QUALITY CONTROL PLAN

ASPHALT MIXTURE Code: QCP-PZ-18


Ed.1 / Rev. 2
IMPRESA PIZZAROTTI &C SpA BINDER COURSE type SKBg II / 2,5 Page 1 of 5
Rehabilitation of R 16 Balti – Falesti - Sculeni Road
Contract RSPSP/W6/03 Section km 4 + 800 - km 30 + 270
Contract RSPSP/W6/04 Section km 30 + 270 km - km 59 + 480
TS, Standards, Norms
Recommended Form code
Type of checking Checked parameter/ Activity Limits Responsible Quality Records
requirements methods frequency for accepted
works

FRESH MIXTURE

rest on sieve
0.63mm:
for small sand: 10-30 %
Particle size distribution
for average sand: 30-45 %
SM STB 1/10 days (accepted
for large sand: 45-65 %
1033:2008; stock-pile)
Grain index GOST 8735- ≥ 1.5
SNiP 3.06.03-
88 Laboratory Test
Sand 85; Laboratory
Dust and clay particles content max 10 % Reports
GOST 8736-93
Clay in lumps content max 2 %
Bulk density 1/1 month -
True density (pyknometer
1/year -
method)
Compressive strength of the SM STB GOST 8269.0-
For source approval min 60 MPa
rock 1033:2008 97
Aggregates Particle size distribution: Laboratory Laboratory Test
Rest on sieve (%): Reports
5 mm = 90÷100;
GOST 8267-93 GOST 8269.0- 1/10 days(accepted 7.5 mm = 30÷60;
Fraction 5-10 mm
SNiP 3.06.03-85 97 stock-pile) 10 mm = max 10;
12.5 mm = max 0.5
Rest on sieve (%):
10 mm = 90÷100;
GOST 8267-93 GOST 8269.0- 1/10 days(accepted 15 mm = 30÷60;
Fraction 10-20 mm
SNiP 3.06.03-85 97 stock-pile) 20 mm = max 10;
25 mm = max 0.5
Fraction 20-40 mm GOST 8267-93 GOST 8269.0- 1/10 days(accepted Rest on sieve (%):
QUALITY CONTROL PLAN
ASPHALT MIXTURE Code: QCP-PZ-18
Ed.1 / Rev. 2
IMPRESA PIZZAROTTI &C SpA BINDER COURSE type SKBg II / 2,5 Page 2 of 5
Rehabilitation of R 16 Balti – Falesti - Sculeni Road
Contract RSPSP/W6/03 Section km 4 + 800 - km 30 + 270
Contract RSPSP/W6/04 Section km 30 + 270 km - km 59 + 480
TS, Standards, Norms
Recommended Form code
Type of checking Checked parameter/ Activity Limits Responsible Quality Records
requirements methods frequency for accepted
works

20 mm = 90÷100;
30 mm = 30÷60;
SNiP 3.06.03-85 97 stock-pile)
40 mm = max 10;
50 mm = max 0.5
Dust and clay particles content max 1 %
1/10 days(accepted
Clay in lumps content GOST 8267-93 GOST 8269.0- max 0.25
stock-pile)
SNiP 3.06.03-85 97
Content of soft particle max 10 %
Shape coefficient max 25%
Mark by crushing GOST 8267-93 1/1 month ≥ 800
GOST 8269.0-
SNiP 3.06.03-85
Bulk density 97 1/1 month -
Resistance by freezing and
GOST 8267-93 GOST 8269.0- 1/6 month F50
thawing
SNiP 3.06.03-85 97
Resistance to fragmentation for source approval mark И II
Moisture content <1%
passing through:
GOST 16557-78 Laboratory Test
GOST 12784-78 1/10 days 1.25mm: 100% Laboratory
Particle size distribution SNiP 3.06.03-85 Reports
0.315mm: min 90%
0.071mm: min 70%
Filler
Porosity GOST 16557 max 35 % by
GOST 12784-78
for source approval volume
Bitumen absorption: GOST 16557 Laboratory Test
GOST 12784-78 max 65 g Laboratory
Reports
The swelling of samples from a GOST 16557 max 2.5 % by
GOST 12784-78 1/6 month
mixture of powder with bitumen volume
Bitumen Penetration at GOST 22245-90 GOST 11501-78 One test/delivery day 61-90 (0,1mm) Laboratory Laboratory Test
25oC Snip 3.06.03-85 min 20 Reports
TS 305.17
QUALITY CONTROL PLAN
ASPHALT MIXTURE Code: QCP-PZ-18
Ed.1 / Rev. 2
IMPRESA PIZZAROTTI &C SpA BINDER COURSE type SKBg II / 2,5 Page 3 of 5
Rehabilitation of R 16 Balti – Falesti - Sculeni Road
Contract RSPSP/W6/03 Section km 4 + 800 - km 30 + 270
Contract RSPSP/W6/04 Section km 30 + 270 km - km 59 + 480
TS, Standards, Norms
Recommended Form code
Type of checking Checked parameter/ Activity Limits Responsible Quality Records
requirements methods frequency for accepted
works

