL VENEER 2 4
PROFIL CAT GOLD MENYERUPAI HPL 11
TACO TH 212 AA RAISED FLOOR
RAISED FLOOR 20
15
1 32
17 47 2
15 35 10
PROFIL VENEER
MENYERUPAI HPL
15 107 107 15 364 15 107 107 15 TACO TH 212 AA GARIS PUTUS - PUTUS
BATAS DINDING BAR
850
CROWN KAYU
CROWN KAYU
DETAIL BACKDROP
SKALA 1 : 35 THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:35 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
MENYERUPAI HPL
LED DIBAWAH
PROFIL VENEER
TACO TH 212 AA
BY CONTRACTOR BEFORE
PRODUCTION
TUNDAN
DINDING BAGIAN
382
20
ENTRANCE
3
1
34
56
56
56
56
76
15
10
SECTION B
14
4
10
32
28
KAYU 3CM
DINDING BAGIAN
FRAME CAT GOLD
402
ENTRANCE
RANTAI BESI
SECTION
2
120
163
33
56
15
6
4
SECTION A
4
MENYERUPAI HPL
10
PROFIL VENEER
TACO TH 212 AA
28
53
SKALA 1 : 20
BESI BETON
CAT GOLD
77
LAMPU
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE SECTION MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
LED DI BAWAH LUKISAN MUST BE RE - CHECKED
AND ADJUST TO THE SITE
KAYU 3CM BY CONTRACTOR BEFORE
PRODUCTION
MENYERUPAI HPL TACO TH
BLOW UP A 212 AA ADA COAKAN
LED DI BAWAH
BESI BETON 2CM
CAT GOLD
4
47
3
105
47
393
BLOW UP B
KACA BEVEL '
1 CM ANTIK DETAIL
FRAME CAT HITAM SKALA 1 : 20
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
BLOW UP A NOTE - ALL DIMENSIONS
2 MUST BE RE - CHECKED
AND ADJUST TO THE SITE
6 11 BY CONTRACTOR BEFORE
PRODUCTION
3
2 91 2 2 91 2 1
1
193
1 2 91 2 2 91 2
1
193
23
KAYU 3CM
1 2
MENYERUPAI HPL TACO TH 212 AA
2
28
DI BAWAH ADA LED COAKAN BLOW UP
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
FRAME CLAASSIC CAT GOLD PRODUCTION
4
10
143 163
163
10
10 373 10
393
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
CEKLONGAN
CAT GOLD
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
132 NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
68 150 23 34 PRODUCTION
4
25
9
61
23
18
22
TOP MARMER HITAM
272
214
166
71 120 18 40 32
281
DETAIL M4
SKALA 1 : 20
32 THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
VENEER
LED DI NOTE - ALL DIMENSIONS
MENYERUPAI HPL TOP MARMER HITAM MUST BE RE - CHECKED
BAWAH TOP
TACO TH 212 AA AND ADJUST TO THE SITE
PINTU KOBOI VENEER BY CONTRACTOR BEFORE
71 146 32 32 MENYERUPAI HPL PRODUCTION
TACO TH 212 AA PROFIL VENEER
4 MENYERUPAI HPL
9 4 TACO TH 212 AA
5 PROFIL VENEER
BLOW UP 1 MENYERUPAI HPL
110 TACO TH 212 AA
74 PINTU KOBOI
LED DI
BAWAH TOP TOP MARMER HITAM
5 281
10 47 164 71
4
71 25 27 38 55 12
29 41 9 4
5 2
276 8
VENEER 1
MENYERUPAI HPL TOP MARMER HITAM
TACO TH 212 AA LED DI 52 110
278 BAWAH TOP
232 47
1
4 8 2
9 4 5
5 2 10
8
1 40 5 5 48 5 48 5 48 71
PROFIL VENEER
MENYERUPAI HPL 52 110 BLOW UP 2
VENEER PROFIL VENEER
TACO TH 212 AA
MENYERUPAI HPL MENYERUPAI HPL
1 TACO TH 212 AA TACO TH 212 AA
8 2
5
10
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
BLOW UP 1
4 5
2 8
1
BLOW UP PROFIL
SKALA 1 : 5
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:5 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BLOW UP 2 BY CONTRACTOR BEFORE
PRODUCTION
6
3
1
BLOW UP PROFIL
SKALA 1 : 5
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:5 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF M4
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
226
151 75
2 2
5 2
30
A 60
B 8 1
30
VENEER
MENYERUPAI HPL
FINGER GROOVE
A B
TACO TH 212 AA 2 2 2 2
5 2
8
1
37 80 71 80 78 80
1
8 2
VENEER 5
7 7
MENYERUPAI HPL
TACO TH 212 AA 5 8 24 8 5 5 8 24 8 5 5 8 24 8 5 5 8 24 8 5
58 2 2 28 30
