BOQ
Table 1
Fixed cost
Table 1
Excavation
Table 1
RMC
Table 1
BOQ-1
Table 1
RMC-1
Table 1
Steel TMT-1
Table 1
Fixed cost-1
Table 1
Steel TMT
Table 1
Formwork
Table 1
Structural steel
Table 1
Blockwork
Table 1
Sheet1
Table 1
Couplers
Table 1
Extra
Table 1
Puddle Flanges
Table 1

1
s converted to an Excel worksheet. All other
orksheets. Please be aware that formula

Excel Worksheet Name

Summary

Summary

Summary-1

BOQ

Fixed cost

Excavation

RMC

BOQ-1

RMC-1

Steel TMT-1

Fixed cost-1

Steel TMT

Formwork

Structural steel

Blockwork

Sheet1

Couplers

Extra

Puddle Flanges

2
Summary for Carrying Out Civil Core & Shell Works for L&T’s Proposed Multi use Development Project (Tow

S.N. Item Description Amount (INR)

1 Part A: Civil Core & Shell Works 225,463,961

2 Part B: Civil Work : MEP Services 7,633,013

3 Part C: Waterproofing Works 20,130,889

Total Amount 253,227,863


Add for GST: 18% 45,581,015
Grand Total 298,808,878

3
elopment Project (Tower and Allied Parking Area), Energy Center at Vadodara, Gujarat

4
Summary for Carrying Out Civil Core & Shell Works for L&T’s Proposed Multi use Development Project (Tow

S.N. Item Description

1 Part A: Civil Core & Shell Works

2 Part B: Civil Work : MEP Services

3 Part C: Waterproofing Works

Total Amount
Add for GST: 18%
Grand Total

165000
Total Excavation / Backfilling / breaking qnty Excavation Mt3/ per Sq.ft.

Total concert qnty concert Mt3/ per Sq.ft.


7,982 0.0484

Total Formwork qnty Formwork Mt2/ per Sq.ft.


53,412 0.32

Total Reinforcement qnty Kg Reinforcement Kg/ per Sq.ft.


950,000 5.75758

Total Structural steel qnty Kg Reinforcement Kg/ per Sq.ft.


23,000 0.13939

Total BW qnty. Total BW Mt2/ Sq.ft


16,384 0.0993

5
Total PLASTER Mt2 Total PLASTER Mt2 / Sq.ft
14,511 0.09

Total soling misc Total soling misc

Total core cutting VDF ETC misc Total core cutting VDF ETC misc

Total MEP misc Total MEP misc

Total Water proofing Total Water proofing

Total misc

6
7
d Multi use Development Project (Tower and Allied Parking Area), Energy Center at Vadodara, Gujarat

Amount (INR)

225,463,961

7,633,013

20,130,889

253,227,863
45,581,015
298,808,878

2,988,233.00
18.11

56,842,305.00
344.50

53075048.00
321.67

61646148.00
373.61

2498384.00
15.14

28,894,387.00
175.12

8
9,978,625.00
60.48

616,945.00
3.74

8,188,764.00
49.63

7,633,013.00
46.26

20,130,889.00 ###
122.01 1530.26

#DIV/0!

9
10
S.N.

ii

iii

11
iv

ii

iii

ii

iii

iv

ii

iii

iv

12
i

ii

ii

ii

iii

iv

ii

iii

iv

13
d

ii

iii

iv

vi

vii

14
i

ii

ii

ii

iii

iv

vi

15
vii

ii

iii

iv

vi

vii

16
i

ii

17
b

ii

iii

ii

iii

ii

iii

iv

vi

vii

18
viii

ix

ii

iii

iv

vi

vii

viii

ix

xi

xii

ii

iii

iv

19
vi

vii

ii

ii

iii

iv

ii

iii

ii

iii

20
1

21
1

22
2

23
3

24
7

10

25
11

12

13

14

26
15

16

17

27
18

19

20

28
21

22

23

29
Annexure A for Carrying Out Civil Core & Shell Works for L&T’s Proposed Multi use Development P

Description

Part A

Notes: All measurements shall be as per IS: 1200 unless otherwise specified

EARTH WORKS

Mass Excavation in all types of soil for all depths (Disposal outside site Premises)
Earthwork in Excavation Using mechanical means/ manual means using Contractor supplied plant and machinery an
including raft, foundations of walls, columns, footings, basements, equipment foundations, plinth beam etc. in all ty
Mass
murrum Excavation
(but excluding in Hard
hard of rock
rock : (Disposal
requiring chiseling outside
using site
rock Premises)
breaker
Mass Excavation in all types rock for all depths: (Disposal Outside siteor blasting), providing shoring, pumping, bai
Premises)
complete . Any type of strata that can be excavated using excavator bucket shall be measured and paid under soil ex
Earthwork
The item rate in Excavation
shall include Using mechanical
providing shoring means/ manual
, strutting, means using
de:watering withContractor
completesupplied
pumpingplant andbailing
system, machinery
out waan
Concrete
including raft,Breaking
foundations (M30of Grade)
walls, columns, footings, basements, equipment foundations, plinth beam etc. in all ty
Breaking of
transport forconcrete/
all masonry
leadnormal
and lifts, in existing
disposal foundation,
of excavated grade slab
material and
using any othervehicle
contractor's structure by mechanical
outside / manual
site premises (Dispom
be excavated
authorized using
disposal yard excavator bucket and that requires chiseling using rock breaker or controlled blasting), p
Muncipal
out water Guidelines
, slush and approved
removal place/location
etc. complete
by municipality
of
. disposal
Any type
outside
tostrata
of
site premises.
be finalized
that canbybe Expenses
contractor
excavated
on own
atusing
his account
cost)ofetc.
excavator
debris manageme
complete
bucket shall as
be pe
m
municipal
(EIC). Royaltycorporation
charges guidelines
for excavation, in covered
Expenses vehicles, housekeeping
debris,of roads and surroundings of ,excavated
royalty for disposal
excavation item only. The item rate shall includeonproviding
account of
shoring management / disposalwith
strutting, de:watering complete earth
pumpingas p
rate.
in covered vehicles, housekeeping of roads and surroundings , etc are included in the rate. No separate payment on
removal
Any over,excavation
excavation,shall transport
be made for good
all leadwithandplumlifts,concrete
disposal (with
of excavated
M10 Grade material usingplums
with 40% contractor's vehicle outsid
of size 160mm down
excavated material as per Muncipal Guidelines and place/location of disposal to be finalized by contractor at his ow
No
Back payment
Filling
instructions shall be
of :Engineer made
Earth From for such
outside
in charge works
(EIC),site of plum concrete.
Royalty charges for excavation, Expenses on account of debris management
Note
muncipal corpration guidelines, in per
Filling1: Mode
in of
foudations, Measrument: As
rafts,trenches,plinths, IS 1200
covered area levelling,
vehicles, podium filling
housekeeping of roadswith approved
and good quality
surroundings , etc. Noearth brought
separate payf
Note 2:
premises, All leads
etc.in and
layerslifts to
not be included
exceeding in
200mm the Unit
in Rates.
depth, breaking clods,watering,compacting
considered. All these expenditures are included in the item rate of excavation. Any over excavation shall be made go each layer with vibrato
Note
Grade3:with
achieve Any
95%40% variation
plumsin160mm
of maximum prices of any component
dry density.
down The rate
graded (butalso
) atshall
the notinclude
cost limited
of to) likeNo
charges
contractor. Diesel,
for labour,
surface
payment shallplant
dressing, and
slushmachinery,
be made royalt
removal,barrica
for such works o
not be
include payable
Note 1: charges
Mode offor to contractor
royalty.
Measrument: during the entire
As per IS 1200 period of contract and its extension if any.
Note 2: All leads and lifts to be included in the Unit Rates.
Back
Note 3:Filling : EarthinAvailable
Any variation prices of any Inside site Premises
component (but not limited to) like Diesel, labour, plant and machinery, royalt
Filling in foudations, rafts,trenches,plinths,
not be payable to contractor during the entire area levelling,
period podiumand
of contract filling with approved
its extension if any.good quality excavated eart
etc.in
Note layers not
4: Contractor exceeding
to submit excavation method statement, excavation plan and safety plan with
200mm in depth, breaking clods,watering,compacting each layer beforevibratory
start ofcompact
activity.
Concrete
maximum dry Works
density. The rate shall also include charges for surface dressing, slush removal,barrication and safety.
for royalty.
Notes:

Clause detailed below to be referred for all concrete items like isolated footings, rafts, retaining walls, plinth beams
shear walls, lift walls, floor slabs, floor beams, Tie /Link Beam, staircase, parapet, pardi, Chajja, lintels, mullions, con
Underground Tanks, STP, lift machine rooms, Elevation Features, mezzanine floors, service shaft slabs / platform, tr
Plum Concrete
lofts, etc. all as perWorks: With in
GFC included plum brought
this work from
order. The outside
following shall be deemed to be included in the item rates:
Providing and Laying Plum concrete by using M 5
a) The concrete shall include all ingredient materials (Cement, Grade concrete 60% andAdmixture
Aggregate, Hard stone, Fly
plum ( Max.
Ash, Silicasize
Fume 160, GGBS,
mm ) 40 w
be
Plum used ) , including
Concrete of M shifting
5 Grade , stacking & laying of plum .
(including erection of scaffolding if required), hoisting to all locations & heights/ Levels / Depths, pouring / laying by
The Item ratebyshall
compaction include
suitable dewatering
means needle /system
surfaceas/ plate
per approved
vibrator,methodology to keep
leaving pockets, holeswork area dryofallinserts
,installation time before
as shop
surfaces
till & junctions,
theConcrete
next operation cost of
orGrade all materials, miscellaneous consumables,labors,tranportation of material
completion of work, hacking the surface / use of approved binding agents to provide key fo to all require
Plum
approved of,Placing
M 7.5
wetting, etc. and preparingvibrating
means ,compacting,
construction Curing
joints with etc. tools,
provision plantkey.
of shear and machinery, hire and fuel charges and al
per specifications, drawings and as directed by EIC. The item rates shall
b) If different grades of concrete are used at junctions, spillover of richer concrete hold good for work at
required all Levels
shall ,depths,
be included heig
in the
pits,
Plum
c) Itemtunnels,
Concrete etc.
rate shall ofinclude
M 10 Grade
filling of tie:rod, wall ties holes with non:shrinking and waterproofing grout material.
Designing of concrete
d) Providing construction mixjoints,
for different grades
expansion of wherever
joints controlleddirected.
concrete should be done in accordance with latest IS:SP
design)
e) Adequate protection of edges and corners from damage duringby
in an approved lab and the same should be got approved EIC , the item
construction rates also manner.
in approved includes cost for the sa
Note: Rate also includes of Providing , placing, fixing and removal of necessary formworks.
f) Work either straight or curved, plain or circular or of any shape, unless otherwise provided for.
g) Keeping the work well cured for at least 7 days from the date of casting or as per relevant IS code (Ponding metho
wet/moist hessian cloths to be wrapped around surfaces). All types of Quality Control tests (green and hardened st
specifications. 30
h) Hacking of all concrete surfaces wherever required.
i) All starters to columns and other vertical elements shall be prepared with concrete mix one grade higher than tha
Plum Concrete of M 15 Grade

Plain cement Concrete :


Providing and laying plain cement concrete (PCC) using 20 mm nominal size well:graded approved quality aggregate
including compacting, curing, establishing approved dewatering system to keep work area dry all time, cleaning, pre
including shuttering complete to the satisfaction of the EIC at all lifts and leads.
Below Foundation, raft, Plinth, Grade Slab, Water Tank, Lift Pit and all other related works.
The Item rate shall include dewatering system as per approved methodology to keep work area dry all time before p
surfaces & junctions, cost of all materials, miscellaneous consumables,labors,tranportation of material to all require
approved means ,Placing vibrating ,compacting, Curing etc. tools, plant and machinery, hire and fuel charges and al
per specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels ,depths, heig
pits, tunnels, etc.
Designing of concrete mix for different grades of controlled concrete should be done in accordance with latest IS:SP
design) in an approved lab and the same should be got approved by EIC , the item rates also includes cost for the sa
Note: Rate also includes of Providing , placing, fixing and removal of necessary formworks.

Plain cement Concrete M 10 Grade

Plain cement Concrete M 15 Grade

Plain cement Concrete M 20 Grade

All RCC members at GL and below


Below Foundation, Rafts, Footings, Pile Caps, Stub Columns, Plinth, Grade Slab, Water Tank, Lift Pit, Trenches, Slabs,
Columns and all other
All RCC members in 20works
Grade:below Ground Level:
Providing and laying Controlled concrete of M 20 Grade from batching plant at site or RMC source from outside ,us
aggregates for Reinforced Cement Concrete (RCC) of various grade conveyed to all locations, lifted and placed in pos
All RCC members
means, in 25 Grade finished evenly and cured. etc. complete (excluding form work, reinforcement and st
vibrated, consolidated
The Item rate shall include cleaning with air jet the surfaces of formwork to receive concrete before placing of concr
of
Alladjacent
RCC membersRCC worksin 30 completed
Grade earlier, cost of all materials, miscellaneous consumables, labors, tranportation of
pumping or other approved means, Placing vibrating, compacting, Curing etc. tools, plant and machinery, hire and f
charges , grout filling of tie:rod holes, wall:ties holes with approvd non:shrinking and waterproofing grout material e
All RCC members
drawings in 40 Grade
and as directed by EIC. The item rates shall hold good for work at all Levels , lead, lifts, Heights, Depths, ele
tunnels, etc.
Designing of concrete mix for different grades of controlled concrete should be done in accordance with latest IS:SP
All RCC members
design) above GL
Floor & in an Slabs,
Roof approvedSunklab and
Slabs, the same
Beams, should
Walls, be got
Pardis, approvedChajjas,
Staircases, by EIC, Columns,
the item rates
Pools,also includes
OHWTs, LMR cost for&the
walls sam
Slabs
testing
and charges required
all miscellaneous for quality check as per approved quality plan.
All RCC members in 25RCC GradeStructures:
Providing and laying M25 Grade Controlled concrete from batching plant at site or RMC source from outside , using
Mode of Measurement
aggregates for Reinforced : RCC members
Cement shall (RCC)
Concrete be certified as per
of various theoretical
grade conveyed quantity from GFClifted
to all locations, drawing.
and placed in pos
All RCC members
means, in 30 Grade finished evenly and cured. etc. complete (excluding form work, reinforcement and st
vibrated, consolidated
The Item rate shall include cleaning with air jet the surfaces of formwork to receive concrete before placing of concr
of
Alladjacent
RCC membersRCC worksin 35 completed
Grade earlier, cost of all materials, miscellaneous consumables, labors, tranportation of
pumping or other approved means, Placing vibrating, compacting, Curing etc. tools, plant and machinery, hire and f
charges , grout filling of tie:rod holes, wall:ties holes with approvd non:shrinking and waterproofing grout material e
All RCC members
drawings in 40 Grade
and as directed by EIC. The item rates shall hold good for work at all Levels , lead, lifts, Heights, Depths, ele
tunnels, etc.
Designing of concrete mix for different grades of controlled concrete should be done in accordance with latest IS:SP
Extra
design) Over
in an for temp lab
approved controlled
and the concrete for M30 Grade by EIC, the item rates also includes cost for the sam
Extra over supply and placement ofsame should
various gradesbe of
gotconcrete
approved for Providing Temperature Controlled Concrete for a
testing charges
of concrete shallrequired for quality
not exceeding check
25 deg. as peratapproved
Celsius quality
final location plan.
of its placement. De:shuttering of formwork shall be
Extra
etc. over
complete for
as Self
per Compacting
methodology Concrete
and quality (SCC)
plan :
approved by Engineer Inatcharge.
Extra over
Mode for Providing :and
of Measurement RCC laying
members Controlled
shall beconcrete
certifiedfrom batching
as per plantquantity
theoretical site orfrom
RMCGFCsource from outside ,usin
drawing
The Item rate shall include cost of all materials, miscellaneous
aggregates for Self Compacting Concrete (SCC) of various grade conveyed to all consumables, labors, tranportation
locations, lifted andofplaced
material to all r
in positio
other approved means, Placing vibrating, compacting, Curing etc. tools, plant and machinery, hire and fuel charges
means,
complete finished evenly
all as per and cured. drawings
specifications, etc. complete
and as(excluding
directed form
by EIC.work, reinforcement
The item rates shalland
holdstructural
good for steel, Mesh,
work at In
all Lev
cleaning with air jet the surfaces of formwork to receive concrete before placing of concrete dewatering wherever n
elevations,
all lead andbasements, trenches,
lifts, tools, plant pits, tunnels,
and machinery, etc.
hire 31fuel charges and all other incidental charges etc., all as per spe
and
Designing of Temperature controlled concrete
by EIC. The rates quoted shall hold good for any depths, mix for different
heights,grades
levels,of controlled
elevations, concrete should
basements, be pits,
trenches donetunnel
in acc
approved lab and the same should be got approved by EIC, the item rates also includes cost for the same. Item rate
Extra over for SCC Cement Concrete (Grade M30 Grade)

Extra over for SCC Cement Concrete (Grade M40 Grade)

FORMWORK :
Following clause detailed below to be referred for all formwork items included in BOQ. The following shall be deem
rates:
Providing, a)The materials,erecting
fabricating, design, and andconstruction
fixing in position of formwork
formwork (including
material bracing,
of approved shoring,system strutting
made&ofSupporting
Ply with bolts witha
comply with the best Indian Standard Code of Practice for false work and
centering and shuttering to correct line and levels including strutting, propping, etc. with necessary bracings in all ax below.
b)Specifically,
provision for making forms for theconcrete
joints in work shall be so
the shuttering constructed
fully leak:proofand erected
to avoid as to resist
leakage of cementthe forceslurry,exerted
dismantlingon them andwir
Super
greater Structure : Conventional Formwork
after the concrete attains sufficient strength to self:support itself without any cracking and distortion. etc. includingt
than three (3)mm. Forms shall be sufficiently tight to prevent the leakage of mortar/grout. *(Masking tape
the
(Up sufficiency
Fire toCheck of theStaircase
Floor,
4.5m Height), whole
all placesof and
the
Headformwork
profilesRoom shall
, LMR
wherever restneeded
entirely with
Misc.the
, other: specified Contractor
itemas per drawing whoand shallproviding
engage arequired
qualifiedsurfa Eng
Providing,
construction
Extra
providing overall fabricating,
methods
formaterials
Staging aboveerecting
to
required and
structurally fixing
4.5 including design in position
the
m Height consumables,
: Extra over For formwork
formwork. Prior
supporting
making material
to start of
any approved
RCC members
of formwork formwork, system
, shifting(slabs made
shuttering
& beams)of
of formwork of Ply
works
up to with
the
height bolts
morea
shutte
all location
centering
EIC d)Forms
requiring
centering,stagingand forshuttering
exposed
strutting, to increasedto correct
surfaces
propping, height line
shall be and
walling,asbracing, madelevelsof
requiredbolting, including
dressed
upto 7wedging, strutting,
timber
m . The staging or propping,
metal.
casing, or Angle
formwork
striking, etc. with
fillets necessary
shall
design
removal, be used bracings
shall be DE
lowering, in the
submitted in all
to ax
angles
shuttering, ro
th
provision
to line
approval and for making
conform
thebefore the
to
proceeding thejoints in
dimensions
to the shuttering
and levels fully
shown leak:proof
on the to avoid
Drawings. leakage
f)The of cement
interior surfaceslurry,
of dismantling
forms shall and
be co r
filling
Extra
after
(The
Fosroc over
the
gap/holes
for Staging
concrete
make) prior
ofabove
attains
tie rods 7.0erect
with
thesufficient
to wherever
placing m of the same.
grout,
Height
strength :etc.
Extraand overall incidental
to self:support
reinforcement, andForany
supporting
itself
work RCC
without
surplus
complete.
members
any
moisture
The(slabs
cracking
shall
activity
be and &
removed
also includes
beams)of
distortion.
from height
etc.
the
allowing
forms more
includingprio
f
cut:outsItem rate shall
openings, include
etc. providing called allfor,
materials
allowing required
for including
dressing with consumables,
approved making
shuttering of formwork
oil to prevent ,shifting
adhesion ofo
requiring
(Up tobe4.5mstaging
Height),to increased height as required uptoneeded 9.5 m. etc.The staging beasor formwork design shall prior
be submitted to t
material
depths
shall
approval
such
&applicable
levels,
before toall
as including
dirt, allplaces
clay,
proceeding
wire, and
centering,
RCC members.
to erect
profiles
reinforcing
strutting,
the
wherever
same.
bar,propping,
wood chips,
walling, : specified
shall
bracing, per
removed
bolting, drawing
from
wedging, and providing
thecasing,
forms required
to concretin
striking, surfa
removal
providing
displaced
Extra
all all
rods,during
Over formaterials
&concrete
Scrificial required andincluding
orproviding
Formworkwithin the
system consumables,
periods specified making
for theofretention
formwork byof ,formwork,
shifting of the
formwork
concrete upwhere
to ,shifting
shall allbelocation
remo
ThetieItem
The Item
centering,
Engineer
nuts
rate
rate shall
shall
strutting,
may
bolts,
include
include
determine,
etc.
propping, providing providing
walling,
construction
all
joints
additional
materials
allbracing,
materials required
required
bolting,
shall be
safe working
including
including
wedging,
formed and the
area providing
consumables,
consumables,
casing, striking,
section of work
extra
making
making
removal,
shall
formwork
be
of formwork
of reconstructed
formwork
lowering, DE
necessa
,shifting
shuttering,
after
of
of
thr
etc.
depths
depths complete
& levels,
& levels, as directed
including
including by EIC
centering,
centering,. The item
strutting,
strutting, rate also
propping,
propping, includeswalling, allowing
walling, work bracing,
bracing, for forming
bolting,
bolting,The grooves,
wedging,
wedging, drips,
casing,
casing, throats,
striking, cut:outs
removalof
removal
striking,allowing
filling
and
all the
adjusted.
allowing
tie gap/holes
fornuts
dressing of tie rods
withetc.
approvedwith grout,
shuttering etc. and all incidental
oil to prevent adhesion complete.
ofbyconcrete activity
to extra
formwork. also includes
Itemwhererate shall also
all tie rods,
cut:outs
i)Formworkrods,
Reinforcement nuts
openings,
shall
& bolts,
&remain
bolts,
etc.
Steel etc.
wherever
and
and for
inbyplace
Works
providing
providing
called
the for,
additional
additional
allowing
minimum timefor
safe
safe working
working
dressing
as specified
area
area
with IS:by
approved
in for 456
providing
providing orextra
shuttering
:1978
formwork
formwork
oil towithin
as varied preventwhere
this
necessa
necessa
adhesion
specifica o
quality
etc.
etc. check
complete
complete as
as
as per approved
directed
directed EIC
by EIC quality
. The
. Not plan.
item
The withstandingrate also
item rate alsothis, includes
includes allowing
allowing forming
forbeforming grooves,
grooves, drips,
drips, throats,
throats, cut:outs
cut:outs o
o
shall
in
Mode
allowing be applicable
accordance
of for
payment with
dressing to all
this
: Area
with RCC members.
standard.
of staging shall be measured side
as per the forms may
plan area stripped
and not the after the minimum
area in contact time
with specifie
concrete
allowing
The
in anyItem for
case ratedressing
not shall
less with48approved
include
than approved
providing
hours)
shuttering
shuttering
afterall materials
the
oil
oil to
concrete to prevent
prevent
required
has been
adhesion
adhesion
including
poured,
of
of concrete
concrete
consumables,
provided
to
to
that
formwork.
formwork.
making
Item
Item
of formwork
the surfaces exposed
rate
rate shall
shall
,shifting
are imm
also
also
of
quality
Supplying check
qualitycompound
check & as per
fixing
as per approved
reinforcement
approved quality
quality plan.
steel
plan.is carried
depths
curing
Mode &
of levels,
payment including
(if
:The centering,
required) and strutting,
curing propping,out inwalling,
accordance bracing, with bolting,
this wedging,
specification. casing,
Bottom striking,
forms removal
shall rem
Providing,
Mode
all ofor
tie rods,
pouring
Straightening,
payment
nuts
as otherwise Areaarea
&,:bolts, of
etc.
in contact
cutting,
staging
and 18
approved
bending
shallwith
thebe
providing
by
andconcrete
bindingwith
measured
additional
Engineer. j)Whenas
safe
deductions
in position
per the plan
working
forms arearea
for openings.
of reinforcement
area by
reused, and barsarea
not the
providing
their
(TMT
extra
original inbars:
contact
formwork
shape,
Fe 500
with) concrete
where
strength,
high yie
necessa
rigidity,
Note
conforming
For Sub : For UGWT
to
Structure STP
IS:1786:2008 & Retaining
with wall
gauge no through
annealed type
binding of tie rod
wire, to, wall
correctties shall
shape beandusedsize for
as formwork
per detailed system.
drawing
etc. complete
smoothness as
shall directed
be by
maintained. EIC . The
All item
material rate also
previously includes
used allowing
in formwork
bar:bending schedules, for all reinforced concrete work such as pile caps, footings, RCC walls, columns / stub colum for forming
must be grooves,
cleaned drips,
off andthroats,
oiled cut:outs
before reuo
allowing
beams, Staircase, Lintels, OHWT, LMR, rafts etc. at all heights and all levels; with correct sizes approved concretealso
so as to for
ensure dressing
uniform with approved
quality and shuttering
texture over oil to
large prevent
areas, adhesion
built to of
close concrete
tolerances to formwork.
and exhibit Item rate
consistently shallgood coq
quality
check
For Superand
concrete check
list of as
the
Structureper
same approved
work have quality
to be plan.
fill before the contractor start any
galvanized binding wire of 18 gauge; if required dewatering, required labor and machines / equipmen works. j) Quoted rates shall be inclusive of
Mode
handling, of payment
constriction joint to
shifting :The
etc. make area
and in contact
concrete
cutting and with smooth.
surface
bending concrete
as per with deductions
drawing, for openings.
reinforcements all complete to the satisfaction of the
Note : For OHWT / water retaining structure scarifies
The Item rate shall include providing all materials required such as reinforcement type of tie rod system , no through
steel bars type(TMTof tiebars:
rod Fe , wall
500tiesconfsh
Coupler:
miscellaneous at all levels
consumables suchin asreinforcement
18 gauge annealed
Supplying and Fixing of Couplers steel Galvanised
bars including Ironmaking
bindingthreading
wire , chairs of bar ,pins ,spacers
at both end,correct
(Each jun s
or
of approved PVC cover block , Cost of Labour, machines / equipment / tools / tackles / vehicles for all transportatio
16 requisite
mm Dia. Bar
reinforcement
forging (if required) and threading shall be treated as one number for payment) the threading of steel b
in the stocking yard, shifting the same
approved coupler supplier at site and contractor. The to ratecutting
shall & bending
include yard, Straightening,
all transportation, cutting,
Handling, bending,shift
unloading, shift
locations, heights, depths & levels, all necessary
and all necessary miscellaneous handling charges etc. complete. miscellaneous handling charges, tying reinforcement steel as per d
required
20 mm Dia. Baretc. complete as directed by EIC. Item rate shall also include testing charges required for quality check as p
: No separate payment for binding wires, chairs, Pins, spacer and cover blocks shall be considered. Only authorized l
as per GFC drawing.
25 mm Dia. Bar

32 mm Dia. Bar

Reduced Coupler: at all levels


Supplying and Fixing of Reduced Couplers in reinforcement steel bars including making threading of bar at both end
separate bars of requisite
Reduced Coupler: forging (if required) and threading shall be treated as one number for payment) the threa
20:16 dia
through approved coupler supplier at site and contractor. The rate shall include all transportation, Handling, unload
fixing and all necessary miscellaneous handling charges etc. complete.
Reduced Coupler: 25:20 dia

Reduced Coupler: 32:25 dia

Reduced Coupler: 40:32 dia

32
Reinforcement Steel Bar Anchor
Providing , drilling and fixing Reinforcement steel bar anchoring work of reinforcement steel in concrete wall with c
at
8mmanyDia
height & location as per instruction of Engineer Incharge .Rate inclusive of cost of all materials, miscellaneous
of material to all required locations by approved means , tools, plant and machinery, hire and fuel charges and all ot
required as per specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels
10mm Dia