0 oC
Penetration index GOST 22245-90 from -1 to +1
Softening point (ring and ball
GOST 11506-73 ≥47 oC
method)
Ductility at
25oC min 55
GOST 22245-90 GOST 11505
min 3.5
0 oC
Fraas point, oC GOST 22245-90 GOST 11507 max -15 Laboratory Test
1/6 month Laboratory
Reports
Inflamability point, C
o
GOST 22245-90 GOST 4333 min 230
Softening point after heating, C o
GOST 22245-90 GOST 11505-75 max 5
DIN EN 13702- according to EN
Dynamic viscosity EN 12591:2009
1 12591:2009
+/-2% aggregate >
15 mm
+/-1% aggregate >
5 mm
At the start of the +/-0.5% aggregate
Asphalt plant Check the asphalt plant Asphalt plant asphalt plant Asphalt plant
TS 305.04 works and when is < 5 mm
calibration calibration specifications operator register
neccessary Filler Scales +/-
0.5%
Bituminous
material +/-0.1%

Fresh bituminous Bitumen temperature-entering Asphalt plant permanently by asphalt plant Asphalt plant
SNiP 3.06.03-85 130÷150oC
mixture control the mixer specifications asphalt plant operator operator register
QUALITY CONTROL PLAN
ASPHALT MIXTURE Code: QCP-PZ-18
Ed.1 / Rev. 2
IMPRESA PIZZAROTTI &C SpA BINDER COURSE type SKBg II / 2,5 Page 4 of 5
Rehabilitation of R 16 Balti – Falesti - Sculeni Road
Contract RSPSP/W6/03 Section km 4 + 800 - km 30 + 270
Contract RSPSP/W6/04 Section km 30 + 270 km - km 59 + 480
TS, Standards, Norms
Recommended Form code
Type of checking Checked parameter/ Activity Limits Responsible Quality Records
requirements methods frequency for accepted
works

Mineral materials temperature at Asphalt plant permanently by asphalt plant Asphalt plant
SNiP 3.06.03-85 165÷185oC
outlet of rotary drier specifications asphalt plant operator operator register

SM STB
Asphalt mixtures temperature Asphalt plant asphalt plant Asphalt plant
1033:2008 1/800 t 140÷160 oC
leaving the asphalt plant specifications operator register
SNiP 3.06.03-86
± 0.3 % related the
approved mix
Bitumen content design for binder
course and
regulating asphalt.
Tolerance from mix
design:
particle size distribution TS 305.08 SM STB Fr.15÷40 mm: +/- 5 % Laboratory Test
Laboratory
STB 1033:2008 1115:2008 fr. 5÷15 mm: +/- 3 % Reports
fr. 0÷ 5 mm +/- 2 %

Density 1/400 t or 1 / day -


Air voids content (Vg) 2,5 ÷ 5 % by volume
compressive strength at:
0.9 – 1,1 Mpa
50oC

Void in the mineral aggregate


13 – 18 %
(VMA)
SM STB Laboratory Test
Swelling STB 1033:2008 0,5 – 0,7 % Laboratory
1115:2008 Reports
Water absorption max 12 % by volume
Asphalt mixtures temperature at STB 1033:2008 SNiP 3.06.03-86 permanently min 120 oC finisher Site register
pouring operator
QUALITY CONTROL PLAN
ASPHALT MIXTURE Code: QCP-PZ-18
Ed.1 / Rev. 2
IMPRESA PIZZAROTTI &C SpA BINDER COURSE type SKBg II / 2,5 Page 5 of 5
Rehabilitation of R 16 Balti – Falesti - Sculeni Road
Contract RSPSP/W6/03 Section km 4 + 800 - km 30 + 270
Contract RSPSP/W6/04 Section km 30 + 270 km - km 59 + 480
TS, Standards, Norms
Recommended Form code
Type of checking Checked parameter/ Activity Limits Responsible Quality Records
requirements methods frequency for accepted
works

Asphalt mixtures temperature at


SNiP 3.06.03-86 SNiP 3.06.03-86 permanently 120÷160 oC
start of compaction
COMPACTED LAYER
Prime coat
application on For each application Laboratory Test
Quantity of prime coat 0.8 ÷ 1.0 kg/m2 Laboratory
supporting carried out Reports
surface TS chapter TS chapter
Tack coat 304.06 304.06
application on For each application Laboratory Test
Quantity of tack coat 0.25 ÷ 0.4 kg/m2 Laboratory
supporting carried out Reports
surface
min 98 % of
compaction degree on core
SniP 3.06.03-85 Min 3 core samples average density of
samples
for each day (taken laboratory samples
between 24-72 hours
SM STB
after compaction at a Laboratory Test
1115:2008; Laboratory
SniP 3.06.03-85; distance of at least not less than the Reports
Control of TS 305.08
Layer thicknes TS 305.16 1m from the edge of thickness indicated
compacted layer TS 305.08 the surface) or min. in project
1 / 800 m2

Final geometrical check: TS chapter at least 6 points/100 F-SP 37


  - Topographer Report
Topographic coordinates 305.16 m2