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 60 60
226
VENEER
MENYERUPAI HPL PROFIL CAT GOLD
TACO TH 212 AA
DETAIL M5
SKALA 1 : 20
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
2
70 70
4 4
66 70
70 74 70 74
2
2 66 2
70
KAKI MEJA
LIST GOLD 2cm BELI DI INFORMA
BESI HITAM
DETAIL M6
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
TOP MARMER PUTIH TOP MARMER PUTIH
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
DETAIL PROFIL
SUPPORT MEJA
70 MENYERUPAI HPL
TACO TH 106 AA 4
BLOWUP PROFIL
120
SUPPORT MEJA
MENYERUPAI HPL TACO TH 106 AA
4 4
13 13
BLOW UP PROFIL 18 18
60 60
4 4
8 8
KAKI MEJA
12 12
MENYERUPAI HPL TACO TH 106 AA
34 83 3 15 3 38 34 10 83 3 15 3 38 8
3 2 2 3 3 2 2 3
120 71
DETAIL M7
SKALA 1 : 15
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF M7
SKALA 1 : 10 THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE IMG REFF MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 18 April 2019
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
LIST GOLD 2cm LIST GOLD 2cm MUST BE RE - CHECKED
AND ADJUST TO THE SITE
2 2 BY CONTRACTOR BEFORE
PRODUCTION
12
66 70 43 70
12
2 2
TOP KAYU FIN.
HPL AICA SAMPING LIST GOLD
MB GLOSSY RED ALMOND
MB - 038 DM 70
4
KAKI MEJA
BELI DI INFORMA BESI
HITAM
71 75
DETAIL M8
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
2 PRODUCTION
30
27
120
116 120 LIST GOLD
1
26
KIST GOLD
4
KUNINGAN
75
2 KAKI MEJA KAYU
TOP MARMER HITAM KIST GOLD 1 41 KEHITAMAN SEMI GLOSS
LIST GOLD KUNINGAN ( seperti di referensi )
KAKI MEJA KAYU
KEHITAMAN SEMI GLOSS
( seperti di referensi )
KIST GOLD 42 3
KUNINGAN 48
DETAIL M9
SKALA 1 : 15
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:15 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
IMG REFF M9
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
CERMIN ANTIQUE
BEVEL 1cm
(PENDING)
AC AC
271
76
200
2005 252 37
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE
INSTALLATION
ELEVASI PEMASANGAN MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated.
scale: date: revision
- do not scale dimensions directly from drawings.
- all discrepancies must be verified.
- all dimensions are to be verified on site.
2. PIC CONTRACTOR MUST SUBMIT FINISHING
SCHEDULE SAMPLES AND DOUBLE CHECK ALL
LAMPU GANTUNG 1:75 08 JULI 2020
- contractors and carpenters are to seek professional advised on
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BISA KUNINGAN
BY CONTRACTOR BEFORE
( TERGANTUNG
PRODUCTION
BISA CRYSTAL
OWNER )
76
SKALA 1 : 5
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL LAMPU MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
376
CRYSTAL
400
2294
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE
INSTALLATION
ELEVASI PEMASANGAN MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated.
scale: date: revision
- do not scale dimensions directly from drawings.
- all discrepancies must be verified.
- all dimensions are to be verified on site.
2. PIC CONTRACTOR MUST SUBMIT FINISHING
SCHEDULE SAMPLES AND DOUBLE CHECK ALL
LAMPU GANTUNG 1:75 08 JULI 2020
- contractors and carpenters are to seek professional advised on
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
376
CRYSTAL
400
886 880
2
ELEVASI PEMASANGAN LAMPU
SKALA 1:75
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE
INSTALLATION
ELEVASI PEMASANGAN MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated.
scale: date: revision
- do not scale dimensions directly from drawings.
