BOQ
Fixed cost
Excavation
RMC
BOQ-1
RMC-1
Steel TMT-1
Fixed cost-1
Steel TMT
Formwork
Structural steel
Blockwork
Sheet1
Couplers
Extra
Puddle Flanges
2
Summary for Carrying Out Civil Core & Shell Works for L&T’s Proposed Multi use Development Project (Tow
3
elopment Project (Tower and Allied Parking Area), Energy Center at Vadodara, Gujarat
4
Summary for Carrying Out Civil Core & Shell Works for L&T’s Proposed Multi use Development Project (Tow
Total Amount
Add for GST: 18%
Grand Total
165000
Total Excavation / Backfilling / breaking qnty Excavation Mt3/ per Sq.ft.
5
Total PLASTER Mt2 Total PLASTER Mt2 / Sq.ft
14,511 0.09
Total core cutting VDF ETC misc Total core cutting VDF ETC misc
Total misc
6
7
d Multi use Development Project (Tower and Allied Parking Area), Energy Center at Vadodara, Gujarat
Amount (INR)
225,463,961
7,633,013
20,130,889
253,227,863
45,581,015
298,808,878
2,988,233.00
18.11
56,842,305.00
344.50
53075048.00
321.67
61646148.00
373.61
2498384.00
15.14
28,894,387.00
175.12
8
9,978,625.00
60.48
616,945.00
3.74
8,188,764.00
49.63
7,633,013.00
46.26
20,130,889.00 ###
122.01 1530.26
#DIV/0!
9
10
S.N.
ii
iii
11
iv
ii
iii
ii
iii
iv
ii
iii
iv
12
i
ii
ii
ii
iii
iv
ii
iii
iv
13
d
ii
iii
iv
vi
vii
14
i
ii
ii
ii
iii
iv
vi
15
vii
ii
iii
iv
vi
vii
16
i
ii
17
b
ii
iii
ii
iii
ii
iii
iv
vi
vii
18
viii
ix
ii
iii
iv
vi
vii
viii
ix
xi
xii
ii
iii
iv
19
vi
vii
ii
ii
iii
iv
ii
iii
ii
iii
20
1
21
1
22
2
23
3
24
7
10
25
11
12
13
14
26
15
16
17
27
18
19
20
28
21
22
23
29
Annexure A for Carrying Out Civil Core & Shell Works for L&T’s Proposed Multi use Development P
Description
Part A
Notes: All measurements shall be as per IS: 1200 unless otherwise specified
EARTH WORKS
Mass Excavation in all types of soil for all depths (Disposal outside site Premises)
Earthwork in Excavation Using mechanical means/ manual means using Contractor supplied plant and machinery an
including raft, foundations of walls, columns, footings, basements, equipment foundations, plinth beam etc. in all ty
Mass
murrum Excavation
(but excluding in Hard
hard of rock
rock : (Disposal
requiring chiseling outside
using site
rock Premises)
breaker
Mass Excavation in all types rock for all depths: (Disposal Outside siteor blasting), providing shoring, pumping, bai
Premises)
complete . Any type of strata that can be excavated using excavator bucket shall be measured and paid under soil ex
Earthwork
The item rate in Excavation
shall include Using mechanical
providing shoring means/ manual
, strutting, means using
de:watering withContractor
completesupplied
pumpingplant andbailing
system, machinery
out waan
Concrete
including raft,Breaking
foundations (M30of Grade)
walls, columns, footings, basements, equipment foundations, plinth beam etc. in all ty
Breaking of
transport forconcrete/
all masonry
leadnormal
and lifts, in existing
disposal foundation,
of excavated grade slab
material and
using any othervehicle
contractor's structure by mechanical
outside / manual
site premises (Dispom
be excavated
authorized using
disposal yard excavator bucket and that requires chiseling using rock breaker or controlled blasting), p
Muncipal
out water Guidelines
, slush and approved
removal place/location
etc. complete
by municipality
of
. disposal
Any type
outside
tostrata
of
site premises.
be finalized
that canbybe Expenses
contractor
excavated
on own
atusing
his account
cost)ofetc.
excavator
debris manageme
complete
bucket shall as
be pe
m
municipal
(EIC). Royaltycorporation
charges guidelines
for excavation, in covered
Expenses vehicles, housekeeping
debris,of roads and surroundings of ,excavated
royalty for disposal
excavation item only. The item rate shall includeonproviding
account of
shoring management / disposalwith
strutting, de:watering complete earth
pumpingas p
rate.
in covered vehicles, housekeeping of roads and surroundings , etc are included in the rate. No separate payment on
removal
Any over,excavation
excavation,shall transport
be made for good
all leadwithandplumlifts,concrete
disposal (with
of excavated
M10 Grade material usingplums
with 40% contractor's vehicle outsid
of size 160mm down
excavated material as per Muncipal Guidelines and place/location of disposal to be finalized by contractor at his ow
No
Back payment
Filling
instructions shall be
of :Engineer made
Earth From for such
outside
in charge works
(EIC),site of plum concrete.
Royalty charges for excavation, Expenses on account of debris management
Note
muncipal corpration guidelines, in per
Filling1: Mode
in of
foudations, Measrument: As
rafts,trenches,plinths, IS 1200
covered area levelling,
vehicles, podium filling
housekeeping of roadswith approved
and good quality
surroundings , etc. Noearth brought
separate payf
Note 2:
premises, All leads
etc.in and
layerslifts to
not be included
exceeding in
200mm the Unit
in Rates.
depth, breaking clods,watering,compacting
considered. All these expenditures are included in the item rate of excavation. Any over excavation shall be made go each layer with vibrato
Note
Grade3:with
achieve Any
95%40% variation
plumsin160mm
of maximum prices of any component
dry density.
down The rate
graded (butalso
) atshall
the notinclude
cost limited
of to) likeNo
charges
contractor. Diesel,
for labour,
surface
payment shallplant
dressing, and
slushmachinery,
be made royalt
removal,barrica
for such works o
not be
include payable
Note 1: charges
Mode offor to contractor
royalty.
Measrument: during the entire
As per IS 1200 period of contract and its extension if any.
Note 2: All leads and lifts to be included in the Unit Rates.
Back
Note 3:Filling : EarthinAvailable
Any variation prices of any Inside site Premises
component (but not limited to) like Diesel, labour, plant and machinery, royalt
Filling in foudations, rafts,trenches,plinths,
not be payable to contractor during the entire area levelling,
period podiumand
of contract filling with approved
its extension if any.good quality excavated eart
etc.in
Note layers not
4: Contractor exceeding
to submit excavation method statement, excavation plan and safety plan with
200mm in depth, breaking clods,watering,compacting each layer beforevibratory
start ofcompact
activity.
Concrete
maximum dry Works
density. The rate shall also include charges for surface dressing, slush removal,barrication and safety.
for royalty.
Notes:
Clause detailed below to be referred for all concrete items like isolated footings, rafts, retaining walls, plinth beams
shear walls, lift walls, floor slabs, floor beams, Tie /Link Beam, staircase, parapet, pardi, Chajja, lintels, mullions, con
Underground Tanks, STP, lift machine rooms, Elevation Features, mezzanine floors, service shaft slabs / platform, tr
Plum Concrete
lofts, etc. all as perWorks: With in
GFC included plum brought
this work from
order. The outside
following shall be deemed to be included in the item rates:
Providing and Laying Plum concrete by using M 5
a) The concrete shall include all ingredient materials (Cement, Grade concrete 60% andAdmixture
Aggregate, Hard stone, Fly
plum ( Max.
Ash, Silicasize
Fume 160, GGBS,
mm ) 40 w
be
Plum used ) , including
Concrete of M shifting
5 Grade , stacking & laying of plum .
(including erection of scaffolding if required), hoisting to all locations & heights/ Levels / Depths, pouring / laying by
The Item ratebyshall
compaction include
suitable dewatering
means needle /system
surfaceas/ plate
per approved
vibrator,methodology to keep
leaving pockets, holeswork area dryofallinserts
,installation time before
as shop
surfaces
till & junctions,
theConcrete
next operation cost of
orGrade all materials, miscellaneous consumables,labors,tranportation of material
completion of work, hacking the surface / use of approved binding agents to provide key fo to all require
Plum
approved of,Placing
M 7.5
wetting, etc. and preparingvibrating
means ,compacting,
construction Curing
joints with etc. tools,
provision plantkey.
of shear and machinery, hire and fuel charges and al
per specifications, drawings and as directed by EIC. The item rates shall
b) If different grades of concrete are used at junctions, spillover of richer concrete hold good for work at
required all Levels
shall ,depths,
be included heig
in the
pits,
Plum
c) Itemtunnels,
Concrete etc.
rate shall ofinclude
M 10 Grade
filling of tie:rod, wall ties holes with non:shrinking and waterproofing grout material.
Designing of concrete
d) Providing construction mixjoints,
for different grades
expansion of wherever
joints controlleddirected.
concrete should be done in accordance with latest IS:SP
design)
e) Adequate protection of edges and corners from damage duringby
in an approved lab and the same should be got approved EIC , the item
construction rates also manner.
in approved includes cost for the sa
Note: Rate also includes of Providing , placing, fixing and removal of necessary formworks.
f) Work either straight or curved, plain or circular or of any shape, unless otherwise provided for.
g) Keeping the work well cured for at least 7 days from the date of casting or as per relevant IS code (Ponding metho
wet/moist hessian cloths to be wrapped around surfaces). All types of Quality Control tests (green and hardened st
specifications. 30
h) Hacking of all concrete surfaces wherever required.
i) All starters to columns and other vertical elements shall be prepared with concrete mix one grade higher than tha
Plum Concrete of M 15 Grade
FORMWORK :
Following clause detailed below to be referred for all formwork items included in BOQ. The following shall be deem
rates:
Providing, a)The materials,erecting
fabricating, design, and andconstruction
fixing in position of formwork
formwork (including
material bracing,
of approved shoring,system strutting
made&ofSupporting
Ply with bolts witha
comply with the best Indian Standard Code of Practice for false work and
centering and shuttering to correct line and levels including strutting, propping, etc. with necessary bracings in all ax below.
b)Specifically,
provision for making forms for theconcrete
joints in work shall be so
the shuttering constructed
fully leak:proofand erected
to avoid as to resist
leakage of cementthe forceslurry,exerted
dismantlingon them andwir
Super
greater Structure : Conventional Formwork
after the concrete attains sufficient strength to self:support itself without any cracking and distortion. etc. includingt
than three (3)mm. Forms shall be sufficiently tight to prevent the leakage of mortar/grout. *(Masking tape
the
(Up sufficiency
Fire toCheck of theStaircase
Floor,
4.5m Height), whole
all placesof and
the
Headformwork
profilesRoom shall
, LMR
wherever restneeded
entirely with
Misc.the
, other: specified Contractor
itemas per drawing whoand shallproviding
engage arequired
qualifiedsurfa Eng
Providing,
construction
Extra
providing overall fabricating,
methods
formaterials
Staging aboveerecting
to
required and
structurally fixing
4.5 including design in position
the
m Height consumables,
: Extra over For formwork
formwork. Prior
supporting
making material
to start of
any approved
RCC members
of formwork formwork, system
, shifting(slabs made
shuttering
& beams)of
of formwork of Ply
works
up to with
the
height bolts
morea
shutte
all location
centering
EIC d)Forms
requiring
centering,stagingand forshuttering
exposed
strutting, to increasedto correct
surfaces
propping, height line
shall be and
walling,asbracing, madelevelsof
requiredbolting, including
dressed
upto 7wedging, strutting,
timber
m . The staging or propping,
metal.
casing, or Angle
formwork
striking, etc. with
fillets necessary
shall
design
removal, be used bracings
shall be DE
lowering, in the
submitted in all
to ax
angles
shuttering, ro
th
provision
to line
approval and for making
conform
thebefore the
to
proceeding thejoints in
dimensions
to the shuttering
and levels fully
shown leak:proof
on the to avoid
Drawings. leakage
f)The of cement
interior surfaceslurry,
of dismantling
forms shall and
be co r
filling
Extra
after
(The
Fosroc over
the
gap/holes
for Staging
concrete
make) prior
ofabove
attains
tie rods 7.0erect
with
thesufficient
to wherever
placing m of the same.
grout,
Height
strength :etc.
Extraand overall incidental
to self:support
reinforcement, andForany
supporting
itself
work RCC
without
surplus
complete.
members
any
moisture
The(slabs
cracking
shall
activity
be and &
removed
also includes
beams)of
distortion.
from height
etc.
the
allowing
forms more
includingprio
f
cut:outsItem rate shall
openings, include
etc. providing called allfor,
materials
allowing required
for including
dressing with consumables,
approved making
shuttering of formwork
oil to prevent ,shifting
adhesion ofo
requiring
(Up tobe4.5mstaging
Height),to increased height as required uptoneeded 9.5 m. etc.The staging beasor formwork design shall prior
be submitted to t
material
depths
shall
approval
such
&applicable
levels,
before toall
as including
dirt, allplaces
clay,
proceeding
wire, and
centering,
RCC members.
to erect
profiles
reinforcing
strutting,
the
wherever
same.
bar,propping,
wood chips,
walling, : specified
shall
bracing, per
removed
bolting, drawing
from
wedging, and providing
thecasing,
forms required
to concretin
striking, surfa
removal
providing
displaced
Extra
all all
rods,during
Over formaterials
&concrete
Scrificial required andincluding
orproviding
Formworkwithin the
system consumables,
periods specified making
for theofretention
formwork byof ,formwork,
shifting of the
formwork
concrete upwhere
to ,shifting
shall allbelocation
remo
ThetieItem
The Item
centering,
Engineer
nuts
rate
rate shall
shall
strutting,
may
bolts,
include
include
determine,
etc.
propping, providing providing
walling,
construction
all
joints
additional
materials
allbracing,
materials required
required
bolting,
shall be
safe working
including
including
wedging,
formed and the
area providing
consumables,
consumables,
casing, striking,
section of work
extra
making
making
removal,
shall
formwork
be
of formwork
of reconstructed
formwork
lowering, DE
necessa
,shifting
shuttering,
after
of
of
thr
etc.
depths
depths complete
& levels,
& levels, as directed
including
including by EIC
centering,
centering,. The item
strutting,
strutting, rate also
propping,
propping, includeswalling, allowing
walling, work bracing,
bracing, for forming
bolting,
bolting,The grooves,
wedging,
wedging, drips,
casing,
casing, throats,
striking, cut:outs
removalof
removal
striking,allowing
filling
and
all the
adjusted.
allowing
tie gap/holes
fornuts
dressing of tie rods
withetc.
approvedwith grout,
shuttering etc. and all incidental
oil to prevent adhesion complete.
ofbyconcrete activity
to extra
formwork. also includes
Itemwhererate shall also
all tie rods,
cut:outs
i)Formworkrods,
Reinforcement nuts
openings,
shall
& bolts,
&remain
bolts,
etc.
Steel etc.
wherever
and
and for
inbyplace
Works
providing
providing
called
the for,
additional
additional
allowing
minimum timefor
safe
safe working
working
dressing
as specified
area
area
with IS:by
approved
in for 456
providing
providing orextra
shuttering
:1978
formwork
formwork
oil towithin
as varied preventwhere
this
necessa
necessa
adhesion
specifica o
quality
etc.
etc. check
complete
complete as
as
as per approved
directed
directed EIC
by EIC quality
. The
. Not plan.
item
The withstandingrate also
item rate alsothis, includes
includes allowing
allowing forming
forbeforming grooves,
grooves, drips,
drips, throats,
throats, cut:outs
cut:outs o
o
shall
in
Mode
allowing be applicable
accordance
of for
payment with
dressing to all
this
: Area
with RCC members.
standard.
of staging shall be measured side
as per the forms may
plan area stripped
and not the after the minimum
area in contact time
with specifie
concrete
allowing
The
in anyItem for
case ratedressing
not shall
less with48approved
include
than approved
providing
hours)
shuttering
shuttering
afterall materials
the
oil
oil to
concrete to prevent
prevent
required
has been
adhesion
adhesion
including
poured,
of
of concrete
concrete
consumables,
provided
to
to
that
formwork.
formwork.
making
Item
Item
of formwork
the surfaces exposed
rate
rate shall
shall
,shifting
are imm
also
also
of
quality
Supplying check
qualitycompound
check & as per
fixing
as per approved
reinforcement
approved quality
quality plan.
steel
plan.is carried
depths
curing
Mode &
of levels,
payment including
(if
:The centering,
required) and strutting,
curing propping,out inwalling,
accordance bracing, with bolting,
this wedging,
specification. casing,
Bottom striking,
forms removal
shall rem
Providing,
Mode
all ofor
tie rods,
pouring
Straightening,
payment
nuts
as otherwise Areaarea
&,:bolts, of
etc.
in contact
cutting,
staging
and 18
approved
bending
shallwith
thebe
providing
by
andconcrete
bindingwith
measured
additional
Engineer. j)Whenas
safe
deductions
in position
per the plan
working
forms arearea
for openings.
of reinforcement
area by
reused, and barsarea
not the
providing
their
(TMT
extra
original inbars:
contact
formwork
shape,
Fe 500
with) concrete
where
strength,
high yie
necessa
rigidity,
Note
conforming
For Sub : For UGWT
to
Structure STP
IS:1786:2008 & Retaining
with wall
gauge no through
annealed type
binding of tie rod
wire, to, wall
correctties shall
shape beandusedsize for
as formwork
per detailed system.
drawing
etc. complete
smoothness as
shall directed
be by
maintained. EIC . The
All item
material rate also
previously includes
used allowing
in formwork
bar:bending schedules, for all reinforced concrete work such as pile caps, footings, RCC walls, columns / stub colum for forming
must be grooves,
cleaned drips,
off andthroats,
oiled cut:outs
before reuo
allowing
beams, Staircase, Lintels, OHWT, LMR, rafts etc. at all heights and all levels; with correct sizes approved concretealso
so as to for
ensure dressing
uniform with approved
quality and shuttering
texture over oil to
large prevent
areas, adhesion
built to of
close concrete
tolerances to formwork.
and exhibit Item rate
consistently shallgood coq
quality
check
For Superand
concrete check
list of as
the
Structureper
same approved
work have quality
to be plan.
fill before the contractor start any
galvanized binding wire of 18 gauge; if required dewatering, required labor and machines / equipmen works. j) Quoted rates shall be inclusive of
Mode
handling, of payment
constriction joint to
shifting :The
etc. make area
and in contact
concrete
cutting and with smooth.
surface
bending concrete
as per with deductions
drawing, for openings.
reinforcements all complete to the satisfaction of the
Note : For OHWT / water retaining structure scarifies
The Item rate shall include providing all materials required such as reinforcement type of tie rod system , no through
steel bars type(TMTof tiebars:
rod Fe , wall
500tiesconfsh
Coupler:
miscellaneous at all levels
consumables suchin asreinforcement
18 gauge annealed
Supplying and Fixing of Couplers steel Galvanised
bars including Ironmaking
bindingthreading
wire , chairs of bar ,pins ,spacers
at both end,correct
(Each jun s
or
of approved PVC cover block , Cost of Labour, machines / equipment / tools / tackles / vehicles for all transportatio
16 requisite
mm Dia. Bar
reinforcement
forging (if required) and threading shall be treated as one number for payment) the threading of steel b
in the stocking yard, shifting the same
approved coupler supplier at site and contractor. The to ratecutting
shall & bending
include yard, Straightening,
all transportation, cutting,
Handling, bending,shift
unloading, shift
locations, heights, depths & levels, all necessary
and all necessary miscellaneous handling charges etc. complete. miscellaneous handling charges, tying reinforcement steel as per d
required
20 mm Dia. Baretc. complete as directed by EIC. Item rate shall also include testing charges required for quality check as p
: No separate payment for binding wires, chairs, Pins, spacer and cover blocks shall be considered. Only authorized l
as per GFC drawing.