12mm Dia

16mm Dia

20mm Dia

25mm Dia

32mm Dia

Structural Steel Works


Supplying, fabricating, delivering at site, hoisting and fixing in position at all heights and all levels and making all stru
the designSteel
Structural drawings Works prepared by the consultants. The structural steel work shall include welded and built up section
welded and built up sections, trusses, built:up purlins, frame work welded and/or bolted, girders, gusset plates, bas
The Item rate shall include providing all materials required such as Structural steel (Confirming to IS: 226 & 2062 ),
Structural
Labour, machinesSteel works : Misc., Ladder,
/ equipment / tools /Staircase
tackles /Etc. vehicles for all transportation, Handling, unloading Structural steel
same to Fabrication yard, shifting from Fabrication yard to all required locations, heights, depths & levels, all necess
etc. as per approved shop drawing and all incidental work required etc. complete as directed by EIC. The rate shall in
Supplying
primer & fixing
and,Fabricating
two coats of MS inserts
epoxy
Supplying and fixingpaint and shall
MS inserts includerequired
including high tensile structural
template fixingbolts, washers,
& keeping them1:3incement
position and as groutin
per GFC
shall also include preparation of shop drawing & obtain approval of EIC ,
removing, cleaning its surface and applying protective measures such oiling, greasing etc. complete to approvaltesting charges required for quality check a
of th
Mode
S/F of
Anchor Measurement:
bolt: M 16 As mmper IS
upto 1200 150 mm for structural steel works.
The Item rate shall include providing all materials required such as Structural steel (Confirming to IS: 226 & 2062 ), m
Providing /Fixing of Anchor bolt : M 16 mm upto 150mm .Providing, drilling and fixing of approved make anchor fast
Labour,
and length machines
of Anchor / equipment
Bolt in concrete/ tools wall
/ tackles / vehicles
and using Grout/foradhesive
all transportation,
as per drawing Handling,
at any unloading
height &Structural
location assteel per
same
Masonry to Fabrication
Works yard, shifting from Fabrication yard to all required locations,
Rates inclusive of all consumable material, staging material, Labour charges, tools and tackles required to complete heights, depths & levels, all necess
etc. as per drawing and all incidental work required etc. complete as directed by EIC. Item rate shall also include tes
Engineer
check as per In charge
approved (EIC).quality plan.
Solid Concrete Block :200mm thick Masonary:
Providing and constructing 200mm thick Solid concrete block masonry (as approved), blocks conforming to IS 2185
mortar mix ratio of 1:5 (1 cement : 5 sand) mixed with approved non:shrinking compound as per manufacturer’s ins
Solid
raking Concrete
out joints, curing, Blockdoing :150mm thick Masonary:
independent double legged scaffolding etc. as per specification at all locations; heigh
Providing and constructing 150mm thick Solid concrete block masonry (as approved), blocks conforming to IS 2185
satisfaction of the EIC.
cement : 4 sand) mixed with approved non:shrinking compound as per manufacturer’s instructions, including provid
Item
Solid
at everyrate shall include
Concrete
1.00m withcost
C/CBlock of all materials,
:100mm
supplying thick
and fixing miscellaneous
Masonary:
2 concrete
nos. 10 mm consumables,labors,tranportation
diamasonry
Tor bars (asandapproved),
8 mm dia links of material
at conforming
300 to all requi
c/c in cement con
Providing
means and constructing
,Curing , tools, plant 100mm
and thick
machinery, Solid
hire and fuelblock
charges, providing erecting & blocks
removing independent to IS 2185
doub
formwork complete with raking out joints, curing, doing independent double legged scaffolding as per specifications
cement
incidental
as directed : 4charges
sand)
by the mixed
EIC with
etc.,toall
his approved
required
entire non:shrinking
as per specifications,
satisfaction. compound
(RCC Patli drawings isaspart
beamMasonary: perof
and manufacturer’s
as directed
the item and instructions,
by EIC.
willThe
not item including
rates
be paid shall provid
hold g
separately)."
Light
at every
heights, weight
lead, concrete
1.00mlifts,Heights,Depths, block
C/C with supplying AAC block2:200mm
and fixing
basements, nos. 10 mm
trenches thick
dia
pits, Tor bars
tunnels, and 8shafts
service mm dia etclinks
.Itemat rate
300 c/c
shall inalso
cementincludecon
Providing
Item rate and
formwork shall constructing
complete include withcost 200mm
of allout
raking thick
materials,light
joints, weight
miscellaneous
curing, doingconcrete block (AAC block )masonry
consumables,labors,tranportation
independent double legged as approved,
scaffolding of as
material blocks confot
to all requi
per specifications
check
bed as
jointingper approved
mortar quality
(confirming plan.
to ASTMC 1660:09)
means
as ,Curing
directed , tools,
EIC plant
byindependent
the to As
his and
entire machinery,
satisfaction. andof
hire(RCC specified
fuel
Patli charges,
beam
thickness
is providing
part
as per manufacturer’s
of theerecting
item and&will
removing
not
instructions comple
be independent
paiddepths
separately)."doub
Mode
Light
curing,
band / of Measurement:
weight
doing
Patli beam concrete
and all per
block
double
other ISincidental
1200
AAC
leggedblock :150mm
scaffolding
charges etc.
etc., thick
as
all per Masonary:
requiredspecification
as per at all locations;
specifications, heights,
drawings and as and
directed lea
b
Providing
Item rateat and
shall constructing
include cost150mm
ofall thick light
allmaterials,
materials, weight concrete
miscellaneous block (AAC block ) masonry as of
consumables,labors,tranportation approved,
material blocks
torate conf
allrequir
requi
Item
for
bed rate
work
jointing shall
all
mortarinclude
Levels , cost
lead,
(confirmingof
lifts,Heights,Depths, miscellaneous
basements, consumables,labors,tranportation
trenches pits, tunnels, service of
shaftsmaterial
etc .Itemto all shal
means ,Curing
meansweight
,Curing ,, tools,
tools, plant and to
plantblock
ASTMC 1660:09)
machinery, hire and of specified
fuel charges, thickness
providing as per manufacturer’s
providing erecting
erecting & & removing
instructions comple
removing independent
independent doub
required
Light
beam of forbeam
100mm quality
concrete
thickcheck
at asand
every per machinery,
approved
1.00mAACC/C block hire
quality
with
and
:100mm fuelthick
plan.
supplying
charges,
and Masonary:
fixing 2 nos. 10 mm dia Tor bars and
doub
band /
Providing
incidental
Mode
Patli
of and
charges
Measurement:
and
constructing all
etc., all
As
other
100mm
required
per IS
incidental
thick charges
as perlight
1200
etc., all
weight concrete
specifications, required
drawings block as per
(AAC
and specifications,
block ) masonry
as directed by EIC. The item8and
drawings
as approved, mmas
rates dia
blocks
shalllinks
directed atbg
confo
hold
20
for Grade,
work atrequired
all Levels formwork
, lead, complete with raking
lifts,Heights,Depths, out joints,
basements, curing, doing
trenches pits, independent
tunnels, service double
shafts legged
etc .Itemscaffolding
rate shal
bed jointing
heights,
heights, lead,
depthsmortar and (confirming
lifts,Heights,Depths,
leads as to basements,
ASTMC 1660:09) of entire
trenches specified thickness
pits, satisfaction.
tunnels, service as per manufacturer’s
shafts etc .Item rateinstructions
ofshall
the also comple
iteminclude wilt
required
Light
beam of for quality
weight
100mm concrete
thickcheck
at as directed
block
every per1.00mAACby
approved
C/C
the
block EIC
quality
with
to plan.
:250mmhis
supplying thick
and Masonary:
fixing 2 nos.
(RCC
10 mm
Patli
dia
beam
Tor
is part
bars and 8 mm dia
and
links at
check
Providing
Item as
rate per
shallapproved
and constructing
include quality
cost 250mmplan.
of complete thick light
allISmaterials, weight concrete
miscellaneous block (AAC block )masonry as of
consumables,labors,tranportation approved
material blocks confo
to all requir
Mode
20
Mode of
Grade,
of Measurement:
required
Measurement: As
formwork
As per
per IS 1200
1200 with raking out joints, curing, doing independent double legged scaffolding
using
means thin bed jointing
,Curing , and
tools, mortar
plant (confirming to ASTMC 1660:09) of specified thickness as&per manufacturer’s instructio
heights,
Hollow
out joints, depths
Concrete
curing, leads
block
doing as:and
100mm
independent
machinery,
directed by thehire
thick
double EIC and
to
Masonary:
legged hisfuel charges,
entire
scaffolding etc.
providing
satisfaction.(RCC erecting
Patli beam
specification
removing
atisall
part ofindependent
the item
locations; anddoub
heights, will
dep
band /
Providing Patli
Item rate shall beam and
and constructing all other
include cost 100mm incidental charges
thick Hollow
of all materials, etc., all required as per specifications,
concrete consumables,labors,tranportation
miscellaneous block masonry as approved blocksofconforming drawings and as directed
material totoallISrequir2185 b
the
for EIC.
work
mortar at all
(confirming
means ,Curing Levels , lead,
to plant
, tools, ASTMC lifts,Heights,Depths,
and1660:09)
machinery,of specified basements,
hire andthickness trenches pits,
as perproviding
fuel charges, tunnels,
manufacturer’s service
erectinginstructions,shafts etc
& removingincluding .Item
independent rate
raking shal
doubou
Item ratefor
required shall include
quality checkcostasofperallapproved
materials,quality
miscellaneous
plan. consumables,labors,tranportation of material to all requi
double
band
meansof/ legged
Patli
,Curing beamscaffolding
and all
, tools, plant as
otherper specifications
incidental
andISmachinery, chargesetc. at all
etc., heights,
all required depths
as per and leads as
specifications,directed by
drawings
hire and fuel charges, providing erecting & removing independent doub the
and EICas to his entir
directed b
Mode
Item rateatMeasurement:
shall include As per
cost 1200
of all materials, miscellaneous consumables,labors,tranportation of material torate
all requi
for work
incidental all
chargesLevels , lead,
etc.,plant lifts,Heights,Depths,
all required basements,
as per specifications, trenches pits, tunnels, service shafts etc .Item shal
means ,Curing
required for quality, tools,check asand permachinery, hire and
approved quality fuel drawings
plan.
and as directed
charges, providing erecting by &EIC. The itemindependent
removing rates shall hold doubg
heights,
band
Mode/of lead,
Patli lifts,Heights,Depths,
beam and allAsother basements,
per ISincidental trenches
charges etc., pits, tunnels, service shafts etc .Item rate shall also include t
check as
Measurement:
per approved quality plan.
1200 33 all required as per specifications, drawings and as directed b
for work at all Levels , lead, lifts,Heights,Depths, basements, trenches pits, tunnels, service shafts etc .Item rate shal
Mode
required of Measurement:
for quality check Asasper perISapproved
1200 quality plan.
100 mm Thick brick work :
Providing and contructing 100mm thick brick masonary with locally available first quality bricks having minimum cru
maximum water absorption 20% (as per local grade 1st quality brick) in cement mortar CM 1:4 (1 cement :4 sand) m
Plastering
compound asWorks :
per manufacturers instructions in specified courses of approved bond and including providing RCC pat
C/C distance with supplying and fixing 2 nos 10mm tor bars with 8 mm dia links at spacing of 300 C/C in cement con
formwork
20 mm Thick complete plasterwith: raking out joints, curing, doing independent double legged scaffolding as per specifications
Providing
as directedand by Applying
the EIC tominimum his entire20 mm thick double
satisfaction. (RCC Patli coatbeam cement sand
is part ofplaster;
the itemfirst andcoat will to
notbebe12paid
mmseparately)."
thick cemen
cement
Item rate : 4shall
sand)include
including costadding 2% by weight
of all materials, of cement consumables,labors,tranportation
miscellaneous approved waterproofing compound, of second
materialcoat torequi
to all be 8
12
meansmm,Curing
Thick,compound
waterproofing plaster
tools, plant: 2% andbymachinery,
weight of cement, hire and finished
fuel sand face
charges, or as required
providing erecting to
& receive
removing specified
independent architectur
doub
Providing and Applying 12mm thick plaster in cement mortar mix ratio of 1:4 (1 cement : 4 sand), to internal surface
plumb
band / and
including Patli level
rakingbeam to and
out external facesincidental
all other
joints, hacking ofconcrete
walls, charges
soffits / ceiling
surfaces etc.,
andallifapplying
any, including
required as per racking
approved out junctions
specifications,
chemical drawings
bonding of masonry
agent andflexicrete and or
as directed conc b
ap
non:
for shrinking
work
Anitermite at all compound
Levels
Treatment , lead, and grouted with
lifts,Heights,Depths,
Works : square cut
basements,stone at junction
trenches then
pits,
dash coat plaster curing for 3 days for creating a bond, prepare junction of concrete / masonry by neat cleaning, poi providing
tunnels, service200 mm
shafts wide
etc 20
.Item gauge
rate GI
shalch
junctions
required
Anitermite
mortar and of grouting
for concrete
quality
Treatment andbelow
check
with masonry workaggregate
as per approved
square subgrade
crush fixed by drilling
quality plan. and
further GI nails,
providing andscrews,
fixing hacking
20 gaugeclosely concrete
GI chicken meshsurfaces,
200 mmapp wi
flexicrete
Mode of
supplying,
masonry or approved
Measurement:
mixing
fixed by Work and equivalent
As
injecting per IS to
1200
chemical concrete
emulsion surfaces
of and then
Chlorophripos apply a scratch
emulsifiable
drilling,: nailing with GI screws/nails, doing jambs, sills, grooves, pattas, wattas, rounding of coat plaster
concentrate cure
20% it for
with three
1% days,
cornerin
concentr
Miscellaneous
scaffolding etc. Item also include plastering to precast concrete window
anti:termite
architectural treatment
drawings, and creating
specifications a continuous
finishedtochemical barrier undersills,
and RCC cornices
all etc.;
around the(where
raft, andspecified
junction of by EIC);
wall and
moulds,
of doing
retaining curing, cleaning,
wall/ramo walls/other alland
etc.walls, complete
barriers,
smooth
thesurface
top
with
approval of
wooden
of
plinth
rundha
the filling,
EIC. (tojunction
External at surfaces,
all
of
leads
wall and
lifts, ducts
chajjas,
floor,
doing
along &inde
the sh
ex
cleaning of surfaces, curing, etc. complete as per specification and to the approval of the EIC.
Item
Rubble
item rate
expansion shall
Soling
joints
rate shall include
Works
over
include cost
the of
with
top
cost thick all materials,
rubbles
surface
of all dry of
materials, from miscellaneous
outside
consolidated
miscellaneous :
earth consumables,
on which
consumables, labors
apron is
labors to,providing
be laid,
,providing erecting
surrounding
erectingwith & removing
of pipes
& removing indep
and
indepco
Providing
part II .The&,raking
scaffolding Laying
contractor 230mm
out joints,
to submit hacking
the 10rubble
yearssoling
concrete with rubbles
surfaces,
guarantee prepare
in brought
junction
the approved from
of
format outside,
concrete
towards //voids
thisfilled
masonry workby neat
prior 80tomm down
cleaning,
release po
o
scaffolding
murrum ,raking
,including out joints, hacking concrete surfaces, prepare junction of concrete masonry by neat cleaning, po
mortarofand
Mode groutingcompaction
Measurement with : square
Plinth with
areacrushmechanical
of aggregate
building vibratory
further
shall be ,compactor
providing
measured for complete
and fixing 20
payment. to gauge
correctGIgrade as per
chicken mesh drawing
/ PVC & to
chic
mortar
Rubble
of and
concreteSoling grouting Workswith with square crush
rubbles aggregate
within site further , providing and
: screws/nails, fixing 20&gauge GI chicken mesh / PVC bond
chic
Providing
of concrete & andLaying
and
masonry
230mm
masonry
fixed
thickby
fixed bydry
drilling,
rubblenailing
drilling, solingwith
nailing withGI
with rubbles
GI (free ofproviding
screws/nails, cost) available
providing
applying
& applyingwithinapproved
site premises,
approved
chemical
chemicalvoids fill
bond
equivalent
chips , murrum
equivalent ,, doing
doing jambs,
jambs, sills,
,including grooves,
compaction
sills, grooves,with pattas,
pattas, wattas,
wattas, rounding
mechanical vibratoryof
rounding corners,
corners, etc.
compactor
of all
all complete
complete
etc. to correct
complete as
as per
grade
per architectural
as per drawin
architectural dra
dra
all
LDPE
all Levels
Levels ,depths,
Sheet
,depths, works heights,
: lead,
heights, lead, lifts,
lifts, basements,
basements, trenches
trenches pits, tunnels, service shafts etc,
etc, complete as
as per instructio
Providing
testing and laying
charges requireda vapourfor barrier
quality usingasLDPE
check per film
approvedof 500pits,
quality
tunnels,
micron thickservice
plan. over the shafts
finished complete
compact earth perfilling.
instructio
The
testing
the charges
extent required
of 100mm andAsthen for quality check as per approved quality plan.
Mode of Measurement: per the sand is spread over. The overlap joints shall be properly jointed either by heat se
IS 1200.
Mode
Providing
The rateof Measurement:
shall & fixing
include of
the As per of
Thermocole
cost IS LDPE
1200 film,
:
Providing & fixing of Thermocole (Density 25Sandkg/m3)layer of 30mm
between thick, consolidation,
concrete surface such as watering etc., complete as dire
foundation,column,beam,sla
all
Rate inclusive of cost of all materials, miscellaneous consumables, labors cleaning surface etc. as all
required locations by approved means , tools, plant and machinery, hire and fuel charges and perother incidental
instruction of E
specifications,
For 25 mm drawings
thickness and as directed by EIC. The item rates shall hold
required locations by approved means , tools, plant and machinery, hire and fuel charges and all other incidental ch good for work at all Levels ,lead, lifts,Heigh
specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels ,lead, lifts,Heigh
For 50 mm thickness

Cement concrete Pedestals :


PEDESTALS FOR ERECTION OF PUMPS AT PUMP ROOM /STP/TERRACE.
Providing
For Cement and laying Controlled
Concrete grade M25concrete from batching plant at site or RMC source from outside , using 10 mm & 2
Reinforced Cement Concrete (RCC) of various grade conveyed to all locations, lifted and placed in position by pumpi
vibrated, consolidated finished evenly and cured. etc. complete including form work.
For
The Cement
Item rateConcrete gradecleaning
shall include M30 with air jet the surfaces of formwork to receive concrete before placing of concr
of adjacent RCC works completed earlier, cost of all materials, miscellaneous consumables, labors, tranportation of
pumping or other approved means, Placing vibrating, compacting, Curing etc. tools, plant and machinery, hire and f
Core
chargesCutting
, grout in RCC
filling :
of tie:rod holes,
Core cutting of specified dia in all typewall:ties holes withelement
of RCC structural approvdasnon:shrinking
per approvedand waterproofing
methodology. Thegrout
Item material
rate shalle
drawings and
consumables, as directed
labors tools, plant and machinery, hire and fuel charges, providing & removing scaffolding/stagingele
by EIC. The item rates shall hold good for work at all Levels , lead, lifts, Heights, Depths,
Core Cutting:
tunnels, etc. 50 mm ,dia an
complete all as per drawings and as directed by EIC. The item rates shall hold good for work at all Levels and all Loca
Designing of concrete mix for different grades of controlled concrete should be done in accordance with latest IS:SP
design) in an approved
Core Cutting: 75 mm dialab and the same should be got approved by EIC, the item rates also includes cost for the sam
testing charges required for quality check as per approved quality plan.
Core
ModeCutting: 100 mm dia
of Measurement : RCC members shall be certified as per theoretical quantity from GFC drawing

Core Cutting: 125 mm dia

Core Cutting: 150 mm dia

Core Cutting: 200 mm dia

34
Core Cutting: 250 mm dia

Core cutting of specified dia in all type of masonry as per approved methodology.
The Item rate shall include cost of all miscellaneous consumables, labors , tools, plant and machinery, hire and fuel c
scaffolding/staging
Core Cutting: 50 mmanddiaall other incidental charges etc. complete all as per drawings and as directed by EIC. The item
Levels and all Location.
Core Cutting: 75 mm dia

Core Cutting: 100 mm dia

Core Cutting: 125 mm dia

Core Cutting: 150 mm dia

Core Cutting: 200 mm dia

Core Cutting: 250 mm dia

Breaking of RCC/PCC Concrete


Breaking of steel reinforcement concrete/plain cement concrete at all levels by mechanical / manual means and dis
yard approved by municipality outside site premises. Expenses on account of debris management / disposal of debr
Masonry
guidelines Breaking :
Breaking ofinmasonry
coveredat vehicles, housekeeping
all levels of /roads
by mechanical andmeans
manual surroundings , providing
and disposal & removing
of same scaffolding/staging
to authorized disposal yard ap
rate.
premises. Expenses on account of debris management / disposal of debris as per municipal corporation guidelines in
Note: Ratein
Chasing shall
RCC be :inclusive of cutting, removing & stacking of reinforcement steel within site premises as per direc
roads and
Chasing in surroundings
all type of RCC, providing
structural&element
removing scaffolding/staging
upto etc.approved
50 mm depth as per shall alsomethodology.
be included in item rate.
The Item rate shall include cost of all miscellaneous consumables, labors , tools, plant and machinery, hire and fuel c
scaffolding/staging and all other incidental charges etc. complete all as per drawings and as directed by EIC. The item
Levels and all Location.

Chasing in Masonry :
Chasing in all type of masonry wall upto 75 mm depth as per approved methodology.
The Item rate shall include cost of all miscellaneous consumables, labors , tools, plant and machinery, hire and fuel c
Cutting of RCC with
scaffolding/staging Diamond
and all cuttingcharges
other incidental Saw: etc. complete all as per drawings and as directed by EIC. The item
Item shall include all activities required for Cutting of concrete RCC works with Diamond Cutting Saw with Machine
Levels andasallper
locations Location.
the approved methodology and instructions of Engineer:in:charge (EIC) including all tools, tackles, m
staging / supporting to adjacent structure , any consumables, etc. complete. The item rate shall include Lowering ,L
out side site premises etc. complete as per instructions of Engineer in charge (EIC).
Mode of Measurement: Cross sectional area of cutting member shall be measured for payment.

Micro Concrete M40 Grade (For sleeves/cutouts filling in slab/wall) :


Providing and laying Micro Concrete of approved make as approved by EIC, conveyed to all locations, all lifts, levels
means, consolidated finished evenly and cured. etc.complete Rate shall include cleaning with air jet, before starting
VDF Flooring
formwork Uptoconcrete,
to receive 125mm dewatering
thick - M20 Concrete
wherever Gradeincluding cost of all materials, labours all lead and lift
necessary
and fuel charges, formwork, scafolding/stagging and all other incidental charges etc., all as per specifications, drawi
as directed by EIC.

35
Providing Non reinforced cement hard vacuum dewatered concrete flooring consisting of the following:
Providing, supplying and laying, finishing M20 grade batch mixed controlled concrete with PP fibres at 0.900 Kg @cu
dewatered flooring of upto 125 mm thk including cleaning, trimming, watering the surface, laying in strips to require
smoothening, curing etc. making 15mm x 10mm expansion/ control joints at intervals, sealing the joints with polyur
complete to the required slope, formation, finish. Cost to include working at all levels, necessary pumping to require
per drawings, providing serrated finish for the ramps including VD operation onsisting of providing side shuttering w
required levels,finishing with required texture (BROOM FINISH ( SAMPLE TO BE APPORVED BY EIC)), Vibrating the co
de:watering using vacuum pumps by suction method and finishing the top surface to required level and grade using
Covering the finished concrete surface with 200 micron thick polythene sheet and cutting grooves of size 6 mm x 10
grooves with Sealant with curing etc. complete at all levels, heights and locations, etc. as directed and to the satisfac

Supply & Applying Con quail integral color , Con Seal integral , Con Charcoal integral color including Labour charges f
material in concrete at batching plant with Labour charges for laying of colour concrete of irregular pattern on slopi
coating. including Supply & Applying of CCE Sealer coating.
Item rate inclusive of all materials, miscellaneous consumables, labours ,transportation of material to all required lo
plant and machinery, hire and fuel charges and all other incidental charges etc., all required as per specifications, dr
item rates shall hold good for work at all Levels, lead, lifts, Heights, Depths etc.

Supplying and Laying Stamped Concrete


Concrete: Supplying and laying M25 Controlled concrete of thickness 100mm or as specified in drawing from batchi
mm downgraded aggregates of various grade conveyed to all locations,lifted and placed in position by pumping or o
consolidated finished evenly and cured. etc. complete (excluding reinforcement steel, Mesh, Insert Plates)
For Stamped Concrete: Supplying and applying and finishing the top surface in accordance with sprinkling of colour
kg/sqmt.Floating the surface application of release agent,stamping the concrete with stamping tools,cleaning the s
application ofacrylic based sealer for finishing.The workshall be done in accordance and approval of EIC to his satisfa
The Item rate shall include cleaning with air jet the surfaces of formwork to receive concrete before placing of concr
of adjacent RCC works completed earlier, cost of all materials, miscellaneous consumables, labors, tranportation of
pumping or other approved means, Placing vibrating, compacting, Curing etc. tools, plant and machinery, hire and f
charges , grout filling of tie:rod holes, wall:ties holes with approvd
non:shrinking and waterproofing grout material etc. complete all as per specifications, drawings and as directed by
for work at all Levels , lead, lifts, Heights, Depths, elevations, basements, trenches, pits, tunnels, etc. Designing of co
controlled concrete should be done in accordance with latest IS:SP:23 (Hand book on concrete mix design) in an app
got approved by EIC, the item rates also includes cost for the same. Item rate shall also include testing charges requ
approved quality plan. Mode of Measurement : RCC members shall be certified as per theoretical quantity from GFC

Sub Total A

Part B

Civil Work : MEP Services

Structural Steel : Shaft /Service Platform

Structural Steel :
Supplying, fabricating, delivering at site, hoisting and fixing in position at all heights and all levels and making all stru
the design drawings prepared by the consultants. The structural steel work shall include welded and built up section
welded and built up sections, trusses, built:up purlins, frame work welded and/or bolted, girders, gusset plates, bas
The Item rate shall include providing all materials required
36 such as Structural steel (Confirming to IS: 226 & 2062 ),
consumables ,scaffolding, Cost of Labour, machines / equipment / tools / tackles / vehicles for all transportation, Ha
the stocking yard, shifting the same to Fabrication yard, shifting from Fabrication yard to all required locations, heig
MS Railing in Shaft :
Providing and fixing railing as per approved drawing and to the satisfaction of EIC.
Rate inclusive of cost of all materials, miscellaneous consumables, labors ,transportation of material to all required l
Heavy
plant duty
and rungs :hire and fuel charges and all other incidental charges etc., all required as per specifications, dr
machinery,
Providing and fixing Heavy duty rungs in R.C.C. wall of water tanks etc. Including cutting, chasing the R.C.C. work a
item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc
as required.
Pl enclose
Storm
Load standard
water
carrying (PHE) drawing100KG
capcity:Upto or give matl description

Drain Channel:
Constructing cast in site R.C.C gutter / drain along the driveway/ courtyards including excavation, concrete ,shutterin
plaster
450mmcoat
Wide,as per drawiing and approval of EIC
Rate inclusive of cost of all materials, miscellaneous consumables, dewatering labors ,transportation of material to a
means , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required as per sp
600EIC.
by mmTheWide
item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc

900 mm Wide

FRP Drain Cover for Fire Tender Path:


Design, Supply & Placing of Drain Covers of width as below with FRP drain cover Perforated & supporting members.
design
450mmrequirements
Wide
1. Loading to be considered for design:
a. Fire‐tender path ‐ As per EN‐124 (D:400)
600
2. mm Wide
Vendor shall get all the design, drawings and calculation of FRP, certified by IIT:B or equivalent authority.
3. 40 Ton certification necessary from competent Lab.
The
900 rates
mm Wideare inclusive of labour, equipment, machinery, steel double:legged scaffolding for required heights, forwa
loading, unloading, Mathadi, Warai charges, shifting of material, safe keeping, maintaining inventory, safety & secu
location for carrying out works at all levels, depth, height,etc complete, including submission of technical proposal,
instructions by EIC.
Construction The work
of Sump should
Pits : be completed in all respects complete to the satisfaction of EIC
Constructing cast in site sump pit of size 2.5mX2mX2m including excavation, concrete ,shuttering with a waterproo
approval of EIC
Grease Trapof
Rate inclusive : cost of all materials, miscellaneous consumables, dewatering labors ,transportation of material to a
Constructing Grease Trap of size as per drawing in brick work of class 75 with cement mortar (1:6), inside plastering
means
1:3 with, tools,
floatingplant
coatand machinery,
ofneat cementhireandand fuelplaster
rough charges
onand all other
outside. incidental
Including chargesbucket
aluminium etc., allasrequired asto
per detail percolle
sp
by EIC.
Puddle The item
Flange rates
& shall
Sleeve, hold good
Manhole for work
Cover at
& all Levels
Steps / ,lead,
Rungs lifts,Heights,Depths
(PHE) etc
nos. 600 x 600 mm dia CI medium duty, double seal manhole covers with frame (weight of covers & weight of fram
Manhole item is paid separately under releavnt item
foundation concrete (1:2:4).
Size of grease
Puddle Flangetrap 1.8mX0.9m X upto 1.5m
Manhole
Hot item is paid separately
Dip Galvanised under with
Pipe Sleeves releavnt item Flange:
Puddle
Supply and fixing of
25mm dia ( Screwed ends) M.S. hot dip galvanized pipe sleeves/Puddle flange (600 to 1000 mm long) of heavy class with
washers etc. Including cutting the M.S. plates, steel bars & welding MS pipe sleeve to MS plate from both sides, t
galvanized after fabrication complete as required. For following dia.
32mm dia ( Screwed ends)

40 mm dia : 8mm thick puddle flange & 12mm MS flange

50 mm dia : 8mm thick puddle flange & 12mm MS flange

65 mm dia : 8mm thick puddle flange & 12mm MS flange

80 mm Flange On Outside

100 mm Flange On Outside

37
150 mm Flange on Outside

200 mm Flange On Outside

250 mm dia : 8mm thick puddle flange & 16mm MS flange

Blank Flanges & Sleeves :


Supply and fixing of M.S. Blank Flanges & Sleeves (600 to 1000 mm long) of heavy class with one side M.S. flanges
cutting the M.S. plates,
Blank Flanges:40mm diasteel bars & welding MS pipe sleeve to MS plate from both sides, complete as required dr

Blank Flanges:50mm dia

Blank Flanges:65mm dia

Blank Flanges:80mm dia

Blank Flanges:100mm dia

Blank Flanges:150mm dia

Blank Flanges:200mm dia

Blank Flanges:250mm dia

Blank Flanges:300mm dia

MS pipe sleeve:200 mm dia.

MS pipe sleeve:150mm dia.

MS pipe sleeve:100 mm dia.