- all discrepancies must be verified.
- all dimensions are to be verified on site.
2. PIC CONTRACTOR MUST SUBMIT FINISHING
SCHEDULE SAMPLES AND DOUBLE CHECK ALL
LAMPU GANTUNG 1:75 08 JULI 2020
- contractors and carpenters are to seek professional advised on
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
376
FIN BESI EMAS
125
31
11
17
17
12
154
8
KUNINGAN
CRYSTAL
SKALA 1 : 15
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL LAMPU MRABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:20 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
1
IMG REFF LAMPU
SKALA 1 : 10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE BLOW UP MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:10 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
154 NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
AC AC
224
276
47
62 140 148 140 143 142 150 142 146 143 145 141 146 140 116 238 12
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:75 08 JULI 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
NOTE DIMENSI YANG DI GAMBAR MUST BE RE - CHECKED
KEMUNGKINAN TIDAK AKURAT AND ADJUST TO THE SITE
KARENA TEMBOK LENGKUNG BY CONTRACTOR BEFORE
NOTE DIMENSI YANG DI GAMBAR PRODUCTION
CONTRACTOR HARUS UKUR KEMUNGKINAN TIDAK AKURAT
CONTRACTOR HARUS UKUR ULANG
ULANG DAN MEMBAGI ULANG LAGI DAN MEMBAGI ULANG LAGI
JIKA ADA YANG BERBEDA HARSP DI
KONSULKAN KE DESAINER DULU
JANGAN DI PUTUSI SENDIRI
54
168
280
327
45
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:75 08 JULI 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE DIMENSI YANG DI GAMBAR NOTE - ALL DIMENSIONS
KEMUNGKINAN TIDAK AKURAT MUST BE RE - CHECKED
CONTRACTOR HARUS UKUR ULANG AND ADJUST TO THE SITE
DAN MEMBAGI ULANG LAGI
BY CONTRACTOR BEFORE
JIKA ADA YANG BERBEDA HARSP DI
KONSULKAN KE DESAINER DULU PRODUCTION
JANGAN DI PUTUSI SENDIRI
151
328
4
NOTE DIMENSI YANG DI GAMBAR
KEMUNGKINAN TIDAK AKURAT
CONTRACTOR HARUS UKUR
ELEVASI
ULANG DAN MEMBAGI ULANG LAGI SKALA 1:60
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE ELEVASI MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:60 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
TASEL DEKORASI
GOLD
WC MALE
623
A
MARMER MOTIF
WARNA HIJAU
LIS KAYU 15cm
WC FEMALE WARNA MENYERUPAI NOTE DIMENSI YANG DI GAMBAR
HPL TACO TH 212 AA RAMP KEMUNGKINAN TIDAK AKURAT
RAISED FLOOR
20 CM CONTRACTOR HARUS UKUR
KAYU ULANG DAN MEMBAGI ULANG LAGI
PANGGUNG 30CM
COKLAT
MENYERUPAI HPL ORIGINAL
TUA
TACO TH 212 AA 1122 HEIGHT
686
storage 22 SQM
3678
DENAH LANTAI 1
SKALA 1:150 THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DENAH GEDUNG MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:150 12 Februari 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
MARMER HITAM MOTIF BY CONTRACTOR BEFORE
UNTUK PELETAKAN NYA PRODUCTION
CONTRCTOR CEK
LAPANGAN MAKE SURE
SIMETRIS PADA
BANGUNAN LIS BESI
KUNINGAN
1096 marmer hitam
15 4 1058 4 15
15
4
162 200
4
15
MARMER HITAM
UNTUK PELETAKAN NYA
CONTRCTOR CEK LAPANGAN
MAKE SURE SIMETRIS PADA
BANGUNAN
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DETAIL MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:35 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
164
KAYU EKSISTING LAMPU LED DI ATS COVE TEMBOK NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
BY CONTRACTOR BEFORE
PRODUCTION
STRG
LED DI ATAS
PROFIL EXISTING
WC MALE
KITCHEN 40 SQM 280 293 282 294 LED spotlight (ADJUSTABLE) dimmer
LED spotlight big
spotlight 2 gang dimmer
SPOTLIGHT for exposed ceiling
led tracklight
TABLE LAMP
f FLOOR LAMP
hanging lamp
aircon linear
LAMPU LED
LAMPU LED LAMPU LED DI ATAS
WC DI ATAS DI ATAS BALOKAN KAYU
BALOKAN KAYU BALOKAN KAYU MENYOROT KE ATAS
MENYOROT KE ATAS MENYOROT KE ATAS
3678
DENAH PLAFON
SKALA 1:150 THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DENAH GEDUNG MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:150 12 Februari 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
4
4
30
30
FLOOR LAMP
BLOWUP FRAME
FRAME BESI CAT HITAM
TABLE LAMP
hanging lamp
single switch
led tracklight
aircon linear
plug 2 gang
plug 1 gang
wall sconce
LED STRIP
4
imbudus
30
LEGENDA
SIMBOL
f
EXTSTING )
EXTSTING )
CROWN
KAYU
308
338
5
SKALA 1:40
806 414
186
186
10
10
10
THIS DRAWING/ DESIGN IS COPYRIGHT RESERVED.