25 mm Dia. Bar
32 mm Dia. Bar
32
Reinforcement Steel Bar Anchor
Providing , drilling and fixing Reinforcement steel bar anchoring work of reinforcement steel in concrete wall with c
at
8mmanyDia
height & location as per instruction of Engineer Incharge .Rate inclusive of cost of all materials, miscellaneous
of material to all required locations by approved means , tools, plant and machinery, hire and fuel charges and all ot
required as per specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels
10mm Dia
12mm Dia
16mm Dia
20mm Dia
25mm Dia
32mm Dia
34
Core Cutting: 250 mm dia
Core cutting of specified dia in all type of masonry as per approved methodology.
The Item rate shall include cost of all miscellaneous consumables, labors , tools, plant and machinery, hire and fuel c
scaffolding/staging
Core Cutting: 50 mmanddiaall other incidental charges etc. complete all as per drawings and as directed by EIC. The item
Levels and all Location.
Core Cutting: 75 mm dia
Chasing in Masonry :
Chasing in all type of masonry wall upto 75 mm depth as per approved methodology.
The Item rate shall include cost of all miscellaneous consumables, labors , tools, plant and machinery, hire and fuel c
Cutting of RCC with
scaffolding/staging Diamond
and all cuttingcharges
other incidental Saw: etc. complete all as per drawings and as directed by EIC. The item
Item shall include all activities required for Cutting of concrete RCC works with Diamond Cutting Saw with Machine
Levels andasallper
locations Location.
the approved methodology and instructions of Engineer:in:charge (EIC) including all tools, tackles, m
staging / supporting to adjacent structure , any consumables, etc. complete. The item rate shall include Lowering ,L
out side site premises etc. complete as per instructions of Engineer in charge (EIC).
Mode of Measurement: Cross sectional area of cutting member shall be measured for payment.
35
Providing Non reinforced cement hard vacuum dewatered concrete flooring consisting of the following:
Providing, supplying and laying, finishing M20 grade batch mixed controlled concrete with PP fibres at 0.900 Kg @cu
dewatered flooring of upto 125 mm thk including cleaning, trimming, watering the surface, laying in strips to require
smoothening, curing etc. making 15mm x 10mm expansion/ control joints at intervals, sealing the joints with polyur
complete to the required slope, formation, finish. Cost to include working at all levels, necessary pumping to require
per drawings, providing serrated finish for the ramps including VD operation onsisting of providing side shuttering w
required levels,finishing with required texture (BROOM FINISH ( SAMPLE TO BE APPORVED BY EIC)), Vibrating the co
de:watering using vacuum pumps by suction method and finishing the top surface to required level and grade using
Covering the finished concrete surface with 200 micron thick polythene sheet and cutting grooves of size 6 mm x 10
grooves with Sealant with curing etc. complete at all levels, heights and locations, etc. as directed and to the satisfac
Supply & Applying Con quail integral color , Con Seal integral , Con Charcoal integral color including Labour charges f
material in concrete at batching plant with Labour charges for laying of colour concrete of irregular pattern on slopi
coating. including Supply & Applying of CCE Sealer coating.
Item rate inclusive of all materials, miscellaneous consumables, labours ,transportation of material to all required lo
plant and machinery, hire and fuel charges and all other incidental charges etc., all required as per specifications, dr
item rates shall hold good for work at all Levels, lead, lifts, Heights, Depths etc.
Sub Total A
Part B
Structural Steel :
Supplying, fabricating, delivering at site, hoisting and fixing in position at all heights and all levels and making all stru
the design drawings prepared by the consultants. The structural steel work shall include welded and built up section
welded and built up sections, trusses, built:up purlins, frame work welded and/or bolted, girders, gusset plates, bas
The Item rate shall include providing all materials required
36 such as Structural steel (Confirming to IS: 226 & 2062 ),
consumables ,scaffolding, Cost of Labour, machines / equipment / tools / tackles / vehicles for all transportation, Ha
the stocking yard, shifting the same to Fabrication yard, shifting from Fabrication yard to all required locations, heig
MS Railing in Shaft :
Providing and fixing railing as per approved drawing and to the satisfaction of EIC.
Rate inclusive of cost of all materials, miscellaneous consumables, labors ,transportation of material to all required l
Heavy
plant duty
and rungs :hire and fuel charges and all other incidental charges etc., all required as per specifications, dr
machinery,
Providing and fixing Heavy duty rungs in R.C.C. wall of water tanks etc. Including cutting, chasing the R.C.C. work a
item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc
as required.
Pl enclose
Storm
Load standard
water
carrying (PHE) drawing100KG
capcity:Upto or give matl description
Drain Channel:
Constructing cast in site R.C.C gutter / drain along the driveway/ courtyards including excavation, concrete ,shutterin
plaster
450mmcoat
Wide,as per drawiing and approval of EIC
Rate inclusive of cost of all materials, miscellaneous consumables, dewatering labors ,transportation of material to a
means , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required as per sp
600EIC.
by mmTheWide
item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc
900 mm Wide
80 mm Flange On Outside
37
150 mm Flange on Outside
UPVC Sleeves :
Supply & fixing of PVC/UPVC sleeves of medium class for following Dia.
UPVC Sleeve :32mm dia
38
UPVC Sleeve :150mm dia
100 mm dia
Sump Pits :Providing and fixing 900mm x 900 mm DI (heavy duty) cover with frame (as per EN:124) with lockable a
(Total WT of cover and frame to be not less than 85 kg).
UGT :Providing and fixing 900mm x 1200 mm DI (heavy duty) cover with frame (as per EN:124) with lockable arrang
WT of cover and frame to be not less than 85 kg).
Terrace Tanks :Providing and fixing 600 mm dia FRP (heavy duty) water tank circular cover with frame (as per EN:12
complete in all regards.
Grease Trap :Providing and fixing 600mm x 600 mm DI (heavy duty) cover with frame (as per EN:124) with lockable
(Total WT of cover and frame to be not less than 85 kg).
Providing MS pipe sleeve :
Providing Mild Steel (MS) ‘C’ class pipes as SLEEVES each to be embedded in RCC walls / beams. And any other RCC
by
DiaEIC
50mm
Dia 65mm
Dia 80mm
4 Module
Sub Total B
Part C
39
Waterproofing Works
Notes: All measurements shall be as per IS: 1200 unless otherwise specified
Space as available within the site for setting up of site office and all other temporary site facilities except for labour accommod
Office Furniture & Equipment viz.Furniture,computers, and cupboards , other office related materials.
Labour Facilities
Drinking Water, Site Sanitation (Washing + Toilets), Drainage Facilities, Labour accommodation outside project site, Labour tra
Transportation including all applicable taxes for machineries & erection work.
Insurance
Insurance Policies such as ,Contractor’s all risk (CAR ) Policy, Workmen Compensation, Group personnel accident, Automobile
Safety Installations like nets, Safety Barrication, Provision of Ambulance with Driver, First Aid facilities, QA/QC Lab facilities alo
etc. providing necessary PPE for Contractors Staff, Labour ,Client, Engineer and consultants appointed by the Client, Safety Ma
Labour Mobilization & Demobilization activity
All scaffolding, ladders, platforms, staging, cranage and plant & equipment required in the execution of work to any height an
required for the works including dewatering.
Water proofing Contractor shall visit the Site & understand the scope of work from EIC prior submitting Techno commercial off
completing work . Work will be measured and paid as per items mention in this BOQ for water proofing work , other items /sc
per methodology submitted by water proofing contractor during Tender stage but not mention in this BOQ will not be measur
For all liquid
provide applied
10 years membrane
Guarantee on stampsystem,
paper Preponding
(In approvedto be carried
format out for
by Engineer In minimum
charge) for24
all hours to ascertain
water proofing workthe quality
included in
waterproofing system, a ponding to be done for at least 48 hours to ascertain watertightness of the system.
Waterproofing Works
40
W/P membrane system-Basement Positive Side Waterproofing Horizontal Surface Below Raft Slab
Supplying and installing waterproofing treatment by using 1.2mm thick fully bonded Preapplied HDPE sheet memb
Slab/footing/as shown in drawing. Membrane shall be installed in strict accordance with the manufacturer’s instruc
bond to resist water migration. The fully bonded HDPE sheet membrane shall consist of a multi layer composite film
HDPE film, self adhesive polymer layer and trafficable. The fully bonded HDPE membrane is loosely-laid on the PCC
Footings/Stitch Slab/as shown in drawings or wherever applicable etc.
The fully bonded Preapplied HDPE sheet waterproofing membrane shall have following typical properties :
1) Elongation > Minimum 75%.
2) Peel adhesion to concrete: > 880N/m (ASTM D 903 Modified)
3) Puncture Resistance: 800N +/- 5 % (as per ASTM E154)
4) Resist hydrostatic pressure of over 60m head of water as per ASTM D5385
Side overlaps shall be a minimum of 75 mm on the selvedge and end overlaps of minimum 75 mm.
The item rate shall include base preparation which include wire-brushing the Concrete/Masonry surface & cleaning
cracks, honeycombs on the RCC members as per manufactures specification and approved methodology. Item rate
miscellaneous consumables,labors,tranportation of material to all required locations by approved means ,Curing , to
fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by EIC.
work at all Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guara
stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include
check as per approved quality plan.
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.
41
Waterproofing Works For Retaining Wall - Positive Side - Self Adhesive Membrane - Unconfined ar
Supplying and Installing self adhesive, SBS Membrane, cold applied , flexible minimum 1.5mm thick waterproofing m
laminated HDPE film, applied on the external surface of the retaining wall post construction and after deshuttering i
The Self Adhesive waterproofing membrane shall have following typical properties :
1) Elongation > 200 %
2) Puncture resistance > 220N
3) Tensile Strength = 4 N/mm, 42N/mm2 /48 N/mm2 for film
4) Resistance to Hydrostatic pressure = > 60 m
5) Tear Resistance = 23 N/mm for system, 340/310 N/mm for film. Waterproofing with Styrene Butadiene Styrene (S
membrane (Positive side):
I. Surface Preparation:
Cleaning and wire-brushing and mechanical grinding to achieve Concrete Surface Profile 2 ( CSP 2). RCC surface shal
contaminants like dust, oil and grease, All surface imperfections, protrusions, structurally unsound and friable concr
joints, cracks, honeycombs, on the RCC surface by injection grouting with non-shrink cementitious grout/Epoxy gro
sleeves, tie rod holes, cut-outs shall be treated with non-shrink cementitious high strength grout material.
II. Water Proofing Application:
Apply the Primer on clean RCC surface by brush or roller. Allow the primer to dry prior to the application of the mem
Styrene Butadiene Styrene (SBS) modified waterproofing membrane to be apply on clean RCC primer surface. Press
top of the applied membrane to ensure a proper and strong adhesion of the bitumen compound with the base surfa
minimum of 75 mm on the selvedge and end overlaps 100 mm. The finished surface should be left exposed for 48 h
manufactures after which further build up works can be carried out.
III. Protection:
The Membrane shall be protected with HDPE Dimpled drain board with 6 to 8 mm thick and composed of high den
to a non-woven geotextile of calendared polypropylene of 120 g/m2. Nodule height is generally 7.3 ± 0.2 mm and m
250 KN/m2 when tested as per ISO 604 OR ASTM D 695 ( Specimen dimensions as per clause 6.7.2), over the water
surface, stuck to the membrane by spot bonding method, using synthetic adhesive with butt joints etc. complete, to
damage. due to ongoing site activities or from sharp aggregates or boulder during backfilling. In all cases, damage du
monitored closely.
Membrane must be properly terminated as per approved methodology by manufacturer. The termination height sh
The item rate shall include base preparation which include wire-brushing the Concrete/Masonry surface & cleaning
cracks, honeycombs on the RCC members as per manufactures specification and approved methodology . Item rate
miscellaneous consumables, labours, transportation of material to all required locations by approved means ,Curing
and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by
for work at all Levels ,lead, lifts, Heights, Depths, basements, trenches, pits, tunnels, water tanks etc and providing g
stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include
check as per approved quality plan.
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.
42
Coal Tar Epoxy - RCC Foundation and Substructure
Providing and applying one coat of epoxy primer and two coats of coal tar epoxy paint of minimum dry film thicknes
specifications to all concrete surfaces in contact with the earth in foundation and substructure.
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
honeycombs on the RCC members as per manufactures specification and approved methodology . Item rate also inc
miscellaneous consumables, labours, transportation of material to all required locations by approved means ,Curing
and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by
for work at all Levels ,lead, lifts, Heights, Depths, basements, trenches, pits, tunnels, water tanks etc and providing g
paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include testin
as per approved quality plan.
Mode of Measurement: Actual area covered with coating shall be measured for payment purpose.
Crystalline WP - Lift Pit Area
Providing and applying Alkaline cement based Crystalline Waterproofing System in two-three coats at a Avg. DFT of
vertical walls and floors area
Providing & Laying for protective Screed for horizontal surface in 1:4 mix to proper gradient over the treated area f
& Laying for protective Plaster for vertical in 1:4 mix over the treated area for thickness of 15 mm
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cementitious grout/Epo
manufactures specification and approved methodology. Item rate also include cost of all materials, miscellaneous co
material to all required locations by approved means ,Curing , tools, plant and machinery, hire and fuel charges and
required as per specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels
basements, trenches, pits, tunnels, water tanks etc and providing guarantee of water proofing work on stamp paper
10 years from date of virtual completion. Item rate shall also include testing charges required for quality check as pe
Construction jointconsidering
Rate shall be quoted TreatmentanyforofRetaining
the make Wall (300mm
mention in MaketoList
450mm
for allwide)- Swellable
waterproofing itemsWater Bar
for the Project
Providing and laying Hydrophilic swellable Water bar made of Polyurethane/rubber suitable
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.for construction joint o
Drawings. Thickness of water bar to be minimum 20mmX10mm or as per manufacturers' specification
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Mode of Measurement: Unit of measurement shall be running meter of joint length.
Construction Joint Considered for Retaining wall a) Horizontal Joint - At Every Slab level 2 layers & one 300 mm abov
interval of 25m as per site condition or shown in GFC Drawing or as per approved by EIC.
43
Treatment of Pressure Release Pipe
Providing ,fixing, treating and sealing pressure release pipe of 40mm Día up to 0.6 meter height GI B class pressure
embedded with PCC layer and extended above raft/foundation/stitch slab up to 150mm above TOC/as shown in dra
PU based liquid membrane applied all around pipe at the HDPF membrane level along with installing hydrophilic sw
200mm height above PCC level round periphery of the pipe .
Providing and applying sealing of pressure release pipe with penetration, Grouting the pressure release pipe with ce
grout, expandable grout additive to full saturation etc. Grouting the pressure release pipes shall be taken up after su
foundation/raft is attained and thereafter the pipe shall cut flush with the top surface of raft and sealed with Polym
Item rate also include cost of all materials, miscellaneous consumables,labors,tranportation of material to all requir
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
directed by EIC. The item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths, basements, trenches
providing guarantee of water proofing work on stamp paper in approved format for a period of 10 years from date o
Podium W/P
also include system
testing withrequired
charges anti root
for quality check as per approved quality plan.
Providing
Upto 1200&mm applying
Lengthpolyurethane/ SBR/ Hybrid Polyurea based elastomeric seamless waterproof membrane in two
1.5 mm. including one coat Primer on the respective areas.
Protection on floor Area: Providing and applying Geotextile fabric of 140 GSM as protection of Horizontal surface.
Providing & laying protective screed and slop making on the treated floor areas in concrete screed M-20 grade for a
minimum thickness of 75mm at end location as per slope of 1:100.