UPVC Sleeves :
Supply & fixing of PVC/UPVC sleeves of medium class for following Dia.
UPVC Sleeve :32mm dia

UPVC Sleeve :50mm dia

UPVC Sleeve :75mm dia

UPVC Sleeve :100mm dia

UPVC Sleeve :125mm dia

38
UPVC Sleeve :150mm dia

UPVC Sleeve :200mm dia

G.I. vent 600 to 1000 mm :


Providing and fixing in position G.I. vent 600 to 1000 mm with brass mosquito proof coupling and air filter including
The entire
80 mm dia fitting shall be hot dip galvanized.

100 mm dia

Plastic manhole step/foot rest :


Installation of plastic manhole step/foot rest of 900 mm length (@ 300 mm c/C) with polypropylene compound inje
(Fe:415) steel reinforcing bar. Provision of the foot rest is envisaged in various tanks/ components of the STP for the
Manhole covers

Sump Pits :Providing and fixing 900mm x 900 mm DI (heavy duty) cover with frame (as per EN:124) with lockable a
(Total WT of cover and frame to be not less than 85 kg).
UGT :Providing and fixing 900mm x 1200 mm DI (heavy duty) cover with frame (as per EN:124) with lockable arrang
WT of cover and frame to be not less than 85 kg).
Terrace Tanks :Providing and fixing 600 mm dia FRP (heavy duty) water tank circular cover with frame (as per EN:12
complete in all regards.
Grease Trap :Providing and fixing 600mm x 600 mm DI (heavy duty) cover with frame (as per EN:124) with lockable
(Total WT of cover and frame to be not less than 85 kg).
Providing MS pipe sleeve :
Providing Mild Steel (MS) ‘C’ class pipes as SLEEVES each to be embedded in RCC walls / beams. And any other RCC
by
DiaEIC
50mm

Dia 65mm

Dia 80mm

Electrical PVC Conduit works


PVC PIPE WORK
Supply,
Supply, Installation,
Installation, Testing
Testing &
& commissioning
commissioning of
of HMS FR Boxes
GI Back PVC conduits
of belowwith all necessary
mentioned sizes & required accessories i.e.
outlet boxes (1.6mm) with cover plates of approved make, etc.
25mm dia. HMS PVC conduit with wall thickness of 2 mm.
2 Module conduit supporting structural members including spacers, clamps etc, bushes and other fittings as well as
Conduits,
Shop drawing preparation and its approval from MEP consultant in Contractor's scope.
Approved
3 Module Make : Precision/BEC/ AKG

4 Module

Sub Total B

Part C

39
Waterproofing Works

Notes: All measurements shall be as per IS: 1200 unless otherwise specified

Preliminaries (All Unit rates shall be inclusive of following Preliminaries)

Preliminary Setting Out & Survey works

Site Infrastructure Facilities

Space as available within the site for setting up of site office and all other temporary site facilities except for labour accommod

Office Furniture & Equipment viz.Furniture,computers, and cupboards , other office related materials.

Labour Facilities

Drinking Water, Site Sanitation (Washing + Toilets), Drainage Facilities, Labour accommodation outside project site, Labour tra

Mobilisation & Establishment of machineries

Transportation including all applicable taxes for machineries & erection work.

Insurance

Insurance Policies such as ,Contractor’s all risk (CAR ) Policy, Workmen Compensation, Group personnel accident, Automobile

Electricity-connection, Electricity & Water Distribution system

Safety & QA/QC Expenses

Safety Installations like nets, Safety Barrication, Provision of Ambulance with Driver, First Aid facilities, QA/QC Lab facilities alo
etc. providing necessary PPE for Contractors Staff, Labour ,Client, Engineer and consultants appointed by the Client, Safety Ma
Labour Mobilization & Demobilization activity

All scaffolding, ladders, platforms, staging, cranage and plant & equipment required in the execution of work to any height an
required for the works including dewatering.
Water proofing Contractor shall visit the Site & understand the scope of work from EIC prior submitting Techno commercial off
completing work . Work will be measured and paid as per items mention in this BOQ for water proofing work , other items /sc
per methodology submitted by water proofing contractor during Tender stage but not mention in this BOQ will not be measur
For all liquid
provide applied
10 years membrane
Guarantee on stampsystem,
paper Preponding
(In approvedto be carried
format out for
by Engineer In minimum
charge) for24
all hours to ascertain
water proofing workthe quality
included in
waterproofing system, a ponding to be done for at least 48 hours to ascertain watertightness of the system.
Waterproofing Works

40
W/P membrane system-Basement Positive Side Waterproofing Horizontal Surface Below Raft Slab
Supplying and installing waterproofing treatment by using 1.2mm thick fully bonded Preapplied HDPE sheet memb
Slab/footing/as shown in drawing. Membrane shall be installed in strict accordance with the manufacturer’s instruc
bond to resist water migration. The fully bonded HDPE sheet membrane shall consist of a multi layer composite film
HDPE film, self adhesive polymer layer and trafficable. The fully bonded HDPE membrane is loosely-laid on the PCC
Footings/Stitch Slab/as shown in drawings or wherever applicable etc.
The fully bonded Preapplied HDPE sheet waterproofing membrane shall have following typical properties :
1) Elongation > Minimum 75%.
2) Peel adhesion to concrete: > 880N/m (ASTM D 903 Modified)
3) Puncture Resistance: 800N +/- 5 % (as per ASTM E154)
4) Resist hydrostatic pressure of over 60m head of water as per ASTM D5385
Side overlaps shall be a minimum of 75 mm on the selvedge and end overlaps of minimum 75 mm.
The item rate shall include base preparation which include wire-brushing the Concrete/Masonry surface & cleaning
cracks, honeycombs on the RCC members as per manufactures specification and approved methodology. Item rate
miscellaneous consumables,labors,tranportation of material to all required locations by approved means ,Curing , to
fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by EIC.
work at all Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guara
stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include
check as per approved quality plan.
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.

41
Waterproofing Works For Retaining Wall - Positive Side - Self Adhesive Membrane - Unconfined ar
Supplying and Installing self adhesive, SBS Membrane, cold applied , flexible minimum 1.5mm thick waterproofing m
laminated HDPE film, applied on the external surface of the retaining wall post construction and after deshuttering i
The Self Adhesive waterproofing membrane shall have following typical properties :
1) Elongation > 200 %
2) Puncture resistance > 220N
3) Tensile Strength = 4 N/mm, 42N/mm2 /48 N/mm2 for film
4) Resistance to Hydrostatic pressure = > 60 m
5) Tear Resistance = 23 N/mm for system, 340/310 N/mm for film. Waterproofing with Styrene Butadiene Styrene (S
membrane (Positive side):
I. Surface Preparation:
Cleaning and wire-brushing and mechanical grinding to achieve Concrete Surface Profile 2 ( CSP 2). RCC surface shal
contaminants like dust, oil and grease, All surface imperfections, protrusions, structurally unsound and friable concr
joints, cracks, honeycombs, on the RCC surface by injection grouting with non-shrink cementitious grout/Epoxy gro
sleeves, tie rod holes, cut-outs shall be treated with non-shrink cementitious high strength grout material.
II. Water Proofing Application:
Apply the Primer on clean RCC surface by brush or roller. Allow the primer to dry prior to the application of the mem
Styrene Butadiene Styrene (SBS) modified waterproofing membrane to be apply on clean RCC primer surface. Press
top of the applied membrane to ensure a proper and strong adhesion of the bitumen compound with the base surfa
minimum of 75 mm on the selvedge and end overlaps 100 mm. The finished surface should be left exposed for 48 h
manufactures after which further build up works can be carried out.
III. Protection:
The Membrane shall be protected with HDPE Dimpled drain board with 6 to 8 mm thick and composed of high den
to a non-woven geotextile of calendared polypropylene of 120 g/m2. Nodule height is generally 7.3 ± 0.2 mm and m
250 KN/m2 when tested as per ISO 604 OR ASTM D 695 ( Specimen dimensions as per clause 6.7.2), over the water
surface, stuck to the membrane by spot bonding method, using synthetic adhesive with butt joints etc. complete, to
damage. due to ongoing site activities or from sharp aggregates or boulder during backfilling. In all cases, damage du
monitored closely.
Membrane must be properly terminated as per approved methodology by manufacturer. The termination height sh
The item rate shall include base preparation which include wire-brushing the Concrete/Masonry surface & cleaning
cracks, honeycombs on the RCC members as per manufactures specification and approved methodology . Item rate
miscellaneous consumables, labours, transportation of material to all required locations by approved means ,Curing
and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by
for work at all Levels ,lead, lifts, Heights, Depths, basements, trenches, pits, tunnels, water tanks etc and providing g
stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include
check as per approved quality plan.

Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.

42
Coal Tar Epoxy - RCC Foundation and Substructure
Providing and applying one coat of epoxy primer and two coats of coal tar epoxy paint of minimum dry film thicknes
specifications to all concrete surfaces in contact with the earth in foundation and substructure.
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
honeycombs on the RCC members as per manufactures specification and approved methodology . Item rate also inc
miscellaneous consumables, labours, transportation of material to all required locations by approved means ,Curing
and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by
for work at all Levels ,lead, lifts, Heights, Depths, basements, trenches, pits, tunnels, water tanks etc and providing g
paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include testin
as per approved quality plan.

Mode of Measurement: Actual area covered with coating shall be measured for payment purpose.
Crystalline WP - Lift Pit Area
Providing and applying Alkaline cement based Crystalline Waterproofing System in two-three coats at a Avg. DFT of
vertical walls and floors area
Providing & Laying for protective Screed for horizontal surface in 1:4 mix to proper gradient over the treated area f
& Laying for protective Plaster for vertical in 1:4 mix over the treated area for thickness of 15 mm
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cementitious grout/Epo
manufactures specification and approved methodology. Item rate also include cost of all materials, miscellaneous co
material to all required locations by approved means ,Curing , tools, plant and machinery, hire and fuel charges and
required as per specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels
basements, trenches, pits, tunnels, water tanks etc and providing guarantee of water proofing work on stamp paper
10 years from date of virtual completion. Item rate shall also include testing charges required for quality check as pe
Construction jointconsidering
Rate shall be quoted TreatmentanyforofRetaining
the make Wall (300mm
mention in MaketoList
450mm
for allwide)- Swellable
waterproofing itemsWater Bar
for the Project
Providing and laying Hydrophilic swellable Water bar made of Polyurethane/rubber suitable
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.for construction joint o
Drawings. Thickness of water bar to be minimum 20mmX10mm or as per manufacturers' specification
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Mode of Measurement: Unit of measurement shall be running meter of joint length.
Construction Joint Considered for Retaining wall a) Horizontal Joint - At Every Slab level 2 layers & one 300 mm abov
interval of 25m as per site condition or shown in GFC Drawing or as per approved by EIC.

Construction joint Treatment for Tower Raft (1000mm to 1800mm thick)


Providing and laying Hydrophilic swellable Water bar made of Polyurethane/rubber for construction joint on Tower
Thickness of water bar to be minimum 20mmX10mm or as per manufacturers' specification
Mode of Measurement: Unit of measurement shall be running meter of joint length.
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Mode of Measurement: Actual running meter of joint length measure for payment purpose.
Construction Joint Considered for Tower Raft - Maximum four pour considered at tower raft for construction joint tr

43
Treatment of Pressure Release Pipe
Providing ,fixing, treating and sealing pressure release pipe of 40mm Día up to 0.6 meter height GI B class pressure
embedded with PCC layer and extended above raft/foundation/stitch slab up to 150mm above TOC/as shown in dra
PU based liquid membrane applied all around pipe at the HDPF membrane level along with installing hydrophilic sw
200mm height above PCC level round periphery of the pipe .
Providing and applying sealing of pressure release pipe with penetration, Grouting the pressure release pipe with ce
grout, expandable grout additive to full saturation etc. Grouting the pressure release pipes shall be taken up after su
foundation/raft is attained and thereafter the pipe shall cut flush with the top surface of raft and sealed with Polym
Item rate also include cost of all materials, miscellaneous consumables,labors,tranportation of material to all requir
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
directed by EIC. The item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths, basements, trenches
providing guarantee of water proofing work on stamp paper in approved format for a period of 10 years from date o
Podium W/P
also include system
testing withrequired
charges anti root
for quality check as per approved quality plan.
Providing
Upto 1200&mm applying
Lengthpolyurethane/ SBR/ Hybrid Polyurea based elastomeric seamless waterproof membrane in two
1.5 mm. including one coat Primer on the respective areas.
Protection on floor Area: Providing and applying Geotextile fabric of 140 GSM as protection of Horizontal surface.
Providing & laying protective screed and slop making on the treated floor areas in concrete screed M-20 grade for a
minimum thickness of 75mm at end location as per slope of 1:100.
The polyurethane based elastomeric seamless waterproof membrane shall have following typical properties :
1) Elongation > 300 %
2) Tensile Strength > 2 N/mm2
3) Tear Resistance > 12 N/mm
4) Bond Strength to Concrete > 2 N/mm2
UGT/STP/OHWT/RWT
Providing and Applying waterproofing - WP + Epoxy coating for Tank
and slope-making for PodiumFloorLandscape
& Wall area Slab, i.e. for Hardscape / Softscape G
Providing and applying 2K polymer modified cementitious
conforming to latest ASTM Standards, as per the specifications listed below coating with minimumand aselongation
approved by at break of 60% in two
the Engineer-in-cha
mm on the respective
The first part shall consist of : areas. to internal surface of RCC floor and walls of STP, UG tanks, OHT,Trenches, Sumps, etc.
operations :
(i) Surfaces to be treated must be dry or slightly damp, free of tar, oil and free of loose particles by wire-brushing an
(i) Treating
Concrete construction
Surface Profile joints,
2 ( CSPcracks,
2) as per honeycombs
ICRI guidelinein (if any),thebyConcret
injection pressure
surface grouting
& cleaning with
with airnon-shrink
jet. Remove cementi
protru
manufactures specification and approved methodology
edges ,then Initial ponding to be done to identify the leakages/seepages in RCC floors and walls using specialized injection nozzles pl
along the construction joints and porous areas as per manufacturers specification.
(ii) Pressure grouting using 40 psi injection grout pump with cement slurry mixed with non shrink admixture at all le Any pipes & Pipe Cutout, sleeves
shrink cementitious
(iii) Treatment to thehigh strength grout
construction joints,material
shoe joints and changes of directions including making 'V' groove at the joi
(ii) Preparing Vatta of 50-75mm
(iv) Laying Seamless Elastomeric Membrane to be done atWaterproofing
all junction of Systemvertical and horizontal
applied by Trowel surface with polymer
/brushing / spraying modified
as per M 1
bonding agent at the rate of 3 ltr. per bag cement.
Coat of Primer Coat if recommended by manufacturer & 2 or more Coat s of Water Proofing Coat s ).
(iii) Providing and applying
(v) Waterproofing Membrane surface appliedtoApproved
application be done on Make 2K polymer
horizontal modifiedareas,
and vertical cementitious coating or anyrecomm
as per Manufacturer's other
manufacturers’ specification and as approved
Engineer-in-charge.The membrane shall be terminated at 300 mm from FFL by the engineer-in-charge .
Waterproofing
(iv) Providing
(vi)Water andof
ponding Wet
applying
test forAreas
15-20 with
minimum mm72 sunken
thick
hours todetails
waterproof
check the forquality
Balcony/Deck
protective plaster & Screed area/Kitchen/Toilet
for wall & floor area Area in 1:4 (1 cem
Providing
waterproofing & Applying
admixture Acrylic Polymer
as per based flexible
manufacturer's cementitious
specification, overbased waterproofing
the waterproof treatment
coating on RCC or PU Coating
surface, curing,ha c
60%in
(v) two
Application to three
of twocoats
The Second Part shall consist of: at
coats aofDFT
Epoxyof 1 to 1.5
coating mm
with to Sunken
including area
one at
coatChajja/Balcony/
of primer as Deck
per area /Kitchen/toilet
manufacturers specificationarea o
with the
instruction following
of EIC. sequence
the cured of
filmoperations
is resistance to corrosion, chemical attack
Protective Coat Providing and laying Geotextile fabric (140GSM) over Water Proofing Coated surface as per Manufa and abrasion and is suitable for applicati
treatment
I) Surfaceby
instructed works, breweries, dairies, meat
Preparation:
the Engineer-in-charge and food
The second partprocessing
shall consist plants. the cured
of providing film
and is non-toxic
applying average and100meets mmthe req
thick.
Cleaning
screed in gradient of 1:100 with minimum thickness at the drain point of 75 mm. The concrete shall be admixed wits
2 coats ofand
Coalwire-brushing
Tar Epoxy willandbe mechanical
applied. grinding to achieve Concrete Surface Profile 2 (CSP 2) The RCC surface
contaminants
(vi)
at theWheredosage theoflike dust,
protection
100 ml oil isand
- 200 grease,of
provided
ml/bag byAll surface
direct
cement, imperfections,
epoxy coating over
compaction, protrusions,
the WP
finishing structurally
membrane,
surface unsound
suitably,contractor
curing, and friable
must
cleaning, make aconcr
testing moc
etc.
perfectly
adhesion clean.
of the etc.
epoxy coating
commendations as directed by the Engineer. over WP membrane. There shall not be any delamination between WP membrane an
The item rate shall
third part grouting
II) Pressure include
shall consist ofofbase preparation
( In case of Main
construction which
joints include
Waterproofing
and honeydoers wire-brushing
combed not have and mechanical grinding
antiroot properties)
concrete: to achieve Concre
Concrete
Pressure
Application surface
Grouting &iscleaning
of Anti-Root to with
doneBarrier ensure air that
system jet as
, all
treating
voids,
per all construction
cracks,
manufacturer's construction joints,joints,
specifications cracks, honeycombs,
cracks,
(Approved Makes by
honeycombs injection
which /any pressure
weak
includes spot
cleani(
cementitious
are grout/Epoxy
filled up completely
manufacturer’s grout on
with non-shrink
specifications the
approved by RCC members
cementitious
EIC. as per manufactures specification and approved
grout/Epoxy grout as manufactures specification and approve methodology
treated
The itemwith
Opening up
rate non-shrink
all cracks
shall in V
include cementitious
shape groove
base preparation high
andstrength
cleaning grout
which includeof dust,aswire-brushing
per
dirt,approved methodology.
loose particle
the etc shall be removed
Concrete/Masonry surface& cracks shall
& cleaning
Item
mortar. rate
joints, cracks, also include
Holes honeycombs cost
to shall be drilled of all
on the materials,
along
RCCthe miscellaneous
crack length
members as perusing consumables,labors,tranportation
pneumaticspecification
manufactures drilling machine of material
at distance
and approved to all requir
of 300mm
methodology. c/c. t
means
depend
Item rate ,Curing
onalso ,width
tools,and
theinclude plant ofand
costlength all machinery,
of crack. the
materials, hire andshall
holes
miscellaneous fuel be charges
cleaned
consumables,andbyallairother incidental
to remove
labours, any charges
dust etc.
transportation ofetc., all required
by blowing
material a
airreq
to all blo
directed
fixed
meansin,Curing by EIC.
these holes The
, tools, item rates
& Pressure shall
plant andinjection hold
machinery, good
Grouting for
hire and work
with fuel at all
non-shrink Levels
charges and ,lead,
cementitiouslifts,Heights,Depths,
grout/Epoxy
all other incidental basements,
groutetc.,
charges injected trenches
througha
all required
providing
After
directed all the
byguarantee
holes
EIC. The ofcompleted,
areitem water
ratesproofing
shallthehold work
grout
goodisonallowed
stamp
for workpaper
toatset inLevels
allfor approved
,lead,format
24 hours and
lifts,the for a period
next
Heights, day of 10
nozzles
Depths, years
are
basements, from
removed date
ando
trenche
also include
providing
III) Preparing testing
guarantee
Vatta: charges required for quality check as per approved quality plan.
of water proofing work on stamp paper in approved format for a period of 10 years from date o
Rate
preparingshall be
also include quoted
testing
vatta considering
charges
of 50-75mm to beany
required done of the
for allmake
quality
at mention
check
junctions as
ofper inapproved
Make List
horizontal for
andquality all plan.
vertical waterproofing items formodified
surface with polymer the Project 1:4
Mode
Rate shall
liters of Measurement:
of SBR beorquoted Actual
Acrylicconsidering area
polymer emulsion covered
any of the for
make
( min water
30%mention proofing shall
in Makeper
solids content) be measured
Listbagforofallcement. for payment purpose.
waterproofing items for the Project
Mode
IV) of Measurement:
Treatment Actual area Packing:
to Pipe Cutouts/Bore covered for water proofing shall be measured for payment purpose.
Annular Space left around pipe cutouts/bore packing in floor and walls shall be grouted by using non-shrink cementi
system as per manufacturer's recommendation.
V) Water Proofing Application & Protection:44
Providing and laying two Coat s of highly flexible two components of polymer based waterproofing treatment as per
24 hrs. of drying waterproof membrane Coating is to be protected with 25 mm thick cement mortar screed for horiz
Protective Screed
Providing and applying protective Screed of Average 20 mm thickness in cement mortar 1:1.5:3 on treated water pr
admixed with integral waterproofing compound at the dosage of 100 ml/bag of cement, compaction, finishing surfa
etc.complete all as per manufacturer's recommendations as directed by the Engineer. This item shall be payable on
Item rate also include cost of all materials,miscellaneous consumables,labors,tranportation of material to all require
means ,Curing , tools, plant and
machinery, hire and fuel charges and all other incidental charges etc., all required as per specifications, drawings an
shall hold good for
work at all Levels ,lead,lifts,Heights,Depths, etc and providing guarantee of water proofing work on stamp paper in a
years from date of virtual completion. Item rate shall also include testing charges required for quality check as per a
be installed as per manufacturer's recommendations, and as directed by Engineer in-charge. Original Material Test C
submitted with the delivery of materials on site.
Cement Plaster with integral water proofing compound
Providing and Applying average 12 mm thick single Coat cement sand plaster of mix ratio 1:4 (1 cement : 4 sand) in
cement approved waterproofing compound, finished smooth finish or as required to receive specified finish to cor
structure (As directed by EIC) ,etc. all complete to the approval of the EIC.
The item rate shall include base preparation which include wire-brushing the Concrete/Masonary surface & cleaning
construction joints, cracks, honeycombs, pipes, sleeves, cutouts on the RCC members as per approved methodology
materials, miscellaneous consumables,labors,tranportation of material to all required locations by approved means
hire and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directe
good for work at all Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and provid
work on stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall als
for quality check as per approved quality plan.
Mode of Measurement: As per IS 1200.

Brick Bat Coba filling at Balcony/Deck area/Kitchen/Toilet Area/Terrace - Sunk area


Providing and filing brickbats in sunken portion of Balcony/Deck area/Kitchen/Toilet Area or any other location as sp
proper slope in cement mortar 1:5 up to required thickness including finishing of top layer with water proof (Waterp
approved quality and dosage as recommended by the manufacturer) cement sand mortar (1:4) for receiving further
drawing.
Item rate shall include cost of all materials, miscellaneous consumables,labors,tranportation of material to all requir
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
directed by EIC. The item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc

AAC Block coba filling at Balcony/Deck area/Kitchen/Toilet Area/Terrace - Sunk area


Providing and filing Light weight Concrete Block (AAC) in sunken portion of Toilets/ Terrace/ balconies or any other l
drawing in proper slope in cement mortar 1:5 up to required thickness including finishing of top layer with water pr
be of approved quality and dosage as recommended by the manufacturer) cement sand mortar (1:4) for receiving fu
Item rate shall include cost of all materials, miscellaneous consumables,labors,tranportation of material to all requi
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
directed by EIC. The item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc

45
Terrace Area
Providing & applying polyurethane based/ SBR/ Polyurea elastomeric seamless waterproof membrane in two to thr
mm. including one coat Primer on the respective areas.
Protection on floor Area: Providing and applying Geotextile fabric of 140 GSM as protection of Horizontal surface.
The polyurethane based elastomeric seamless waterproof membrane shall have following typical properties :
1) Elongation > 300 %
2) Tensile Strength > 2 N/mm2
3) Tear Resistance > 12 N/mm
4) Bond Strength to Concrete > 2 N/mm2
Water Proofing Treatment shall be in Following Steps for Area in Terrace :
1. Surface Preparation:
Cleaning and wire-brushing and mechanically grinding to achieve Concrete Surface profile 2 ( CSP 2) The RCC surface
Broken AAClike
contaminants Blockdust,coba
oil andfor additional
grease, thickness
All surface at Terrace
imperfections, area ifstructurally
protrusions, necessary as perand
unsound sitefriable
requireme
concr
Providing and laying
perfectly clean. etc. broken AAC block coba in Terrace Area or any other location as specified as shown on drawing
1:5 up to required
2. Pressure grouting thickness as per drawing.
of construction joints and honey combed concrete:
Item rateGrouting
Pressure shall include costtoofensure
is done all materials,
that allmiscellaneous consumables,labors,tranportation
voids, cracks, construction joints, cracks, honeycombsof material
/any weakto all spot
requir(
means ,Curing
are filled , tools, plant
up completely withand machinery,
non-shrink hire and fuel
cementitious charges and
grout/Epoxy all other
grout incidental charges
as manufactures etc., alland
specification required
approve a
directed
Opening by up EIC. The item
all cracks in Vrates
shapeshall holdand
groove good for work
cleaning at all Levels
of dust, ,lead,
dirt, loose lifts,Heights,Depths
particle etc
etc shall be removed & cracks shall
mortar. Holes to shall be drilled along the crack length using pneumatic drilling machine at distance of 300mm c/c. t
depend on the width and length of crack. the holes shall be cleaned by air to remove any dust etc. by blowing air blo
fixed in these holes & Pressure injection Grouting with non-shrink cementitious grout/Epoxy grout injected through
After all the holes are injected, the grout is allowed to set for 24 hours and the next day nozzles are removed and ho
3. Preparing Vatta:
preparing vatta of 50-75mm to be done at all junctions of horizontal and vertical surface with polymer modified 1:4
China
litres ofMosaic flooring
SBR or Acrylic - At Terrace
polymer emulsion Area
( min 30% solids content) per bag of cement.
Providing
4. Treatment to rain water pipe outlet:flooring using multi-coloured broken tiles over terrace area and plain and curv
and laying for china mosaic
40mm
AnnularofSpace
Brocken
left pieces
aroundofpipeplancutouts/bore
ceramic tilespacking
laid overin1:4 cement
floor mortar
and walls shallbedding at requisite
be grouted by usinglevel area level
non-shrink in tru
cementi
installed brickbat cobra on terrace.
system as per manufacturer's recommendation.
Item rate Proofing
5.Water shall includeApplication
cost of all materials, miscellaneous consumables,labors,tranportation of material to all requir
& Protection:
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
RCC
directedsurface
by EIC.shall
The itembe treated with
rates shall holdpolyurethane/SBR/Polyurea
good for work at all Levels ,lead,based elastomericetc
lifts,Heights,Depths seamless waterpr
coats at a DFT of 1 to 1.5 mm. of approved make applied
Mode of Measurement: Actual area finish shall be measured for payment purpose in two coats on horizontal surface and Ver
finished floor level ( FFL).
A minimum slope of 1:100 and average thickness of 150mm using Brick bat coba of appropriate s
achieve the required slope laid over 15-20mm thick waterproof cement mortar 1:4 on well prepared
between Brick bat thoroughly grouted with waterproof cement mortar 1:4 and finished with 20mm
1:4 including rounding off the junction of roof and parapet walls for a height of 300mm with Brick b
plaster using waterproof Admixture and conducting necessary leakage/dampness tests, furnishing
complete as directed. (Waterproofing admixtures shall be of approved quality and dosage as recom
by EIC .
The item rate shall include base preparation which include wire-brushing the Concrete/masonry su
treating all construction joints, cracks, honeycombs on the RCC members as per manufactures spe
methodology . Item rate also include cost of all materials, miscellaneous consumables,labors,tranp
required locations by approved means ,Curing , tools, plant and machinery, hire and fuel charges a
etc., all required as per specifications, drawings and as directed by EIC. The item rates shall hold g
lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee o
paper in approved format for a period of 10 years from date of virtual completion. Item rate shall als
required for quality check as per approved quality plan.
Mode of Measurement: Plan area covered for water proofing shall be measured for payment purpos
Note: Additional Quantity of Brick bat filling for average thickness more than 150mm shall be paid

46
Water proofing works for Parapet wall
Providing and applying acrylic emulsion based elastomeric seamless waterproof membrane in two coats at a DFT of
manufacturer's recommendation.
1. Surface Preparation:
Cleaning and wire-brushing the RCC surface thoroughly of all contaminants like dust, oil and grease, All surface impe
unsound and friable concrete must be removed and make it perfectly clean. etc.
2. Pressure grouting of construction joints and honey combed concrete:
Pressure Grouting is done to ensure that all voids, cracks, construction joints, cracks, honeycombs /any weak spot (
are filled up completely with non-shrink cementitious grout/Epoxy grout as manufactures specification and approve
Opening up all cracks in V shape groove and cleaning of dust, dirt, loose particle etc shall be removed & cracks shall
mortar. Holes to shall be drilled along the crack length using pneumatic drilling machine at distance of 300mm c/c. t
depend on the width and length of crack. the holes shall be cleaned by air to remove any dust etc. by blowing air blo
fixed in these holes & Pressure injection Grouting with non-shrink cementitious grout/Epoxy grout injected through
After all the holes are completed, the grout is allowed to set for 24 hours and the next day nozzles are removed and
Over the prepared surface, 2 coats of acrylic waterproofing coating to be applied as per approved methodology to m
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose

Expansion Joint Treatment


Providing & laying expansion joint system using Tape with Two component high performance epoxy adhesive for ho
manufacturers’ specifications. The System also includes the application of 300GSM Geo Textile fabric and protection
The sealing system must be capable of accommodating movements as per design calculations.
The item rate shall include base preparation which include wire-brushing and mechanical grinding to achieve concre
Concrete surface & cleaning with air jet, treating all construction joints, cracks, honeycombs, pipes, sleeves on the R
non-shrink cementitious grout/Epoxy grout at any porous area as per manufactures specification and approved met
of all materials, miscellaneous consumables,labors,tranportation of material to all required locations by approved m
machinery, hire and fuel charges and all other incidental charges etc., all required as per specifications, drawings an
shall hold good for work at all Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc a
proofing work on stamp paper in approved format for a period of 10 years from date of virtual completion. Item rat
required for quality check as per approved quality plan.
Extra Over
Expansion fortoitem
Joint no 19 at
be treated butallwith
levelaluminium flashig
of slab area or as of
per10approved
guage andEIC300 mm wide instead of 20 guage as extra
location.
driveway
Protectionarea
flashing: ‐ For the protection of the joint tape system on floor and wall with aluminium flashing 0f 20 gau
Expansion
screwed onJoint
one to be treated
sides over theatjoint
all level of slab
treated area or as per approved EIC location.
area.
Protection flashing: ‐ ForUnit
Mode of Measurement: the protection
of measurementof the shall
joint be
tape systemmeter
running on floor and wall with aluminium flashing 0f 10 gau
length.
screwed
Rate shallon
beone sidesconsidering
quoted over the joint
anytreated area.(Driveway
of the above make for Area)
all waterproofing items for the Project.
50mm thick joint

47
Pipe Penetration Treatment (Core Cut treatment for Pipe) up to 150mm
Providing & laying application of non-shrink, cementitious micro concrete around the pipe areas Fo
with High strength, . All such areas to be suitably water proofed with cementitious/ PU coating to ensure leakpr
manufacturer's recommendation..
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Threshold
Rate shall beTreatment For Door
quoted considering anyArea-Main
of the aboveDoor+Toilet Door
make for all waterproofing items for the Project.
Providing & applying Micro Concrete for watta making of 75mm wide & 40mm height with bond coat of 2K polymer
having minimum elongation at break of 60% over the Clean Surface.
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Rate shall be quoted considering any of the make mention in Make List for all waterproofing items for the Project
Mode of Measurement: Unit of measurement shall be Single finish length of watta.