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:40 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
FLOOR LIGHT LED DI BAWAH
AC LAMPU SPOT TANAMAN NOTE - ALL DIMENSIONS
RAISED FL LED BAWAH SOFA LED BELAKANG KASIR
WC PERLU AC FLOOR LIGHT MUST BE RE - CHECKED
AC 251 42 WALL LAMP AND ADJUST TO THE SITE
WC PERLU AC BY CONTRACTOR BEFORE
PRODUCTION
COLOKAN STAGE STRG
BY OWNER
160
LED MEJA KASIR
174 WC MALE f
f f
f
f f
430
149
f
f f 3O CM DR LT
WC FEMALE KALO PERLU TAMBAHAN FLOOR LIGHTT
148
POS LED SHELVING BAR f
LED RCPT
163
LED DI BAWAH f
34 LED DI DALAM ACRILIC
PANGGUNG
109
1766 KALO PERLU TAMBAHAN
1051 109
LED MEJA ONYX POS
f 36 LEGENDA
SIMBOL KETERANGAN
LED spotlight (ADJUSTABLE) dimmer
159 LED spotlight big
spotlight 2 gang dimmer
f
LED DI LASERCUT SPOTLIGHT for exposed ceiling
led tracklight
f wall sconce
3O CM DR LT wingle switch 2 gang
single switch
179 443 double switch 2 gang
tv, dvd , tv cable
storage 22 SQM f
f f
imbudus
plug 2 gang
f f plug 1 gang
f
143 LED STRIP
OFFICE
LAMPU SPOT LUKISAN
50 SQM ATAS BAR
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE DENAH GEDUNG MARABUNTHA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:150 12 Februari 2020
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.
NOTE - ALL DIMENSIONS
MUST BE RE - CHECKED
AND ADJUST TO THE SITE
CH 2800 BY CONTRACTOR BEFORE
PRODUCTION
183
15 15
42
508 LED BAWAH
88 MEJA
242
51 LED BELAKANG
15 CERMIN
LEGENDA
66 SIMBOL KETERANGAN
LED spotlight (ADJUSTABLE) dimmer
LED spotlight big
spotlight 2 gang dimmer
64 SPOTLIGHT for exposed ceiling
led tracklight
15 LED BAWAH f
TABLE LAMP
FLOOR LAMP
COVE
170 NAIK KE ATAS 15 CM
15
revision. date This drawing cannot be reproduced (whether part/whole) or modified Important Note: drawing title: project:
project interior design: drawing no:
no. page
without first obtaining our written consent. We reserve the copyright
to all our designs. This drawing is subjected to modification of its design
1.ALL FINISHING &SPECIFICATION MUST BE
and measurements from time to time to suit site construction purposes.
General notes: -
CONFIRMED TO DESIGNER BEFORE JUDUL APA
- all dimensions are in millemetres, unless otherwise stated. INSTALLATION scale: date:
- do not scale dimensions directly from drawings. revision
- all discrepancies must be verified. 2. PIC CONTRACTOR MUST SUBMIT FINISHING
- all dimensions are to be verified on site. 1:60 09 Juni 2016
- contractors and carpenters are to seek professional advised on SCHEDULE SAMPLES AND DOUBLE CHECK ALL
reinforcement of support. drawn by: checked by:
- all shelvings and internal arcass are in selected polykem finish, DIMENSION ON SITE BEFORE PRODUCTION
unless otherwise stated.