The polyurethane based elastomeric seamless waterproof membrane shall have following typical properties :
1) Elongation > 300 %
2) Tensile Strength > 2 N/mm2
3) Tear Resistance > 12 N/mm
4) Bond Strength to Concrete > 2 N/mm2
UGT/STP/OHWT/RWT
Providing and Applying waterproofing - WP + Epoxy coating for Tank
and slope-making for PodiumFloorLandscape
& Wall area Slab, i.e. for Hardscape / Softscape G
Providing and applying 2K polymer modified cementitious
conforming to latest ASTM Standards, as per the specifications listed below coating with minimumand aselongation
approved by at break of 60% in two
the Engineer-in-cha
mm on the respective
The first part shall consist of : areas. to internal surface of RCC floor and walls of STP, UG tanks, OHT,Trenches, Sumps, etc.
operations :
(i) Surfaces to be treated must be dry or slightly damp, free of tar, oil and free of loose particles by wire-brushing an
(i) Treating
Concrete construction
Surface Profile joints,
2 ( CSPcracks,
2) as per honeycombs
ICRI guidelinein (if any),thebyConcret
injection pressure
surface grouting
& cleaning with
with airnon-shrink
jet. Remove cementi
protru
manufactures specification and approved methodology
edges ,then Initial ponding to be done to identify the leakages/seepages in RCC floors and walls using specialized injection nozzles pl
along the construction joints and porous areas as per manufacturers specification.
(ii) Pressure grouting using 40 psi injection grout pump with cement slurry mixed with non shrink admixture at all le Any pipes & Pipe Cutout, sleeves
shrink cementitious
(iii) Treatment to thehigh strength grout
construction joints,material
shoe joints and changes of directions including making 'V' groove at the joi
(ii) Preparing Vatta of 50-75mm
(iv) Laying Seamless Elastomeric Membrane to be done atWaterproofing
all junction of Systemvertical and horizontal
applied by Trowel surface with polymer
/brushing / spraying modified
as per M 1
bonding agent at the rate of 3 ltr. per bag cement.
Coat of Primer Coat if recommended by manufacturer & 2 or more Coat s of Water Proofing Coat s ).
(iii) Providing and applying
(v) Waterproofing Membrane surface appliedtoApproved
application be done on Make 2K polymer
horizontal modifiedareas,
and vertical cementitious coating or anyrecomm
as per Manufacturer's other
manufacturers’ specification and as approved
Engineer-in-charge.The membrane shall be terminated at 300 mm from FFL by the engineer-in-charge .
Waterproofing
(iv) Providing
(vi)Water andof
ponding Wet
applying
test forAreas
15-20 with
minimum mm72 sunken
thick
hours todetails
waterproof
check the forquality
Balcony/Deck
protective plaster & Screed area/Kitchen/Toilet
for wall & floor area Area in 1:4 (1 cem
Providing
waterproofing & Applying
admixture Acrylic Polymer
as per based flexible
manufacturer's cementitious
specification, overbased waterproofing
the waterproof treatment
coating on RCC or PU Coating
surface, curing,ha c
60%in
(v) two
Application to three
of twocoats
The Second Part shall consist of: at
coats aofDFT
Epoxyof 1 to 1.5
coating mm
with to Sunken
including area
one at
coatChajja/Balcony/
of primer as Deck
per area /Kitchen/toilet
manufacturers specificationarea o
with the
instruction following
of EIC. sequence
the cured of
filmoperations
is resistance to corrosion, chemical attack
Protective Coat Providing and laying Geotextile fabric (140GSM) over Water Proofing Coated surface as per Manufa and abrasion and is suitable for applicati
treatment
I) Surfaceby
instructed works, breweries, dairies, meat
Preparation:
the Engineer-in-charge and food
The second partprocessing
shall consist plants. the cured
of providing film
and is non-toxic
applying average and100meets mmthe req
thick.
Cleaning
screed in gradient of 1:100 with minimum thickness at the drain point of 75 mm. The concrete shall be admixed wits
2 coats ofand
Coalwire-brushing
Tar Epoxy willandbe mechanical
applied. grinding to achieve Concrete Surface Profile 2 (CSP 2) The RCC surface
contaminants
(vi)
at theWheredosage theoflike dust,
protection
100 ml oil isand
- 200 grease,of
provided
ml/bag byAll surface
direct
cement, imperfections,
epoxy coating over
compaction, protrusions,
the WP
finishing structurally
membrane,
surface unsound
suitably,contractor
curing, and friable
must
cleaning, make aconcr
testing moc
etc.
perfectly
adhesion clean.
of the etc.
epoxy coating
commendations as directed by the Engineer. over WP membrane. There shall not be any delamination between WP membrane an
The item rate shall
third part grouting
II) Pressure include
shall consist ofofbase preparation
( In case of Main
construction which
joints include
Waterproofing
and honeydoers wire-brushing
combed not have and mechanical grinding
antiroot properties)
concrete: to achieve Concre
Concrete
Pressure
Application surface
Grouting &iscleaning
of Anti-Root to with
doneBarrier ensure air that
system jet as
, all
treating
voids,
per all construction
cracks,
manufacturer's construction joints,joints,
specifications cracks, honeycombs,
cracks,
(Approved Makes by
honeycombs injection
which /any pressure
weak
includes spot
cleani(
cementitious
are grout/Epoxy
filled up completely
manufacturer’s grout on
with non-shrink
specifications the
approved by RCC members
cementitious
EIC. as per manufactures specification and approved
grout/Epoxy grout as manufactures specification and approve methodology
treated
The itemwith
Opening up
rate non-shrink
all cracks
shall in V
include cementitious
shape groove
base preparation high
andstrength
cleaning grout
which includeof dust,aswire-brushing
per
dirt,approved methodology.
loose particle
the etc shall be removed
Concrete/Masonry surface& cracks shall
& cleaning
Item
mortar. rate
joints, cracks, also include
Holes honeycombs cost
to shall be drilled of all
on the materials,
along
RCCthe miscellaneous
crack length
members as perusing consumables,labors,tranportation
pneumaticspecification
manufactures drilling machine of material
at distance
and approved to all requir
of 300mm
methodology. c/c. t
means
depend
Item rate ,Curing
onalso ,width
tools,and
theinclude plant ofand
costlength all machinery,
of crack. the
materials, hire andshall
holes
miscellaneous fuel be charges
cleaned
consumables,andbyallairother incidental
to remove
labours, any charges
dust etc.
transportation ofetc., all required
by blowing
material a
airreq
to all blo
directed
fixed
meansin,Curing by EIC.
these holes The
, tools, item rates
& Pressure shall
plant andinjection hold
machinery, good
Grouting for
hire and work
with fuel at all
non-shrink Levels
charges and ,lead,
cementitiouslifts,Heights,Depths,
grout/Epoxy
all other incidental basements,
groutetc.,
charges injected trenches
througha
all required
providing
After
directed all the
byguarantee
holes
EIC. The ofcompleted,
areitem water
ratesproofing
shallthehold work
grout
goodisonallowed
stamp
for workpaper
toatset inLevels
allfor approved
,lead,format
24 hours and
lifts,the for a period
next
Heights, day of 10
nozzles
Depths, years
are
basements, from
removed date
ando
trenche
also include
providing
III) Preparing testing
guarantee
Vatta: charges required for quality check as per approved quality plan.
of water proofing work on stamp paper in approved format for a period of 10 years from date o
Rate
preparingshall be
also include quoted
testing
vatta considering
charges
of 50-75mm to beany
required done of the
for allmake
quality
at mention
check
junctions as
ofper inapproved
Make List
horizontal for
andquality all plan.
vertical waterproofing items formodified
surface with polymer the Project 1:4
Mode
Rate shall
liters of Measurement:
of SBR beorquoted Actual
Acrylicconsidering area
polymer emulsion covered
any of the for
make
( min water
30%mention proofing shall
in Makeper
solids content) be measured
Listbagforofallcement. for payment purpose.
waterproofing items for the Project
Mode
IV) of Measurement:
Treatment Actual area Packing:
to Pipe Cutouts/Bore covered for water proofing shall be measured for payment purpose.
Annular Space left around pipe cutouts/bore packing in floor and walls shall be grouted by using non-shrink cementi
system as per manufacturer's recommendation.
V) Water Proofing Application & Protection:44
Providing and laying two Coat s of highly flexible two components of polymer based waterproofing treatment as per
24 hrs. of drying waterproof membrane Coating is to be protected with 25 mm thick cement mortar screed for horiz
Protective Screed
Providing and applying protective Screed of Average 20 mm thickness in cement mortar 1:1.5:3 on treated water pr
admixed with integral waterproofing compound at the dosage of 100 ml/bag of cement, compaction, finishing surfa
etc.complete all as per manufacturer's recommendations as directed by the Engineer. This item shall be payable on
Item rate also include cost of all materials,miscellaneous consumables,labors,tranportation of material to all require
means ,Curing , tools, plant and
machinery, hire and fuel charges and all other incidental charges etc., all required as per specifications, drawings an
shall hold good for
work at all Levels ,lead,lifts,Heights,Depths, etc and providing guarantee of water proofing work on stamp paper in a
years from date of virtual completion. Item rate shall also include testing charges required for quality check as per a
be installed as per manufacturer's recommendations, and as directed by Engineer in-charge. Original Material Test C
submitted with the delivery of materials on site.
Cement Plaster with integral water proofing compound
Providing and Applying average 12 mm thick single Coat cement sand plaster of mix ratio 1:4 (1 cement : 4 sand) in
cement approved waterproofing compound, finished smooth finish or as required to receive specified finish to cor
structure (As directed by EIC) ,etc. all complete to the approval of the EIC.
The item rate shall include base preparation which include wire-brushing the Concrete/Masonary surface & cleaning
construction joints, cracks, honeycombs, pipes, sleeves, cutouts on the RCC members as per approved methodology
materials, miscellaneous consumables,labors,tranportation of material to all required locations by approved means
hire and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directe
good for work at all Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and provid
work on stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall als
for quality check as per approved quality plan.
Mode of Measurement: As per IS 1200.
45
Terrace Area
Providing & applying polyurethane based/ SBR/ Polyurea elastomeric seamless waterproof membrane in two to thr
mm. including one coat Primer on the respective areas.
Protection on floor Area: Providing and applying Geotextile fabric of 140 GSM as protection of Horizontal surface.
The polyurethane based elastomeric seamless waterproof membrane shall have following typical properties :
1) Elongation > 300 %
2) Tensile Strength > 2 N/mm2
3) Tear Resistance > 12 N/mm
4) Bond Strength to Concrete > 2 N/mm2
Water Proofing Treatment shall be in Following Steps for Area in Terrace :
1. Surface Preparation:
Cleaning and wire-brushing and mechanically grinding to achieve Concrete Surface profile 2 ( CSP 2) The RCC surface
Broken AAClike
contaminants Blockdust,coba
oil andfor additional
grease, thickness
All surface at Terrace
imperfections, area ifstructurally
protrusions, necessary as perand
unsound sitefriable
requireme
concr
Providing and laying
perfectly clean. etc. broken AAC block coba in Terrace Area or any other location as specified as shown on drawing
1:5 up to required
2. Pressure grouting thickness as per drawing.
of construction joints and honey combed concrete:
Item rateGrouting
Pressure shall include costtoofensure
is done all materials,
that allmiscellaneous consumables,labors,tranportation
voids, cracks, construction joints, cracks, honeycombsof material
/any weakto all spot
requir(
means ,Curing
are filled , tools, plant
up completely withand machinery,
non-shrink hire and fuel
cementitious charges and
grout/Epoxy all other
grout incidental charges
as manufactures etc., alland
specification required
approve a
directed
Opening by up EIC. The item
all cracks in Vrates
shapeshall holdand
groove good for work
cleaning at all Levels
of dust, ,lead,
dirt, loose lifts,Heights,Depths
particle etc
etc shall be removed & cracks shall
mortar. Holes to shall be drilled along the crack length using pneumatic drilling machine at distance of 300mm c/c. t
depend on the width and length of crack. the holes shall be cleaned by air to remove any dust etc. by blowing air blo
fixed in these holes & Pressure injection Grouting with non-shrink cementitious grout/Epoxy grout injected through
After all the holes are injected, the grout is allowed to set for 24 hours and the next day nozzles are removed and ho
3. Preparing Vatta:
preparing vatta of 50-75mm to be done at all junctions of horizontal and vertical surface with polymer modified 1:4
China
litres ofMosaic flooring
SBR or Acrylic - At Terrace
polymer emulsion Area
( min 30% solids content) per bag of cement.
Providing
4. Treatment to rain water pipe outlet:flooring using multi-coloured broken tiles over terrace area and plain and curv
and laying for china mosaic
40mm
AnnularofSpace
Brocken
left pieces
aroundofpipeplancutouts/bore
ceramic tilespacking
laid overin1:4 cement
floor mortar
and walls shallbedding at requisite
be grouted by usinglevel area level
non-shrink in tru
cementi
installed brickbat cobra on terrace.
system as per manufacturer's recommendation.
Item rate Proofing
5.Water shall includeApplication
cost of all materials, miscellaneous consumables,labors,tranportation of material to all requir
& Protection:
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
RCC
directedsurface
by EIC.shall
The itembe treated with
rates shall holdpolyurethane/SBR/Polyurea
good for work at all Levels ,lead,based elastomericetc
lifts,Heights,Depths seamless waterpr
coats at a DFT of 1 to 1.5 mm. of approved make applied
Mode of Measurement: Actual area finish shall be measured for payment purpose in two coats on horizontal surface and Ver
finished floor level ( FFL).
A minimum slope of 1:100 and average thickness of 150mm using Brick bat coba of appropriate s
achieve the required slope laid over 15-20mm thick waterproof cement mortar 1:4 on well prepared
between Brick bat thoroughly grouted with waterproof cement mortar 1:4 and finished with 20mm
1:4 including rounding off the junction of roof and parapet walls for a height of 300mm with Brick b
plaster using waterproof Admixture and conducting necessary leakage/dampness tests, furnishing
complete as directed. (Waterproofing admixtures shall be of approved quality and dosage as recom
by EIC .
The item rate shall include base preparation which include wire-brushing the Concrete/masonry su
treating all construction joints, cracks, honeycombs on the RCC members as per manufactures spe
methodology . Item rate also include cost of all materials, miscellaneous consumables,labors,tranp
required locations by approved means ,Curing , tools, plant and machinery, hire and fuel charges a
etc., all required as per specifications, drawings and as directed by EIC. The item rates shall hold g
lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee o
paper in approved format for a period of 10 years from date of virtual completion. Item rate shall als
required for quality check as per approved quality plan.
Mode of Measurement: Plan area covered for water proofing shall be measured for payment purpos
Note: Additional Quantity of Brick bat filling for average thickness more than 150mm shall be paid
46
Water proofing works for Parapet wall
Providing and applying acrylic emulsion based elastomeric seamless waterproof membrane in two coats at a DFT of
manufacturer's recommendation.
1. Surface Preparation:
Cleaning and wire-brushing the RCC surface thoroughly of all contaminants like dust, oil and grease, All surface impe
unsound and friable concrete must be removed and make it perfectly clean. etc.
2. Pressure grouting of construction joints and honey combed concrete:
Pressure Grouting is done to ensure that all voids, cracks, construction joints, cracks, honeycombs /any weak spot (
are filled up completely with non-shrink cementitious grout/Epoxy grout as manufactures specification and approve
Opening up all cracks in V shape groove and cleaning of dust, dirt, loose particle etc shall be removed & cracks shall
mortar. Holes to shall be drilled along the crack length using pneumatic drilling machine at distance of 300mm c/c. t
depend on the width and length of crack. the holes shall be cleaned by air to remove any dust etc. by blowing air blo
fixed in these holes & Pressure injection Grouting with non-shrink cementitious grout/Epoxy grout injected through
After all the holes are completed, the grout is allowed to set for 24 hours and the next day nozzles are removed and
Over the prepared surface, 2 coats of acrylic waterproofing coating to be applied as per approved methodology to m
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose
47
Pipe Penetration Treatment (Core Cut treatment for Pipe) up to 150mm
Providing & laying application of non-shrink, cementitious micro concrete around the pipe areas Fo
with High strength, . All such areas to be suitably water proofed with cementitious/ PU coating to ensure leakpr
manufacturer's recommendation..
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Threshold
Rate shall beTreatment For Door
quoted considering anyArea-Main
of the aboveDoor+Toilet Door
make for all waterproofing items for the Project.
Providing & applying Micro Concrete for watta making of 75mm wide & 40mm height with bond coat of 2K polymer
having minimum elongation at break of 60% over the Clean Surface.
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Rate shall be quoted considering any of the make mention in Make List for all waterproofing items for the Project
Mode of Measurement: Unit of measurement shall be Single finish length of watta.