Waterproofing Treatment below bottom Member Deck Window


Providing & Applying Acrylic Polymer based flexible cementitious based waterproofing treatment or PU Coating ha
60%in two to three coats at a DFT of 1 to 1.5 mm to Sunken area at bottom member window deck area including p
I) Preparing Vatta:
preparing vatta of 25 mm to be done at all junctions of horizontal and vertical surface with polymer modified 1:4 ce
of SBR or Acrylic polymer emulsion ( min 30% solids content) per bag of cement.
Providing and laying two Coat s of highly flexible two components of polymer based waterproofing treatment as per
sand shall be sprinkled over 2nd coat to create a protection cum mechanical key for final finish.
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.

Sub Total C

TOTAL

ADD FOR GST: 18%

GRAND TOTAL

48
d Parking Area), Energy Center at Vadodara, Gujarat

Quantity
Uni Rate Amount (INR)
Tower NTA Total Quantity

253,227,863

M3 6,983 7,645 14,628 140 2,047,920

M3 10 10 20 1,150 23,000

M3 10 10 20 2,500 50,000

M3 551 903 1,454 594 863,313

M3 10 10 20 200 4,000

M3 5 5 10 4,027 40,274

M3 5 5 10 4,213 42,130

M3 10 10 20 4,425 88,501

49
M3 10 10 20 4,561 91,228

M3 5 5 10 6,686 66,858

M3 83 5 88 6,907 607,780

M3 5 50 55 7,136 392,502

M3 10 10 20 6,695 133,901

M3 10 10 20 6,848 136,967

M3 1,547 1,658 3,205 7,075 22,676,362

M3 10 10 20 7,443 148,866

M3 10 10 20 7,023 140,452

M3 4,434 10 4,444 7,250 32,216,925

M3 10 10 20 7,550 151,001

M3 10 10 20 7,618 152,351

M3 10 10 20 917 18,340

50
M3 100 100 200 937 187,400

M3 100 100 200 1,066 213,200

M2 44,441 8,534 52,975 993 52,605,051

287 100 387 993 384,297

M2 10 10 20 1,538 30,760

M2 10 10 20 1,788 35,760

M2 5 5 10 1,918 19,180

MT 179 207 386 64,495 24,895,044

MT 564 564 65,162 36,751,104

EA 5 5 10 99 994

EA 5 5 10 118 1,181

EA 5 5 10 156 1,555

EA 5 5 10 215 2,146

EA 5 5 10 147 1,469

EA 5 5 10 202 2,016

EA 5 5 10 331 3,312

EA 5 5 10 425 4,248

51
EA 5 5 10 135 1,350

EA 5 5 10 150 1,500

EA 5 5 10 175 1,750

EA 5 5 10 200 2,000

EA 5 5 10 225 2,250

EA 5 5 10 275 2,750

EA 5 5 10 325 3,250

MT 20 2 22 108,625 2,389,759

MT 1 1 108,625 108,625

KG 30 30 60 109 6,518

EA 10 10 20 1,705 34,100

M2 5 5 10 1,803 18,027

M2 5 5 10 1,499 14,989

M2 5 5 10 1,178 11,778

M2 4,741 5 4,746 1,800 8,544,790

M2 11,513 5 11,518 1,712 19,724,257

M2 5 5 10 1,146 11,461

M3 55 5 60 9,044 542,623

M2 5 5 10 1,596 15,962

52
M2 5 5 10 1,050 10,500

M2 12,462 100 12,562 745 9,358,690

M2 1,109 10 1,119 465 520,335

M2 820 10 830 120 99,600

M3 50 200 250 2,169 542,175

M3 50 50 100 619 61,870

M2 50 50 100 129 12,900

M2 50 50 100 69 6,900

M2 50 50 100 133 13,340

M3 5 5 10 10,123 101,226

M3 5 5 10 10,350 103,495

Inch 10 10 20 58 1,150

Inch 10 10 20 75 1,495

Inch 10 10 20 92 1,840

Inch 10 10 20 109 2,185

Inch 10 10 20 127 2,530

Inch 10 10 20 144 2,875

53
Inch 10 10 20 161 3,220

Inch 10 10 20 46 920

Inch 10 10 20 63 1,265

Inch 10 10 20 81 1,610

Inch 10 10 20 98 1,955

Inch 10 10 20 115 2,300

Inch 10 10 20 132 2,645

Inch 10 10 20 150 2,990

M3 10 10 20 2,500 50,000

M3 10 10 20 750 15,000

M2 10 10 20 3,500 70,000

M2 10 10 20 200 4,000

M2 10 10 20 16,000 320,000

M3 10 10 20 44,625 892,500

54
M2 10 3,330 3,340 1,137 3,798,084

M2 10 3,330 3,340 730 2,436,579

M2 170 10 180 1,937 348,660

225,463,961

MT - - 108,625 -

55
KG 1,500 1,500 180 270,000

EA 5 5 10 2,000 20,000

M 64 64 9,075 580,800

M 64 64 11,350 726,400

M 32 32 13,976 447,232

M 64 64 11,062 707,942

M 64 64 13,270 849,306

M 32 32 19,402 620,858

EA 5 5 250,000 1,250,000

EA 2 2 49,978 99,956

EA 5 5 10 1,725 17,250

EA 5 5 10 2,070 20,700

EA 5 5 10 2,300 23,000

EA 5 5 10 2,473 24,725

EA 5 5 10 3,278 32,775

EA 5 5 10 3,542 35,420

EA 5 5 10 3,853 38,525

56
EA 5 5 10 5,693 56,925

EA 5 5 10 7,993 79,925

EA 5 5 10 10,868 108,675

EA 5 5 10 288 2,875

EA 5 5 10 374 3,738

EA 5 5 10 546 5,463

EA 5 5 10 604 6,038

EA 5 5 10 748 7,475

EA 5 5 10 1,093 10,925

EA 5 5 10 1,898 18,975

EA 5 5 10 3,105 31,050

EA 5 5 10 4,198 41,975

EA 5 5 10 7,993 79,925

EA 5 5 10 5,578 55,775

EA 5 5 10 3,853 38,525

EA 5 5 10 288 2,875

EA 5 5 10 403 4,025

EA 5 5 10 518 5,175

EA 5 5 10 633 6,325

EA 5 5 10 748 7,475

57
EA 5 5 10 863 8,625

EA 5 5 10 978 9,775

EA 5 5 10 8,000 80,000

EA 5 5 10 10,000 100,000

EA 5 5 10 2,000 20,000

EA 5 5 24,604 123,021

EA 4 4 114,860 459,439

EA 4 4 5,727 22,908

EA 2 2 13,291 26,581

M 10 10 20 2,876 57,520

M 10 10 20 3,234 64,680

M 10 10 20 3,600 72,000

RM 2,000 2,000 90 179,400

Nos. 200 200 288 57,500

Nos. 25 25 334 8,338

Nos. 10 10 420 4,198

7,633,013

58
59
M2 2,503 10 2,513 960 2,412,480

60
M2 1,357 1,357 1,140 1,546,980

61
M2 100 10 110 550 60,500

M2 57 5 62 840 52,080

M - 951 951 1,200 1,141,200

M 294 10 304 935 284,240

62
EA 10 10 1,020 10,200

M2 2,195 2,195 1,380 3,029,100

M2 182 731 913 1,140 1,040,820

M2 4,652 10 4,662 660 3,076,920

63
M2 1,892 10 1,902 284 539,979

M2 4,030 10 4,040 525 2,121,000

M3 386 5 391 6,500 2,541,500

M3 5 5 10 4,750 47,500

64
M2 677 10 687 1,380 948,060

M3 5 5 10 5700 57,000

M2 677 5 682 960 654,720

65
M2 299 5 304 605 183,920

M 10 10 20 3,080 61,600

M 10 10 20 1,980 39,600

66
EA 10 10 20 1,650 33,000

M 269 5 274 495 135,630

M2 103 5 108 1,045 112,860

20,130,889

253,227,863

45,581,015

298,808,878

67
165000 1534.71

131.25 110 137.5

Total
Excavation / Excavation
2,988,233.00
Backfilling / Mt3/ per Sq.ft.
breaking qnty
16,142 0.0978 18.11

2750

2995

3275

68
3455

3275

3455

3595

3595

3720

3905

4205

3720

3905

4200

4205

69
Total concert concert Mt3/ 56842305.00
qnty per Sq.ft.

7,982 0.0484 344.50

Total Formwork Formwork


qnty Mt2/ per Sq.ft. 53075048.00

53,412 0.32 321.67

2.3394

3.4182

5.7576
Total
Reinforcement
Reinforcement 61646148.00
Kg/ per Sq.ft.
qnty Kg
950,000 5.75758 373.61

70
Total Structural Reinforcement 2498384.00
steel qnty Kg Kg/ per Sq.ft.

23,000 0.13939 15.14

71
Total BW Mt2/
Total BW qnty. 28,894,387.00
Sq.ft

16,384 0.0993 175.12

Total PLASTER Total PLASTER 9,978,625.00


Mt2 Mt2 / Sq.ft

14,511 0.09 60.48

Total soling
Total soling misc misc 616,945.00

3.74

72
73
836.8789352644

Total core Total core


cutting VDF ETC cutting VDF 8,188,764.00
misc ETC misc

49.63

74
75
76
Total MEP
Total MEP misc misc 7,633,013.00

46.26

77
78
Pedilite 800 900

79
950 950

80
325 650

850 700

1000

81
2400 850

1900 1150

1150 950

750 550

82
378

378

Brick Bats 3000+


sand / cement
1:5 = 1050 equal
6400 1291
to 3000 +1050
+850 +1355 =
6780

AAC block 1875+


sand / cement
1:5 = 1050 equal
6400 1291
to
1875+1050+850+
945= 4750

83
1900 1150

6400 140

800 1291

84
400 550

1800

600

85
450 450

900

Total Water Total Water


proofing proofing 20,130,889.00 950.00

122.01

1,534.71

86
S NO Item
Originally considered Labour colony
1 Labour colony
30000 2 Water for Labour colony
80000 3 Toilets
20000
4 Electricity
1000000 Local Liasoning
Site
1 Security
2 Drinking water
3 Toilets
Operation of toilets
Dewatering pump with pipes & accessories
100% initially now 50% cost 4
50000 5 Runnig cost
6 Access Scaffolding staircase
50000 7 Electricity
30000 8 Water curing
25000 9 Curing Tank, Curing Pipe, Vibrators, Grinders, Curing Pipe, Has
Concrete Pump
50% initially now 25% cost 10
11 Establishment Office ,Store , Cement
godown
12 Barrication Sheets & Signages, Safety Nets
1000000 13 Electrical Connection & LightFixtures
14 Transportation
30000 15 Office Refreshment Charges
16 Stationary Charges
17 Testing Charges for materials
50% initially now 25% cost 18 Tower Crane with operator
Design work for formwork
JCB
100% initially now 50% Cost Material Lift/Manpower lift
Opearator
60000 19 Housekeeping/QAQC/Safty
20 Mobile/Travelling Charges
21 Site office/PC/etc
23 Survey work for
400000 Plumbing Works
Office For L&T Staff of 1000sqft inc electricity bill and comple

24 CAR policy on total 110% contract value


25 WC on labour cost 20% value of contract
value

87
26 PBG interest up to end of DLP
Bank deposit interest income
Retention Interest 5 % on completion &
27 rest till DLP 24 months
28 CAPEX interest
Mobilisation advance 10%

28 Mobilisation advance bank guarantees charg

29 PBG Charge
30 Salaries
31 Back Office
TOTAL

RCC
Steel
formwork
BlockWork
Plastering

Important Points

Total Sqft
Cost
Cost per Sqft

Steel per sqft


RMC per sqft
Formwork per sqft
Blockwork per sqft
Plaster per sqft

Labour charges

Blockwork per sqft


Plaster per sqft

88
89
90
Nos Per month total months Capital Cost

1 75,000 18 1,350,000
1 25,000 18 450,000
1 25,000 18 450,000
1 8,000 18 144,000
1 15,000 18 270,000
100,000

3 15,000 18 810,000
1 25,000 18 450,000
2 30,000 1 60,000
1 8,000 18 144,000

2 100,000 0.5 100,000


1 35,000 3 105,000
1 200,000 0.5 100,000
1 45,000 18 810,000
1 25,000 18 450,000
, Grinders, Curing Pipe, Has 1 20,000 18 360,000

0 250,000 15 0
1 200,000 1 200,000
1 40,000 20 800,000
1 LS 1 500,000
1 25,000 18 450,000
1 25,000 18 450,000
1 7,500 18 135,000
1 10,000 18 180,000
1 250,000 15 937,500
1 100,000 1 100,000
1 130,000 3 195,000
1 250,000 3 375,000
3 20,000 15 900,000
1 45,000 18 810,000
1 25,000 18 450,000
1 LS 1 400,000
1 100,000 6 600,000
1 LS 1 300,000
electricity bill and comple 1 750,000 LS 750,000

200,000,000 0.15% 330,000


60,000,000 0.36% 216,000

91
4 5.00% 10,000,000 10.0% 4,000,000
4 -10,000,000 5% -2,000,000
2,900,000
14.50%
50,000,000 0
20,000,000 10.00%
30,000,000 0.83% 18 4,500,000
20,000,000 2 0.7% 280,000

4 5.00% 10,000,000 0.7% 280,000


325,000 18 5,850,000
200,000,000 2.50% 5,000,000
36,041,500

total cost 36,041,500

25% 8442 cum 1067 per cum


15% 973 MT 5556 per Mt
25% 53412 sqm 169 per sqm
15.0% 16,324 sqm 331.18 per sqm
20.0% 17721 sqm 407 per sqm

165000
312832074
1895.95196364

5.897 kgs per sqft 75 442.27 72,975,000.00


0.0512 cum per sqf 12500 639.55 105,525,000.00
0.3237 sqm per sqf 1200 388.45 64,094,400.00
0.0989 sqm per sqft
0.1074 sqm per sqft

1470.27 242,594,400.00
0.00
1470.27 242,594,400.00
0.09893333333 sqm per sqft
0.1074 sqm per sqft

92
93
94
working by sunil sir

capex

50% considered

Concrete pump with Operator ,addl pipe line & 25% considered

14,685,500.00 89.00303

95
Project head
Project manager
Sr. engineer
Site engineer
supervisors
safety engineer
safety supervisors
21,356,000.00 129 billing/planning/Quality engin
quality engineer
store manager
store assistants
Plumber & Electrician
9,010,375.00
5,406,225.00
9,010,375.00
5,406,225.00
7,208,300.00
36,041,500.00

9,730,000.00
5,065,200.00
40,059,000.00

44 259.47 42,812,000.00
4100.25 209.78 34,614,310.50
0 0.00 0.00
54,854,200.00
332.45

469.25 77,426,310.50
332.45 54,854,200.00
801.70 132,280,510.50

96
97
98
99
0.25 100000 25000
1 75000 75000
1 50000 50000
1 30000 30000
2 25000 50000
1 25000 25000
1 20000 20000
0 40000 0
0 40000 0
0 30000 0
1 25000 25000
1 25000 25000
325000

100
101
Excavation of Soil Refilling Hard Rock
Description Rate
Excavation of soil 85 700
Timbering 100 200
Stacking I/s 0 0
Royalty 100 100
disposal 0 0
285 1000
Add OH & CP @ 18% 15% 43 150

Total Amont 327.75 1150

Back filling

Description Rate
Fro Out side earth 300
Compaction 125
Watering 0
Royalty 50

Backfilling 475
Add OH & CP @ 15% 25% 119

Total Amont 593.75

102
Soling from within the site
Rate per cum 0
Labour Charges incl transportation to place 350
Esic & PF 33% 11550%
Water, Electricity, Safety 1% 466%
CP & OH 15% 7052%
TOTAL 54068%

Soling from outside the site


Rate per cum 1550
Labour Charges incl transportation to place 250
Esic & PF 33% 8250%
Water, Electricity, Safety 1% 333%
CP & OH 15% 28287%
TOTAL 216870%

103
M10-PCC M15-PCC M 20-PCC M 20-sub
For slab
Basic Rate 3275.00 3455.00 3595.00 3595.00
Extra for SCC 0 0
GST 0.18 590 622 647 647
Supplier rate.with GST 3865 4077 4242 4242
wastage% 0.05 193 204 212 212
Fixed cost 1067 1067 1067 1067
pumping charges 200 200 200 200
Scaffolding Charges 50 50 100 100
Labour 400 400 400 500
Formwork 500.00 500.00 500.00
6275 6498 6722 6322
ESIC & PF on labour 0.20 80 80 80 100
charges 33% on Labour
Add for Water & Electricity @ 0.00 0 0 0 0
House keeping & Add for 0.01 64 66 68 64
Safety @ %
6419 6644 6870 6486
Add OH & CP @ 15% 0.15 963 997 1030 973
less GST 18% -696 -734 -764 -764
to be quoted Say 6686 6907 7136 6695

Plum Concrete M5
Per Cum 2750.00

M10 60% 1650


Soling stone 40% 1500 600

Pumping 0 0

Labour 700 700


Formwork 100 100

3,050

104
ESIC & PF on labour charges
0.20 140
33% on Labour

Add for Water & Electricity @ 0.00 0

House keeping & Add for Safety


0.01 31.9
@%
3221.9
Add OH & CP @ 15% 25.00% 805.475
4027.38

105
M30-super M35-super M40-super M30-sub M40-sub
M 25-sub M 25-super
structure structure structure structure structure
3720.00 3720.00 3905.00 4150.00 4205.00 3905.00 4205.00
0 0 0 0 0 0 0
670 670 703 747 757 703 757
4390 4390 4608 4897 4962 4608 4962
219 219 230 245 248 230 248
1067 1067 1067 1067 1067 1067 1067
200 200 200 200 200 200 200
100 250 250 250 250 100 100
500 500 500 500 500 500 500

6476 6626 6856 7159 7227 6706 7077

100 100 100 100 100 100 100

0 0 0 0 0 0 0

66 67 70 73 73 68 72
6642 6794 7025 7332 7401 6874 7249
996 1019 1054 1100 1110 1031 1087
-790 -790 -829 -881 -893 -829 -893
6848 7023 7250 7550 7618 7075 7443

M7.5 M10 M15


2995.00 3275.00 3455.00

1797 1965 2073


600 600 600

0 0 0

700 700 700


100 100 100

3,197 3,365 3,473

106
140 140 140

0 0 0

33.37 35.05 36.13

3370.37 3540.05 3649.13


842.5925 885.0125 912.2825
4212.96 4425.06 4561.41

107
M30-\
M30-\ coloured
coloured M 20-PCC
concrete
concrete Basic Rate given by L&T
7900.00 3595.00 7900.00 M5 2750
0 0 M7.5 2995
1422 647 1422 M10 3275
9322 4242 9322 M15 3455
466 212 466 M20 3595
1067 1067 1067 M25 3720
200 200 200 M30 3905
250 100 250 M35
500 500 500 M40 4205

11805 6322 11805

100 100 100

0 0 0

119 64 119
12024 6486 12024
1804 973 1804
-1678 -764 -1678
12150 6695 12150

727.720813273372 634.36
PP Fibre 50.00
LDPE sheet 200
40
microns
Groove cutting 40
Groove filling
22
Labour
Excaliber
chemical cost 30
for filling
TOTAL 909.72 634.360688437498
Add OH &
227 95
CP @ 25%

108
1,137.15 729.51

109
S.N.

ii

iii

110
iv

ii

iii

ii

iii

iv

ii

iii

iv

111
i

ii

ii

ii

iii

iv

ii

iii

iv

112
d

ii

iii

iv

vi

vii

113
i

ii

ii

ii

iii

iv

vi

114
vii

ii

iii

iv

vi

vii

115
i

ii

116
b

ii

iii

ii

iii

ii

iii

iv

vi

vii

117
viii

ix

ii

iii

iv

vi

vii

viii

ix

xi

xii

ii

iii

iv

118
vi

vii

ii

ii

iii

iv

ii

iii

ii

iii

119
1

120
1

121
2

122
3

123
7

10

124
11

12

13

14

125
15

16

17

126
18

19

20

127
21

22

23

128
Annexure A for Carrying Out Civil Core & Shell Works for L&T’s Proposed Multi use Development P

Description

Part A

Notes: All measurements shall be as per IS: 1200 unless otherwise specified

EARTH WORKS

Mass Excavation in all types of soil for all depths (Disposal outside site Premises)
Earthwork in Excavation Using mechanical means/ manual means using Contractor supplied plant and machinery an
including raft, foundations of walls, columns, footings, basements, equipment foundations, plinth beam etc. in all ty
Mass
murrum Excavation
(but excluding in Hard
hard of rock
rock : (Disposal
requiring chiseling outside
using site
rock Premises)
breaker
Mass Excavation in all types rock for all depths: (Disposal Outside siteor blasting), providing shoring, pumping, bai
Premises)
complete . Any type of strata that can be excavated using excavator bucket shall be measured and paid under soil ex
Earthwork
The item rate in Excavation
shall include Using mechanical
providing shoring means/ manual
, strutting, means using
de:watering withContractor
completesupplied
pumpingplant andbailing
system, machinery
out waan
Concrete
including raft,Breaking
foundations (M30of Grade)
walls, columns, footings, basements, equipment foundations, plinth beam etc. in all ty
Breaking of
transport forconcrete/
all masonry
leadnormal
and lifts, in existing
disposal foundation,
of excavated grade slab
material and
using any othervehicle
contractor's structure by mechanical
outside / manual
site premises (Dispom
be excavated
authorized using
disposal yard excavator bucket and that requires chiseling using rock breaker or controlled blasting), p
Muncipal
out water Guidelines
, slush and approved
removal place/location
etc. complete
by municipality
of
. disposal
Any type
outside
tostrata
of
site premises.
be finalized
that canbybe Expenses
contractor
excavated
on own
atusing
his account
cost)ofetc.
excavator
debris manageme
complete
bucket shall as
be pe
m
municipal
(EIC). Royaltycorporation
charges guidelines
for excavation, in covered
Expenses vehicles, housekeeping
debris,of roads and surroundings of ,excavated
royalty for disposal
excavation item only. The item rate shall includeonproviding
account of
shoring management / disposalwith
strutting, de:watering complete earth
pumpingas p
rate.
in covered vehicles, housekeeping of roads and surroundings , etc are included in the rate. No separate payment on
removal
Any over,excavation
excavation,shall transport
be made for good
all leadwithandplumlifts,concrete
disposal (with
of excavated
M10 Grade material usingplums
with 40% contractor's vehicle outsid
of size 160mm down
excavated material as per Muncipal Guidelines and place/location of disposal to be finalized by contractor at his ow
No
Back payment
Filling
instructions shall be
of :Engineer made
Earth From for such
outside
in charge works
(EIC),site of plum concrete.
Royalty charges for excavation, Expenses on account of debris management
Note
muncipal corpration guidelines, in per
Filling1: Mode
in of
foudations, Measrument: As
rafts,trenches,plinths, IS 1200
covered area levelling,
vehicles, podium filling
housekeeping of roadswith approved
and good quality
surroundings , etc. Noearth brought
separate payf
Note 2:
premises, All leads
etc.in and
layerslifts to
not be included
exceeding in
200mm the Unit
in Rates.
depth, breaking clods,watering,compacting
considered. All these expenditures are included in the item rate of excavation. Any over excavation shall be made go each layer with vibrato
Note
Grade3:with
achieve Any
95%40% variation
plumsin160mm
of maximum prices of any component
dry density.
down The rate
graded (butalso
) atshall
the notinclude
cost limited
of to) likeNo
charges
contractor. Diesel,
for labour,
surface
payment shallplant
dressing, and
slushmachinery,
be made royalt
removal,barrica
for such works o
not be
include payable
Note 1: charges
Mode offor to contractor
royalty.
Measrument: during the entire
As per IS 1200 period of contract and its extension if any.
Note 2: All leads and lifts to be included in the Unit Rates.
Back
Note 3:Filling : EarthinAvailable
Any variation prices of any Inside site Premises
component (but not limited to) like Diesel, labour, plant and machinery, royalt
Filling in foudations, rafts,trenches,plinths,
not be payable to contractor during the entire area levelling,
period podiumand
of contract filling with approved
its extension if any.good quality excavated eart
etc.in
Note layers not
4: Contractor exceeding
to submit excavation method statement, excavation plan and safety plan with
200mm in depth, breaking clods,watering,compacting each layer beforevibratory
start ofcompact
activity.
Concrete
maximum dry Works
density. The rate shall also include charges for surface dressing, slush removal,barrication and safety.
for royalty.
Notes:

Clause detailed below to be referred for all concrete items like isolated footings, rafts, retaining walls, plinth beams
shear walls, lift walls, floor slabs, floor beams, Tie /Link Beam, staircase, parapet, pardi, Chajja, lintels, mullions, con
Underground Tanks, STP, lift machine rooms, Elevation Features, mezzanine floors, service shaft slabs / platform, tr
Plum Concrete
lofts, etc. all as perWorks: With in
GFC included plum brought
this work from
order. The outside
following shall be deemed to be included in the item rates:
Providing and Laying Plum concrete by using M 5
a) The concrete shall include all ingredient materials (Cement, Grade concrete 60% andAdmixture
Aggregate, Hard stone, Fly
plum ( Max.
Ash, Silicasize
Fume 160, GGBS,
mm ) 40 w
be
Plum used ) , including
Concrete of M shifting
5 Grade , stacking & laying of plum .
(including erection of scaffolding if required), hoisting to all locations & heights/ Levels / Depths, pouring / laying by
The Item ratebyshall
compaction include
suitable dewatering
means needle /system
surfaceas/ plate
per approved
vibrator,methodology to keep
leaving pockets, holeswork area dryofallinserts
,installation time before
as shop
surfaces
till & junctions,
theConcrete
next operation cost of
orGrade all materials, miscellaneous consumables,labors,tranportation of material
completion of work, hacking the surface / use of approved binding agents to provide key fo to all require
Plum
approved of,Placing
M 7.5
wetting, etc. and preparingvibrating
means ,compacting,
construction Curing
joints with etc. tools,
provision plantkey.
of shear and machinery, hire and fuel charges and al
per specifications, drawings and as directed by EIC. The item rates shall
b) If different grades of concrete are used at junctions, spillover of richer concrete hold good for work at
required all Levels
shall ,depths,
be included heig
in the
pits,
Plum
c) Itemtunnels,
Concrete etc.
rate shall ofinclude
M 10 Grade
filling of tie:rod, wall ties holes with non:shrinking and waterproofing grout material.
Designing of concrete
d) Providing construction mixjoints,
for different grades
expansion of wherever
joints controlleddirected.
concrete should be done in accordance with latest IS:SP
design)
e) Adequate protection of edges and corners from damage duringby
in an approved lab and the same should be got approved EIC , the item
construction rates also manner.
in approved includes cost for the sa
Note: Rate also includes of Providing , placing, fixing and removal of necessary formworks.
f) Work either straight or curved, plain or circular or of any shape, unless otherwise provided for.
g) Keeping the work well cured for at least 7 days from the date of casting or as per relevant IS code (Ponding metho
wet/moist hessian cloths to be wrapped around surfaces). All types of Quality Control tests (green and hardened st
specifications. 129
h) Hacking of all concrete surfaces wherever required.
i) All starters to columns and other vertical elements shall be prepared with concrete mix one grade higher than tha
Plum Concrete of M 15 Grade

Plain cement Concrete :


Providing and laying plain cement concrete (PCC) using 20 mm nominal size well:graded approved quality aggregate
including compacting, curing, establishing approved dewatering system to keep work area dry all time, cleaning, pre
including shuttering complete to the satisfaction of the EIC at all lifts and leads.
Below Foundation, raft, Plinth, Grade Slab, Water Tank, Lift Pit and all other related works.
The Item rate shall include dewatering system as per approved methodology to keep work area dry all time before p
surfaces & junctions, cost of all materials, miscellaneous consumables,labors,tranportation of material to all require
approved means ,Placing vibrating ,compacting, Curing etc. tools, plant and machinery, hire and fuel charges and al
per specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels ,depths, heig
pits, tunnels, etc.
Designing of concrete mix for different grades of controlled concrete should be done in accordance with latest IS:SP
design) in an approved lab and the same should be got approved by EIC , the item rates also includes cost for the sa
Note: Rate also includes of Providing , placing, fixing and removal of necessary formworks.

