Sr.

No Description of Idea Subbmited by Deppt


Raw coal belt area lighting and welding power point to be
1 E&I
separeted. Because light should be off during welding work.
Abinash Sahoo

2 Existing P&V system needs to be remove from LC2 and cooling E&I
arrangement to be provided from IO room AC. Abinash Sahoo

3 Existing P&V system needs to be remove from LC5 and cooling E&I
arrangement to be provided from IO room AC. Abinash Sahoo

4 Lighting ckt modification in Hooper building for reducing idle E&I


lighting unit. Abinash Sahoo

5 Pump house and MCC9 lighting ckt needs to be separate. E&I


Abinash Sahoo

6 Logic Modification in Cement mill with Roller Lub Flow L1 limit E&I
for ease of operation and nuisanse tripping. Soubhagya Behera

7 L21BC1 can be operated with VFD to eliminate spillage of E&I


material Soubhagya Behera

HAG valve stand FO oil temp to be provided as real time data


8 E&I
for ease of operation
Soubhagya Behera

9 Sov may installed in HAG instrument air & Atomizing air line to E&I
stop idle air consumption during mill stoppage. Soubhagya Behera

10 E&I
LC-05 light modification work with push button Jitendar Gupta

11 E&I
Clinker silo extraction tunnel Lighting ckt modification. Jitendar Gupta

12 Logic to be made for Critical belt conveyors for idle running. E&I

Jitendar Gupta
13 Booster fan operation from VFD or soft starter E&I
Jitendar Gupta
14 Float valve to be installed in packing plant water tank to stop E&I
the water overflow. Krishna
15 E&I
AC needs to run in Energy saving mode (ie temp. to maintain
22*C) Subrat Panigrahi
feasibility Saving Potential Action plan Responsibility
Lighting ckt
yes rewiring will be Jitendar Gupta
done

P&V will removed


yes and AC will install Abinash Sahoo

P&V will removed


yes 5 kwh/hour can be save. Abinash Sahoo
and AC will install

Lighting ckt
yes rewiring will be Jitendar Gupta
done

Lighting ckt
yes rewiring will be Jitendar Gupta
done

Logic to be
Nuisance tripping will be
yes implemented in Anand Krishnamurthy
eliminate Cement Mill

Lighting ckt
yes 1.8 kwh/ hour will be save rewiring will be Soubhagya Behera
done

RTD to be fixed
Nuisance tripping will be and signal to be
yes Soubhagya Behera
eliminate integrated with
DCS

SOV will install in


compressed air consumption
yes will be reduced. Reciver inlet at Soubhagya Behera
HAG floor

Lighting ckt
yes rewiring will be Jitendar Gupta
done

Lighting ckt
yes rewiring will be Jitendar Gupta
done

Logic to be made
yes in DCS with no Anand Krishnamurthy
load current.

RAL jamming issue will be new VFD need to


yes Janak Sethi.
resolved. install

yes Float valve will be Krishna


installed
yes Energy saving Janak Sethi.
setting will nbe
enabled in AC CDP
Lead Time Result Area Remarks

31.07.2022 Productivity In progress

31.07.2022 Cost Completed

31.07.2022 Productivity In progress

31.07.2022 Productivity In progress

31.09.2022

31.07.2022 Productivity In progress


31.09.2022
31.07.2022 Cost Completed