Sub Total C
TOTAL
GRAND TOTAL
48
d Parking Area), Energy Center at Vadodara, Gujarat
Quantity
Uni Rate Amount (INR)
Tower NTA Total Quantity
253,227,863
M3 10 10 20 1,150 23,000
M3 10 10 20 2,500 50,000
M3 10 10 20 200 4,000
M3 5 5 10 4,027 40,274
M3 5 5 10 4,213 42,130
M3 10 10 20 4,425 88,501
49
M3 10 10 20 4,561 91,228
M3 5 5 10 6,686 66,858
M3 83 5 88 6,907 607,780
M3 5 50 55 7,136 392,502
M3 10 10 20 6,695 133,901
M3 10 10 20 6,848 136,967
M3 10 10 20 7,443 148,866
M3 10 10 20 7,023 140,452
M3 10 10 20 7,550 151,001
M3 10 10 20 7,618 152,351
M3 10 10 20 917 18,340
50
M3 100 100 200 937 187,400
M2 10 10 20 1,538 30,760
M2 10 10 20 1,788 35,760
M2 5 5 10 1,918 19,180
EA 5 5 10 99 994
EA 5 5 10 118 1,181
EA 5 5 10 156 1,555
EA 5 5 10 215 2,146
EA 5 5 10 147 1,469
EA 5 5 10 202 2,016
EA 5 5 10 331 3,312
EA 5 5 10 425 4,248
51
EA 5 5 10 135 1,350
EA 5 5 10 150 1,500
EA 5 5 10 175 1,750
EA 5 5 10 200 2,000
EA 5 5 10 225 2,250
EA 5 5 10 275 2,750
EA 5 5 10 325 3,250
MT 20 2 22 108,625 2,389,759
MT 1 1 108,625 108,625
KG 30 30 60 109 6,518
EA 10 10 20 1,705 34,100
M2 5 5 10 1,803 18,027
M2 5 5 10 1,499 14,989
M2 5 5 10 1,178 11,778
M2 5 5 10 1,146 11,461
M3 55 5 60 9,044 542,623
M2 5 5 10 1,596 15,962
52
M2 5 5 10 1,050 10,500
M2 50 50 100 69 6,900
M3 5 5 10 10,123 101,226
M3 5 5 10 10,350 103,495
Inch 10 10 20 58 1,150
Inch 10 10 20 75 1,495
Inch 10 10 20 92 1,840
53
Inch 10 10 20 161 3,220
Inch 10 10 20 46 920
Inch 10 10 20 63 1,265
Inch 10 10 20 81 1,610
Inch 10 10 20 98 1,955
M3 10 10 20 2,500 50,000
M3 10 10 20 750 15,000
M2 10 10 20 3,500 70,000
M2 10 10 20 200 4,000
M2 10 10 20 16,000 320,000
M3 10 10 20 44,625 892,500
54
M2 10 3,330 3,340 1,137 3,798,084
225,463,961
MT - - 108,625 -
55
KG 1,500 1,500 180 270,000
EA 5 5 10 2,000 20,000
M 64 64 9,075 580,800
M 64 64 11,350 726,400
M 32 32 13,976 447,232
M 64 64 11,062 707,942
M 64 64 13,270 849,306
M 32 32 19,402 620,858
EA 5 5 250,000 1,250,000
EA 2 2 49,978 99,956
EA 5 5 10 1,725 17,250
EA 5 5 10 2,070 20,700
EA 5 5 10 2,300 23,000
EA 5 5 10 2,473 24,725
EA 5 5 10 3,278 32,775
EA 5 5 10 3,542 35,420
EA 5 5 10 3,853 38,525
56
EA 5 5 10 5,693 56,925
EA 5 5 10 7,993 79,925
EA 5 5 10 10,868 108,675
EA 5 5 10 288 2,875
EA 5 5 10 374 3,738
EA 5 5 10 546 5,463
EA 5 5 10 604 6,038
EA 5 5 10 748 7,475
EA 5 5 10 1,093 10,925
EA 5 5 10 1,898 18,975
EA 5 5 10 3,105 31,050
EA 5 5 10 4,198 41,975
EA 5 5 10 7,993 79,925
EA 5 5 10 5,578 55,775
EA 5 5 10 3,853 38,525
EA 5 5 10 288 2,875
EA 5 5 10 403 4,025
EA 5 5 10 518 5,175
EA 5 5 10 633 6,325
EA 5 5 10 748 7,475
57
EA 5 5 10 863 8,625
EA 5 5 10 978 9,775
EA 5 5 10 8,000 80,000
EA 5 5 10 10,000 100,000
EA 5 5 10 2,000 20,000
EA 5 5 24,604 123,021
EA 4 4 114,860 459,439
EA 4 4 5,727 22,908
EA 2 2 13,291 26,581
M 10 10 20 2,876 57,520
M 10 10 20 3,234 64,680
M 10 10 20 3,600 72,000
7,633,013
58
59
M2 2,503 10 2,513 960 2,412,480
60
M2 1,357 1,357 1,140 1,546,980
61
M2 100 10 110 550 60,500
M2 57 5 62 840 52,080
62
EA 10 10 1,020 10,200
63
M2 1,892 10 1,902 284 539,979
M3 5 5 10 4,750 47,500
64
M2 677 10 687 1,380 948,060
M3 5 5 10 5700 57,000
65
M2 299 5 304 605 183,920
M 10 10 20 3,080 61,600
M 10 10 20 1,980 39,600
66
EA 10 10 20 1,650 33,000
20,130,889
253,227,863
45,581,015
298,808,878
67
165000 1534.71
Total
Excavation / Excavation
2,988,233.00
Backfilling / Mt3/ per Sq.ft.
breaking qnty
16,142 0.0978 18.11
2750
2995
3275
68
3455
3275
3455
3595
3595
3720
3905
4205
3720
3905
4200
4205
69
Total concert concert Mt3/ 56842305.00
qnty per Sq.ft.
2.3394
3.4182
5.7576
Total
Reinforcement
Reinforcement 61646148.00
Kg/ per Sq.ft.
qnty Kg
950,000 5.75758 373.61
70
Total Structural Reinforcement 2498384.00
steel qnty Kg Kg/ per Sq.ft.
71
Total BW Mt2/
Total BW qnty. 28,894,387.00
Sq.ft
Total soling
Total soling misc misc 616,945.00
3.74
72
73
836.8789352644
49.63
74
75
76
Total MEP
Total MEP misc misc 7,633,013.00
46.26
77
78
Pedilite 800 900
79
950 950
80
325 650
850 700
1000
81
2400 850
1900 1150
1150 950
750 550
82
378
378
83
1900 1150
6400 140
800 1291
84
400 550
1800
600
85
450 450
900
122.01
1,534.71
86
S NO Item
Originally considered Labour colony
1 Labour colony
30000 2 Water for Labour colony
80000 3 Toilets
20000
4 Electricity
1000000 Local Liasoning
Site
1 Security
2 Drinking water
3 Toilets
Operation of toilets
Dewatering pump with pipes & accessories
100% initially now 50% cost 4
50000 5 Runnig cost
6 Access Scaffolding staircase
50000 7 Electricity
30000 8 Water curing
25000 9 Curing Tank, Curing Pipe, Vibrators, Grinders, Curing Pipe, Has
Concrete Pump
50% initially now 25% cost 10
11 Establishment Office ,Store , Cement
godown
12 Barrication Sheets & Signages, Safety Nets
1000000 13 Electrical Connection & LightFixtures
14 Transportation
30000 15 Office Refreshment Charges
16 Stationary Charges
17 Testing Charges for materials
50% initially now 25% cost 18 Tower Crane with operator
Design work for formwork
JCB
100% initially now 50% Cost Material Lift/Manpower lift
Opearator
60000 19 Housekeeping/QAQC/Safty
20 Mobile/Travelling Charges
21 Site office/PC/etc
23 Survey work for
400000 Plumbing Works
Office For L&T Staff of 1000sqft inc electricity bill and comple
87
26 PBG interest up to end of DLP
Bank deposit interest income
Retention Interest 5 % on completion &
27 rest till DLP 24 months
28 CAPEX interest
Mobilisation advance 10%
29 PBG Charge
30 Salaries
31 Back Office
TOTAL
RCC
Steel
formwork
BlockWork
Plastering
Important Points
Total Sqft
Cost
Cost per Sqft
Labour charges
88
89
90
Nos Per month total months Capital Cost
1 75,000 18 1,350,000
1 25,000 18 450,000
1 25,000 18 450,000
1 8,000 18 144,000
1 15,000 18 270,000
100,000
3 15,000 18 810,000
1 25,000 18 450,000
2 30,000 1 60,000
1 8,000 18 144,000
0 250,000 15 0
1 200,000 1 200,000
1 40,000 20 800,000
1 LS 1 500,000
1 25,000 18 450,000
1 25,000 18 450,000
1 7,500 18 135,000
1 10,000 18 180,000
1 250,000 15 937,500
1 100,000 1 100,000
1 130,000 3 195,000
1 250,000 3 375,000
3 20,000 15 900,000
1 45,000 18 810,000
1 25,000 18 450,000
1 LS 1 400,000
1 100,000 6 600,000
1 LS 1 300,000
electricity bill and comple 1 750,000 LS 750,000
91
4 5.00% 10,000,000 10.0% 4,000,000
4 -10,000,000 5% -2,000,000
2,900,000
14.50%
50,000,000 0
20,000,000 10.00%
30,000,000 0.83% 18 4,500,000
20,000,000 2 0.7% 280,000
165000
312832074
1895.95196364
1470.27 242,594,400.00
0.00
1470.27 242,594,400.00
0.09893333333 sqm per sqft
0.1074 sqm per sqft
92
93
94
working by sunil sir
capex
50% considered
Concrete pump with Operator ,addl pipe line & 25% considered
14,685,500.00 89.00303
95
Project head
Project manager
Sr. engineer
Site engineer
supervisors
safety engineer
safety supervisors
21,356,000.00 129 billing/planning/Quality engin
quality engineer
store manager
store assistants
Plumber & Electrician
9,010,375.00
5,406,225.00
9,010,375.00
5,406,225.00
7,208,300.00
36,041,500.00
9,730,000.00
5,065,200.00
40,059,000.00
44 259.47 42,812,000.00
4100.25 209.78 34,614,310.50
0 0.00 0.00
54,854,200.00
332.45
469.25 77,426,310.50
332.45 54,854,200.00
801.70 132,280,510.50
96
97
98
99
0.25 100000 25000
1 75000 75000
1 50000 50000
1 30000 30000
2 25000 50000
1 25000 25000
1 20000 20000
0 40000 0
0 40000 0
0 30000 0
1 25000 25000
1 25000 25000
325000
100
101
Excavation of Soil Refilling Hard Rock
Description Rate
Excavation of soil 85 700
Timbering 100 200
Stacking I/s 0 0
Royalty 100 100
disposal 0 0
285 1000
Add OH & CP @ 18% 15% 43 150
Back filling
Description Rate
Fro Out side earth 300
Compaction 125
Watering 0
Royalty 50
Backfilling 475
Add OH & CP @ 15% 25% 119
102
Soling from within the site
Rate per cum 0
Labour Charges incl transportation to place 350
Esic & PF 33% 11550%
Water, Electricity, Safety 1% 466%
CP & OH 15% 7052%
TOTAL 54068%
103
M10-PCC M15-PCC M 20-PCC M 20-sub
For slab
Basic Rate 3275.00 3455.00 3595.00 3595.00
Extra for SCC 0 0
GST 0.18 590 622 647 647
Supplier rate.with GST 3865 4077 4242 4242
wastage% 0.05 193 204 212 212
Fixed cost 1067 1067 1067 1067
pumping charges 200 200 200 200
Scaffolding Charges 50 50 100 100
Labour 400 400 400 500
Formwork 500.00 500.00 500.00
6275 6498 6722 6322
ESIC & PF on labour 0.20 80 80 80 100
charges 33% on Labour
Add for Water & Electricity @ 0.00 0 0 0 0
House keeping & Add for 0.01 64 66 68 64
Safety @ %
6419 6644 6870 6486
Add OH & CP @ 15% 0.15 963 997 1030 973
less GST 18% -696 -734 -764 -764
to be quoted Say 6686 6907 7136 6695
Plum Concrete M5
Per Cum 2750.00
Pumping 0 0
3,050
104
ESIC & PF on labour charges
0.20 140
33% on Labour
105
M30-super M35-super M40-super M30-sub M40-sub
M 25-sub M 25-super
structure structure structure structure structure
3720.00 3720.00 3905.00 4150.00 4205.00 3905.00 4205.00
0 0 0 0 0 0 0
670 670 703 747 757 703 757
4390 4390 4608 4897 4962 4608 4962
219 219 230 245 248 230 248
1067 1067 1067 1067 1067 1067 1067
200 200 200 200 200 200 200
100 250 250 250 250 100 100
500 500 500 500 500 500 500
0 0 0 0 0 0 0
66 67 70 73 73 68 72
6642 6794 7025 7332 7401 6874 7249
996 1019 1054 1100 1110 1031 1087
-790 -790 -829 -881 -893 -829 -893
6848 7023 7250 7550 7618 7075 7443
0 0 0
106
140 140 140
0 0 0
107
M30-\
M30-\ coloured
coloured M 20-PCC
concrete
concrete Basic Rate given by L&T
7900.00 3595.00 7900.00 M5 2750
0 0 M7.5 2995
1422 647 1422 M10 3275
9322 4242 9322 M15 3455
466 212 466 M20 3595
1067 1067 1067 M25 3720
200 200 200 M30 3905
250 100 250 M35
500 500 500 M40 4205
0 0 0
119 64 119
12024 6486 12024
1804 973 1804
-1678 -764 -1678
12150 6695 12150
727.720813273372 634.36
PP Fibre 50.00
LDPE sheet 200
40
microns
Groove cutting 40
Groove filling
22
Labour
Excaliber
chemical cost 30
for filling
TOTAL 909.72 634.360688437498
Add OH &
227 95
CP @ 25%
108
1,137.15 729.51
109
S.N.
ii
iii
110
iv
ii
iii
ii
iii
iv
ii
iii
iv
111
i
ii
ii
ii
iii
iv
ii
iii
iv
112
d
ii
iii
iv
vi
vii
113
i
ii
ii
ii
iii
iv
vi
114
vii
ii
iii
iv
vi
vii
115
i
ii
116
b
ii
iii
ii
iii
ii
iii
iv
vi
vii
117
viii
ix
ii
iii
iv
vi
vii
viii
ix
xi
xii
ii
iii
iv
118
vi
vii
ii
ii
iii
iv
ii
iii
ii
iii
119
1
120
1
121
2
122
3
123
7
10
124
11
12
13
14
125
15
16
17
126
18
19
20
127
21
22
23
128
Annexure A for Carrying Out Civil Core & Shell Works for L&T’s Proposed Multi use Development P
Description
Part A
Notes: All measurements shall be as per IS: 1200 unless otherwise specified
EARTH WORKS
Mass Excavation in all types of soil for all depths (Disposal outside site Premises)
Earthwork in Excavation Using mechanical means/ manual means using Contractor supplied plant and machinery an
including raft, foundations of walls, columns, footings, basements, equipment foundations, plinth beam etc. in all ty
Mass
murrum Excavation
(but excluding in Hard
hard of rock
rock : (Disposal
requiring chiseling outside
using site
rock Premises)
breaker
Mass Excavation in all types rock for all depths: (Disposal Outside siteor blasting), providing shoring, pumping, bai
Premises)
complete . Any type of strata that can be excavated using excavator bucket shall be measured and paid under soil ex
Earthwork
The item rate in Excavation
shall include Using mechanical
providing shoring means/ manual
, strutting, means using
de:watering withContractor
completesupplied
pumpingplant andbailing
system, machinery
out waan
Concrete
including raft,Breaking
foundations (M30of Grade)
walls, columns, footings, basements, equipment foundations, plinth beam etc. in all ty
Breaking of
transport forconcrete/
all masonry
leadnormal
and lifts, in existing
disposal foundation,
of excavated grade slab
material and
using any othervehicle
contractor's structure by mechanical
outside / manual
site premises (Dispom
be excavated
authorized using
disposal yard excavator bucket and that requires chiseling using rock breaker or controlled blasting), p
Muncipal
out water Guidelines
, slush and approved
removal place/location
etc. complete
by municipality
of
. disposal
Any type
outside
tostrata
of
site premises.
be finalized
that canbybe Expenses
contractor
excavated
on own
atusing
his account
cost)ofetc.
excavator
debris manageme
complete
bucket shall as
be pe
m
municipal
(EIC). Royaltycorporation
charges guidelines
for excavation, in covered
Expenses vehicles, housekeeping
debris,of roads and surroundings of ,excavated
royalty for disposal
excavation item only. The item rate shall includeonproviding
account of
shoring management / disposalwith
strutting, de:watering complete earth
pumpingas p
rate.
in covered vehicles, housekeeping of roads and surroundings , etc are included in the rate. No separate payment on
removal
Any over,excavation
excavation,shall transport
be made for good
all leadwithandplumlifts,concrete
disposal (with
of excavated
M10 Grade material usingplums
with 40% contractor's vehicle outsid
of size 160mm down
excavated material as per Muncipal Guidelines and place/location of disposal to be finalized by contractor at his ow
No
Back payment
Filling
instructions shall be
of :Engineer made
Earth From for such
outside
in charge works
(EIC),site of plum concrete.
Royalty charges for excavation, Expenses on account of debris management
Note
muncipal corpration guidelines, in per
Filling1: Mode
in of
foudations, Measrument: As
rafts,trenches,plinths, IS 1200
covered area levelling,
vehicles, podium filling
housekeeping of roadswith approved
and good quality
surroundings , etc. Noearth brought
separate payf
Note 2:
premises, All leads
etc.in and
layerslifts to
not be included
exceeding in
200mm the Unit
in Rates.
depth, breaking clods,watering,compacting
considered. All these expenditures are included in the item rate of excavation. Any over excavation shall be made go each layer with vibrato
Note
Grade3:with
achieve Any
95%40% variation
plumsin160mm
of maximum prices of any component
dry density.
down The rate
graded (butalso
) atshall
the notinclude
cost limited
of to) likeNo
charges
contractor. Diesel,
for labour,
surface
payment shallplant
dressing, and
slushmachinery,
be made royalt
removal,barrica
for such works o
not be
include payable
Note 1: charges
Mode offor to contractor
royalty.
Measrument: during the entire
As per IS 1200 period of contract and its extension if any.
Note 2: All leads and lifts to be included in the Unit Rates.