Plain cement Concrete M 10 Grade

Plain cement Concrete M 15 Grade

Plain cement Concrete M 20 Grade

All RCC members at GL and below


Below Foundation, Rafts, Footings, Pile Caps, Stub Columns, Plinth, Grade Slab, Water Tank, Lift Pit, Trenches, Slabs,
Columns and all other
All RCC members in 20works
Grade:below Ground Level:
Providing and laying Controlled concrete of M 20 Grade from batching plant at site or RMC source from outside ,us
aggregates for Reinforced Cement Concrete (RCC) of various grade conveyed to all locations, lifted and placed in pos
All RCC members
means, in 25 Grade finished evenly and cured. etc. complete (excluding form work, reinforcement and st
vibrated, consolidated
The Item rate shall include cleaning with air jet the surfaces of formwork to receive concrete before placing of concr
of
Alladjacent
RCC membersRCC worksin 30 completed
Grade earlier, cost of all materials, miscellaneous consumables, labors, tranportation of
pumping or other approved means, Placing vibrating, compacting, Curing etc. tools, plant and machinery, hire and f
charges , grout filling of tie:rod holes, wall:ties holes with approvd non:shrinking and waterproofing grout material e
All RCC members
drawings in 40 Grade
and as directed by EIC. The item rates shall hold good for work at all Levels , lead, lifts, Heights, Depths, ele
tunnels, etc.
Designing of concrete mix for different grades of controlled concrete should be done in accordance with latest IS:SP
All RCC members
design) above GL
Floor & in an Slabs,
Roof approvedSunklab and
Slabs, the same
Beams, should
Walls, be got
Pardis, approvedChajjas,
Staircases, by EIC, Columns,
the item rates
Pools,also includes
OHWTs, LMR cost for&the
walls sam
Slabs
testing
and charges required
all miscellaneous for quality check as per approved quality plan.
All RCC members in 25RCC GradeStructures:
Providing and laying M25 Grade Controlled concrete from batching plant at site or RMC source from outside , using
Mode of Measurement
aggregates for Reinforced : RCC members
Cement shall (RCC)
Concrete be certified as per
of various theoretical
grade conveyed quantity from GFClifted
to all locations, drawing.
and placed in pos
All RCC members
means, in 30 Grade finished evenly and cured. etc. complete (excluding form work, reinforcement and st
vibrated, consolidated
The Item rate shall include cleaning with air jet the surfaces of formwork to receive concrete before placing of concr
of
Alladjacent
RCC membersRCC worksin 35 completed
Grade earlier, cost of all materials, miscellaneous consumables, labors, tranportation of
pumping or other approved means, Placing vibrating, compacting, Curing etc. tools, plant and machinery, hire and f
charges , grout filling of tie:rod holes, wall:ties holes with approvd non:shrinking and waterproofing grout material e
All RCC members
drawings in 40 Grade
and as directed by EIC. The item rates shall hold good for work at all Levels , lead, lifts, Heights, Depths, ele
tunnels, etc.
Designing of concrete mix for different grades of controlled concrete should be done in accordance with latest IS:SP
Extra
design) Over
in an for temp lab
approved controlled
and the concrete for M30 Grade by EIC, the item rates also includes cost for the sam
Extra over supply and placement ofsame should
various gradesbe of
gotconcrete
approved for Providing Temperature Controlled Concrete for a
testing charges
of concrete shallrequired for quality
not exceeding check
25 deg. as peratapproved
Celsius quality
final location plan.
of its placement. De:shuttering of formwork shall be
Extra
etc. over
complete for
as Self
per Compacting
methodology Concrete
and quality (SCC)
plan :
approved by Engineer Inatcharge.
Extra over
Mode for Providing :and
of Measurement RCC laying
members Controlled
shall beconcrete
certifiedfrom batching
as per plantquantity
theoretical site orfrom
RMCGFCsource from outside ,usin
drawing
The Item rate shall include cost of all materials, miscellaneous
aggregates for Self Compacting Concrete (SCC) of various grade conveyed to all consumables, labors, tranportation
locations, lifted andofplaced
material to all r
in positio
other approved means, Placing vibrating, compacting, Curing etc. tools, plant and machinery, hire and fuel charges
means,
complete finished evenly
all as per and cured. drawings
specifications, etc. complete
and as(excluding
directed form
by EIC.work, reinforcement
The item rates shalland
holdstructural
good for steel, Mesh,
work at In
all Lev
cleaning with air jet the surfaces of formwork to receive concrete before placing of concrete dewatering wherever n
elevations,
all lead andbasements, trenches,
lifts, tools, plant pits, tunnels,
and machinery, etc.
hire 130fuel charges and all other incidental charges etc., all as per spe
and
Designing of Temperature controlled concrete
by EIC. The rates quoted shall hold good for any depths, mix for different
heights,grades
levels,of controlled
elevations, concrete should
basements, be pits,
trenches donetunnel
in acc
approved lab and the same should be got approved by EIC, the item rates also includes cost for the same. Item rate
Extra over for SCC Cement Concrete (Grade M30 Grade)

Extra over for SCC Cement Concrete (Grade M40 Grade)

FORMWORK :
Following clause detailed below to be referred for all formwork items included in BOQ. The following shall be deem
rates:
Providing, a)The materials,erecting
fabricating, design, and andconstruction
fixing in position of formwork
formwork (including
material bracing,
of approved shoring,system strutting
made&ofSupporting
Ply with bolts witha
comply with the best Indian Standard Code of Practice for false work and
centering and shuttering to correct line and levels including strutting, propping, etc. with necessary bracings in all ax below.
b)Specifically,
provision for making forms for theconcrete
joints in work shall be so
the shuttering constructed
fully leak:proofand erected
to avoid as to resist
leakage of cementthe forceslurry,exerted
dismantlingon them andwir
Super
greater Structure : Conventional Formwork
after the concrete attains sufficient strength to self:support itself without any cracking and distortion. etc. includingt
than three (3)mm. Forms shall be sufficiently tight to prevent the leakage of mortar/grout. *(Masking tape
the
(Up sufficiency
Fire toCheck of theStaircase
Floor,
4.5m Height), whole
all placesof and
the
Headformwork
profilesRoom shall
, LMR
wherever restneeded
entirely with
Misc.the
, other: specified Contractor
itemas per drawing whoand shallproviding
engage arequired
qualifiedsurfa Eng
Providing,
construction
Extra
providing overall fabricating,
methods
formaterials
Staging aboveerecting
to
required and
structurally fixing
4.5 including design in position
the
m Height consumables,
: Extra over For formwork
formwork. Prior
supporting
making material
to start of
any approved
RCC members
of formwork formwork, system
, shifting(slabs made
shuttering
& beams)of
of formwork of Ply
works
up to with
the
height bolts
morea
shutte
all location
centering
EIC d)Forms
requiring
centering,stagingand forshuttering
exposed
strutting, to increasedto correct
surfaces
propping, height line
shall be and
walling,asbracing, madelevelsof
requiredbolting, including
dressed
upto 7wedging, strutting,
timber
m . The staging or propping,
metal.
casing, or Angle
formwork
striking, etc. with
fillets necessary
shall
design
removal, be used bracings
shall be DE
lowering, in the
submitted in all
to ax
angles
shuttering, ro
th
provision
to line
approval and for making
conform
thebefore the
to
proceeding thejoints in
dimensions
to the shuttering
and levels fully
shown leak:proof
on the to avoid
Drawings. leakage
f)The of cement
interior surfaceslurry,
of dismantling
forms shall and
be co r
filling
Extra
after
(The
Fosroc over
the
gap/holes
for Staging
concrete
make) prior
ofabove
attains
tie rods 7.0erect
with
thesufficient
to wherever
placing m of the same.
grout,
Height
strength :etc.
Extraand overall incidental
to self:support
reinforcement, andForany
supporting
itself
work RCC
without
surplus
complete.
members
any
moisture
The(slabs
cracking
shall
activity
be and &
removed
also includes
beams)of
distortion.
from height
etc.
the
allowing
forms more
includingprio
f
cut:outsItem rate shall
openings, include
etc. providing called allfor,
materials
allowing required
for including
dressing with consumables,
approved making
shuttering of formwork
oil to prevent ,shifting
adhesion ofo
requiring
(Up tobe4.5mstaging
Height),to increased height as required uptoneeded 9.5 m. etc.The staging beasor formwork design shall prior
be submitted to t
material
depths
shall
approval
such
&applicable
levels,
before toall
as including
dirt, allplaces
clay,
proceeding
wire, and
centering,
RCC members.
to erect
profiles
reinforcing
strutting,
the
wherever
same.
bar,propping,
wood chips,
walling, : specified
shall
bracing, per
removed
bolting, drawing
from
wedging, and providing
thecasing,
forms required
to concretin
striking, surfa
removal
providing
displaced
Extra
all all
rods,during
Over formaterials
&concrete
Scrificial required andincluding
orproviding
Formworkwithin the
system consumables,
periods specified making
for theofretention
formwork byof ,formwork,
shifting of the
formwork
concrete upwhere
to ,shifting
shall allbelocation
remo
ThetieItem
The Item
centering,
Engineer
nuts
rate
rate shall
shall
strutting,
may
bolts,
include
include
determine,
etc.
propping, providing providing
walling,
construction
all
joints
additional
materials
allbracing,
materials required
required
bolting,
shall be
safe working
including
including
wedging,
formed and the
area providing
consumables,
consumables,
casing, striking,
section of work
extra
making
making
removal,
shall
formwork
be
of formwork
of reconstructed
formwork
lowering, DE
necessa
,shifting
shuttering,
after
of
of
thr
etc.
depths
depths complete
& levels,
& levels, as directed
including
including by EIC
centering,
centering,. The item
strutting,
strutting, rate also
propping,
propping, includeswalling, allowing
walling, work bracing,
bracing, for forming
bolting,
bolting,The grooves,
wedging,
wedging, drips,
casing,
casing, throats,
striking, cut:outs
removalof
removal
striking,allowing
filling
and
all the
adjusted.
allowing
tie gap/holes
fornuts
dressing of tie rods
withetc.
approvedwith grout,
shuttering etc. and all incidental
oil to prevent adhesion complete.
ofbyconcrete activity
to extra
formwork. also includes
Itemwhererate shall also
all tie rods,
cut:outs
i)Formworkrods,
Reinforcement nuts
openings,
shall
& bolts,
&remain
bolts,
etc.
Steel etc.
wherever
and
and for
inbyplace
Works
providing
providing
called
the for,
additional
additional
allowing
minimum timefor
safe
safe working
working
dressing
as specified
area
area
with IS:by
approved
in for 456
providing
providing orextra
shuttering
:1978
formwork
formwork
oil towithin
as varied preventwhere
this
necessa
necessa
adhesion
specifica o
quality
etc.
etc. check
complete
complete as
as
as per approved
directed
directed EIC
by EIC quality
. The
. Not plan.
item
The withstandingrate also
item rate alsothis, includes
includes allowing
allowing forming
forbeforming grooves,
grooves, drips,
drips, throats,
throats, cut:outs
cut:outs o
o
shall
in
Mode
allowing be applicable
accordance
of for
payment with
dressing to all
this
: Area
with RCC members.
standard.
of staging shall be measured side
as per the forms may
plan area stripped
and not the after the minimum
area in contact time
with specifie
concrete
allowing
The
in anyItem for
case ratedressing
not shall
less with48approved
include
than approved
providing
hours)
shuttering
shuttering
afterall materials
the
oil
oil to
concrete to prevent
prevent
required
has been
adhesion
adhesion
including
poured,
of
of concrete
concrete
consumables,
provided
to
to
that
formwork.
formwork.
making
Item
Item
of formwork
the surfaces exposed
rate
rate shall
shall
,shifting
are imm
also
also
of
quality
Supplying check
qualitycompound
check & as per
fixing
as per approved
reinforcement
approved quality
quality plan.
steel
plan.is carried
depths
curing
Mode &
of levels,
payment including
(if
:The centering,
required) and strutting,
curing propping,out inwalling,
accordance bracing, with bolting,
this wedging,
specification. casing,
Bottom striking,
forms removal
shall rem
Providing,
Mode
all ofor
tie rods,
pouring
Straightening,
payment
nuts
as otherwise Areaarea
&,:bolts, of
etc.
in contact
cutting,
staging
and 18
approved
bending
shallwith
thebe
providing
by
andconcrete
bindingwith
measured
additional
Engineer. j)Whenas
safe
deductions
in position
per the plan
working
forms arearea
for openings.
of reinforcement
area by
reused, and barsarea
not the
providing
their
(TMT
extra
original inbars:
contact
formwork
shape,
Fe 500
with) concrete
where
strength,
high yie
necessa
rigidity,
Note
conforming
For Sub : For UGWT
to
Structure STP
IS:1786:2008 & Retaining
with wall
gauge no through
annealed type
binding of tie rod
wire, to, wall
correctties shall
shape beandusedsize for
as formwork
per detailed system.
drawing
etc. complete
smoothness as
shall directed
be by
maintained. EIC . The
All item
material rate also
previously includes
used allowing
in formwork
bar:bending schedules, for all reinforced concrete work such as pile caps, footings, RCC walls, columns / stub colum for forming
must be grooves,
cleaned drips,
off andthroats,
oiled cut:outs
before reuo
allowing
beams, Staircase, Lintels, OHWT, LMR, rafts etc. at all heights and all levels; with correct sizes approved concretealso
so as to for
ensure dressing
uniform with approved
quality and shuttering
texture over oil to
large prevent
areas, adhesion
built to of
close concrete
tolerances to formwork.
and exhibit Item rate
consistently shallgood coq
quality
check
For Superand
concrete check
list of as
the
Structureper
same approved
work have quality
to be plan.
fill before the contractor start any
galvanized binding wire of 18 gauge; if required dewatering, required labor and machines / equipmen works. j) Quoted rates shall be inclusive of
Mode
handling, of payment
constriction joint to
shifting :The
etc. make area
and in contact
concrete
cutting and with smooth.
surface
bending concrete
as per with deductions
drawing, for openings.
reinforcements all complete to the satisfaction of the
Note : For OHWT / water retaining structure scarifies
The Item rate shall include providing all materials required such as reinforcement type of tie rod system , no through
steel bars type(TMTof tiebars:
rod Fe , wall
500tiesconfsh
Coupler:
miscellaneous at all levels
consumables suchin asreinforcement
18 gauge annealed
Supplying and Fixing of Couplers steel Galvanised
bars including Ironmaking
bindingthreading
wire , chairs of bar ,pins ,spacers
at both end,correct
(Each jun s
or
of approved PVC cover block , Cost of Labour, machines / equipment / tools / tackles / vehicles for all transportatio
16 requisite
mm Dia. Bar
reinforcement
forging (if required) and threading shall be treated as one number for payment) the threading of steel b
in the stocking yard, shifting the same
approved coupler supplier at site and contractor. The to ratecutting
shall & bending
include yard, Straightening,
all transportation, cutting,
Handling, bending,shift
unloading, shift
locations, heights, depths & levels, all necessary
and all necessary miscellaneous handling charges etc. complete. miscellaneous handling charges, tying reinforcement steel as per d
required
20 mm Dia. Baretc. complete as directed by EIC. Item rate shall also include testing charges required for quality check as p
: No separate payment for binding wires, chairs, Pins, spacer and cover blocks shall be considered. Only authorized l
as per GFC drawing.
25 mm Dia. Bar

32 mm Dia. Bar

Reduced Coupler: at all levels


Supplying and Fixing of Reduced Couplers in reinforcement steel bars including making threading of bar at both end
separate bars of requisite
Reduced Coupler: forging (if required) and threading shall be treated as one number for payment) the threa
20:16 dia
through approved coupler supplier at site and contractor. The rate shall include all transportation, Handling, unload
fixing and all necessary miscellaneous handling charges etc. complete.
Reduced Coupler: 25:20 dia

Reduced Coupler: 32:25 dia

Reduced Coupler: 40:32 dia

131
Reinforcement Steel Bar Anchor
Providing , drilling and fixing Reinforcement steel bar anchoring work of reinforcement steel in concrete wall with c
at
8mmanyDia
height & location as per instruction of Engineer Incharge .Rate inclusive of cost of all materials, miscellaneous
of material to all required locations by approved means , tools, plant and machinery, hire and fuel charges and all ot
required as per specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels
10mm Dia

12mm Dia

16mm Dia

20mm Dia

25mm Dia

32mm Dia

Structural Steel Works


Supplying, fabricating, delivering at site, hoisting and fixing in position at all heights and all levels and making all stru
the designSteel
Structural drawings Works prepared by the consultants. The structural steel work shall include welded and built up section
welded and built up sections, trusses, built:up purlins, frame work welded and/or bolted, girders, gusset plates, bas
The Item rate shall include providing all materials required such as Structural steel (Confirming to IS: 226 & 2062 ),
Structural
Labour, machinesSteel works : Misc., Ladder,
/ equipment / tools /Staircase
tackles /Etc. vehicles for all transportation, Handling, unloading Structural steel
same to Fabrication yard, shifting from Fabrication yard to all required locations, heights, depths & levels, all necess
etc. as per approved shop drawing and all incidental work required etc. complete as directed by EIC. The rate shall in
Supplying
primer & fixing
and,Fabricating
two coats of MS inserts
epoxy
Supplying and fixingpaint and shall
MS inserts includerequired
including high tensile structural
template fixingbolts, washers,
& keeping them1:3incement
position and as groutin
per GFC
shall also include preparation of shop drawing & obtain approval of EIC ,
removing, cleaning its surface and applying protective measures such oiling, greasing etc. complete to approvaltesting charges required for quality check a
of th
Mode
S/F of
Anchor Measurement:
bolt: M 16 As mmper IS
upto 1200 150 mm for structural steel works.
The Item rate shall include providing all materials required such as Structural steel (Confirming to IS: 226 & 2062 ), m
Providing /Fixing of Anchor bolt : M 16 mm upto 150mm .Providing, drilling and fixing of approved make anchor fast
Labour,
and length machines
of Anchor / equipment
Bolt in concrete/ tools wall
/ tackles / vehicles
and using Grout/ foradhesive
all transportation,
as per drawing Handling,
at any unloading
height &Structural
location assteel per
same
Masonry to Fabrication
Works yard, shifting from Fabrication yard to all required locations,
Rates inclusive of all consumable material, staging material, Labour charges, tools and tackles required to complete heights, depths & levels, all necess
etc. as per drawing and all incidental work required etc. complete as directed by EIC. Item rate shall also include tes
Engineer
check as per In charge
approved (EIC).quality plan.
Solid Concrete Block :200mm thick Masonary:
Providing and constructing 200mm thick Solid concrete block masonry (as approved), blocks conforming to IS 2185
mortar mix ratio of 1:5 (1 cement : 5 sand) mixed with approved non:shrinking compound as per manufacturer’s ins
Solid
raking Concrete
out joints, curing, Blockdoing :150mm thick Masonary:
independent double legged scaffolding etc. as per specification at all locations; heigh
Providing and constructing 150mm thick Solid concrete block masonry (as approved), blocks conforming to IS 2185
satisfaction of the EIC.
cement : 4 sand) mixed with approved non:shrinking compound as per manufacturer’s instructions, including provid
Item
Solid
at everyrate shall include
Concrete
1.00m withcost
C/CBlock of all materials,
:100mm
supplying thick
and fixing miscellaneous
Masonary:
2 concrete
nos. 10 mm consumables,labors,tranportation
diamasonry
Tor bars (asandapproved),
8 mm dia links of material
at conforming
300 to all requi
c/c in cement con
Providing
means and constructing
,Curing , tools, plant 100mm
and thick
machinery, Solid
hire and fuel block
charges, providing erecting & blocks
removing independent to IS 2185
doub
formwork complete with raking out joints, curing, doing independent double legged scaffolding as per specifications
cement
incidental
as directed : 4charges
sand)
by the mixed
EIC with
etc.,toall
his approved
required
entire non:shrinking
as per specifications,
satisfaction. compound
(RCC Patli drawings isaspart
beamMasonary: perof
and manufacturer’s
as directed
the item and instructions,
by EIC.
willThe
not item including
rates
be paid shall provid
hold g
separately)."
Light
at every
heights, weight
lead, concrete
1.00mlifts,Heights,Depths, block
C/C with supplying AAC block2:200mm
and fixing
basements, nos. 10 mm
trenches thick
dia
pits, Tor bars
tunnels, and 8shafts
service mm dia etclinks
.Itemat rate
300 c/c
shall inalso
cementincludecon
Providing
Item rate and
formwork shall constructing
complete include withcost 200mm
of allout
raking thick
materials,light
joints, weight
miscellaneous
curing, concrete
doing block (AAC block )masonry
consumables,labors,tranportation
independent double legged as approved,
scaffolding of as
material blocks confot
to all requi
per specifications
check
bed as
jointingper approved
mortar quality
(confirming plan.
to ASTMC 1660:09)
means
as ,Curing
directed , tools,
EIC plant
byindependent
the to As
his and
entire machinery,
satisfaction. andof
hire(RCC specified
fuel
Patli charges,
beam
thickness
is providing
part
as per manufacturer’s
of theerecting
item and&will
removing
not
instructions comple
be independent
paiddepths
separately)."doub
Mode
Light
curing,
band / of Measurement:
weight
doing
Patli beam concrete
and all per
block
double
other ISincidental
1200
AAC
leggedblock :150mm
scaffolding
charges etc.
etc., thick
as
all per Masonary:
requiredspecification
as per at all locations;
specifications, heights,
drawings and as and
directed lea
b
Providing
Item rateat and
shall constructing
include cost150mm
ofall thick light
allmaterials,
materials, weight concrete
miscellaneous block (AAC block ) masonry as of
consumables,labors,tranportation approved,
material blocks
torate conf
allrequir
requi
Item
for
bed rate
work
jointing shall
all
mortarinclude
Levels , cost
lead,
(confirmingof
lifts,Heights,Depths, miscellaneous
basements, consumables,labors,tranportation
trenches pits, tunnels, service of
shaftsmaterial
etc .Itemto all shal
means ,Curing
meansweight
,Curing ,, tools,
tools, plant and to
plantblock
ASTMC 1660:09)
machinery, hire and of specified
fuel charges, thickness
providing as per manufacturer’s
providing erecting
erecting & & removing
instructions comple
removing independent
independent doub
required
Light
beam of forbeam
100mm quality
concrete
thickcheck
at asand
every per machinery,
approved
1.00mAACC/C block hire
quality
with
and
:100mm fuelthick
plan.
supplying
charges,
and Masonary:
fixing 2 nos. 10 mm dia Tor bars and
doub
band /
Providing
incidental
Mode
Patli
of and
charges
Measurement:
and
constructing all
etc., all
As
other
100mm
required
per IS
incidental
thick charges
as perlight
1200
etc., all
weight concrete
specifications, required
drawings block as per
(AAC
and specifications,
block ) masonry
as directed by EIC. The item8and
drawings
as approved, mmas
rates dia
blocks
shalllinks
directed atbg
confo
hold
20
for Grade,
work atrequired
all Levels formwork
, lead, complete with raking
lifts,Heights,Depths, out joints,
basements, curing, doing
trenches pits, independent
tunnels, service double
shafts legged
etc .Itemscaffolding
rate shal
bed jointing
heights,
heights, lead,
depthsmortar and (confirming
lifts,Heights,Depths,
leads as to basements,
ASTMC 1660:09) of entire
trenches specified thickness
pits, satisfaction.
tunnels, service as per manufacturer’s
shafts etc .Item rateinstructions
ofshall
the also comple
iteminclude wilt
required
Light
beam of for quality
weight
100mm concrete
thickcheck
at as directed
block
every per1.00mAACby
approved
C/C
the
block EIC
quality
with
to plan.
:250mmhis
supplying thick
and Masonary:
fixing 2 nos.
(RCC
10 mm
Patli
dia
beam
Tor
is part
bars and 8 mm dia
and
links at
check
Providing
Item as
rate per
shallapproved
and constructing
include quality
cost 250mmplan.
of complete thick light
allISmaterials, weight concrete
miscellaneous block (AAC block )masonry as of
consumables,labors,tranportation approved
material blocks confo
to all requir
Mode
20
Mode of
Grade,
of Measurement:
required
Measurement: As
formwork
As per
per IS 1200
1200 with raking out joints, curing, doing independent double legged scaffolding
using
means thin bed jointing
,Curing , and
tools, mortar
plant (confirming to ASTMC 1660:09) of specified thickness as&per manufacturer’s instructio
heights,
Hollow
out joints, depths
Concrete
curing, leads
block
doing as:and
100mm
independent
machinery,
directed by thehire
thick
double EIC and
to
Masonary:
legged
fuel
his charges,
entire
scaffolding etc.
providing
satisfaction.(RCC erecting
Patli beam
specification
removing
atisall
part ofindependent
the item
locations; anddoub
heights, will
dep
band /
Providing Patli
Item rate shall beam and
and constructing all other
include cost 100mm incidental charges
thick Hollow
of all materials, etc., all required as per specifications,
concrete consumables,labors,tranportation
miscellaneous block masonry as approved blocksofconforming drawings and as directed
material totoallISrequir2185 b
the
for EIC.
work
mortar at all
(confirming
means ,Curing Levels , lead,
to plant
, tools, ASTMC lifts,Heights,Depths,
and1660:09)
machinery,of specified basements,
hire andthickness trenches
fuel charges, pits,
as perproviding tunnels,
manufacturer’s service
erectinginstructions,shafts etc
& removingincluding .Item
independent rate
raking shal
doubou
Item ratefor
required shall include
quality checkcostasofperallapproved
materials,quality
miscellaneous
plan. consumables,labors,tranportation of material to all requi
double
band
meansof/ legged
Patli
,Curing beamscaffolding
and all
, tools, plant as
otherper specifications
incidental
andISmachinery, chargesetc. at all
etc., heights,
all required depths
as per and leads as
specifications,directed by
drawings
hire and fuel charges, providing erecting & removing independent doub the
and EICas to his entir
directed b
Mode
Item rateatMeasurement:
shall include As per
cost 1200
of all materials, miscellaneous consumables,labors,tranportation of material torate
all requi
for work
incidental all
chargesLevels , lead,
etc.,plant lifts,Heights,Depths,
all required basements,
as per specifications, trenches pits, tunnels, service shafts etc .Item shal
means ,Curing
required for quality, tools,check asand permachinery, hire and
approved quality fuel drawings
plan.
and as directed
charges, providing erecting by &EIC. The itemindependent
removing rates shall hold doubg
heights,
band
Mode/of lead,
Patli lifts,Heights,Depths,
beam and allAsother
Measurement: basements,
per ISincidental
1200 trenches
charges 132 etc., all required as per specifications, drawings and as directed bt
pits, tunnels, service shafts etc .Item rate shall also include
check as per approved quality plan.
for work at all Levels , lead, lifts,Heights,Depths, basements, trenches pits, tunnels, service shafts etc .Item rate shal
Mode
required of Measurement:
for quality check Asasper perISapproved
1200 quality plan.
100 mm Thick brick work :
Providing and contructing 100mm thick brick masonary with locally available first quality bricks having minimum cru
maximum water absorption 20% (as per local grade 1st quality brick) in cement mortar CM 1:4 (1 cement :4 sand) m
Plastering
compound asWorks :
per manufacturers instructions in specified courses of approved bond and including providing RCC pat
C/C distance with supplying and fixing 2 nos 10mm tor bars with 8 mm dia links at spacing of 300 C/C in cement con
formwork
20 mm Thick complete plasterwith: raking out joints, curing, doing independent double legged scaffolding as per specifications
Providing
as directedand by Applying
the EIC tominimum his entire20 mm thick double
satisfaction. (RCC Patli coatbeam cement sand
is part ofplaster;
the itemfirst andcoat will to
notbebe12paid
mmseparately)."
thick cemen
cement
Item rate : 4shall
sand)include
including costadding 2% by weight
of all materials, of cement consumables,labors,tranportation
miscellaneous approved waterproofing compound, of second
materialcoat torequi
to all be 8
12
meansmm,Curing
Thick,compound
waterproofing plaster
tools, plant: 2% andbymachinery,
weight of cement, hire and finished
fuel sand face
charges, or as required
providing erecting to
& receive
removing specified
independent architectur
doub
Providing and Applying 12mm thick plaster in cement mortar mix ratio of 1:4 (1 cement : 4 sand), to internal surface
plumb
band / and
including Patli level
rakingbeam to and
out external facesincidental
all other
joints, hacking ofconcrete
walls, charges
soffits / ceiling
surfaces etc.,
andallifapplying
any, including
required as per racking
approved out junctions
specifications,
chemical drawings
bonding of masonry
agent andflexicrete and or
as directed conc b
ap
non:
for shrinking
work
Anitermite at all compound
Levels
Treatment , lead, and grouted with
lifts,Heights,Depths,
Works : square cut
basements,stone at junction
trenches then
pits,
dash coat plaster curing for 3 days for creating a bond, prepare junction of concrete / masonry by neat cleaning, poi providing
tunnels, service200 mm
shafts wide
etc 20
.Item gauge
rate GI
shalch
junctions
required
Anitermite
mortar and of grouting
for concrete
quality
Treatment andbelow
check
with masonry workaggregate
as per approved
square subgrade
crush fixed by drilling
quality plan. and
further GI nails,
providing andscrews,
fixing hacking
20 gaugeclosely concrete
GI chicken meshsurfaces,
200 mmapp wi
flexicrete
Mode of
supplying,
masonry or approved
Measurement:
mixing
fixed by Work and equivalent
As
injecting per IS to
1200
chemical concrete
emulsion surfaces
of and then
Chlorophripos apply a scratch
emulsifiable
drilling,: nailing with GI screws/nails, doing jambs, sills, grooves, pattas, wattas, rounding of coat plaster
concentrate cure
20% it for
with three
1% days,
cornerin
concentr
Miscellaneous
scaffolding etc. Item also include plastering to precast concrete window
anti:termite
architectural treatment
drawings, and creating
specifications a continuous
finishedtochemical barrier undersills,
and RCC cornices
all etc.;
around the(where
raft, andspecified
junction of by EIC);
wall and
moulds,
of doing
retaining curing, cleaning,
wall/ramo walls/other alland
etc.walls, complete
barriers,
smooth
thesurface
top
with
approval of
wooden
of
plinth
rundha
the filling,
EIC. (tojunction
External at surfaces,
all
of
leads
wall and
lifts, ducts
chajjas,
floor,
doing
along &inde
the sh
ex
cleaning of surfaces, curing, etc. complete as per specification and to the approval of the EIC.
Item
Rubble
item rate
expansion shall
Soling
joints
rate shall include
Works
over
include cost
the of
with
top
cost thick all materials,
rubbles
surface
of all dry of
materials, from miscellaneous
outside
consolidated
miscellaneous :
earth consumables,
on which
consumables, labors
apron is
labors to,providing
be laid,
,providing erecting
surrounding
erectingwith & removing
of pipes
& removing indep
and
indepco
Providing
part II .The&,raking
scaffolding Laying
contractor 230mm
out joints,
to submit hacking
the 10rubble
yearssoling
concrete with rubbles
surfaces,
guarantee prepare
in brought
junction
the approved from
of
format outside,
concrete
towards //voids
thisfilled
masonry workby neat
prior 80tomm down
cleaning,
release po
o
scaffolding
murrum ,raking
,including out joints, hacking concrete surfaces, prepare junction of concrete masonry by neat cleaning, po
mortarofand
Mode groutingcompaction
Measurement with : square
Plinth with
areacrushmechanical
of aggregate
building vibratory
further
shall be ,compactor
providing
measured for complete
and fixing 20
payment. to gauge
correctGIgrade as per
chicken mesh drawing
/ PVC & to
chic
mortar
Rubble
of and
concreteSoling grouting Workswith with square crush
rubbles aggregate
within site further , providing and
: screws/nails, fixing 20&gauge GI chicken mesh / PVC bond
chic
Providing
of concrete & andLaying
and
masonry
230mm
masonry
fixed
thickby
fixed bydry
drilling,
rubblenailing
drilling, solingwith
nailing withGI
with rubbles
GI (free ofproviding
screws/nails, cost) available
providing
applying
& applyingwithinapproved
site premises,
approved
chemical
chemicalvoids fill
bond
equivalent
chips , murrum
equivalent ,, doing
doing jambs,
jambs, sills,
,including grooves,
compaction
sills, grooves,with pattas,
pattas, wattas,
wattas, rounding
mechanical vibratoryof
rounding corners,
corners, etc.
compactor
of all
all complete
complete
etc. to correct
complete as
as per
grade
per architectural
as per drawin
architectural dra
dra
all
LDPE
all Levels
Levels ,depths,
Sheet
,depths, works heights,
: lead,
heights, lead, lifts,
lifts, basements,
basements, trenches
trenches pits, tunnels, service shafts etc,
etc, complete as
as per instructio
Providing
testing and laying
charges requireda vapourfor barrier
quality usingasLDPE
check per film
approvedof 500pits,
quality
tunnels,
micron thickservice
plan. over the shafts
finished complete
compact earth perfilling.
instructio
The
testing
the charges
extent required
of 100mm andAsthen for quality check as per approved quality plan.
Mode of Measurement: per the sand is spread over. The overlap joints shall be properly jointed either by heat se
IS 1200.
Mode
Providing
The rateof Measurement:
shall & fixing
include of
the As per of
Thermocole
cost IS LDPE
1200 film,
:
Providing & fixing of Thermocole (Density 25Sandkg/m3)layer of 30mm
between thick, consolidation,
concrete surface such as watering etc., complete as dire
foundation,column,beam,sla
all
Rate inclusive of cost of all materials, miscellaneous consumables, labors cleaning surface etc. as all
required locations by approved means , tools, plant and machinery, hire and fuel charges and perother incidental
instruction of E
specifications,
For 25 mm drawings
thickness and as directed by EIC. The item rates shall hold
required locations by approved means , tools, plant and machinery, hire and fuel charges and all other incidental ch good for work at all Levels ,lead, lifts,Heigh
specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels ,lead, lifts,Heigh
For 50 mm thickness