Back
Note 3:Filling : EarthinAvailable
Any variation prices of any Inside site Premises
component (but not limited to) like Diesel, labour, plant and machinery, royalt
Filling in foudations, rafts,trenches,plinths,
not be payable to contractor during the entire area levelling,
period podiumand
of contract filling with approved
its extension if any.good quality excavated eart
etc.in
Note layers not
4: Contractor exceeding
to submit excavation method statement, excavation plan and safety plan with
200mm in depth, breaking clods,watering,compacting each layer beforevibratory
start ofcompact
activity.
Concrete
maximum dry Works
density. The rate shall also include charges for surface dressing, slush removal,barrication and safety.
for royalty.
Notes:
Clause detailed below to be referred for all concrete items like isolated footings, rafts, retaining walls, plinth beams
shear walls, lift walls, floor slabs, floor beams, Tie /Link Beam, staircase, parapet, pardi, Chajja, lintels, mullions, con
Underground Tanks, STP, lift machine rooms, Elevation Features, mezzanine floors, service shaft slabs / platform, tr
Plum Concrete
lofts, etc. all as perWorks: With in
GFC included plum brought
this work from
order. The outside
following shall be deemed to be included in the item rates:
Providing and Laying Plum concrete by using M 5
a) The concrete shall include all ingredient materials (Cement, Grade concrete 60% andAdmixture
Aggregate, Hard stone, Fly
plum ( Max.
Ash, Silicasize
Fume 160, GGBS,
mm ) 40 w
be
Plum used ) , including
Concrete of M shifting
5 Grade , stacking & laying of plum .
(including erection of scaffolding if required), hoisting to all locations & heights/ Levels / Depths, pouring / laying by
The Item ratebyshall
compaction include
suitable dewatering
means needle /system
surfaceas/ plate
per approved
vibrator,methodology to keep
leaving pockets, holeswork area dryofallinserts
,installation time before
as shop
surfaces
till & junctions,
theConcrete
next operation cost of
orGrade all materials, miscellaneous consumables,labors,tranportation of material
completion of work, hacking the surface / use of approved binding agents to provide key fo to all require
Plum
approved of,Placing
M 7.5
wetting, etc. and preparingvibrating
means ,compacting,
construction Curing
joints with etc. tools,
provision plantkey.
of shear and machinery, hire and fuel charges and al
per specifications, drawings and as directed by EIC. The item rates shall
b) If different grades of concrete are used at junctions, spillover of richer concrete hold good for work at
required all Levels
shall ,depths,
be included heig
in the
pits,
Plum
c) Itemtunnels,
Concrete etc.
rate shall ofinclude
M 10 Grade
filling of tie:rod, wall ties holes with non:shrinking and waterproofing grout material.
Designing of concrete
d) Providing construction mixjoints,
for different grades
expansion of wherever
joints controlleddirected.
concrete should be done in accordance with latest IS:SP
design)
e) Adequate protection of edges and corners from damage duringby
in an approved lab and the same should be got approved EIC , the item
construction rates also manner.
in approved includes cost for the sa
Note: Rate also includes of Providing , placing, fixing and removal of necessary formworks.
f) Work either straight or curved, plain or circular or of any shape, unless otherwise provided for.
g) Keeping the work well cured for at least 7 days from the date of casting or as per relevant IS code (Ponding metho
wet/moist hessian cloths to be wrapped around surfaces). All types of Quality Control tests (green and hardened st
specifications. 129
h) Hacking of all concrete surfaces wherever required.
i) All starters to columns and other vertical elements shall be prepared with concrete mix one grade higher than tha
Plum Concrete of M 15 Grade
FORMWORK :
Following clause detailed below to be referred for all formwork items included in BOQ. The following shall be deem
rates:
Providing, a)The materials,erecting
fabricating, design, and andconstruction
fixing in position of formwork
formwork (including
material bracing,
of approved shoring,system strutting
made&ofSupporting
Ply with bolts witha
comply with the best Indian Standard Code of Practice for false work and
centering and shuttering to correct line and levels including strutting, propping, etc. with necessary bracings in all ax below.
b)Specifically,
provision for making forms for theconcrete
joints in work shall be so
the shuttering constructed
fully leak:proofand erected
to avoid as to resist
leakage of cementthe forceslurry,exerted
dismantlingon them andwir
Super
greater Structure : Conventional Formwork
after the concrete attains sufficient strength to self:support itself without any cracking and distortion. etc. includingt
than three (3)mm. Forms shall be sufficiently tight to prevent the leakage of mortar/grout. *(Masking tape
the
(Up sufficiency
Fire toCheck of theStaircase
Floor,
4.5m Height), whole
all placesof and
the
Headformwork
profilesRoom shall
, LMR
wherever restneeded
entirely with
Misc.the
, other: specified Contractor
itemas per drawing whoand shallproviding
engage arequired
qualifiedsurfa Eng
Providing,
construction
Extra
providing overall fabricating,
methods
formaterials
Staging aboveerecting
to
required and
structurally fixing
4.5 including design in position
the
m Height consumables,
: Extra over For formwork
formwork. Prior
supporting
making material
to start of
any approved
RCC members
of formwork formwork, system
, shifting(slabs made
shuttering
& beams)of
of formwork of Ply
works
up to with
the
height bolts
morea
shutte
all location
centering
EIC d)Forms
requiring
centering,stagingand forshuttering
exposed
strutting, to increasedto correct
surfaces
propping, height line
shall be and
walling,asbracing, madelevelsof
requiredbolting, including
dressed
upto 7wedging, strutting,
timber
m . The staging or propping,
metal.
casing, or Angle
formwork
striking, etc. with
fillets necessary
shall
design
removal, be used bracings
shall be DE
lowering, in the
submitted in all
to ax
angles
shuttering, ro
th
provision
to line
approval and for making
conform
thebefore the
to
proceeding thejoints in
dimensions
to the shuttering
and levels fully
shown leak:proof
on the to avoid
Drawings. leakage
f)The of cement
interior surfaceslurry,
of dismantling
forms shall and
be co r
filling
Extra
after
(The
Fosroc over
the
gap/holes
for Staging
concrete
make) prior
ofabove
attains
tie rods 7.0erect
with
thesufficient
to wherever
placing m of the same.
grout,
Height
strength :etc.
Extraand overall incidental
to self:support
reinforcement, andForany
supporting
itself
work RCC
without
surplus
complete.
members
any
moisture
The(slabs
cracking
shall
activity
be and &
removed
also includes
beams)of
distortion.
from height
etc.
the
allowing
forms more
includingprio
f
cut:outsItem rate shall
openings, include
etc. providing called allfor,
materials
allowing required
for including
dressing with consumables,
approved making
shuttering of formwork
oil to prevent ,shifting
adhesion ofo
requiring
(Up tobe4.5mstaging
Height),to increased height as required uptoneeded 9.5 m. etc.The staging beasor formwork design shall prior
be submitted to t
material
depths
shall
approval
such
&applicable
levels,
before toall
as including
dirt, allplaces
clay,
proceeding
wire, and
centering,
RCC members.
to erect
profiles
reinforcing
strutting,
the
wherever
same.
bar,propping,
wood chips,
walling, : specified
shall
bracing, per
removed
bolting, drawing
from
wedging, and providing
thecasing,
forms required
to concretin
striking, surfa
removal
providing
displaced
Extra
all all
rods,during
Over formaterials
&concrete
Scrificial required andincluding
orproviding
Formworkwithin the
system consumables,
periods specified making
for theofretention
formwork byof ,formwork,
shifting of the
formwork
concrete upwhere
to ,shifting
shall allbelocation
remo
ThetieItem
The Item
centering,
Engineer
nuts
rate
rate shall
shall
strutting,
may
bolts,
include
include
determine,
etc.
propping, providing providing
walling,
construction
all
joints
additional
materials
allbracing,
materials required
required
bolting,
shall be
safe working
including
including
wedging,
formed and the
area providing
consumables,
consumables,
casing, striking,
section of work
extra
making
making
removal,
shall
formwork
be
of formwork
of reconstructed
formwork
lowering, DE
necessa
,shifting
shuttering,
after
of
of
thr
etc.
depths
depths complete
& levels,
& levels, as directed
including
including by EIC
centering,
centering,. The item
strutting,
strutting, rate also
propping,
propping, includeswalling, allowing
walling, work bracing,
bracing, for forming
bolting,
bolting,The grooves,
wedging,
wedging, drips,
casing,
casing, throats,
striking, cut:outs
removalof
removal
striking,allowing
filling
and
all the
adjusted.
allowing
tie gap/holes
fornuts
dressing of tie rods
withetc.
approvedwith grout,
shuttering etc. and all incidental
oil to prevent adhesion complete.
ofbyconcrete activity
to extra
formwork. also includes
Itemwhererate shall also
all tie rods,
cut:outs
i)Formworkrods,
Reinforcement nuts
openings,
shall
& bolts,
&remain
bolts,
etc.
Steel etc.
wherever
and
and for
inbyplace
Works
providing
providing
called
the for,
additional
additional
allowing
minimum timefor
safe
safe working
working
dressing
as specified
area
area
with IS:by
approved
in for 456
providing
providing orextra
shuttering
:1978
formwork
formwork
oil towithin
as varied preventwhere
this
necessa
necessa
adhesion
specifica o
quality
etc.
etc. check
complete
complete as
as
as per approved
directed
directed EIC
by EIC quality
. The
. Not plan.
item
The withstandingrate also
item rate alsothis, includes
includes allowing
allowing forming
forbeforming grooves,
grooves, drips,
drips, throats,
throats, cut:outs
cut:outs o
o
shall
in
Mode
allowing be applicable
accordance
of for
payment with
dressing to all
this
: Area
with RCC members.
standard.
of staging shall be measured side
as per the forms may
plan area stripped
and not the after the minimum
area in contact time
with specifie
concrete
allowing
The
in anyItem for
case ratedressing
not shall
less with48approved
include
than approved
providing
hours)
shuttering
shuttering
afterall materials
the
oil
oil to
concrete to prevent
prevent
required
has been
adhesion
adhesion
including
poured,
of
of concrete
concrete
consumables,
provided
to
to
that
formwork.
formwork.
making
Item
Item
of formwork
the surfaces exposed
rate
rate shall
shall
,shifting
are imm
also
also
of
quality
Supplying check
qualitycompound
check & as per
fixing
as per approved
reinforcement
approved quality
quality plan.
steel
plan.is carried
depths
curing
Mode &
of levels,
payment including
(if
:The centering,
required) and strutting,
curing propping,out inwalling,
accordance bracing, with bolting,
this wedging,
specification. casing,
Bottom striking,
forms removal
shall rem
Providing,
Mode
all ofor
tie rods,
pouring
Straightening,
payment
nuts
as otherwise Areaarea
&,:bolts, of
etc.
in contact
cutting,
staging
and 18
approved
bending
shallwith
thebe
providing
by
andconcrete
bindingwith
measured
additional
Engineer. j)Whenas
safe
deductions
in position
per the plan
working
forms arearea
for openings.
of reinforcement
area by
reused, and barsarea
not the
providing
their
(TMT
extra
original inbars:
contact
formwork
shape,
Fe 500
with) concrete
where
strength,
high yie
necessa
rigidity,
Note
conforming
For Sub : For UGWT
to
Structure STP
IS:1786:2008 & Retaining
with wall
gauge no through
annealed type
binding of tie rod
wire, to, wall
correctties shall
shape beandusedsize for
as formwork
per detailed system.
drawing
etc. complete
smoothness as
shall directed
be by
maintained. EIC . The
All item
material rate also
previously includes
used allowing
in formwork
bar:bending schedules, for all reinforced concrete work such as pile caps, footings, RCC walls, columns / stub colum for forming
must be grooves,
cleaned drips,
off andthroats,
oiled cut:outs
before reuo
allowing
beams, Staircase, Lintels, OHWT, LMR, rafts etc. at all heights and all levels; with correct sizes approved concretealso
so as to for
ensure dressing
uniform with approved
quality and shuttering
texture over oil to
large prevent
areas, adhesion
built to of
close concrete
tolerances to formwork.
and exhibit Item rate
consistently shallgood coq
quality
check
For Superand
concrete check
list of as
the
Structureper
same approved
work have quality
to be plan.
fill before the contractor start any
galvanized binding wire of 18 gauge; if required dewatering, required labor and machines / equipmen works. j) Quoted rates shall be inclusive of
Mode
handling, of payment
constriction joint to
shifting :The
etc. make area
and in contact
concrete
cutting and with smooth.
surface
bending concrete
as per with deductions
drawing, for openings.
reinforcements all complete to the satisfaction of the
Note : For OHWT / water retaining structure scarifies
The Item rate shall include providing all materials required such as reinforcement type of tie rod system , no through
steel bars type(TMTof tiebars:
rod Fe , wall
500tiesconfsh
Coupler:
miscellaneous at all levels
consumables suchin asreinforcement
18 gauge annealed
Supplying and Fixing of Couplers steel Galvanised
bars including Ironmaking
bindingthreading
wire , chairs of bar ,pins ,spacers
at both end,correct
(Each jun s
or
of approved PVC cover block , Cost of Labour, machines / equipment / tools / tackles / vehicles for all transportatio
16 requisite
mm Dia. Bar
reinforcement
forging (if required) and threading shall be treated as one number for payment) the threading of steel b
in the stocking yard, shifting the same
approved coupler supplier at site and contractor. The to ratecutting
shall & bending
include yard, Straightening,
all transportation, cutting,
Handling, bending,shift
unloading, shift
locations, heights, depths & levels, all necessary
and all necessary miscellaneous handling charges etc. complete. miscellaneous handling charges, tying reinforcement steel as per d
required
20 mm Dia. Baretc. complete as directed by EIC. Item rate shall also include testing charges required for quality check as p
: No separate payment for binding wires, chairs, Pins, spacer and cover blocks shall be considered. Only authorized l
as per GFC drawing.
25 mm Dia. Bar
32 mm Dia. Bar
131
Reinforcement Steel Bar Anchor
Providing , drilling and fixing Reinforcement steel bar anchoring work of reinforcement steel in concrete wall with c
at
8mmanyDia
height & location as per instruction of Engineer Incharge .Rate inclusive of cost of all materials, miscellaneous
of material to all required locations by approved means , tools, plant and machinery, hire and fuel charges and all ot
required as per specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels
10mm Dia
12mm Dia
16mm Dia
20mm Dia
25mm Dia
32mm Dia
133
Core Cutting: 250 mm dia
Core cutting of specified dia in all type of masonry as per approved methodology.
The Item rate shall include cost of all miscellaneous consumables, labors , tools, plant and machinery, hire and fuel c
scaffolding/staging
Core Cutting: 50 mmanddiaall other incidental charges etc. complete all as per drawings and as directed by EIC. The item
Levels and all Location.
Core Cutting: 75 mm dia
Chasing in Masonry :
Chasing in all type of masonry wall upto 75 mm depth as per approved methodology.
The Item rate shall include cost of all miscellaneous consumables, labors , tools, plant and machinery, hire and fuel c
Cutting of RCC with
scaffolding/staging Diamond
and all cuttingcharges
other incidental Saw: etc. complete all as per drawings and as directed by EIC. The item
Item shall include all activities required for Cutting of concrete RCC works with Diamond Cutting Saw with Machine
Levels andasallper
locations Location.
the approved methodology and instructions of Engineer:in:charge (EIC) including all tools, tackles, m
staging / supporting to adjacent structure , any consumables, etc. complete. The item rate shall include Lowering ,L
out side site premises etc. complete as per instructions of Engineer in charge (EIC).
Mode of Measurement: Cross sectional area of cutting member shall be measured for payment.
134
Providing Non reinforced cement hard vacuum dewatered concrete flooring consisting of the following:
Providing, supplying and laying, finishing M20 grade batch mixed controlled concrete with PP fibres at 0.900 Kg @cu
dewatered flooring of upto 125 mm thk including cleaning, trimming, watering the surface, laying in strips to require
smoothening, curing etc. making 15mm x 10mm expansion/ control joints at intervals, sealing the joints with polyur
complete to the required slope, formation, finish. Cost to include working at all levels, necessary pumping to require
per drawings, providing serrated finish for the ramps including VD operation onsisting of providing side shuttering w
required levels,finishing with required texture (BROOM FINISH ( SAMPLE TO BE APPORVED BY EIC)), Vibrating the co
de:watering using vacuum pumps by suction method and finishing the top surface to required level and grade using
Covering the finished concrete surface with 200 micron thick polythene sheet and cutting grooves of size 6 mm x 10
grooves with Sealant with curing etc. complete at all levels, heights and locations, etc. as directed and to the satisfac
Supply & Applying Con quail integral color , Con Seal integral , Con Charcoal integral color including Labour charges f
material in concrete at batching plant with Labour charges for laying of colour concrete of irregular pattern on slopi
coating. including Supply & Applying of CCE Sealer coating.
Item rate inclusive of all materials, miscellaneous consumables, labours ,transportation of material to all required lo
plant and machinery, hire and fuel charges and all other incidental charges etc., all required as per specifications, dr
item rates shall hold good for work at all Levels, lead, lifts, Heights, Depths etc.
Sub Total A
Part B
Structural Steel :
Supplying, fabricating, delivering at site, hoisting and fixing in position at all heights and all levels and making all stru
the design drawings prepared by the consultants. The structural steel work shall include welded and built up section
welded and built up sections, trusses, built:up purlins, frame work welded and/or bolted, girders, gusset plates, bas
The Item rate shall include providing all materials required
135 such as Structural steel (Confirming to IS: 226 & 2062 ),
consumables ,scaffolding, Cost of Labour, machines / equipment / tools / tackles / vehicles for all transportation, Ha
the stocking yard, shifting the same to Fabrication yard, shifting from Fabrication yard to all required locations, heig
MS Railing in Shaft :
Providing and fixing railing as per approved drawing and to the satisfaction of EIC.
Rate inclusive of cost of all materials, miscellaneous consumables, labors ,transportation of material to all required l
Heavy
plant duty
and rungs :hire and fuel charges and all other incidental charges etc., all required as per specifications, dr
machinery,
Providing and fixing Heavy duty rungs in R.C.C. wall of water tanks etc. Including cutting, chasing the R.C.C. work a
item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc
as required.
Pl enclose
Storm
Load standard
water
carrying (PHE) drawing100KG
capcity:Upto or give matl description
Drain Channel:
Constructing cast in site R.C.C gutter / drain along the driveway/ courtyards including excavation, concrete ,shutterin
plaster
450mmcoat
Wide,as per drawiing and approval of EIC
Rate inclusive of cost of all materials, miscellaneous consumables, dewatering labors ,transportation of material to a
means , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required as per sp
600EIC.
by mmTheWide
item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc
900 mm Wide
80 mm Flange On Outside
136
150 mm Flange on Outside
UPVC Sleeves :
Supply & fixing of PVC/UPVC sleeves of medium class for following Dia.
UPVC Sleeve :32mm dia
137
UPVC Sleeve :150mm dia
100 mm dia
Sump Pits :Providing and fixing 900mm x 900 mm DI (heavy duty) cover with frame (as per EN:124) with lockable a
(Total WT of cover and frame to be not less than 85 kg).
UGT :Providing and fixing 900mm x 1200 mm DI (heavy duty) cover with frame (as per EN:124) with lockable arrang
WT of cover and frame to be not less than 85 kg).
Terrace Tanks :Providing and fixing 600 mm dia FRP (heavy duty) water tank circular cover with frame (as per EN:12
complete in all regards.
Grease Trap :Providing and fixing 600mm x 600 mm DI (heavy duty) cover with frame (as per EN:124) with lockable
(Total WT of cover and frame to be not less than 85 kg).
Providing MS pipe sleeve :
Providing Mild Steel (MS) ‘C’ class pipes as SLEEVES each to be embedded in RCC walls / beams. And any other RCC
by
DiaEIC
50mm
Dia 65mm
Dia 80mm
4 Module
Sub Total B
Part C
138
Waterproofing Works
Notes: All measurements shall be as per IS: 1200 unless otherwise specified
Space as available within the site for setting up of site office and all other temporary site facilities except for labour accommod
Office Furniture & Equipment viz.Furniture,computers, and cupboards , other office related materials.
Labour Facilities
Drinking Water, Site Sanitation (Washing + Toilets), Drainage Facilities, Labour accommodation outside project site, Labour tra
Transportation including all applicable taxes for machineries & erection work.
Insurance
Insurance Policies such as ,Contractor’s all risk (CAR ) Policy, Workmen Compensation, Group personnel accident, Automobile
Safety Installations like nets, Safety Barrication, Provision of Ambulance with Driver, First Aid facilities, QA/QC Lab facilities alo
etc. providing necessary PPE for Contractors Staff, Labour ,Client, Engineer and consultants appointed by the Client, Safety Ma
Labour Mobilization & Demobilization activity
All scaffolding, ladders, platforms, staging, cranage and plant & equipment required in the execution of work to any height an
required for the works including dewatering.
Water proofing Contractor shall visit the Site & understand the scope of work from EIC prior submitting Techno commercial off
completing work . Work will be measured and paid as per items mention in this BOQ for water proofing work , other items /sc
per methodology submitted by water proofing contractor during Tender stage but not mention in this BOQ will not be measur
For all liquid
provide applied
10 years membrane
Guarantee on stampsystem,
paper Preponding
(In approvedto be carried
format out for
by Engineer In minimum
charge) for24
all hours to ascertain
water proofing workthe quality
included in
waterproofing system, a ponding to be done for at least 48 hours to ascertain watertightness of the system.
Waterproofing Works
139
W/P membrane system-Basement Positive Side Waterproofing Horizontal Surface Below Raft Slab
Supplying and installing waterproofing treatment by using 1.2mm thick fully bonded Preapplied HDPE sheet memb
Slab/footing/as shown in drawing. Membrane shall be installed in strict accordance with the manufacturer’s instruc
bond to resist water migration. The fully bonded HDPE sheet membrane shall consist of a multi layer composite film
HDPE film, self adhesive polymer layer and trafficable. The fully bonded HDPE membrane is loosely-laid on the PCC
Footings/Stitch Slab/as shown in drawings or wherever applicable etc.
The fully bonded Preapplied HDPE sheet waterproofing membrane shall have following typical properties :
1) Elongation > Minimum 75%.
2) Peel adhesion to concrete: > 880N/m (ASTM D 903 Modified)
3) Puncture Resistance: 800N +/- 5 % (as per ASTM E154)
4) Resist hydrostatic pressure of over 60m head of water as per ASTM D5385
Side overlaps shall be a minimum of 75 mm on the selvedge and end overlaps of minimum 75 mm.
The item rate shall include base preparation which include wire-brushing the Concrete/Masonry surface & cleaning
cracks, honeycombs on the RCC members as per manufactures specification and approved methodology. Item rate
miscellaneous consumables,labors,tranportation of material to all required locations by approved means ,Curing , to
fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by EIC.
work at all Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guara
stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include
check as per approved quality plan.
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.
140
Waterproofing Works For Retaining Wall - Positive Side - Self Adhesive Membrane - Unconfined ar
Supplying and Installing self adhesive, SBS Membrane, cold applied , flexible minimum 1.5mm thick waterproofing m
laminated HDPE film, applied on the external surface of the retaining wall post construction and after deshuttering i
The Self Adhesive waterproofing membrane shall have following typical properties :
1) Elongation > 200 %
2) Puncture resistance > 220N
3) Tensile Strength = 4 N/mm, 42N/mm2 /48 N/mm2 for film
4) Resistance to Hydrostatic pressure = > 60 m
5) Tear Resistance = 23 N/mm for system, 340/310 N/mm for film. Waterproofing with Styrene Butadiene Styrene (S
membrane (Positive side):
I. Surface Preparation:
Cleaning and wire-brushing and mechanical grinding to achieve Concrete Surface Profile 2 ( CSP 2). RCC surface shal
contaminants like dust, oil and grease, All surface imperfections, protrusions, structurally unsound and friable concr
joints, cracks, honeycombs, on the RCC surface by injection grouting with non-shrink cementitious grout/Epoxy gro
sleeves, tie rod holes, cut-outs shall be treated with non-shrink cementitious high strength grout material.
II. Water Proofing Application:
Apply the Primer on clean RCC surface by brush or roller. Allow the primer to dry prior to the application of the mem
Styrene Butadiene Styrene (SBS) modified waterproofing membrane to be apply on clean RCC primer surface. Press
top of the applied membrane to ensure a proper and strong adhesion of the bitumen compound with the base surfa
minimum of 75 mm on the selvedge and end overlaps 100 mm. The finished surface should be left exposed for 48 h
manufactures after which further build up works can be carried out.
III. Protection:
The Membrane shall be protected with HDPE Dimpled drain board with 6 to 8 mm thick and composed of high den
to a non-woven geotextile of calendared polypropylene of 120 g/m2. Nodule height is generally 7.3 ± 0.2 mm and m
250 KN/m2 when tested as per ISO 604 OR ASTM D 695 ( Specimen dimensions as per clause 6.7.2), over the water
surface, stuck to the membrane by spot bonding method, using synthetic adhesive with butt joints etc. complete, to
damage. due to ongoing site activities or from sharp aggregates or boulder during backfilling. In all cases, damage du
monitored closely.
Membrane must be properly terminated as per approved methodology by manufacturer. The termination height sh
The item rate shall include base preparation which include wire-brushing the Concrete/Masonry surface & cleaning
cracks, honeycombs on the RCC members as per manufactures specification and approved methodology . Item rate
miscellaneous consumables, labours, transportation of material to all required locations by approved means ,Curing
and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by
for work at all Levels ,lead, lifts, Heights, Depths, basements, trenches, pits, tunnels, water tanks etc and providing g
stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include
check as per approved quality plan.
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.
141
Coal Tar Epoxy - RCC Foundation and Substructure
Providing and applying one coat of epoxy primer and two coats of coal tar epoxy paint of minimum dry film thicknes
specifications to all concrete surfaces in contact with the earth in foundation and substructure.
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
honeycombs on the RCC members as per manufactures specification and approved methodology . Item rate also inc
miscellaneous consumables, labours, transportation of material to all required locations by approved means ,Curing
and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by
for work at all Levels ,lead, lifts, Heights, Depths, basements, trenches, pits, tunnels, water tanks etc and providing g
paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include testin
as per approved quality plan.
Mode of Measurement: Actual area covered with coating shall be measured for payment purpose.
Crystalline WP - Lift Pit Area
Providing and applying Alkaline cement based Crystalline Waterproofing System in two-three coats at a Avg. DFT of
vertical walls and floors area
Providing & Laying for protective Screed for horizontal surface in 1:4 mix to proper gradient over the treated area f
& Laying for protective Plaster for vertical in 1:4 mix over the treated area for thickness of 15 mm
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cementitious grout/Epo
manufactures specification and approved methodology. Item rate also include cost of all materials, miscellaneous co
material to all required locations by approved means ,Curing , tools, plant and machinery, hire and fuel charges and
required as per specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels
basements, trenches, pits, tunnels, water tanks etc and providing guarantee of water proofing work on stamp paper
10 years from date of virtual completion. Item rate shall also include testing charges required for quality check as pe
Construction jointconsidering
Rate shall be quoted TreatmentanyforofRetaining
the make Wall (300mm
mention in MaketoList
450mm
for allwide)- Swellable
waterproofing itemsWater Bar
for the Project
Providing and laying Hydrophilic swellable Water bar made of Polyurethane/rubber suitable
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.for construction joint o
Drawings. Thickness of water bar to be minimum 20mmX10mm or as per manufacturers' specification
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Mode of Measurement: Unit of measurement shall be running meter of joint length.
Construction Joint Considered for Retaining wall a) Horizontal Joint - At Every Slab level 2 layers & one 300 mm abov
interval of 25m as per site condition or shown in GFC Drawing or as per approved by EIC.
142
Treatment of Pressure Release Pipe
Providing ,fixing, treating and sealing pressure release pipe of 40mm Día up to 0.6 meter height GI B class pressure
embedded with PCC layer and extended above raft/foundation/stitch slab up to 150mm above TOC/as shown in dra
PU based liquid membrane applied all around pipe at the HDPF membrane level along with installing hydrophilic sw
200mm height above PCC level round periphery of the pipe .
Providing and applying sealing of pressure release pipe with penetration, Grouting the pressure release pipe with ce
grout, expandable grout additive to full saturation etc. Grouting the pressure release pipes shall be taken up after su
foundation/raft is attained and thereafter the pipe shall cut flush with the top surface of raft and sealed with Polym
Item rate also include cost of all materials, miscellaneous consumables,labors,tranportation of material to all requir
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
directed by EIC. The item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths, basements, trenches
providing guarantee of water proofing work on stamp paper in approved format for a period of 10 years from date o
Podium W/P
also include system
testing withrequired
charges anti root
for quality check as per approved quality plan.
Providing
Upto 1200&mm applying
Lengthpolyurethane/ SBR/ Hybrid Polyurea based elastomeric seamless waterproof membrane in two
1.5 mm. including one coat Primer on the respective areas.
Protection on floor Area: Providing and applying Geotextile fabric of 140 GSM as protection of Horizontal surface.
Providing & laying protective screed and slop making on the treated floor areas in concrete screed M-20 grade for a
minimum thickness of 75mm at end location as per slope of 1:100.
The polyurethane based elastomeric seamless waterproof membrane shall have following typical properties :
1) Elongation > 300 %
2) Tensile Strength > 2 N/mm2
3) Tear Resistance > 12 N/mm
4) Bond Strength to Concrete > 2 N/mm2
UGT/STP/OHWT/RWT
Providing and Applying waterproofing - WP + Epoxy coating for Tank
and slope-making for PodiumFloorLandscape
& Wall area Slab, i.e. for Hardscape / Softscape G
Providing and applying 2K polymer modified cementitious
conforming to latest ASTM Standards, as per the specifications listed below coating with minimumand aselongation
approved by at break of 60% in two
the Engineer-in-cha
mm on the respective
The first part shall consist of : areas. to internal surface of RCC floor and walls of STP, UG tanks, OHT,Trenches, Sumps, etc.
operations :
(i) Surfaces to be treated must be dry or slightly damp, free of tar, oil and free of loose particles by wire-brushing an
(i) Treating
Concrete construction
Surface Profile joints,
2 ( CSPcracks,
2) as per honeycombs
ICRI guidelinein (if any),thebyConcret
injection pressure
surface grouting
& cleaning with
with airnon-shrink
jet. Remove cementi
protru
manufactures specification and approved methodology
edges ,then Initial ponding to be done to identify the leakages/seepages in RCC floors and walls using specialized injection nozzles pl
along the construction joints and porous areas as per manufacturers specification.
(ii) Pressure grouting using 40 psi injection grout pump with cement slurry mixed with non shrink admixture at all le Any pipes & Pipe Cutout, sleeves
shrink cementitious
(iii) Treatment to thehigh strength grout
construction joints,material
shoe joints and changes of directions including making 'V' groove at the joi
(ii) Preparing Vatta of 50-75mm
(iv) Laying Seamless Elastomeric Membrane to be done atWaterproofing
all junction of Systemvertical and horizontal
applied by Trowel surface with polymer
/brushing / spraying modified
as per M 1
bonding agent at the rate of 3 ltr. per bag cement.
Coat of Primer Coat if recommended by manufacturer & 2 or more Coat s of Water Proofing Coat s ).
(iii) Providing and applying
(v) Waterproofing Membrane surface appliedtoApproved
application be done on Make 2K polymer
horizontal modifiedareas,
and vertical cementitious coating or anyrecomm
as per Manufacturer's other
manufacturers’ specification and as approved
Engineer-in-charge.The membrane shall be terminated at 300 mm from FFL by the engineer-in-charge .
Waterproofing
(iv) Providing
(vi)Water andof
ponding Wet
applying
test forAreas
15-20 with
minimum mm72 sunken
thick
hours todetails
waterproof
check the forquality
Balcony/Deck
protective plaster & Screed area/Kitchen/Toilet
for wall & floor area Area in 1:4 (1 cem
Providing
waterproofing & Applying
admixture Acrylic Polymer
as per based flexible
manufacturer's cementitious
specification, overbased waterproofing
the waterproof treatment
coating on RCC or PU Coating
surface, curing,ha c
60%in
(v) two
Application to three
of twocoats
The Second Part shall consist of: at
coats aofDFT
Epoxyof 1 to 1.5
coating mm
with to Sunken
including area
one at
coatChajja/Balcony/
of primer as Deck
per area /Kitchen/toilet
manufacturers specificationarea o
with the
instruction following
of EIC. sequence
the cured of
filmoperations
is resistance to corrosion, chemical attack
Protective Coat Providing and laying Geotextile fabric (140GSM) over Water Proofing Coated surface as per Manufa and abrasion and is suitable for applicati
treatment
I) Surfaceby
instructed works, breweries, dairies, meat
Preparation:
the Engineer-in-charge and food
The second partprocessing
shall consist plants. the cured
of providing film
and is non-toxic
applying average and100meets mmthe req
thick.
Cleaning
screed in gradient of 1:100 with minimum thickness at the drain point of 75 mm. The concrete shall be admixed wits
2 coats ofand
Coalwire-brushing
Tar Epoxy willandbe mechanical
applied. grinding to achieve Concrete Surface Profile 2 (CSP 2) The RCC surface
contaminants
(vi)
at theWheredosage theoflike dust,
protection
100 ml oil isand
- 200 grease,of
provided
ml/bag byAll surface
direct
cement, imperfections,
epoxy coating over
compaction, protrusions,
the WP
finishing structurally
membrane,
surface unsound
suitably,contractor
curing, and friable
must
cleaning, make aconcr
testing moc
etc.
perfectly
adhesion clean.
of the etc.
epoxy coating
commendations as directed by the Engineer. over WP membrane. There shall not be any delamination between WP membrane an
The item rate shall
third part grouting
II) Pressure include
shall consist ofofbase preparation
( In case of Main
construction which
joints include
Waterproofing
and honeydoers wire-brushing
combed not have and mechanical grinding
antiroot properties)
concrete: to achieve Concre
Concrete
Pressure
Application surface
Grouting &iscleaning
of Anti-Root to with
doneBarrier ensure air that
system jet as
, all
treating
voids,
per all construction
cracks,
manufacturer's construction joints,joints,
specifications cracks, honeycombs,
cracks,
(Approved Makes by
honeycombs injection
which /any pressure
weak
includes spot
cleani(
cementitious
are grout/Epoxy
filled up completely
manufacturer’s grout on
with non-shrink
specifications the
approved by RCC members
cementitious
EIC. as per manufactures specification and approved
grout/Epoxy grout as manufactures specification and approve methodology
treated
The itemwith
Opening up
rate non-shrink
all cracks
shall in V
include cementitious
shape groove
base preparation high
andstrength
cleaning grout
which includeof dust,aswire-brushing
per
dirt,approved methodology.
loose particle
the etc shall be removed
Concrete/Masonry surface& cracks shall
& cleaning
Item
mortar. rate
joints, cracks, also include
Holes honeycombs cost
to shall be drilled of all
on the materials,
along
RCCthe miscellaneous
crack length
members as perusing consumables,labors,tranportation
pneumaticspecification
manufactures drilling machine of material
at distance
and approved to all requir
of 300mm
methodology. c/c. t
means
depend
Item rate ,Curing
onalso ,width
tools,and
theinclude plant ofand
costlength all machinery,
of crack. the
materials, hire andshall
holes
miscellaneous fuel be charges
cleaned
consumables,andbyallairother incidental
to remove
labours, any charges
dust etc.
transportation ofetc., all required
by blowing
material a
airreq
to all blo
directed
fixed
meansin,Curing by EIC.
these holes The
, tools, item rates
& Pressure shall
plant andinjection hold
machinery, good
Grouting for
hire and work
with fuel at all
non-shrink Levels
charges and ,lead,
cementitiouslifts,Heights,Depths,
grout/Epoxy
all other incidental basements,
groutetc.,
charges injected trenches
througha
all required
providing
After
directed all the
byguarantee
holes
EIC. The ofcompleted,
areitem water
ratesproofing
shallthehold work
grout
goodisonallowed
stamp
for workpaper
toatset inLevels
allfor approved
,lead,format
24 hours and
lifts,the for a period
next
Heights, day of 10
nozzles
Depths, years
are
basements, from
removed date
ando
trenche
also include
providing
III) Preparing testing
guarantee
Vatta: charges required for quality check as per approved quality plan.
of water proofing work on stamp paper in approved format for a period of 10 years from date o
Rate
preparingshall be
also include quoted
testing
vatta considering
charges
of 50-75mm to beany
required done of the
for allmake
quality
at mention
check
junctions as
ofper inapproved
Make List
horizontal for
andquality all plan.
vertical waterproofing items formodified
surface with polymer the Project 1:4
Mode
Rate shall
liters of Measurement:
of SBR beorquoted Actual
Acrylicconsidering area
polymer emulsion covered
any of the for
make
( min water
30%mention proofing shall
in Makeper
solids content) be measured
Listbagforofallcement. for payment purpose.
waterproofing items for the Project
Mode
IV) of Measurement:
Treatment Actual area Packing:
to Pipe Cutouts/Bore covered for water proofing shall be measured for payment purpose.