Cement concrete Pedestals :


PEDESTALS FOR ERECTION OF PUMPS AT PUMP ROOM /STP/TERRACE.
Providing
For Cement and laying Controlled
Concrete grade M25concrete from batching plant at site or RMC source from outside , using 10 mm & 2
Reinforced Cement Concrete (RCC) of various grade conveyed to all locations, lifted and placed in position by pumpi
vibrated, consolidated finished evenly and cured. etc. complete including form work.
For
The Cement
Item rateConcrete gradecleaning
shall include M30 with air jet the surfaces of formwork to receive concrete before placing of concr
of adjacent RCC works completed earlier, cost of all materials, miscellaneous consumables, labors, tranportation of
pumping or other approved means, Placing vibrating, compacting, Curing etc. tools, plant and machinery, hire and f
Core
chargesCutting
, grout in RCC
filling :
of tie:rod holes,
Core cutting of specified dia in all typewall:ties holes withelement
of RCC structural approvdasnon:shrinking
per approvedand waterproofing
methodology. Thegrout
Item material
rate shalle
drawings and
consumables, as directed
labors tools, plant and machinery, hire and fuel charges, providing & removing scaffolding/stagingele
by EIC. The item rates shall hold good for work at all Levels , lead, lifts, Heights, Depths,
Core Cutting:
tunnels, etc. 50 mm ,dia an
complete all as per drawings and as directed by EIC. The item rates shall hold good for work at all Levels and all Loca
Designing of concrete mix for different grades of controlled concrete should be done in accordance with latest IS:SP
design) in an approved
Core Cutting: 75 mm dialab and the same should be got approved by EIC, the item rates also includes cost for the sam
testing charges required for quality check as per approved quality plan.
Core
ModeCutting: 100 mm dia
of Measurement : RCC members shall be certified as per theoretical quantity from GFC drawing

Core Cutting: 125 mm dia

Core Cutting: 150 mm dia

Core Cutting: 200 mm dia

133
Core Cutting: 250 mm dia

Core cutting of specified dia in all type of masonry as per approved methodology.
The Item rate shall include cost of all miscellaneous consumables, labors , tools, plant and machinery, hire and fuel c
scaffolding/staging
Core Cutting: 50 mmanddiaall other incidental charges etc. complete all as per drawings and as directed by EIC. The item
Levels and all Location.
Core Cutting: 75 mm dia

Core Cutting: 100 mm dia

Core Cutting: 125 mm dia

Core Cutting: 150 mm dia

Core Cutting: 200 mm dia

Core Cutting: 250 mm dia

Breaking of RCC/PCC Concrete


Breaking of steel reinforcement concrete/plain cement concrete at all levels by mechanical / manual means and dis
yard approved by municipality outside site premises. Expenses on account of debris management / disposal of debr
Masonry
guidelines Breaking :
Breaking ofinmasonry
coveredat vehicles, housekeeping
all levels of /roads
by mechanical andmeans
manual surroundings , providing
and disposal & removing
of same scaffolding/staging
to authorized disposal yard ap
rate.
premises. Expenses on account of debris management / disposal of debris as per municipal corporation guidelines in
Note: Ratein
Chasing shall
RCC be :inclusive of cutting, removing & stacking of reinforcement steel within site premises as per direc
roads and
Chasing in surroundings
all type of RCC, providing
structural&element
removing scaffolding/staging
upto etc.approved
50 mm depth as per shall alsomethodology.
be included in item rate.
The Item rate shall include cost of all miscellaneous consumables, labors , tools, plant and machinery, hire and fuel c
scaffolding/staging and all other incidental charges etc. complete all as per drawings and as directed by EIC. The item
Levels and all Location.

Chasing in Masonry :
Chasing in all type of masonry wall upto 75 mm depth as per approved methodology.
The Item rate shall include cost of all miscellaneous consumables, labors , tools, plant and machinery, hire and fuel c
Cutting of RCC with
scaffolding/staging Diamond
and all cuttingcharges
other incidental Saw: etc. complete all as per drawings and as directed by EIC. The item
Item shall include all activities required for Cutting of concrete RCC works with Diamond Cutting Saw with Machine
Levels andasallper
locations Location.
the approved methodology and instructions of Engineer:in:charge (EIC) including all tools, tackles, m
staging / supporting to adjacent structure , any consumables, etc. complete. The item rate shall include Lowering ,L
out side site premises etc. complete as per instructions of Engineer in charge (EIC).
Mode of Measurement: Cross sectional area of cutting member shall be measured for payment.

Micro Concrete M40 Grade (For sleeves/cutouts filling in slab/wall) :


Providing and laying Micro Concrete of approved make as approved by EIC, conveyed to all locations, all lifts, levels
means, consolidated finished evenly and cured. etc.complete Rate shall include cleaning with air jet, before starting
VDF Flooring
formwork Uptoconcrete,
to receive 125mm dewatering
thick - M20 Concrete
wherever Gradeincluding cost of all materials, labours all lead and lift
necessary
and fuel charges, formwork, scafolding/stagging and all other incidental charges etc., all as per specifications, drawi
as directed by EIC.

134
Providing Non reinforced cement hard vacuum dewatered concrete flooring consisting of the following:
Providing, supplying and laying, finishing M20 grade batch mixed controlled concrete with PP fibres at 0.900 Kg @cu
dewatered flooring of upto 125 mm thk including cleaning, trimming, watering the surface, laying in strips to require
smoothening, curing etc. making 15mm x 10mm expansion/ control joints at intervals, sealing the joints with polyur
complete to the required slope, formation, finish. Cost to include working at all levels, necessary pumping to require
per drawings, providing serrated finish for the ramps including VD operation onsisting of providing side shuttering w
required levels,finishing with required texture (BROOM FINISH ( SAMPLE TO BE APPORVED BY EIC)), Vibrating the co
de:watering using vacuum pumps by suction method and finishing the top surface to required level and grade using
Covering the finished concrete surface with 200 micron thick polythene sheet and cutting grooves of size 6 mm x 10
grooves with Sealant with curing etc. complete at all levels, heights and locations, etc. as directed and to the satisfac

Supply & Applying Con quail integral color , Con Seal integral , Con Charcoal integral color including Labour charges f
material in concrete at batching plant with Labour charges for laying of colour concrete of irregular pattern on slopi
coating. including Supply & Applying of CCE Sealer coating.
Item rate inclusive of all materials, miscellaneous consumables, labours ,transportation of material to all required lo
plant and machinery, hire and fuel charges and all other incidental charges etc., all required as per specifications, dr
item rates shall hold good for work at all Levels, lead, lifts, Heights, Depths etc.

Supplying and Laying Stamped Concrete


Concrete: Supplying and laying M25 Controlled concrete of thickness 100mm or as specified in drawing from batchi
mm downgraded aggregates of various grade conveyed to all locations,lifted and placed in position by pumping or o
consolidated finished evenly and cured. etc. complete (excluding reinforcement steel, Mesh, Insert Plates)
For Stamped Concrete: Supplying and applying and finishing the top surface in accordance with sprinkling of colour
kg/sqmt.Floating the surface application of release agent,stamping the concrete with stamping tools,cleaning the s
application ofacrylic based sealer for finishing.The workshall be done in accordance and approval of EIC to his satisfa
The Item rate shall include cleaning with air jet the surfaces of formwork to receive concrete before placing of concr
of adjacent RCC works completed earlier, cost of all materials, miscellaneous consumables, labors, tranportation of
pumping or other approved means, Placing vibrating, compacting, Curing etc. tools, plant and machinery, hire and f
charges , grout filling of tie:rod holes, wall:ties holes with approvd
non:shrinking and waterproofing grout material etc. complete all as per specifications, drawings and as directed by
for work at all Levels , lead, lifts, Heights, Depths, elevations, basements, trenches, pits, tunnels, etc. Designing of co
controlled concrete should be done in accordance with latest IS:SP:23 (Hand book on concrete mix design) in an app
got approved by EIC, the item rates also includes cost for the same. Item rate shall also include testing charges requ
approved quality plan. Mode of Measurement : RCC members shall be certified as per theoretical quantity from GFC

Sub Total A

Part B

Civil Work : MEP Services

Structural Steel : Shaft /Service Platform

Structural Steel :
Supplying, fabricating, delivering at site, hoisting and fixing in position at all heights and all levels and making all stru
the design drawings prepared by the consultants. The structural steel work shall include welded and built up section
welded and built up sections, trusses, built:up purlins, frame work welded and/or bolted, girders, gusset plates, bas
The Item rate shall include providing all materials required
135 such as Structural steel (Confirming to IS: 226 & 2062 ),
consumables ,scaffolding, Cost of Labour, machines / equipment / tools / tackles / vehicles for all transportation, Ha
the stocking yard, shifting the same to Fabrication yard, shifting from Fabrication yard to all required locations, heig
MS Railing in Shaft :
Providing and fixing railing as per approved drawing and to the satisfaction of EIC.
Rate inclusive of cost of all materials, miscellaneous consumables, labors ,transportation of material to all required l
Heavy
plant duty
and rungs :hire and fuel charges and all other incidental charges etc., all required as per specifications, dr
machinery,
Providing and fixing Heavy duty rungs in R.C.C. wall of water tanks etc. Including cutting, chasing the R.C.C. work a
item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc
as required.
Pl enclose
Storm
Load standard
water
carrying (PHE) drawing100KG
capcity:Upto or give matl description

Drain Channel:
Constructing cast in site R.C.C gutter / drain along the driveway/ courtyards including excavation, concrete ,shutterin
plaster
450mmcoat
Wide,as per drawiing and approval of EIC
Rate inclusive of cost of all materials, miscellaneous consumables, dewatering labors ,transportation of material to a
means , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required as per sp
600EIC.
by mmTheWide
item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc

900 mm Wide

FRP Drain Cover for Fire Tender Path:


Design, Supply & Placing of Drain Covers of width as below with FRP drain cover Perforated & supporting members.
design
450mmrequirements
Wide
1. Loading to be considered for design:
a. Fire‐tender path ‐ As per EN‐124 (D:400)
600
2. mm Wide
Vendor shall get all the design, drawings and calculation of FRP, certified by IIT:B or equivalent authority.
3. 40 Ton certification necessary from competent Lab.
The
900 rates
mm Wideare inclusive of labour, equipment, machinery, steel double:legged scaffolding for required heights, forwa
loading, unloading, Mathadi, Warai charges, shifting of material, safe keeping, maintaining inventory, safety & secu
location for carrying out works at all levels, depth, height,etc complete, including submission of technical proposal,
instructions by EIC.
Construction The work
of Sump should
Pits : be completed in all respects complete to the satisfaction of EIC
Constructing cast in site sump pit of size 2.5mX2mX2m including excavation, concrete ,shuttering with a waterproo
approval of EIC
Grease Trapof
Rate inclusive : cost of all materials, miscellaneous consumables, dewatering labors ,transportation of material to a
Constructing Grease Trap of size as per drawing in brick work of class 75 with cement mortar (1:6), inside plastering
means
1:3 with, tools,
floatingplant
coatand machinery,
ofneat cementhireandand fuelplaster
rough charges
onand all other
outside. incidental
Including chargesbucket
aluminium etc., allasrequired asto
per detail percolle
sp
by EIC.
Puddle The item
Flange rates
& shall
Sleeve, hold good
Manhole for work
Cover at
& all Levels
Steps / ,lead,
Rungs lifts,Heights,Depths
(PHE) etc
nos. 600 x 600 mm dia CI medium duty, double seal manhole covers with frame (weight of covers & weight of fram
Manhole item is paid separately under releavnt item
foundation concrete (1:2:4).
Size of grease
Puddle Flangetrap 1.8mX0.9m X upto 1.5m
Manhole
Hot item is paid separately
Dip Galvanised under with
Pipe Sleeves releavnt item Flange:
Puddle
Supply and fixing of
25mm dia ( Screwed ends) M.S. hot dip galvanized pipe sleeves/Puddle flange (600 to 1000 mm long) of heavy class with
washers etc. Including cutting the M.S. plates, steel bars & welding MS pipe sleeve to MS plate from both sides, t
galvanized after fabrication complete as required. For following dia.
32mm dia ( Screwed ends)

40 mm dia : 8mm thick puddle flange & 12mm MS flange

50 mm dia : 8mm thick puddle flange & 12mm MS flange

65 mm dia : 8mm thick puddle flange & 12mm MS flange

80 mm Flange On Outside

100 mm Flange On Outside

136
150 mm Flange on Outside

200 mm Flange On Outside

250 mm dia : 8mm thick puddle flange & 16mm MS flange

Blank Flanges & Sleeves :


Supply and fixing of M.S. Blank Flanges & Sleeves (600 to 1000 mm long) of heavy class with one side M.S. flanges
cutting the M.S. plates,
Blank Flanges:40mm diasteel bars & welding MS pipe sleeve to MS plate from both sides, complete as required dr

Blank Flanges:50mm dia

Blank Flanges:65mm dia

Blank Flanges:80mm dia

Blank Flanges:100mm dia

Blank Flanges:150mm dia

Blank Flanges:200mm dia

Blank Flanges:250mm dia

Blank Flanges:300mm dia

MS pipe sleeve:200 mm dia.

MS pipe sleeve:150mm dia.

MS pipe sleeve:100 mm dia.

UPVC Sleeves :
Supply & fixing of PVC/UPVC sleeves of medium class for following Dia.
UPVC Sleeve :32mm dia

UPVC Sleeve :50mm dia

UPVC Sleeve :75mm dia

UPVC Sleeve :100mm dia

UPVC Sleeve :125mm dia

137
UPVC Sleeve :150mm dia

UPVC Sleeve :200mm dia

G.I. vent 600 to 1000 mm :


Providing and fixing in position G.I. vent 600 to 1000 mm with brass mosquito proof coupling and air filter including
The entire
80 mm dia fitting shall be hot dip galvanized.

100 mm dia

Plastic manhole step/foot rest :


Installation of plastic manhole step/foot rest of 900 mm length (@ 300 mm c/C) with polypropylene compound inje
(Fe:415) steel reinforcing bar. Provision of the foot rest is envisaged in various tanks/ components of the STP for the
Manhole covers

Sump Pits :Providing and fixing 900mm x 900 mm DI (heavy duty) cover with frame (as per EN:124) with lockable a
(Total WT of cover and frame to be not less than 85 kg).
UGT :Providing and fixing 900mm x 1200 mm DI (heavy duty) cover with frame (as per EN:124) with lockable arrang
WT of cover and frame to be not less than 85 kg).
Terrace Tanks :Providing and fixing 600 mm dia FRP (heavy duty) water tank circular cover with frame (as per EN:12
complete in all regards.
Grease Trap :Providing and fixing 600mm x 600 mm DI (heavy duty) cover with frame (as per EN:124) with lockable
(Total WT of cover and frame to be not less than 85 kg).
Providing MS pipe sleeve :
Providing Mild Steel (MS) ‘C’ class pipes as SLEEVES each to be embedded in RCC walls / beams. And any other RCC
by
DiaEIC
50mm

Dia 65mm

Dia 80mm

Electrical PVC Conduit works


PVC PIPE WORK
Supply,
Supply, Installation,
Installation, Testing
Testing &
& commissioning
commissioning of
of HMS FR Boxes
GI Back PVC conduits
of belowwith all necessary
mentioned sizes & required accessories i.e.
outlet boxes (1.6mm) with cover plates of approved make, etc.
25mm dia. HMS PVC conduit with wall thickness of 2 mm.
2 Module conduit supporting structural members including spacers, clamps etc, bushes and other fittings as well as
Conduits,
Shop drawing preparation and its approval from MEP consultant in Contractor's scope.
Approved
3 Module Make : Precision/BEC/ AKG

4 Module

Sub Total B

Part C

138
Waterproofing Works

Notes: All measurements shall be as per IS: 1200 unless otherwise specified

Preliminaries (All Unit rates shall be inclusive of following Preliminaries)

Preliminary Setting Out & Survey works

Site Infrastructure Facilities

Space as available within the site for setting up of site office and all other temporary site facilities except for labour accommod

Office Furniture & Equipment viz.Furniture,computers, and cupboards , other office related materials.

Labour Facilities

Drinking Water, Site Sanitation (Washing + Toilets), Drainage Facilities, Labour accommodation outside project site, Labour tra

Mobilisation & Establishment of machineries

Transportation including all applicable taxes for machineries & erection work.

Insurance

Insurance Policies such as ,Contractor’s all risk (CAR ) Policy, Workmen Compensation, Group personnel accident, Automobile

Electricity-connection, Electricity & Water Distribution system

Safety & QA/QC Expenses

Safety Installations like nets, Safety Barrication, Provision of Ambulance with Driver, First Aid facilities, QA/QC Lab facilities alo
etc. providing necessary PPE for Contractors Staff, Labour ,Client, Engineer and consultants appointed by the Client, Safety Ma
Labour Mobilization & Demobilization activity

All scaffolding, ladders, platforms, staging, cranage and plant & equipment required in the execution of work to any height an
required for the works including dewatering.
Water proofing Contractor shall visit the Site & understand the scope of work from EIC prior submitting Techno commercial off
completing work . Work will be measured and paid as per items mention in this BOQ for water proofing work , other items /sc
per methodology submitted by water proofing contractor during Tender stage but not mention in this BOQ will not be measur
For all liquid
provide applied
10 years membrane
Guarantee on stampsystem,
paper Preponding
(In approvedto be carried
format out for
by Engineer In minimum
charge) for24
all hours to ascertain
water proofing workthe quality
included in
waterproofing system, a ponding to be done for at least 48 hours to ascertain watertightness of the system.
Waterproofing Works

139
W/P membrane system-Basement Positive Side Waterproofing Horizontal Surface Below Raft Slab
Supplying and installing waterproofing treatment by using 1.2mm thick fully bonded Preapplied HDPE sheet memb
Slab/footing/as shown in drawing. Membrane shall be installed in strict accordance with the manufacturer’s instruc
bond to resist water migration. The fully bonded HDPE sheet membrane shall consist of a multi layer composite film
HDPE film, self adhesive polymer layer and trafficable. The fully bonded HDPE membrane is loosely-laid on the PCC
Footings/Stitch Slab/as shown in drawings or wherever applicable etc.
The fully bonded Preapplied HDPE sheet waterproofing membrane shall have following typical properties :
1) Elongation > Minimum 75%.
2) Peel adhesion to concrete: > 880N/m (ASTM D 903 Modified)
3) Puncture Resistance: 800N +/- 5 % (as per ASTM E154)
4) Resist hydrostatic pressure of over 60m head of water as per ASTM D5385
Side overlaps shall be a minimum of 75 mm on the selvedge and end overlaps of minimum 75 mm.
The item rate shall include base preparation which include wire-brushing the Concrete/Masonry surface & cleaning
cracks, honeycombs on the RCC members as per manufactures specification and approved methodology. Item rate
miscellaneous consumables,labors,tranportation of material to all required locations by approved means ,Curing , to
fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by EIC.
work at all Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guara
stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include
check as per approved quality plan.
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.

140
Waterproofing Works For Retaining Wall - Positive Side - Self Adhesive Membrane - Unconfined ar
Supplying and Installing self adhesive, SBS Membrane, cold applied , flexible minimum 1.5mm thick waterproofing m
laminated HDPE film, applied on the external surface of the retaining wall post construction and after deshuttering i
The Self Adhesive waterproofing membrane shall have following typical properties :
1) Elongation > 200 %
2) Puncture resistance > 220N
3) Tensile Strength = 4 N/mm, 42N/mm2 /48 N/mm2 for film
4) Resistance to Hydrostatic pressure = > 60 m
5) Tear Resistance = 23 N/mm for system, 340/310 N/mm for film. Waterproofing with Styrene Butadiene Styrene (S
membrane (Positive side):
I. Surface Preparation:
Cleaning and wire-brushing and mechanical grinding to achieve Concrete Surface Profile 2 ( CSP 2). RCC surface shal
contaminants like dust, oil and grease, All surface imperfections, protrusions, structurally unsound and friable concr
joints, cracks, honeycombs, on the RCC surface by injection grouting with non-shrink cementitious grout/Epoxy gro
sleeves, tie rod holes, cut-outs shall be treated with non-shrink cementitious high strength grout material.
II. Water Proofing Application:
Apply the Primer on clean RCC surface by brush or roller. Allow the primer to dry prior to the application of the mem
Styrene Butadiene Styrene (SBS) modified waterproofing membrane to be apply on clean RCC primer surface. Press
top of the applied membrane to ensure a proper and strong adhesion of the bitumen compound with the base surfa
minimum of 75 mm on the selvedge and end overlaps 100 mm. The finished surface should be left exposed for 48 h
manufactures after which further build up works can be carried out.
III. Protection:
The Membrane shall be protected with HDPE Dimpled drain board with 6 to 8 mm thick and composed of high den
to a non-woven geotextile of calendared polypropylene of 120 g/m2. Nodule height is generally 7.3 ± 0.2 mm and m
250 KN/m2 when tested as per ISO 604 OR ASTM D 695 ( Specimen dimensions as per clause 6.7.2), over the water
surface, stuck to the membrane by spot bonding method, using synthetic adhesive with butt joints etc. complete, to
damage. due to ongoing site activities or from sharp aggregates or boulder during backfilling. In all cases, damage du
monitored closely.
Membrane must be properly terminated as per approved methodology by manufacturer. The termination height sh
The item rate shall include base preparation which include wire-brushing the Concrete/Masonry surface & cleaning
cracks, honeycombs on the RCC members as per manufactures specification and approved methodology . Item rate
miscellaneous consumables, labours, transportation of material to all required locations by approved means ,Curing
and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by
for work at all Levels ,lead, lifts, Heights, Depths, basements, trenches, pits, tunnels, water tanks etc and providing g
stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include
check as per approved quality plan.

Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.

141
Coal Tar Epoxy - RCC Foundation and Substructure
Providing and applying one coat of epoxy primer and two coats of coal tar epoxy paint of minimum dry film thicknes
specifications to all concrete surfaces in contact with the earth in foundation and substructure.
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
honeycombs on the RCC members as per manufactures specification and approved methodology . Item rate also inc
miscellaneous consumables, labours, transportation of material to all required locations by approved means ,Curing
and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directed by
for work at all Levels ,lead, lifts, Heights, Depths, basements, trenches, pits, tunnels, water tanks etc and providing g
paper in approved format for a period of 10 years from date of virtual completion. Item rate shall also include testin
as per approved quality plan.

Mode of Measurement: Actual area covered with coating shall be measured for payment purpose.
Crystalline WP - Lift Pit Area
Providing and applying Alkaline cement based Crystalline Waterproofing System in two-three coats at a Avg. DFT of
vertical walls and floors area
Providing & Laying for protective Screed for horizontal surface in 1:4 mix to proper gradient over the treated area f
& Laying for protective Plaster for vertical in 1:4 mix over the treated area for thickness of 15 mm
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cementitious grout/Epo
manufactures specification and approved methodology. Item rate also include cost of all materials, miscellaneous co
material to all required locations by approved means ,Curing , tools, plant and machinery, hire and fuel charges and
required as per specifications, drawings and as directed by EIC. The item rates shall hold good for work at all Levels
basements, trenches, pits, tunnels, water tanks etc and providing guarantee of water proofing work on stamp paper
10 years from date of virtual completion. Item rate shall also include testing charges required for quality check as pe
Construction jointconsidering
Rate shall be quoted TreatmentanyforofRetaining
the make Wall (300mm
mention in MaketoList
450mm
for allwide)- Swellable
waterproofing itemsWater Bar
for the Project
Providing and laying Hydrophilic swellable Water bar made of Polyurethane/rubber suitable
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.for construction joint o
Drawings. Thickness of water bar to be minimum 20mmX10mm or as per manufacturers' specification
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Mode of Measurement: Unit of measurement shall be running meter of joint length.
Construction Joint Considered for Retaining wall a) Horizontal Joint - At Every Slab level 2 layers & one 300 mm abov
interval of 25m as per site condition or shown in GFC Drawing or as per approved by EIC.

Construction joint Treatment for Tower Raft (1000mm to 1800mm thick)


Providing and laying Hydrophilic swellable Water bar made of Polyurethane/rubber for construction joint on Tower
Thickness of water bar to be minimum 20mmX10mm or as per manufacturers' specification
Mode of Measurement: Unit of measurement shall be running meter of joint length.
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Mode of Measurement: Actual running meter of joint length measure for payment purpose.
Construction Joint Considered for Tower Raft - Maximum four pour considered at tower raft for construction joint tr

142
Treatment of Pressure Release Pipe
Providing ,fixing, treating and sealing pressure release pipe of 40mm Día up to 0.6 meter height GI B class pressure
embedded with PCC layer and extended above raft/foundation/stitch slab up to 150mm above TOC/as shown in dra
PU based liquid membrane applied all around pipe at the HDPF membrane level along with installing hydrophilic sw
200mm height above PCC level round periphery of the pipe .
Providing and applying sealing of pressure release pipe with penetration, Grouting the pressure release pipe with ce
grout, expandable grout additive to full saturation etc. Grouting the pressure release pipes shall be taken up after su
foundation/raft is attained and thereafter the pipe shall cut flush with the top surface of raft and sealed with Polym
Item rate also include cost of all materials, miscellaneous consumables,labors,tranportation of material to all requir
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
directed by EIC. The item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths, basements, trenches
providing guarantee of water proofing work on stamp paper in approved format for a period of 10 years from date o
Podium W/P
also include system
testing withrequired
charges anti root
for quality check as per approved quality plan.
Providing
Upto 1200&mm applying
Lengthpolyurethane/ SBR/ Hybrid Polyurea based elastomeric seamless waterproof membrane in two
1.5 mm. including one coat Primer on the respective areas.
Protection on floor Area: Providing and applying Geotextile fabric of 140 GSM as protection of Horizontal surface.
Providing & laying protective screed and slop making on the treated floor areas in concrete screed M-20 grade for a
minimum thickness of 75mm at end location as per slope of 1:100.
The polyurethane based elastomeric seamless waterproof membrane shall have following typical properties :
1) Elongation > 300 %
2) Tensile Strength > 2 N/mm2
3) Tear Resistance > 12 N/mm
4) Bond Strength to Concrete > 2 N/mm2
UGT/STP/OHWT/RWT
Providing and Applying waterproofing - WP + Epoxy coating for Tank
and slope-making for PodiumFloorLandscape
& Wall area Slab, i.e. for Hardscape / Softscape G
Providing and applying 2K polymer modified cementitious
conforming to latest ASTM Standards, as per the specifications listed below coating with minimumand aselongation
approved by at break of 60% in two
the Engineer-in-cha
mm on the respective
The first part shall consist of : areas. to internal surface of RCC floor and walls of STP, UG tanks, OHT,Trenches, Sumps, etc.
operations :
(i) Surfaces to be treated must be dry or slightly damp, free of tar, oil and free of loose particles by wire-brushing an
(i) Treating
Concrete construction
Surface Profile joints,
2 ( CSPcracks,
2) as per honeycombs
ICRI guidelinein (if any),thebyConcret
injection pressure
surface grouting
& cleaning with
with airnon-shrink
jet. Remove cementi
protru
manufactures specification and approved methodology
edges ,then Initial ponding to be done to identify the leakages/seepages in RCC floors and walls using specialized injection nozzles pl
along the construction joints and porous areas as per manufacturers specification.
(ii) Pressure grouting using 40 psi injection grout pump with cement slurry mixed with non shrink admixture at all le Any pipes & Pipe Cutout, sleeves
shrink cementitious
(iii) Treatment to thehigh strength grout
construction joints,material
shoe joints and changes of directions including making 'V' groove at the joi
(ii) Preparing Vatta of 50-75mm
(iv) Laying Seamless Elastomeric Membrane to be done atWaterproofing
all junction of Systemvertical and horizontal
applied by Trowel surface with polymer
/brushing / spraying modified
as per M 1
bonding agent at the rate of 3 ltr. per bag cement.
Coat of Primer Coat if recommended by manufacturer & 2 or more Coat s of Water Proofing Coat s ).
(iii) Providing and applying
(v) Waterproofing Membrane surface appliedtoApproved
application be done on Make 2K polymer
horizontal modifiedareas,
and vertical cementitious coating or anyrecomm
as per Manufacturer's other
manufacturers’ specification and as approved
Engineer-in-charge.The membrane shall be terminated at 300 mm from FFL by the engineer-in-charge .
Waterproofing
(iv) Providing
(vi)Water andof
ponding Wet
applying
test forAreas
15-20 with
minimum mm72 sunken
thick
hours todetails
waterproof
check the forquality
Balcony/Deck
protective plaster & Screed area/Kitchen/Toilet
for wall & floor area Area in 1:4 (1 cem
Providing
waterproofing & Applying
admixture Acrylic Polymer
as per based flexible
manufacturer's cementitious
specification, overbased waterproofing
the waterproof treatment
coating on RCC or PU Coating
surface, curing,ha c
60%in
(v) two
Application to three
of twocoats
The Second Part shall consist of: at
coats aofDFT
Epoxyof 1 to 1.5
coating mm
with to Sunken
including area
one at
coatChajja/Balcony/
of primer as Deck
per area /Kitchen/toilet
manufacturers specificationarea o
with the
instruction following
of EIC. sequence
the cured of
filmoperations
is resistance to corrosion, chemical attack
Protective Coat Providing and laying Geotextile fabric (140GSM) over Water Proofing Coated surface as per Manufa and abrasion and is suitable for applicati
treatment
I) Surfaceby
instructed works, breweries, dairies, meat
Preparation:
the Engineer-in-charge and food
The second partprocessing
shall consist plants. the cured
of providing film
and is non-toxic
applying average and100meets mmthe req
thick.
Cleaning
screed in gradient of 1:100 with minimum thickness at the drain point of 75 mm. The concrete shall be admixed wits
2 coats ofand
Coalwire-brushing
Tar Epoxy willandbe mechanical
applied. grinding to achieve Concrete Surface Profile 2 (CSP 2) The RCC surface
contaminants
(vi)
at theWheredosage theoflike dust,
protection
100 ml oil isand
- 200 grease,of
provided
ml/bag byAll surface
direct
cement, imperfections,
epoxy coating over
compaction, protrusions,
the WP
finishing structurally
membrane,
surface unsound
suitably,contractor
curing, and friable
must
cleaning, make aconcr
testing moc
etc.
perfectly
adhesion clean.
of the etc.
epoxy coating
commendations as directed by the Engineer. over WP membrane. There shall not be any delamination between WP membrane an
The item rate shall
third part grouting
II) Pressure include
shall consist ofofbase preparation
( In case of Main
construction which
joints include
Waterproofing
and honeydoers wire-brushing
combed not have and mechanical grinding
antiroot properties)
concrete: to achieve Concre
Concrete
Pressure
Application surface
Grouting &iscleaning
of Anti-Root to with
doneBarrier ensure air that
system jet as
, all
treating
voids,
per all construction
cracks,
manufacturer's construction joints,joints,
specifications cracks, honeycombs,
cracks,
(Approved Makes by
honeycombs injection
which /any pressure
weak
includes spot
cleani(
cementitious
are grout/Epoxy
filled up completely
manufacturer’s grout on
with non-shrink
specifications the
approved by RCC members
cementitious
EIC. as per manufactures specification and approved
grout/Epoxy grout as manufactures specification and approve methodology
treated
The itemwith
Opening up
rate non-shrink
all cracks
shall in V
include cementitious
shape groove
base preparation high
andstrength
cleaning grout
which includeof dust,aswire-brushing
per
dirt,approved methodology.
loose particle
the etc shall be removed
Concrete/Masonry surface& cracks shall
& cleaning
Item
mortar. rate
joints, cracks, also include
Holes honeycombs cost
to shall be drilled of all
on the materials,
along
RCCthe miscellaneous
crack length
members as perusing consumables,labors,tranportation
pneumaticspecification
manufactures drilling machine of material
at distance
and approved to all requir
of 300mm
methodology. c/c. t
means
depend
Item rate ,Curing
onalso ,width
tools,and
theinclude plant ofand
costlength all machinery,
of crack. the
materials, hire andshall
holes
miscellaneous fuel be charges
cleaned
consumables,andbyallairother incidental
to remove
labours, any charges
dust etc.
transportation ofetc., all required
by blowing
material a
airreq
to all blo
directed
fixed
meansin,Curing by EIC.
these holes The
, tools, item rates
& Pressure shall
plant andinjection hold
machinery, good
Grouting for
hire and work
with fuel at all
non-shrink Levels
charges and ,lead,
cementitiouslifts,Heights,Depths,
grout/Epoxy
all other incidental basements,
groutetc.,
charges injected trenches
througha
all required
providing
After
directed all the
byguarantee
holes
EIC. The ofcompleted,
areitem water
ratesproofing
shallthehold work
grout
goodisonallowed
stamp
for workpaper
toatset inLevels
allfor approved
,lead,format
24 hours and
lifts,the for a period
next
Heights, day of 10
nozzles
Depths, years
are
basements, from
removed date
ando
trenche
also include
providing
III) Preparing testing
guarantee
Vatta: charges required for quality check as per approved quality plan.
of water proofing work on stamp paper in approved format for a period of 10 years from date o
Rate
preparingshall be
also include quoted
testing
vatta considering
charges
of 50-75mm to beany
required done of the
for allmake
quality
at mention
check
junctions as
ofper inapproved
Make List
horizontal for
andquality all plan.
vertical waterproofing items formodified
surface with polymer the Project 1:4
Mode
Rate shall
liters of Measurement:
of SBR beorquoted Actual
Acrylicconsidering area
polymer emulsion covered
any of the for
make
( min water
30%mention proofing shall
in Makeper
solids content) be measured
Listbagforofallcement. for payment purpose.
waterproofing items for the Project
Mode
IV) of Measurement:
Treatment Actual area Packing:
to Pipe Cutouts/Bore covered for water proofing shall be measured for payment purpose.
Annular Space left around pipe cutouts/bore packing in floor and walls shall be grouted by using non-shrink cementi
system as per manufacturer's recommendation.
V) Water Proofing Application & Protection:143
Providing and laying two Coat s of highly flexible two components of polymer based waterproofing treatment as per
24 hrs. of drying waterproof membrane Coating is to be protected with 25 mm thick cement mortar screed for horiz
Protective Screed
Providing and applying protective Screed of Average 20 mm thickness in cement mortar 1:1.5:3 on treated water pr
admixed with integral waterproofing compound at the dosage of 100 ml/bag of cement, compaction, finishing surfa
etc.complete all as per manufacturer's recommendations as directed by the Engineer. This item shall be payable on
Item rate also include cost of all materials,miscellaneous consumables,labors,tranportation of material to all require
means ,Curing , tools, plant and
machinery, hire and fuel charges and all other incidental charges etc., all required as per specifications, drawings an
shall hold good for
work at all Levels ,lead,lifts,Heights,Depths, etc and providing guarantee of water proofing work on stamp paper in a
years from date of virtual completion. Item rate shall also include testing charges required for quality check as per a
be installed as per manufacturer's recommendations, and as directed by Engineer in-charge. Original Material Test C
submitted with the delivery of materials on site.
Cement Plaster with integral water proofing compound
Providing and Applying average 12 mm thick single Coat cement sand plaster of mix ratio 1:4 (1 cement : 4 sand) in
cement approved waterproofing compound, finished smooth finish or as required to receive specified finish to cor
structure (As directed by EIC) ,etc. all complete to the approval of the EIC.
The item rate shall include base preparation which include wire-brushing the Concrete/Masonary surface & cleaning
construction joints, cracks, honeycombs, pipes, sleeves, cutouts on the RCC members as per approved methodology
materials, miscellaneous consumables,labors,tranportation of material to all required locations by approved means
hire and fuel charges and all other incidental charges etc., all required as per specifications, drawings and as directe
good for work at all Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and provid
work on stamp paper in approved format for a period of 10 years from date of virtual completion. Item rate shall als
for quality check as per approved quality plan.
Mode of Measurement: As per IS 1200.

Brick Bat Coba filling at Balcony/Deck area/Kitchen/Toilet Area/Terrace - Sunk area


Providing and filing brickbats in sunken portion of Balcony/Deck area/Kitchen/Toilet Area or any other location as sp
proper slope in cement mortar 1:5 up to required thickness including finishing of top layer with water proof (Waterp
approved quality and dosage as recommended by the manufacturer) cement sand mortar (1:4) for receiving further
drawing.
Item rate shall include cost of all materials, miscellaneous consumables,labors,tranportation of material to all requir
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
directed by EIC. The item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc

AAC Block coba filling at Balcony/Deck area/Kitchen/Toilet Area/Terrace - Sunk area


Providing and filing Light weight Concrete Block (AAC) in sunken portion of Toilets/ Terrace/ balconies or any other l
drawing in proper slope in cement mortar 1:5 up to required thickness including finishing of top layer with water pr
be of approved quality and dosage as recommended by the manufacturer) cement sand mortar (1:4) for receiving fu
Item rate shall include cost of all materials, miscellaneous consumables,labors,tranportation of material to all requi
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
directed by EIC. The item rates shall hold good for work at all Levels ,lead, lifts,Heights,Depths etc

144
Terrace Area
Providing & applying polyurethane based/ SBR/ Polyurea elastomeric seamless waterproof membrane in two to thr
mm. including one coat Primer on the respective areas.
Protection on floor Area: Providing and applying Geotextile fabric of 140 GSM as protection of Horizontal surface.
The polyurethane based elastomeric seamless waterproof membrane shall have following typical properties :
1) Elongation > 300 %
2) Tensile Strength > 2 N/mm2
3) Tear Resistance > 12 N/mm
4) Bond Strength to Concrete > 2 N/mm2
Water Proofing Treatment shall be in Following Steps for Area in Terrace :
1. Surface Preparation:
Cleaning and wire-brushing and mechanically grinding to achieve Concrete Surface profile 2 ( CSP 2) The RCC surface
Broken AAClike
contaminants Blockdust,coba
oil andfor additional
grease, thickness
All surface at Terrace
imperfections, area ifstructurally
protrusions, necessary as perand
unsound sitefriable
requireme
concr
Providing and laying
perfectly clean. etc. broken AAC block coba in Terrace Area or any other location as specified as shown on drawing
1:5 up to required
2. Pressure grouting thickness as per drawing.
of construction joints and honey combed concrete:
Item rateGrouting
Pressure shall include costtoofensure
is done all materials,
that allmiscellaneous consumables,labors,tranportation
voids, cracks, construction joints, cracks, honeycombsof material
/any weakto all spot
requir(
means ,Curing
are filled , tools, plant
up completely withand machinery,
non-shrink hire and fuel
cementitious charges and
grout/Epoxy all other
grout incidental charges
as manufactures etc., alland
specification required
approve a
directed
Opening by up EIC. The item
all cracks in Vrates
shapeshall holdand
groove good for work
cleaning at all Levels
of dust, ,lead,
dirt, loose lifts,Heights,Depths
particle etc
etc shall be removed & cracks shall
mortar. Holes to shall be drilled along the crack length using pneumatic drilling machine at distance of 300mm c/c. t
depend on the width and length of crack. the holes shall be cleaned by air to remove any dust etc. by blowing air blo
fixed in these holes & Pressure injection Grouting with non-shrink cementitious grout/Epoxy grout injected through
After all the holes are injected, the grout is allowed to set for 24 hours and the next day nozzles are removed and ho
3. Preparing Vatta:
preparing vatta of 50-75mm to be done at all junctions of horizontal and vertical surface with polymer modified 1:4
China
litres ofMosaic flooring
SBR or Acrylic - At Terrace
polymer emulsion Area
( min 30% solids content) per bag of cement.
Providing
4. Treatment to rain water pipe outlet:flooring using multi-coloured broken tiles over terrace area and plain and curv
and laying for china mosaic
40mm
AnnularofSpace
Brocken
left pieces
aroundofpipeplancutouts/bore
ceramic tilespacking
laid overin1:4 cement
floor mortar
and walls shallbedding at requisite
be grouted by usinglevel area level
non-shrink in tru
cementi
installed brickbat cobra on terrace.
system as per manufacturer's recommendation.
Item rate Proofing
5.Water shall includeApplication
cost of all materials, miscellaneous consumables,labors,tranportation of material to all requir
& Protection:
means ,Curing , tools, plant and machinery, hire and fuel charges and all other incidental charges etc., all required a
RCC
directedsurface
by EIC.shall
The itembe treated with
rates shall holdpolyurethane/SBR/Polyurea
good for work at all Levels ,lead,based elastomericetc
lifts,Heights,Depths seamless waterpr
coats at a DFT of 1 to 1.5 mm. of approved make applied
Mode of Measurement: Actual area finish shall be measured for payment purpose in two coats on horizontal surface and Ver
finished floor level ( FFL).
A minimum slope of 1:100 and average thickness of 150mm using Brick bat coba of appropriate s
achieve the required slope laid over 15-20mm thick waterproof cement mortar 1:4 on well prepared
between Brick bat thoroughly grouted with waterproof cement mortar 1:4 and finished with 20mm
1:4 including rounding off the junction of roof and parapet walls for a height of 300mm with Brick b
plaster using waterproof Admixture and conducting necessary leakage/dampness tests, furnishing
complete as directed. (Waterproofing admixtures shall be of approved quality and dosage as recom
by EIC .
The item rate shall include base preparation which include wire-brushing the Concrete/masonry su
treating all construction joints, cracks, honeycombs on the RCC members as per manufactures spe
methodology . Item rate also include cost of all materials, miscellaneous consumables,labors,tranp
required locations by approved means ,Curing , tools, plant and machinery, hire and fuel charges a
etc., all required as per specifications, drawings and as directed by EIC. The item rates shall hold g
lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee o
paper in approved format for a period of 10 years from date of virtual completion. Item rate shall als
required for quality check as per approved quality plan.
Mode of Measurement: Plan area covered for water proofing shall be measured for payment purpos
Note: Additional Quantity of Brick bat filling for average thickness more than 150mm shall be paid

145
Water proofing works for Parapet wall
Providing and applying acrylic emulsion based elastomeric seamless waterproof membrane in two coats at a DFT of
manufacturer's recommendation.
1. Surface Preparation:
Cleaning and wire-brushing the RCC surface thoroughly of all contaminants like dust, oil and grease, All surface impe
unsound and friable concrete must be removed and make it perfectly clean. etc.
2. Pressure grouting of construction joints and honey combed concrete:
Pressure Grouting is done to ensure that all voids, cracks, construction joints, cracks, honeycombs /any weak spot (
are filled up completely with non-shrink cementitious grout/Epoxy grout as manufactures specification and approve
Opening up all cracks in V shape groove and cleaning of dust, dirt, loose particle etc shall be removed & cracks shall
mortar. Holes to shall be drilled along the crack length using pneumatic drilling machine at distance of 300mm c/c. t
depend on the width and length of crack. the holes shall be cleaned by air to remove any dust etc. by blowing air blo
fixed in these holes & Pressure injection Grouting with non-shrink cementitious grout/Epoxy grout injected through
After all the holes are completed, the grout is allowed to set for 24 hours and the next day nozzles are removed and
Over the prepared surface, 2 coats of acrylic waterproofing coating to be applied as per approved methodology to m
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose

Expansion Joint Treatment


Providing & laying expansion joint system using Tape with Two component high performance epoxy adhesive for ho
manufacturers’ specifications. The System also includes the application of 300GSM Geo Textile fabric and protection
The sealing system must be capable of accommodating movements as per design calculations.
The item rate shall include base preparation which include wire-brushing and mechanical grinding to achieve concre
Concrete surface & cleaning with air jet, treating all construction joints, cracks, honeycombs, pipes, sleeves on the R
non-shrink cementitious grout/Epoxy grout at any porous area as per manufactures specification and approved met
of all materials, miscellaneous consumables,labors,tranportation of material to all required locations by approved m
machinery, hire and fuel charges and all other incidental charges etc., all required as per specifications, drawings an
shall hold good for work at all Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc a
proofing work on stamp paper in approved format for a period of 10 years from date of virtual completion. Item rat
required for quality check as per approved quality plan.
Extra Over
Expansion fortoitem
Joint no 19 at
be treated butallwith
levelaluminium flashig
of slab area or as of
per10approved
guage andEIC300 mm wide instead of 20 guage as extra
location.
driveway
Protectionarea
flashing: ‐ For the protection of the joint tape system on floor and wall with aluminium flashing 0f 20 gau
Expansion
screwed onJoint
one to be treated
sides over theatjoint
all level of slab
treated area or as per approved EIC location.
area.
Protection flashing: ‐ ForUnit
Mode of Measurement: the protection
of measurementof the shall
joint be
tape systemmeter
running on floor and wall with aluminium flashing 0f 10 gau
length.
screwed
Rate shallon
beone sidesconsidering
quoted over the joint
anytreated area.(Driveway
of the above make for Area)
all waterproofing items for the Project.
50mm thick joint

146
Pipe Penetration Treatment (Core Cut treatment for Pipe) up to 150mm
Providing & laying application of non-shrink, cementitious micro concrete around the pipe areas Fo
with High strength, . All such areas to be suitably water proofed with cementitious/ PU coating to ensure leakpr
manufacturer's recommendation..
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Threshold
Rate shall beTreatment For Door
quoted considering anyArea-Main
of the aboveDoor+Toilet Door
make for all waterproofing items for the Project.
Providing & applying Micro Concrete for watta making of 75mm wide & 40mm height with bond coat of 2K polymer
having minimum elongation at break of 60% over the Clean Surface.
The item rate shall include base preparation which include wire-brushing the Concrete surface & cleaning with air je
construction joints, cracks, honeycombs, pipes, sleeves on the RCC members injection grouting with non-shrink cem
porous area as per manufactures specification and approved methodology . Item rate also include cost of all materia
consumables,labors,tranportation of material to all required locations by approved means ,Curing , tools, plant and
all other incidental charges etc., all required as per specifications, drawings and as directed by EIC. The item rates sh
Levels ,lead, lifts,Heights,Depths, basements, trenches, pits, tunnels, water tanks etc and providing guarantee of wa
approved format for a period of 10 years from date of virtual completion. Item rate shall also include testing charge
approved quality plan.
Rate shall be quoted considering any of the make mention in Make List for all waterproofing items for the Project
Mode of Measurement: Unit of measurement shall be Single finish length of watta.

Waterproofing Treatment below bottom Member Deck Window


Providing & Applying Acrylic Polymer based flexible cementitious based waterproofing treatment or PU Coating ha
60%in two to three coats at a DFT of 1 to 1.5 mm to Sunken area at bottom member window deck area including p
I) Preparing Vatta:
preparing vatta of 25 mm to be done at all junctions of horizontal and vertical surface with polymer modified 1:4 ce
of SBR or Acrylic polymer emulsion ( min 30% solids content) per bag of cement.
Providing and laying two Coat s of highly flexible two components of polymer based waterproofing treatment as per
sand shall be sprinkled over 2nd coat to create a protection cum mechanical key for final finish.
Mode of Measurement: Actual area covered for water proofing shall be measured for payment purpose.

Sub Total C

Labour charges per nsq.ft 375

TOTAL

ADD FOR GST: 18%

GRAND TOTAL

147
d Parking Area), Energy Center at Vadodara, Gujarat

Quantity
Uni Rate Amount (INR)
Tower NTA Total Quantity

246,561,138

M3 6,983 7,645 14,628 140 2,047,920

M3 10 10 20 1,150 23,000

M3 10 10 20 2,500 50,000

M3 551 903 1,454 594 863,313

M3 10 10 20 200 4,000

M3 5 5 10 2,841 28,406

M3 5 5 10 3,026 30,262

M3 10 10 20 3,238 64,766

148
M3 10 10 20 3,375 67,493

M3 5 5 10 4,250 42,497

M3 83 5 88 4,471 393,408

M3 5 50 55 4,642 255,325

M3 10 10 20 4,642 92,846

M3 10 10 20 4,796 95,912

M3 1,547 1,658 3,205 5,023 16,097,297

M3 10 10 20 5,391 107,811

M3 10 10 20 4,796 95,912

M3 4,434 10 4,444 5,023 22,320,246

M3 10 10 20 5,323 106,462

M3 10 10 20 5,391 107,811

M3 10 10 20 917 18,340

149
M3 100 100 200 937 187,400

M3 100 100 200 1,066 213,200

M2 44,441 8,534 52,975 - -

287 100 387 - -

M2 10 10 20 545 10,900

M2 10 10 20 795 15,900

M2 5 5 10 925 9,250

MT 179 207 386 54,496 21,035,430

MT 564 564 54,496 30,735,705

EA 5 5 10 99 994

EA 5 5 10 118 1,181

EA 5 5 10 156 1,555

EA 5 5 10 215 2,146

EA 5 5 10 147 1,469

EA 5 5 10 202 2,016

EA 5 5 10 331 3,312

EA 5 5 10 425 4,248

150
EA 5 5 10 135 1,350

EA 5 5 10 150 1,500

EA 5 5 10 175 1,750

EA 5 5 10 200 2,000

EA 5 5 10 225 2,250

EA 5 5 10 275 2,750

EA 5 5 10 325 3,250

MT 20 2 22 108,625 2,389,759

MT 1 1 108,625 108,625

KG 30 30 60 109 6,518

EA 10 10 20 1,705 34,100

M2 5 5 10 1,803 18,027

M2 5 5 10 1,499 14,989

M2 5 5 10 1,178 11,778

M2 4,741 5 4,746 1,800 8,544,790

M2 11,513 5 11,518 1,712 19,724,257

M2 5 5 10 1,146 11,461

M3 55 5 60 9,044 542,623

M2 5 5 10 1,596 15,962

151
M2 5 5 10 1,050 10,500

M2 12,462 100 12,562 745 9,358,690

M2 1,109 10 1,119 465 520,335

M2 820 10 830 120 99,600

M3 50 200 250 2,169 542,175

M3 50 50 100 619 61,870

M2 50 50 100 129 12,900

M2 50 50 100 69 6,900

M2 50 50 100 133 13,340

M3 5 5 10 10,123 101,226

M3 5 5 10 10,350 103,495

Inch 10 10 20 58 1,150

Inch 10 10 20 75 1,495

Inch 10 10 20 92 1,840

Inch 10 10 20 109 2,185

Inch 10 10 20 127 2,530

Inch 10 10 20 144 2,875

152
Inch 10 10 20 161 3,220

Inch 10 10 20 46 920

Inch 10 10 20 63 1,265

Inch 10 10 20 81 1,610

Inch 10 10 20 98 1,955

Inch 10 10 20 115 2,300

Inch 10 10 20 132 2,645

Inch 10 10 20 150 2,990

M3 10 10 20 2,500 50,000

M3 10 10 20 750 15,000

M2 10 10 20 3,500 70,000

M2 10 10 20 200 4,000

M2 10 10 20 16,000 320,000

M3 10 10 20 44,625 892,500

153
M2 10 3,330 3,340 874 2,919,247

M2 10 3,330 3,340 746 2,492,346

M2 170 10 180 1,937 348,660

144,547,236

MT - - 108,625 -

154
KG 1,500 1,500 180 270,000

EA 5 5 10 2,000 20,000

M 64 64 9,075 580,800

M 64 64 11,350 726,400

M 32 32 13,976 447,232

M 64 64 11,062 707,942

M 64 64 13,270 849,306

M 32 32 19,402 620,858

EA 5 5 250,000 1,250,000

EA 2 2 49,978 99,956

EA 5 5 10 1,725 17,250

EA 5 5 10 2,070 20,700

EA 5 5 10 2,300 23,000

EA 5 5 10 2,473 24,725

EA 5 5 10 3,278 32,775

EA 5 5 10 3,542 35,420

EA 5 5 10 3,853 38,525

155
EA 5 5 10 5,693 56,925

EA 5 5 10 7,993 79,925

EA 5 5 10 10,868 108,675

EA 5 5 10 288 2,875

EA 5 5 10 374 3,738

EA 5 5 10 546 5,463

EA 5 5 10 604 6,038

EA 5 5 10 748 7,475

EA 5 5 10 1,093 10,925

EA 5 5 10 1,898 18,975

EA 5 5 10 3,105 31,050

EA 5 5 10 4,198 41,975

EA 5 5 10 7,993 79,925

EA 5 5 10 5,578 55,775

EA 5 5 10 3,853 38,525

EA 5 5 10 288 2,875

EA 5 5 10 403 4,025

EA 5 5 10 518 5,175

EA 5 5 10 633 6,325

EA 5 5 10 748 7,475

156
EA 5 5 10 863 8,625

EA 5 5 10 978 9,775

EA 5 5 10 8,000 80,000

EA 5 5 10 10,000 100,000

EA 5 5 10 2,000 20,000

EA 5 5 24,604 123,021

EA 4 4 114,860 459,439

EA 4 4 5,727 22,908

EA 2 2 13,291 26,581

M 10 10 20 2,876 57,520

M 10 10 20 3,234 64,680

M 10 10 20 3,600 72,000

RM 2,000 2,000 90 179,400

Nos. 200 200 288 57,500

Nos. 25 25 334 8,338

Nos. 10 10 420 4,198

7,633,013

157
158
M2 2,503 10 2,513 960 2,412,480

159
M2 1,357 1,357 1,140 1,546,980

160
M2 100 10 110 550 60,500

M2 57 5 62 840 52,080

M - 951 951 1,200 1,141,200

M 294 10 304 935 284,240

161
EA 10 10 1,020 10,200

M2 2,195 2,195 1,380 3,029,100

M2 182 731 913 1,140 1,040,820

M2 4,652 10 4,662 660 3,076,920

162
M2 1,892 10 1,902 284 539,979

M2 4,030 10 4,040 525 2,121,000

M3 386 5 391 6,500 2,541,500

M3 5 5 10 4,750 47,500

163
M2 677 10 687 1,380 948,060

M3 5 5 10 5700 57,000

M2 677 5 682 960 654,720

164
M2 299 5 304 605 183,920

M 10 10 20 3,080 61,600

M 10 10 20 1,980 39,600

165
EA 10 10 20 1,650 33,000

M 269 5 274 495 135,630

M2 103 5 108 1,045 112,860

20,130,889

165,000 450 74,250,000

246,561,138

44,381,005

290,942,143

166
165000 1494.31

131.25 110 137.5

Total
Excavation / Excavation
2,988,233.00
Backfilling / Mt3/ per Sq.ft.
breaking qnty
16,142 0.0978 18.11