Annular Space left around pipe cutouts/bore packing in floor and walls shall be grouted by using non-shrink cementi
system as per manufacturer's recommendation.
V) Water Proofing Application & Protection:143
Providing and laying two Coat s of highly flexible two components of polymer based waterproofing treatment as per
24 hrs. of drying waterproof membrane Coating is to be protected with 25 mm thick cement mortar screed for horiz
Protective Screed
Providing and applying protective Screed of Average 20 mm thickness in cement mortar 1:1.5:3 on treated water pr
admixed with integral waterproofing compound at the dosage of 100 ml/bag of cement, compaction, finishing surfa
etc.complete all as per manufacturer's recommendations as directed by the Engineer. This item shall be payable on
Item rate also include cost of all materials,miscellaneous consumables,labors,tranportation of material to all require
means ,Curing , tools, plant and
machinery, hire and fuel charges and all other incidental charges etc., all required as per specifications, drawings an
shall hold good for
work at all Levels ,lead,lifts,Heights,Depths, etc and providing guarantee of water proofing work on stamp paper in a
years from date of virtual completion. Item rate shall also include testing charges required for quality check as per a
be installed as per manufacturer's recommendations, and as directed by Engineer in-charge. Original Material Test C
submitted with the delivery of materials on site.
Cement Plaster with integral water proofing compound
Providing and Applying average 12 mm thick single Coat cement sand plaster of mix ratio 1:4 (1 cement : 4 sand) in
cement approved waterproofing compound, finished smooth finish or as required to receive specified finish to cor
structure (As directed by EIC) ,etc. all complete to the approval of the EIC.
The item rate shall include base preparation which include wire-brushing the Concrete/Masonary surface & cleaning
construction joints, cracks, honeycombs, pipes, sleeves, cutouts on the RCC members as per approved methodology
materials, miscellaneous consumables,labors,tranportation of material to all required locations by approved means
hire and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directe
good for work at all Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and provid
work on stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall als
for quality check as per approved quality plan.
Mode of Measurement: As per IS 1200.
144
Terrace Area
Providing & applying polyurethane based/ SBR/ Polyurea elastomeric seamless waterproof membrane in two to thr
mm. including one coat Primer on the respective areas.
Protection on floor Area: Providing and applying Geotextile fabric of 140 GSM as protection of Horizontal surface.
The polyurethane based elastomeric seamless waterproof membrane shall have following typical properties :
1) Elongation > 300 %
2) Tensile Strength > 2 N/mm2
3) Tear Resistance > 12 N/mm
4) Bond Strength to Concrete > 2 N/mm2
Water Proofing Treatment shall be in Following Steps for Area in Terrace :
1. Surface Preparation:
Cleaning and wire-brushing and mechanically grinding to achieve Concrete Surface profile 2 ( CSP 2) The RCC surface
Broken AAClike
contaminants Blockdust,coba
oil andfor additional
grease, thickness
All surface at Terrace
imperfections, area ifstructurally
protrusions, necessary as perand
unsound sitefriable
requireme
concr
Providing and laying
perfectly clean. etc. broken AAC block coba in Terrace Area or any other location as specified as shown on drawing
1:5 up to required
2. Pressure grouting thickness as per drawing.
of construction joints and honey combed concrete:
Item rateGrouting
Pressure shall include costtoofensure
is done all materials,
that allmiscellaneous consumables,labors,tranportation
voids, cracks, construction joints, cracks, honeycombsof material
/any weakto all spot
requir(
means ,Curing
are filled , tools, plant
up completely withand machinery,
non-shrink hire and fuel
cementitious charges and
grout/Epoxy all other
grout incidental charges
as manufactures etc., alland
specification required
approve a
directed
Opening by up EIC. The item
all cracks in Vrates
shapeshall holdand
groove good for work
cleaning at all Levels
of dust, ,lead,
dirt, loose lifts,Heights,Depths
particle etc
etc shall be removed & cracks shall
mortar. Holes to shall be drilled along the crack length using pneumatic drilling machine at distance of 300mm c/c. t
depend on the width and length of crack. the holes shall be cleaned by air to remove any dust etc. by blowing air blo
fixed in these holes & Pressure injection Grouting with non-shrink cementitious grout/Epoxy grout injected through
After all the holes are injected, the grout is allowed to set for 24 hours and the next day nozzles are removed and ho
3. Preparing Vatta:
preparing vatta of 50-75mm to be done at all junctions of horizontal and vertical surface with polymer modified 1:4
China
litres ofMosaic flooring
SBR or Acrylic - At Terrace
polymer emulsion Area
( min 30% solids content) per bag of cement.
Providing
4. Treatment to rain water pipe outlet:flooring using multi-coloured broken tiles over terrace area and plain and curv
and laying for china mosaic
40mm
AnnularofSpace
Brocken
left pieces
aroundofpipeplancutouts/bore
ceramic tilespacking
laid overin1:4 cement
floor mortar
and walls shallbedding at requisite
be grouted by usinglevel area level
non-shrink in tru
cementi
installed brickbat cobra on terrace.
system as per manufacturer's recommendation.
Item rate Proofing
5.Water shall includeApplication
cost of all materials, miscellaneous consumables,labors,tranportation of material to all requir
& Protection:
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
RCC
directedsurface
by EIC.shall
The itembe treated with
rates shall holdpolyurethane/SBR/Polyurea
good for work at all Levels ,lead,based elastomericetc
lifts,Heights,Depths seamless waterpr
coats at a DFT of 1 to 1.5 mm. of approved make applied
Mode of Measurement: Actual area finish shall be measured for payment purpose in two coats on horizontal surface and Ver
finished floor level ( FFL).
A minimum slope of 1:100 and average thickness of 150mm using Brick bat coba of appropriate s
achieve the required slope laid over 15-20mm thick waterproof cement mortar 1:4 on well prepared
between Brick bat thoroughly grouted with waterproof cement mortar 1:4 and finished with 20mm
1:4 including rounding off the junction of roof and parapet walls for a height of 300mm with Brick b
plaster using waterproof Admixture and conducting necessary leakage/dampness tests, furnishing
complete as directed. (Waterproofing admixtures shall be of approved quality and dosage as recom
by EIC .
The item rate shall include base preparation which include wire-brushing the Concrete/masonry su
treating all construction joints, cracks, honeycombs on the RCC members as per manufactures spe
methodology . Item rate also include cost of all materials, miscellaneous consumables,labors,tranp
required locations by approved means ,Curing , tools, plant and machinery, hire and fuel charges a
etc., all required as per specifications, drawings and as directed by EIC. The item rates shall hold g
lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee o
paper in approved format for a period of 10 years from date of virtual completion. Item rate shall als
required for quality check as per approved quality plan.
Mode of Measurement: Plan area covered for water proofing shall be measured for payment purpos
Note: Additional Quantity of Brick bat filling for average thickness more than 150mm shall be paid
145
Water proofing works for Parapet wall
Providing and applying acrylic emulsion based elastomeric seamless waterproof membrane in two coats at a DFT of
manufacturer's recommendation.
1. Surface Preparation:
Cleaning and wire-brushing the RCC surface thoroughly of all contaminants like dust, oil and grease, All surface impe
unsound and friable concrete must be removed and make it perfectly clean. etc.
2. Pressure grouting of construction joints and honey combed concrete:
Pressure Grouting is done to ensure that all voids, cracks, construction joints, cracks, honeycombs /any weak spot (
are filled up completely with non-shrink cementitious grout/Epoxy grout as manufactures specification and approve
Opening up all cracks in V shape groove and cleaning of dust, dirt, loose particle etc shall be removed & cracks shall
mortar. Holes to shall be drilled along the crack length using pneumatic drilling machine at distance of 300mm c/c. t
depend on the width and length of crack. the holes shall be cleaned by air to remove any dust etc. by blowing air blo
fixed in these holes & Pressure injection Grouting with non-shrink cementitious grout/Epoxy grout injected through
After all the holes are completed, the grout is allowed to set for 24 hours and the next day nozzles are removed and
Over the prepared surface, 2 coats of acrylic waterproofing coating to be applied as per approved methodology to m
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose
146
Pipe Penetration Treatment (Core Cut treatment for Pipe) up to 150mm
Providing & laying application of non-shrink, cementitious micro concrete around the pipe areas Fo
with High strength, . All such areas to be suitably water proofed with cementitious/ PU coating to ensure leakpr
manufacturer's recommendation..
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Threshold
Rate shall beTreatment For Door
quoted considering anyArea-Main
of the aboveDoor+Toilet Door
make for all waterproofing items for the Project.
Providing & applying Micro Concrete for watta making of 75mm wide & 40mm height with bond coat of 2K polymer
having minimum elongation at break of 60% over the Clean Surface.
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Rate shall be quoted considering any of the make mention in Make List for all waterproofing items for the Project
Mode of Measurement: Unit of measurement shall be Single finish length of watta.
Sub Total C
TOTAL
GRAND TOTAL
147
d Parking Area), Energy Center at Vadodara, Gujarat
Quantity
Uni Rate Amount (INR)
Tower NTA Total Quantity
246,561,138
M3 10 10 20 1,150 23,000
M3 10 10 20 2,500 50,000
M3 10 10 20 200 4,000
M3 5 5 10 2,841 28,406
M3 5 5 10 3,026 30,262
M3 10 10 20 3,238 64,766
148
M3 10 10 20 3,375 67,493
M3 5 5 10 4,250 42,497
M3 83 5 88 4,471 393,408
M3 5 50 55 4,642 255,325
M3 10 10 20 4,642 92,846
M3 10 10 20 4,796 95,912
M3 10 10 20 5,391 107,811
M3 10 10 20 4,796 95,912
M3 10 10 20 5,323 106,462
M3 10 10 20 5,391 107,811
M3 10 10 20 917 18,340
149
M3 100 100 200 937 187,400
M2 10 10 20 545 10,900
M2 10 10 20 795 15,900
M2 5 5 10 925 9,250
EA 5 5 10 99 994
EA 5 5 10 118 1,181
EA 5 5 10 156 1,555
EA 5 5 10 215 2,146
EA 5 5 10 147 1,469
EA 5 5 10 202 2,016
EA 5 5 10 331 3,312
EA 5 5 10 425 4,248
150
EA 5 5 10 135 1,350
EA 5 5 10 150 1,500
EA 5 5 10 175 1,750
EA 5 5 10 200 2,000
EA 5 5 10 225 2,250
EA 5 5 10 275 2,750
EA 5 5 10 325 3,250
MT 20 2 22 108,625 2,389,759
MT 1 1 108,625 108,625
KG 30 30 60 109 6,518
EA 10 10 20 1,705 34,100
M2 5 5 10 1,803 18,027
M2 5 5 10 1,499 14,989
M2 5 5 10 1,178 11,778
M2 5 5 10 1,146 11,461
M3 55 5 60 9,044 542,623
M2 5 5 10 1,596 15,962
151
M2 5 5 10 1,050 10,500
M2 50 50 100 69 6,900
M3 5 5 10 10,123 101,226
M3 5 5 10 10,350 103,495
Inch 10 10 20 58 1,150
Inch 10 10 20 75 1,495
Inch 10 10 20 92 1,840
152
Inch 10 10 20 161 3,220
Inch 10 10 20 46 920
Inch 10 10 20 63 1,265
Inch 10 10 20 81 1,610
Inch 10 10 20 98 1,955
M3 10 10 20 2,500 50,000
M3 10 10 20 750 15,000
M2 10 10 20 3,500 70,000
M2 10 10 20 200 4,000
M2 10 10 20 16,000 320,000
M3 10 10 20 44,625 892,500
153
M2 10 3,330 3,340 874 2,919,247
144,547,236
MT - - 108,625 -
154
KG 1,500 1,500 180 270,000
EA 5 5 10 2,000 20,000
M 64 64 9,075 580,800
M 64 64 11,350 726,400
M 32 32 13,976 447,232
M 64 64 11,062 707,942
M 64 64 13,270 849,306
M 32 32 19,402 620,858
EA 5 5 250,000 1,250,000
EA 2 2 49,978 99,956
EA 5 5 10 1,725 17,250
EA 5 5 10 2,070 20,700
EA 5 5 10 2,300 23,000
EA 5 5 10 2,473 24,725
EA 5 5 10 3,278 32,775
EA 5 5 10 3,542 35,420
EA 5 5 10 3,853 38,525
155
EA 5 5 10 5,693 56,925
EA 5 5 10 7,993 79,925
EA 5 5 10 10,868 108,675
EA 5 5 10 288 2,875
EA 5 5 10 374 3,738
EA 5 5 10 546 5,463
EA 5 5 10 604 6,038
EA 5 5 10 748 7,475
EA 5 5 10 1,093 10,925
EA 5 5 10 1,898 18,975
EA 5 5 10 3,105 31,050
EA 5 5 10 4,198 41,975
EA 5 5 10 7,993 79,925
EA 5 5 10 5,578 55,775
EA 5 5 10 3,853 38,525
EA 5 5 10 288 2,875
EA 5 5 10 403 4,025
EA 5 5 10 518 5,175
EA 5 5 10 633 6,325
EA 5 5 10 748 7,475
156
EA 5 5 10 863 8,625
EA 5 5 10 978 9,775
EA 5 5 10 8,000 80,000
EA 5 5 10 10,000 100,000
EA 5 5 10 2,000 20,000
EA 5 5 24,604 123,021
EA 4 4 114,860 459,439
EA 4 4 5,727 22,908
EA 2 2 13,291 26,581
M 10 10 20 2,876 57,520
M 10 10 20 3,234 64,680
M 10 10 20 3,600 72,000
7,633,013
157
158
M2 2,503 10 2,513 960 2,412,480
159
M2 1,357 1,357 1,140 1,546,980
160
M2 100 10 110 550 60,500
M2 57 5 62 840 52,080
161
EA 10 10 1,020 10,200
162
M2 1,892 10 1,902 284 539,979
M3 5 5 10 4,750 47,500
163
M2 677 10 687 1,380 948,060
M3 5 5 10 5700 57,000
164
M2 299 5 304 605 183,920
M 10 10 20 3,080 61,600
M 10 10 20 1,980 39,600
165
EA 10 10 20 1,650 33,000
20,130,889
246,561,138
44,381,005
290,942,143
166
165000 1494.31
Total
Excavation / Excavation
2,988,233.00
Backfilling / Mt3/ per Sq.ft.
breaking qnty
16,142 0.0978 18.11
2750
2995
3275
167
3455
3275
3455
3595
3595
3720
3905
4205
3720
3905
4200
4205
168
Total concert concert Mt3/ 39733867.00
qnty per Sq.ft.
2.3394
3.4182
5.7576
Total
Reinforcement
Reinforcement 51771135.00
Kg/ per Sq.ft.
qnty Kg
950,000 5.75758 313.76
169
Total Structural Reinforcement 2498384.00
steel qnty Kg Kg/ per Sq.ft.