2750

2995

3275

167
3455

3275

3455

3595

3595

3720

3905

4205

3720

3905

4200

4205

168
Total concert concert Mt3/ 39733867.00
qnty per Sq.ft.

7,982 0.0484 240.81

Total Formwork Formwork


qnty Mt2/ per Sq.ft. 36050.00

53,412 0.32 0.22

2.3394

3.4182

5.7576
Total
Reinforcement
Reinforcement 51771135.00
Kg/ per Sq.ft.
qnty Kg
950,000 5.75758 313.76

169
Total Structural Reinforcement 2498384.00
steel qnty Kg Kg/ per Sq.ft.

23,000 0.13939 15.14

170
Total BW Mt2/
Total BW qnty. 28,894,387.00
Sq.ft

16,384 0.0993 175.12

Total PLASTER Total PLASTER 9,978,625.00


Mt2 Mt2 / Sq.ft

14,511 0.09 60.48

Total soling
Total soling misc misc 616,945.00

3.74

171
172
836.8789352644

Total core Total core


cutting VDF ETC cutting VDF 7,365,694.00
misc ETC misc

44.64

173
174
175
Total MEP
Total MEP misc misc 7,633,013.00

46.26

176
177
Pedilite 800 900

178
950 950

179
325 650

850 700

1000

180
2400 850

1900 1150

1150 950

750 550

181
378

378

Brick Bats 3000+


sand / cement
1:5 = 1050 equal
6400 1291
to 3000 +1050
+850 +1355 =
6780

AAC block 1875+


sand / cement
1:5 = 1050 equal
6400 1291
to
1875+1050+850+
945= 4750

182
1900 1150

6400 140

800 1291

183
400 550

1800

600

184
450 450

900

Total Water Total Water


proofing proofing 20,130,889.00 950.00

122.01

1,494.31

185
M10-PCC M15-PCC M 20-PCC M 20-sub
For slab
Basic Rate 3275.00 3455.00 3595.00 3595.00
Extra for SCC 0 0
GST 0.18 590 622 647 647
Supplier rate.with GST 3865 4077 4242 4242
wastage% 0.05 193 204 212 212
Fixed cost 0 0 0 0
pumping charges 200 200 200 200
Scaffolding Charges 0 0 0 0
Labour 0 0 0 0
Formwork 0.00 0.00 0.00
4258 4481 4654 4654
ESIC & PF on labour 0.20 0 0 0 0
charges 33% on Labour
Add for Water & Electricity @ 0.00 0 0 0 0
House keeping & Add for 0.01 43 45 47 47
Safety @ %
4300 4526 4701 4701
Add OH & CP @ 15% 0.15 645 679 705 705
less GST 18% -696 -734 -764 -764
to be quoted Say 4250 4471 4642 4642

Plum Concrete M5
Per Cum 2750.00

M10 60% 1650


Soling stone 40% 1500 600

Pumping 0 0

Labour 0 0
Formwork 0 0

2,250

186
ESIC & PF on labour charges
0.20 0
33% on Labour

Add for Water & Electricity @ 0.00 0

House keeping & Add for Safety


0.01 22.5
@%
2272.5
Add OH & CP @ 15% 25.00% 568.13
2840.63

187
M30-super M35-super M40-super M30-sub M40-sub
M 25-sub M 25-super
structure structure structure structure structure
3720.00 3720.00 3905.00 4150.00 4205.00 3905.00 4205.00
0 0 0 0 0 0 0
670 670 703 747 757 703 757
4390 4390 4608 4897 4962 4608 4962
219 219 230 245 248 230 248
0 0 0 0 0 0 0
200 200 200 200 200 200 200
0 0 0 0 0 0 0
0 0 0 0 0 0 0

4809 4809 5038 5342 5410 5038 5410

0 0 0 0 0 0 0

0 0 0 0 0 0 0

48 48 50 53 54 50 54
4857 4857 5089 5395 5464 5089 5464
729 729 763 809 820 763 820
-790 -790 -829 -881 -893 -829 -893
4796 4796 5023 5323 5391 5023 5391

M7.5 M10 M15


2995.00 3275.00 3455.00

1797 1965 2073


600 600 600

0 0 0

0 0 0
0 0 0

2,397 2,565 2,673

188
0 0 0

0 0 0

23.97 25.65 26.73

2420.97 2590.65 2699.73


605.24 647.66 674.93
3026.21 3238.31 3374.66

189
M30-\
M30-\ coloured
coloured M 20-PCC
concrete
concrete Basic Rate given by L&T
7900.00 3595.00 7900.00 M5 2750
0 0 M7.5 2995
1422 647 1422 M10 3275
9322 4242 9322 M15 3455
466 212 466 M20 3595
0 0 0 M25 3720
200 200 200 M30 3905
0 100 250 M35
0 0 0 M40 4205

9988 4754 10238

0 0 0

0 0 0

100 48 102
10088 4802 10340
1513 720 1551
-1678 -764 -1678
9923 4758 10214

517.220772554348 648.88
PP Fibre 50.00
LDPE sheet 200
40
microns
Groove cutting 40
Groove filling
22
Labour
Excaliber
chemical cost 30
for filling
TOTAL 699.22 648.8794384375
Add OH &
175 97
CP @ 25%

190
874.03 746.21

191
STEEL REINFORCEMENT substructure
Reinforcement for R.C.C work including
straightening
cutting, bending, placing in position and binding
all
complete.
Cold Twisted Bars
II /5.29.3 /67
Cost for 1 MT
MATERIALS:
Deformed twisted steel bars1.00q
Wastage 5% 0.05 q
Total 1.05 q Tonne 0.05 40000.00
unloading of steel Tonne 0.00 400.00
Chairs, Spacers, pin bars, etc Tonne 0.01 40000.00
GI Binding wire 18 G kg 12.00 60.00
Cover block 1 time 100.00 3.00
LABOUR:
for straightening, cutting, bending, binding and
placing
in position Tonne 0.00 7500.00

Sundries 1 time
shifting of steel & Lifting Ton 0.00 750.00

Fixed cost for crane/ labour


ESIC & PF on labour charges 33% on Labour 0.20
Add for Water & Electricity @ 2% 0.00
Add for Safety t @ 1% 0.01
Add OH & CP @ 15% 0.10
Grand Total:

Say RS per MT

STEEL REINFORCEMENT super structure


Reinforcement for R.C.C work including
straightening
cutting, bending, placing in position and binding
all
complete.

192
Cold Twisted Bars
II /5.29.3 /67
Cost for 1 MT
MATERIALS:
Deformed twisted steel bars1.00q
Wastage 5% 0.05 q
Total 1.05 q Tonne 0.05 40000.00
unloading of steel Tonne 0.00 400.00
Chairs, Spacers, pin bars, etc Tonne 0.01 40000.00
GI Binding wire 18 G kg 12.00 60.00
Cover block 1 time 100.00 3.00
LABOUR:
for straightening, cutting, bending, binding and
placing
in position Tonne 0.00 8000.00

Sundries 1 time
shifting of steel & Lifting Ton 0.00 750.00

Fixed cost for crane/ labour


ESIC & PF on labour charges 33% on Labour 0.20
Add for Water & Electricity @ 2% 0.00
Add for Safety t @ 1% 0.01
Add OH & CP @ 15% 0.10
Grand Total:

Say RS per MT

193
40000.00

2000.00 Basic Rate Rs 40000/-


0.00
400.00
720.00
300.00

0.00

75.00
0.00
43495.00
5556.244
0.00
0.00
490.51
4954.18
54495.93

54495.93

194
40000.00

2000.00 Basic Rate Rs 40000/-


0.00
400.00
720.00
300.00

0.00

75.00
0.00
43495.00
5556.244
0.00
0.00
490.51
4954.18
54495.93

54495.93

195
S NO Item
Originally considered Labour colony
1 Labour colony
30000 2 Water for Labour colony
80000 3 Toilets
20000
4 Electricity
1000000 Local Liasoning
Site
1 Security
2 Drinking water
3 Toilets
Operation of toilets
Dewatering pump with pipes & accessories
100% initially now 50% cost 4
50000 5 Runnig cost
6 Access Scaffolding staircase
50000 7 Electricity
30000 8 Water curing
25000 9 Curing Tank, Curing Pipe, Vibrators, Grinders, Curing Pipe, Has
Concrete Pump
50% initially now 25% cost 10
11 Establishment Office ,Store , Cement
godown
12 Barrication Sheets & Signages, Safety Nets
1000000 13 Electrical Connection & LightFixtures
14 Transportation
30000 15 Office Refreshment Charges
16 Stationary Charges
17 Testing Charges for materials
50% initially now 25% cost 18 Tower Crane with operator
Design work for formwork
JCB
100% initially now 50% Cost Material Lift/Manpower lift
Opearator
60000 19 Housekeeping/QAQC/Safty
20 Mobile/Travelling Charges
21 Site office/PC/etc
23 Survey work for
400000 Plumbing Works
Office For L&T Staff of 1000sqft inc electricity bill and comple

24 CAR policy on total 110% contract value


25 WC on labour cost 20% value of contract
value

196
26 PBG interest up to end of DLP
Bank deposit interest income
Retention Interest 5 % on completion &
27 rest till DLP 24 months
28 CAPEX interest
Mobilisation advance 10%

28 Mobilisation advance bank guarantees charg

29 PBG Charge
30 Salaries
31 Back Office
TOTAL

RCC
Steel
formwork
BlockWork
Plastering

Important Points

Total Sqft
Cost
Cost per Sqft

Steel per sqft


RMC per sqft
Formwork per sqft
Blockwork per sqft
Plaster per sqft

Labour charges

Blockwork per sqft


Plaster per sqft

197
198
199
Nos Per month total months Capital Cost

0 75,000 18 0
0 25,000 18 0
0 25,000 18 0
0 8,000 18 0
0 15,000 18 0
1 100,000

3 15,000 18 810,000
1 25,000 18 450,000
2 30,000 1 60,000
1 8,000 18 144,000

2 100,000 0.5 100,000


1 35,000 3 105,000
1 200,000 0.5 100,000
1 45,000 18 810,000
1 25,000 18 450,000
, Grinders, Curing Pipe, Has 1 20,000 18 360,000

0 250,000 15 0
1 200,000 1 200,000
1 40,000 20 800,000
1 LS 1 500,000
1 10,000 18 180,000
1 20,000 18 360,000
1 7,500 18 135,000
1 10,000 18 180,000
0 250,000 15 0
1 100,000 1 100,000
1 130,000 3 195,000
0 250,000 3 0
0 20,000 15 0
1 25,000 18 450,000
1 10,000 18 180,000
1 LS 1 400,000
1 100,000 6 600,000
1 LS 1 300,000
electricity bill and comple 1 750,000 LS 750,000

200,000,000 0.15% 330,000


60,000,000 0.36% 216,000

200
4 5.00% 10,000,000 10.0% 4,000,000
4 -10,000,000 5% -2,000,000
2,900,000
14.50%
50,000,000 0
20,000,000 10.00%
30,000,000 0.83% 18 4,500,000
20,000,000 2 0.7% 280,000

4 5.00% 10,000,000 0.7% 280,000


325,000 18 5,850,000
200,000,000 2.50% 5,000,000
30,175,000

total cost 30,175,000

25% 8442 cum 894 per cum


15% 973 MT 4652 per Mt
25% 53412 sqm 141 per sqm
15.0% 16,324 sqm 277.28 per sqm
20.0% 17721 sqm 341 per sqm

165,000.00
246,561,138.00
1,494.31

5.897 kgs per sqft 75 442.27 72,975,000.00


0.0512 cum per sqf 12500 639.55 105,525,000.00
0.3237 sqm per sqf 1200 388.45 64,094,400.00
0.0989 sqm per sqft
0.1074 sqm per sqft

1470.27 242,594,400.00
0.00
1470.27 242,594,400.00
0.09893333333 sqm per sqft
0.1074 sqm per sqft

201
202
203
working by sunil sir

capex

50% considered

Concrete pump with Operator ,addl pipe line & 25% considered

8,819,000.00 53.44848

204
Project head
Project manager
Sr. engineer
Site engineer
supervisors
safety engineer
safety supervisors
21,356,000.00 129 billing/planning/Quality engin
quality engineer
store manager
store assistants
Plumber & Electrician
7,543,750.00
4,526,250.00
7,543,750.00
4,526,250.00
6,035,000.00
30,175,000.00

9,730,000.00
5,065,200.00
40,059,000.00

44 259.47 42,812,000.00
4100.25 209.78 34,614,310.50
0 0.00 0.00
54,854,200.00
332.45

469.25 77,426,310.50
332.45 54,854,200.00
801.7001 132,280,510.50

205
206
207
208
0.25 100000 25000
1 75000 75000
1 50000 50000
1 30000 30000
2 25000 50000
1 25000 25000
1 20000 20000
0 40000 0
0 40000 0
0 30000 0
1 25000 25000
1 25000 25000
325000

209
210
STEEL REINFORCEMENT substructure
Reinforcement for R.C.C work including
straightening
cutting, bending, placing in position and binding
all
complete.
Cold Twisted Bars
II /5.29.3 /67
Cost for 1 MT
MATERIALS:
Deformed twisted steel bars1.00q
Wastage 5% 0.05 q
Total 1.05 q Tonne 0.05 40000.00
unloading of steel Tonne 0.00 400.00
Chairs, Spacers, pin bars, etc Tonne 0.01 40000.00
GI Binding wire 18 G kg 12.00 60.00
Cover block 1 time 100.00 3.00
LABOUR:
for straightening, cutting, bending, binding and
placing
in position Tonne 1.00 7500.00

Sundries 1 time
shifting of steel & Lifting Ton 0.00 750.00

Fixed cost for crane/ labour


ESIC & PF on labour charges 33% on Labour 0.20
Add for Water & Electricity @ 2% 0.00
Add for Safety t @ 1% 0.01
Add OH & CP @ 15% 0.10
Grand Total:

Say RS per MT

STEEL REINFORCEMENT super structure


Reinforcement for R.C.C work including
straightening
cutting, bending, placing in position and binding
all
complete.

211
Cold Twisted Bars
II /5.29.3 /67
Cost for 1 MT
MATERIALS:
Deformed twisted steel bars1.00q
Wastage 5% 0.05 q
Total 1.05 q Tonne 0.05 40000.00
unloading of steel Tonne 0.00 400.00
Chairs, Spacers, pin bars, etc Tonne 0.01 40000.00
GI Binding wire 18 G kg 12.00 60.00
Cover block 1 time 100.00 3.00
LABOUR:
for straightening, cutting, bending, binding and
placing
in position Tonne 1.00 8000.00

Sundries 1 time
shifting of steel & Lifting Ton 0.00 750.00

Fixed cost for crane/ labour


ESIC & PF on labour charges 33% on Labour 0.20
Add for Water & Electricity @ 2% 0.00
Add for Safety t @ 1% 0.01
Add OH & CP @ 15% 0.10
Grand Total:

Say RS per MT

212
40000.00

2000.00 Basic Rate Rs 40000/-


0.00
400.00
720.00
300.00

7500.00

75.00
0.00
50995.00
5556.244
1500.00
0.00
580.51
5863.18
64494.93

64494.93

213
40000.00

2000.00 Basic Rate Rs 40000/-


0.00
400.00
720.00
300.00

8000.00

75.00
0.00
51495.00
5556.244
1600.00
0.00
586.51
5923.78
65161.53

65161.53

214
Formwork Flat slab
for 10 m x 10 m 100 sqm

Scaffolding Charges Labour/ Material 1 10 10 3


Ply 35 1.2 2.4
MS tube/Channel Tie Rods, etc 1 10 10
Labour rate for shuttering & deshuttering 1 10 10
cleaning & tape extra expenses 1 10 10 1
Grinding & cleaning after slab 1 10 10 1
Shuttering oil for deshuttering FOSROC make 1 10 10 1
fixed cost

ESIC & PF on labour charges 33% on 10%


Labour
Add for Water & Electricity @ 2% 0%
Add for Safety @ 1%

Add OH & CP @ 15% 15%


Say

215
Rate
300 cum 60 18000 RENTED
100 sqm 645.6 6456 10 times repetition Basic Rate Ply 60/- sft
100 rmt 20 1100 20/- per kg 8 repetetions
100 sqm 350 35000
100 sqm 5 500
100 sqm 5 500
100 sqm 5 500
100 169 16870
81894

3600.00

0.00
854.94
86349.26
12952.39
99301.65

Say RS 993 per sqm

216
217
STEEL STRUCTURAL
Cost for 1 MT
MATERIALS:
Structural Steel 1.00 MT
Wastage 5% 0.05 MT
Total 1.05 MT Tonne 0.05 45000.00
unloading of steel Tonne 1.05 750.00
LABOUR:
for straightening, cutting, bending, binding and
placing it for erection
in position along with Hydra/Farana Charges Tonne 1.00 25000.00
Epoxy Painting Work & Grouting Tonne 1.00 10000.00

Sundries 1 time
shifting of steel Ton 0.00 750.00

Fixed cost for crane/ labour


ESIC & PF on labour charges 33% on Labour 0.20
Add for Water & Electricity @ 2% 0.00
Add for Safety t @ 1% 0.01
Add OH & CP @ 15% 0.15
Grand Total:

Say RS

218
45000.00
Basic Rate Rs 45000/-
2250.00
787.50

25000.00
10000.00

750.00
0.00
83787.50
5556.244
5000.00
0.00
837.88
13443.81
108625.42

108625.42

219
Block size 600x200x200 1.8 0.024

Block work 3m x 3m x 200 mm thick 1.8


Patli at every 1.0 m (0.2x 0.2X3 mtr) 3 0.360
As per BOQ item 1.440
Materials Qty
AAC block 60
wastage 2%
Patli 3 nos 3*.2*.2 0.36
Shuttering for patli 3.6
main Steel for Patli 16.02
ring for patli 5.022
Shifting of Block 61
Fixing of Blocks with chemical 0.90
Sundries 1
Scaffolding charges 21.6
Fixed cost 9
Labour
Labour Cost for Fixing of Blocks 9
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:

Block size 600x200x200 1.8 0.024

Block work 3m x 3m x 200 mm thick 1.8


Patli at every 1.0 m (0.2x 0.2X3 mtr) 3 0.360
As per BOQ item 1.440
Materials Qty
AAC block 75
wastage 2%

220
Patli 3 nos 3*.2*.2 0
Shuttering for patli 0
main Steel for Patli 0
ring for patli 0
Shifting of Block 77
Fixing of Blocks with chemical 0.90
Sundries 1
Scaffolding charges 21.6
Fixed cost 9
Labour
Labour Cost for Fixing of Blocks 9
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:

Block size 600x200x150 1.35

Block work 3 m x 3 m x 150 mm thick 1.35


Patli at every 1m 3 0.270
As per BOQ item 1.080
Materials Qty
AAC block 60
wastage 2%
Patli 10 nos 10*.15*.2 0.27
Shuttering for patli 1.8
Main steeel for patli 14.4
ring for patli 2.79
Shifting of Block 61
Fixing of Blocks with chemical 0.9
Sundries 1
Scaffolding charges 21.6
Fixed cost 9
Labour

221
Labour Cost for Fixing of Blocks 9
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:

Block size 600x200x250 2.25

Block work 3 m x 3 m x 250 mm thick 2.25


Patli at every 1.5 m 3 0.450
As per BOQ item 1.800
Materials Qty
AAC block 60
wastage 2%
Patli 10 nos 10*.2*.2 0.45
Shuttering for patli 4.5
main Steel for Patli 16.02
ring for patli 5.022
Shifting of Block 61
Fixing of Blocks with chemical 1
Sundries 1
Scaffolding charges 21.6
Fixed cost 9
Labour
Labour Cost for Fixing of Blocks 9
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:

222
Block size 100mm thick 0.9

Block work 3m x 3 m x 100 mm thick 0.9


Patli at every 1m 3 0.180
As per BOQ item 0.720
Materials Qty
AAC block 60
wastage 2%
Patli 10 nos 10*.15*.2 0.18
Shuttering for patli 1.8

Main steeel for patli 16.02

ring for patli 2.79


Shifting of Block 61
Fixing of Blocks with chemical 1
Sundries 1
Scaffolding charges 21.6
Fixed cost 9
Labour
Labour Cost for Fixing of Blocks 9
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:

Block size 100mm thick hollow 0.9

Block work 3m x 3 m x 100 mm thick 0.9

223
Patli at every 1m 3 0.180
As per BOQ item 0.720
Materials Qty
AAC block 60
wastage 2%
Patli 10 nos 10*.15*.2 0.18
Shuttering for patli 1.8

Main steeel for patli 16.02

ring for patli 2.79


Shifting of Block 61
Fixing of Blocks with chemical 1
Sundries 1
Scaffolding charges 21.6
Fixed cost 9
Labour
Labour Cost for Fixing of Blocks 9
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:

Block size 100mm thick solid block 0.9

Block work 3m x 3 m x 100 mm thick 0.9


Patli at every 1m 3 0.180
As per BOQ item 0.720
Materials Qty
AAC block 60
wastage 2%
Patli 10 nos 10*.15*.2 0.18
Shuttering for patli 1.8

224
Main steeel for patli 16.02
ring for patli 2.79
Shifting of Block 61
Fixing of Blocks with chemical 1
Sundries 1
Scaffolding charges 21.6
Fixed cost 9
Labour
Labour Cost for Fixing of Blocks 9
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:

Block size 150mm thick solid block 1.35

Block work 3m x 3 m x 150 mm thick 1.35


Patli at every 1m 3 0.270
As per BOQ item 1.080
Materials Qty
AAC block 90
wastage 2%
Patli 10 nos 10*.15*.2 0.18
Shuttering for patli 1.8
Main steeel for patli 16.02
ring for patli 2.79
Shifting of Block 92
Fixing of Blocks with chemical 1
Sundries 1
Scaffolding charges 21.6
Fixed cost 13.5
Labour
Labour Cost for Fixing of Blocks 14
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment

225
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:

Block size 200mm thick solid block 1.8

Block work 3m x 3 m x 150 mm thick 1.8


Patli at every 1m 3 0.360
As per BOQ item 1.440
Materials Qty
AAC block 60
wastage 2%
Patli 10 nos 10*.15*.2 0.18
Shuttering for patli 1.8
Main steeel for patli 16.02
ring for patli 2.79
Shifting of Block 61
Fixing of Blocks with chemical 1
Sundries 1
Scaffolding charges 21.6
Fixed cost 18
Labour
Labour Cost for Fixing of Blocks 18
TOTAL AMOUNT
ESIC & PF on labour charges Labour
Add for Water & Electricity
Add for Safety & Site Establishment
Add CP& OH
Total:
Rate Analysed for:
Rate per Unit:

226
Basic Rateb 2650 working by sunil sir
75 Nos
60

41.67

Rate Amount
35 2120
42
6500 2340
350 1260
60 961
60.00 301
2.00 122
675 608
Ls 100
25 540
331 2981

269 2420
TOTAL AMOUNT 13796
10.00% 254
0% 0
1% 40
15% 2114
Total: 16204
2 Cum
9002 per Cum
1800 per Sqm

Basic Rateb 2650


75 Nos
60

41.67

Rate Amount
35 2650
53

227
6500 0
350 0
60 0
60.00 0
2.00 153
675 608
Ls 100
25 540
331 2981

269 2420
TOTAL AMOUNT 9504
10.00% 257
0% 0
1% 41
15% 1470
Total: 11273
2 Cum
6263 per Cum
1253 per Sqm

75 Nos
60

Rate Amount
48 2862
57
6500 1755
350.00 630
60.00 864 12mm considered
60.00 167 10mm considered
2.00 122
675 608
Ls 100
25 540
331 2981

228
269 2421
TOTAL AMOUNT 13107
10% 254
0% 0
1% 40
15% 2010
Total: 15412
1 Cum
11416 per Cum
1712 per Sqm

Basic Rateb 2650


75 Nos
60

Rate Amount
80 4770
95
6500 2925
350 1575
60 961
60.00 301
2.00 122
675 608
Ls 100
25 540
331 2981

269 2421
TOTAL AMOUNT 17399
10% 254
0% 0
1% 40
15% 2654
Total: 20348
2 Cum
9044 per Cum

229
2261 per Sqm

2650
75 Nos
60.000

Rate Amount
32 1908
38
6500 1170
350.00 630
12mm considered
60.00 961
10mm considered
60.00 167
2.00 122
675 608
Ls 100
25 540
1 9

269 2421
TOTAL AMOUNT 8675
10% 254
0% 0
1% 40
15% 1345
Total: 10315
1 Cum
11461 per Cum
1146 per Sqm

3400
75 Nos
60.000

230
Rate Amount
41 2448
49
6500 1170
350.00 630
12mm considered
60.00 961
10mm considered
60.00 167
2.00 122
675 608
Ls 100
25 540
331 2981

269 2421
TOTAL AMOUNT 12197
10% 254
0% 0
1% 40
15% 1874
Total: 14366
1 Cum
15962 per Cum
1596 per Sqm

3000
75 Nos
60.000

Rate Amount
36 2160
43
6500 1170
350.00 630

231
60.00 961 12mm considered
60.00 167 10mm considered
2.00 122
675 608
Ls 100
25 540
0 0

269 2421
TOTAL AMOUNT 8923
10% 254
0% 0
1% 40
15% 1383
Total: 10600
1 Cum
11778 per Cum
1178 per Sqm

3000
75 Nos
90.000

Rate Amount
36 3240
65
6500 1170
350.00 630
60.00 961 12mm considered
60.00 167 10mm considered
2.00 184
675 608
Ls 100
25 540
0 0

269 3632
TOTAL AMOUNT 11296
10% 382
0% 0
1% 53

232
15% 1760
Total: 13490
1 Cum
9993 per Cum
1499 per Sqm

3000
75 Nos
60.000

Rate Amount
72 4320
86
6500 1170
350.00 630
60.00 961 12mm considered
60.00 167 10mm considered
2.00 122
675 608
Ls 100
25 540
0 0

269 4842
TOTAL AMOUNT 13547
10% 496
0% 0
1% 65
15% 2116
Total: 16224
2 Cum
9013 per Cum
1803 per Sqm

233
Sr.No. Item Basic Rate Labour Rate TOTAL Quantity Amount
1 Excavation 85 250 335 14628 4900380
2 Backfilling 300 250 550 1454 799700
3 Soling 1600 250 1850 250 462500
4 Steel TMT 40000 8000 48000 950 45600000
5 RMC 4800 700 5500 8442 46431000
6 Formwork 80.7 350 430.7 53412 23004548
7 Blockwork 580 300 880 16,324 14365120
8 Plaster 290 160 450 17721 7974450
9 Structural Steel 48000 50500 98500 23 2265500
10 0
11 0
12 0
13 0
14 0
15 0
16 0
Amount 145803198

234
Rebar Coupler Price for coupler
Description inclusive of OH & Profit Total
threading @20%

16 mm size coupler 82.8 16.56 99.36

20 mm size coupler 98.4 19.68 118.08

25mm size coupler 129.6 25.92 155.52

32mm size coupler 178.8 35.76 214.56

40mm size coupler 306 61.2 367.2

12x16 reducer 114 22.8 136.8


16x20 mm size
122.4 24.48 146.88
coupler
20 x 25 Reducer 168 33.6 201.6
25 x 32 Reducer 276 55.2 331.2
32x 40 Reducer 354 70.8 424.8

235
Drain 1x.45x1
Nos L W H Qty unit Rate Amount
Excavation 1 1 0.45 0.5 0.225 m3 350 78.75
PCC 1 1 0.65 0.1 0.065 m3 6500 422.5
Walls 2 1 0.2 0.5 0.2 m3 6500 1300
Formwork wall 4 1 0.5 2 m2 350 700
Steel Wall 4 13.49333 53.97333 Kg 60 3238.4
Edge angle 2 1 12 kg 65 780
plaster 4 1 0.5 2 m2 365 730
7249.65
9062.063
Drain 1x.6x1
Nos L W H Qty unit Rate Amount
Excavation 1 1 0.6 0.5 0.3 m3 350 105
PCC 1 1 0.8 0.1 0.08 m3 6500 520
Walls 2 1 0.2 0.5 0.2 m3 6500 1300
Formwork wall 4 1 0.5 2 m2 350 700
Steel Wall 4 13.49333 53.97333 Kg 60 3238.4
Edge angle 2 1 12 kg 65 780
plaster 4 1 0.5 2 m2 365 730
7373.4
9216.75
Drain 1x.9x1
Nos L W H Qty unit Rate Amount
Excavation 1 1 0.9 0.5 0.45 m3 350 157.5
PCC 1 1 1.1 0.1 0.11 m3 6500 715
Walls 2 1 0.2 0.5 0.2 m3 6500 1300
Formwork wall 4 1 0.5 2 m2 350 700
Steel Wall 4 13.49333 53.97333 Kg 60 3238.4
Edge angle 2 1 12 kg 65 780
plaster 4 1 0.5 2 m2 365 730
7620.9
9526.125

236
chasing in masonry 2.25
labour 1200
Rate per Sqm 533.3333
ESIC PF 52.8
Profitr 58.61333

chasing in masonry 0.5


labour+machinery charges 2550
Rate per Sqm 5100
ESIC PF 504.9
Safety,water electricity 244.647
Profitr 584.9547
6434.502

237
PUDDLE FLANGES HOT DIP GALVANISED
BOTH
END
SIZE FLANGE
25MM 1500
32MM 1800
40MM 2000
50MM 2150
65MM 2850
80MM 3080
100MM 3350
150MM 4950
200MM 6950
250MM 9450
300MM 10950