170
Total BW Mt2/
Total BW qnty. 28,894,387.00
Sq.ft
Total soling
Total soling misc misc 616,945.00
3.74
171
172
836.8789352644
44.64
173
174
175
Total MEP
Total MEP misc misc 7,633,013.00
46.26
176
177
Pedilite 800 900
178
950 950
179
325 650
850 700
1000
180
2400 850
1900 1150
1150 950
750 550
181
378
378
182
1900 1150
6400 140
800 1291
183
400 550
1800
600
184
450 450
900
122.01
1,494.31
185
M10-PCC M15-PCC M 20-PCC M 20-sub
For slab
Basic Rate 3275.00 3455.00 3595.00 3595.00
Extra for SCC 0 0
GST 0.18 590 622 647 647
Supplier rate.with GST 3865 4077 4242 4242
wastage% 0.05 193 204 212 212
Fixed cost 0 0 0 0
pumping charges 200 200 200 200
Scaffolding Charges 0 0 0 0
Labour 0 0 0 0
Formwork 0.00 0.00 0.00
4258 4481 4654 4654
ESIC & PF on labour 0.20 0 0 0 0
charges 33% on Labour
Add for Water & Electricity @ 0.00 0 0 0 0
House keeping & Add for 0.01 43 45 47 47
Safety @ %
4300 4526 4701 4701
Add OH & CP @ 15% 0.15 645 679 705 705
less GST 18% -696 -734 -764 -764
to be quoted Say 4250 4471 4642 4642
Plum Concrete M5
Per Cum 2750.00
Pumping 0 0
Labour 0 0
Formwork 0 0
2,250
186
ESIC & PF on labour charges
0.20 0
33% on Labour
187
M30-super M35-super M40-super M30-sub M40-sub
M 25-sub M 25-super
structure structure structure structure structure
3720.00 3720.00 3905.00 4150.00 4205.00 3905.00 4205.00
0 0 0 0 0 0 0
670 670 703 747 757 703 757
4390 4390 4608 4897 4962 4608 4962
219 219 230 245 248 230 248
0 0 0 0 0 0 0
200 200 200 200 200 200 200
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
48 48 50 53 54 50 54
4857 4857 5089 5395 5464 5089 5464
729 729 763 809 820 763 820
-790 -790 -829 -881 -893 -829 -893
4796 4796 5023 5323 5391 5023 5391
0 0 0
0 0 0
0 0 0
188
0 0 0
0 0 0
189
M30-\
M30-\ coloured
coloured M 20-PCC
concrete
concrete Basic Rate given by L&T
7900.00 3595.00 7900.00 M5 2750
0 0 M7.5 2995
1422 647 1422 M10 3275
9322 4242 9322 M15 3455
466 212 466 M20 3595
0 0 0 M25 3720
200 200 200 M30 3905
0 100 250 M35
0 0 0 M40 4205
0 0 0
0 0 0
100 48 102
10088 4802 10340
1513 720 1551
-1678 -764 -1678
9923 4758 10214
517.220772554348 648.88
PP Fibre 50.00
LDPE sheet 200
40
microns
Groove cutting 40
Groove filling
22
Labour
Excaliber
chemical cost 30
for filling
TOTAL 699.22 648.8794384375
Add OH &
175 97
CP @ 25%
190
874.03 746.21
191
STEEL REINFORCEMENT substructure
Reinforcement for R.C.C work including
straightening
cutting, bending, placing in position and binding
all
complete.
Cold Twisted Bars
II /5.29.3 /67
Cost for 1 MT
MATERIALS:
Deformed twisted steel bars1.00q
Wastage 5% 0.05 q
Total 1.05 q Tonne 0.05 40000.00
unloading of steel Tonne 0.00 400.00
Chairs, Spacers, pin bars, etc Tonne 0.01 40000.00
GI Binding wire 18 G kg 12.00 60.00
Cover block 1 time 100.00 3.00
LABOUR:
for straightening, cutting, bending, binding and
placing
in position Tonne 0.00 7500.00
Sundries 1 time
shifting of steel & Lifting Ton 0.00 750.00
Say RS per MT
192
Cold Twisted Bars
II /5.29.3 /67
Cost for 1 MT
MATERIALS:
Deformed twisted steel bars1.00q
Wastage 5% 0.05 q
Total 1.05 q Tonne 0.05 40000.00
unloading of steel Tonne 0.00 400.00
Chairs, Spacers, pin bars, etc Tonne 0.01 40000.00
GI Binding wire 18 G kg 12.00 60.00
Cover block 1 time 100.00 3.00
LABOUR:
for straightening, cutting, bending, binding and
placing
in position Tonne 0.00 8000.00
Sundries 1 time
shifting of steel & Lifting Ton 0.00 750.00
Say RS per MT
193
40000.00
0.00
75.00
0.00
43495.00
5556.244
0.00
0.00
490.51
4954.18
54495.93
54495.93
194
40000.00
0.00
75.00
0.00
43495.00
5556.244
0.00
0.00
490.51
4954.18
54495.93
54495.93
195
S NO Item
Originally considered Labour colony
1 Labour colony
30000 2 Water for Labour colony
80000 3 Toilets
20000
4 Electricity
1000000 Local Liasoning
Site
1 Security
2 Drinking water
3 Toilets
Operation of toilets
Dewatering pump with pipes & accessories
100% initially now 50% cost 4
50000 5 Runnig cost
6 Access Scaffolding staircase
50000 7 Electricity
30000 8 Water curing
25000 9 Curing Tank, Curing Pipe, Vibrators, Grinders, Curing Pipe, Has
Concrete Pump
50% initially now 25% cost 10
11 Establishment Office ,Store , Cement
godown
12 Barrication Sheets & Signages, Safety Nets
1000000 13 Electrical Connection & LightFixtures
14 Transportation
30000 15 Office Refreshment Charges
16 Stationary Charges
17 Testing Charges for materials
50% initially now 25% cost 18 Tower Crane with operator
Design work for formwork
JCB
100% initially now 50% Cost Material Lift/Manpower lift
Opearator
60000 19 Housekeeping/QAQC/Safty
20 Mobile/Travelling Charges
21 Site office/PC/etc
23 Survey work for
400000 Plumbing Works
Office For L&T Staff of 1000sqft inc electricity bill and comple
196
26 PBG interest up to end of DLP
Bank deposit interest income
Retention Interest 5 % on completion &
27 rest till DLP 24 months
28 CAPEX interest
Mobilisation advance 10%
29 PBG Charge
30 Salaries
31 Back Office
TOTAL
RCC
Steel
formwork
BlockWork
Plastering
Important Points
Total Sqft
Cost
Cost per Sqft
Labour charges
197
198
199
Nos Per month total months Capital Cost
0 75,000 18 0
0 25,000 18 0
0 25,000 18 0
0 8,000 18 0
0 15,000 18 0
1 100,000
3 15,000 18 810,000
1 25,000 18 450,000
2 30,000 1 60,000
1 8,000 18 144,000
0 250,000 15 0
1 200,000 1 200,000
1 40,000 20 800,000
1 LS 1 500,000
1 10,000 18 180,000
1 20,000 18 360,000
1 7,500 18 135,000
1 10,000 18 180,000
0 250,000 15 0
1 100,000 1 100,000
1 130,000 3 195,000
0 250,000 3 0
0 20,000 15 0
1 25,000 18 450,000
1 10,000 18 180,000
1 LS 1 400,000
1 100,000 6 600,000
1 LS 1 300,000
electricity bill and comple 1 750,000 LS 750,000
200
4 5.00% 10,000,000 10.0% 4,000,000
4 -10,000,000 5% -2,000,000
2,900,000
14.50%
50,000,000 0
20,000,000 10.00%
30,000,000 0.83% 18 4,500,000
20,000,000 2 0.7% 280,000
165,000.00
246,561,138.00
1,494.31
1470.27 242,594,400.00
0.00
1470.27 242,594,400.00
0.09893333333 sqm per sqft
0.1074 sqm per sqft
201
202
203
working by sunil sir
capex
50% considered
Concrete pump with Operator ,addl pipe line & 25% considered
8,819,000.00 53.44848
204
Project head
Project manager
Sr. engineer
Site engineer
supervisors
safety engineer
safety supervisors
21,356,000.00 129 billing/planning/Quality engin
quality engineer
store manager
store assistants
Plumber & Electrician
7,543,750.00
4,526,250.00
7,543,750.00
4,526,250.00
6,035,000.00
30,175,000.00
9,730,000.00
5,065,200.00
40,059,000.00
44 259.47 42,812,000.00
4100.25 209.78 34,614,310.50
0 0.00 0.00
54,854,200.00
332.45
469.25 77,426,310.50
332.45 54,854,200.00
801.7001 132,280,510.50
205
206
207
208
0.25 100000 25000
1 75000 75000
1 50000 50000
1 30000 30000
2 25000 50000
1 25000 25000
1 20000 20000
0 40000 0
0 40000 0
0 30000 0
1 25000 25000
1 25000 25000
325000
209
210
STEEL REINFORCEMENT substructure
Reinforcement for R.C.C work including
straightening
cutting, bending, placing in position and binding
all
complete.
Cold Twisted Bars
II /5.29.3 /67
Cost for 1 MT
MATERIALS:
Deformed twisted steel bars1.00q
Wastage 5% 0.05 q
Total 1.05 q Tonne 0.05 40000.00
unloading of steel Tonne 0.00 400.00
Chairs, Spacers, pin bars, etc Tonne 0.01 40000.00
GI Binding wire 18 G kg 12.00 60.00
Cover block 1 time 100.00 3.00
LABOUR:
for straightening, cutting, bending, binding and
placing
in position Tonne 1.00 7500.00
Sundries 1 time
shifting of steel & Lifting Ton 0.00 750.00
Say RS per MT
211
Cold Twisted Bars
II /5.29.3 /67
Cost for 1 MT
MATERIALS:
Deformed twisted steel bars1.00q
Wastage 5% 0.05 q
Total 1.05 q Tonne 0.05 40000.00
unloading of steel Tonne 0.00 400.00
Chairs, Spacers, pin bars, etc Tonne 0.01 40000.00
GI Binding wire 18 G kg 12.00 60.00
Cover block 1 time 100.00 3.00
LABOUR:
for straightening, cutting, bending, binding and
placing
in position Tonne 1.00 8000.00
Sundries 1 time
shifting of steel & Lifting Ton 0.00 750.00
Say RS per MT
212
40000.00
7500.00
75.00
0.00
50995.00
5556.244
1500.00
0.00
580.51
5863.18
64494.93
64494.93
213
40000.00
8000.00
75.00
0.00
51495.00
5556.244
1600.00
0.00
586.51
5923.78
65161.53
65161.53
214
Formwork Flat slab
for 10 m x 10 m 100 sqm
215
Rate
300 cum 60 18000 RENTED
100 sqm 645.6 6456 10 times repetition Basic Rate Ply 60/- sft
100 rmt 20 1100 20/- per kg 8 repetetions
100 sqm 350 35000
100 sqm 5 500
100 sqm 5 500
100 sqm 5 500
100 169 16870
81894
3600.00
0.00
854.94
86349.26
12952.39
99301.65
216
217
STEEL STRUCTURAL
Cost for 1 MT
MATERIALS:
Structural Steel 1.00 MT
Wastage 5% 0.05 MT
Total 1.05 MT Tonne 0.05 45000.00
unloading of steel Tonne 1.05 750.00
LABOUR:
for straightening, cutting, bending, binding and
placing it for erection
in position along with Hydra/Farana Charges Tonne 1.00 25000.00
Epoxy Painting Work & Grouting Tonne 1.00 10000.00
Sundries 1 time
shifting of steel Ton 0.00 750.00
Say RS
218
45000.00
Basic Rate Rs 45000/-
2250.00
787.50
25000.00
10000.00
750.00
0.00
83787.50
5556.244
5000.00
0.00
837.88
13443.81
108625.42
108625.42
219
Block size 600x200x200 1.8 0.024
220
Patli 3 nos 3*.2*.2 0
Shuttering for patli 0
main Steel for Patli 0
ring for patli 0
Shifting of Block 77
Fixing of Blocks with chemical 0.90
Sundries 1
Scaffolding charges 21.6
Fixed cost 9
Labour
Labour Cost for Fixing of Blocks 9
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:
221
Labour Cost for Fixing of Blocks 9
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:
222
Block size 100mm thick 0.9
223
Patli at every 1m 3 0.180
As per BOQ item 0.720
Materials Qty
AAC block 60
wastage 2%
Patli 10 nos 10*.15*.2 0.18
Shuttering for patli 1.8
224
Main steeel for patli 16.02
ring for patli 2.79
Shifting of Block 61
Fixing of Blocks with chemical 1
Sundries 1
Scaffolding charges 21.6
Fixed cost 9
Labour
Labour Cost for Fixing of Blocks 9
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:
225
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:
226
Basic Rateb 2650 working by sunil sir
75 Nos
60
41.67
Rate Amount
35 2120
42
6500 2340
350 1260
60 961
60.00 301
2.00 122
675 608
Ls 100
25 540
331 2981
269 2420
TOTAL AMOUNT 13796
10.00% 254
0% 0
1% 40
15% 2114
Total: 16204
2 Cum
9002 per Cum
1800 per Sqm
41.67
Rate Amount
35 2650
53
227
6500 0
350 0
60 0
60.00 0
2.00 153
675 608
Ls 100
25 540
331 2981
269 2420
TOTAL AMOUNT 9504
10.00% 257
0% 0
1% 41
15% 1470
Total: 11273
2 Cum
6263 per Cum
1253 per Sqm
75 Nos
60
Rate Amount
48 2862
57
6500 1755
350.00 630
60.00 864 12mm considered
60.00 167 10mm considered
2.00 122
675 608
Ls 100
25 540
331 2981
228
269 2421
TOTAL AMOUNT 13107
10% 254
0% 0
1% 40
15% 2010
Total: 15412
1 Cum
11416 per Cum
1712 per Sqm
Rate Amount
80 4770
95
6500 2925
350 1575
60 961
60.00 301
2.00 122
675 608
Ls 100
25 540
331 2981
269 2421
TOTAL AMOUNT 17399
10% 254
0% 0
1% 40
15% 2654
Total: 20348
2 Cum
9044 per Cum
229
2261 per Sqm
2650
75 Nos
60.000
Rate Amount
32 1908
38
6500 1170
350.00 630
12mm considered
60.00 961
10mm considered
60.00 167
2.00 122
675 608
Ls 100
25 540
1 9
269 2421
TOTAL AMOUNT 8675
10% 254
0% 0
1% 40
15% 1345
Total: 10315
1 Cum
11461 per Cum
1146 per Sqm
3400
75 Nos
60.000
230
Rate Amount
41 2448
49
6500 1170
350.00 630
12mm considered
60.00 961
10mm considered
60.00 167
2.00 122
675 608
Ls 100
25 540
331 2981
269 2421
TOTAL AMOUNT 12197
10% 254
0% 0
1% 40
15% 1874
Total: 14366
1 Cum
15962 per Cum
1596 per Sqm
3000
75 Nos
60.000
Rate Amount
36 2160
43
6500 1170
350.00 630
231
60.00 961 12mm considered
60.00 167 10mm considered
2.00 122
675 608
Ls 100
25 540
0 0
269 2421
TOTAL AMOUNT 8923
10% 254
0% 0
1% 40
15% 1383
Total: 10600
1 Cum
11778 per Cum
1178 per Sqm
3000
75 Nos
90.000
Rate Amount
36 3240
65
6500 1170
350.00 630
60.00 961 12mm considered
60.00 167 10mm considered
2.00 184
675 608
Ls 100
25 540
0 0
269 3632
TOTAL AMOUNT 11296
10% 382
0% 0
1% 53
232
15% 1760
Total: 13490
1 Cum
9993 per Cum
1499 per Sqm
3000
75 Nos
60.000
Rate Amount
72 4320
86
6500 1170
350.00 630
60.00 961 12mm considered
60.00 167 10mm considered
2.00 122
675 608
Ls 100
25 540
0 0
269 4842
TOTAL AMOUNT 13547
10% 496
0% 0
1% 65
15% 2116
Total: 16224
2 Cum
9013 per Cum
1803 per Sqm
233
Sr.No. Item Basic Rate Labour Rate TOTAL Quantity Amount
1 Excavation 85 250 335 14628 4900380
2 Backfilling 300 250 550 1454 799700
3 Soling 1600 250 1850 250 462500
4 Steel TMT 40000 8000 48000 950 45600000
5 RMC 4800 700 5500 8442 46431000
6 Formwork 80.7 350 430.7 53412 23004548
7 Blockwork 580 300 880 16,324 14365120
8 Plaster 290 160 450 17721 7974450
9 Structural Steel 48000 50500 98500 23 2265500
10 0
11 0
12 0
13 0
14 0
15 0
16 0
Amount 145803198
234
Rebar Coupler Price for coupler
Description inclusive of OH & Profit Total
threading @20%
235
Drain 1x.45x1
Nos L W H Qty unit Rate Amount
Excavation 1 1 0.45 0.5 0.225 m3 350 78.75
PCC 1 1 0.65 0.1 0.065 m3 6500 422.5
Walls 2 1 0.2 0.5 0.2 m3 6500 1300
Formwork wall 4 1 0.5 2 m2 350 700
Steel Wall 4 13.49333 53.97333 Kg 60 3238.4
Edge angle 2 1 12 kg 65 780
plaster 4 1 0.5 2 m2 365 730
7249.65
9062.063
Drain 1x.6x1
Nos L W H Qty unit Rate Amount
Excavation 1 1 0.6 0.5 0.3 m3 350 105
PCC 1 1 0.8 0.1 0.08 m3 6500 520
Walls 2 1 0.2 0.5 0.2 m3 6500 1300
Formwork wall 4 1 0.5 2 m2 350 700
Steel Wall 4 13.49333 53.97333 Kg 60 3238.4
Edge angle 2 1 12 kg 65 780
plaster 4 1 0.5 2 m2 365 730
7373.4
9216.75
Drain 1x.9x1
Nos L W H Qty unit Rate Amount
Excavation 1 1 0.9 0.5 0.45 m3 350 157.5
PCC 1 1 1.1 0.1 0.11 m3 6500 715
Walls 2 1 0.2 0.5 0.2 m3 6500 1300
Formwork wall 4 1 0.5 2 m2 350 700
Steel Wall 4 13.49333 53.97333 Kg 60 3238.4
Edge angle 2 1 12 kg 65 780
plaster 4 1 0.5 2 m2 365 730
7620.9
9526.125
236
chasing in masonry 2.25
labour 1200
Rate per Sqm 533.3333
ESIC PF 52.8
Profitr 58.61333
237
PUDDLE FLANGES HOT DIP GALVANISED
BOTH
END
SIZE FLANGE
25MM 1500
32MM 1800
40MM 2000
50MM 2150
65MM 2850
80MM 3080
100MM 3350
150MM 4950
200MM 6950
250MM 9450
300MM 10950
238