PROJECT

ON

PAINT SHOP

Under Guidance :- Submitted by :-


Mr. OM PRAKASH VIKRANT MATHUR
SHASHANK DUBEY
(HOD Paint Shop) B.Tech (ME)
HIET Gzb
CERTIFICATE
This is to certified that Mr. SHASHANK DUBEY & VIKRANT MATHUR,
student of B.Tech in Mechanical Engg. (4th sem ) from Hi-Tech Institute
Of Engineering & Technology Ghaziabad (U P) has successfully
completed his training in PAINT shop from 25th July 2011 to 7th
August 2011 under guidance of Mr. OM PRAKASH (HOD) PAINT
shop.

During this period I found his to be very co-operative ,


sincere & Working.
I wish his good luck and success for all his future
assignments.

Mr. OM PRAKASH

(HOD) PAINT SHOP


CONTENT

1. INTRODUCTION

2. BLOCK DIAGRAM

3. STAGES

4. INSPECTION

5. DISPATCH FOR SUB ASSEMBLY


INTRODUCTION

Painting is a process of making surface


fine by the addition of various emulsions
& chemicals. This is accomplished under
controlled conditions of temperature &
pressure.
BLOCK DIAGRAM
STAGE NO: - 1
LOADING

Process of dispatching the components for further


operations, often receiving it from fabrication shop. It is
hanged to conveyer belt which is supported by trolleys and
the components refer to other stages of the paint shop.

STAGE NO: - 2
HOT WATER SPRAY

Hot water spray is similar to saturated steam process. In that


steam is the driving force for reaching centre of the
components. In this process hot water is used to cleanising
the dirt & lubricants.
STAGE NO: - 3
KNOCK OFF DEGREASE (SPRAY)

This process is also known as Saponification process.

In which the chemical REDOLINE 1352 is used at 50-60ο C for


washing the components to remove the lubricant (grease) by
nozzle spray.

STAGE NO: - 4
DEGREASE (DIP)

This process is same as that of stage-3 but in this the


components is dipped in the tank filled with REDOLINE 1352
at same conditions.
STAGE NO: - 5
WATER RINSE – 1 (SPRAY)

The components which are coming from previous stage are


washed away by NORMAL water spray. This is done at
ambient temperature.

STAGE NO: - 6
WATER RINSE – 2 (DIP)

This stage is same as that of stage 5 but operations are


carried out in NORMAL water.
STAGE NO: - 7
MIST SPRAY WITH FRESH D-M WATER

Mist spray is done to wash the components by DI-MINERAL


WATER, which prevents unnecessary chemical reactions in
next stage.

STAGE NO: - 8
SURFACE ACTIVATION (DIP)

In this stage the surface activation chemical (FEXODINE 56)


activates the component to obtain the fine crystalline
structure for phosphate coating which increases the
corrosion resistance and adhesive property.
STAGE NO: - 9
PHOSPHATING (DIP)

Phosphating is done for covering the component surface by


the layers of zinc, nickel and manganese-phosphate which
allows the better adhesion for electro coated paint. In this
stage PHOSPHARIC ACID [H3PO4] is used as phosphating
chemical.

STAGE NO: - 10
WATER RINSE-3 (SPRAY)

In this stage the components are washed out by spray for


removal of phosphating chemical leftovers.
STAGE NO: - 11
RCDM (DIP)

RCDM (Recirculation with de-minral water).


This process is also known as pre-treatment process. The
components are dip in D-M water for RE WASH.

STAGE NO: - 12
FRESH D-M (SPRAY)

This is the last stage where fresh DM water is sprayed.


It consists of the enclosure, drain pan, associated piping
with accessories,
nozzles, etc.
Fresh DM water is sprayed only when vehicle presents
by interlocked with
the limit switch detecting carrier travel, and rinsed water
will be cascaded.
STAGE NO: - 13

ACED COATING (SPRAY)

ACED(Acrylic Cathode Electro deposition) is hearth of paint


shop.
In this stage the components are dip in aced. There is 200
volt current by the arrangement of anode and cathode. There
are 30 cathodes in aced and the copper plate which are fitted
in the conveyer belt works as anode. This arrangement
conduct the paint on the components.

STAGE NO: - 14
ULTRA FILTRATE-1 (SPRAY)
Ultra filtration means extremely fine filtration. This is a
necessary stage after the aced coating because, the drops are
produce on the weld part in the aced coating. These drops
are remove by spray.
STAGE NO: - 15
ULTRA FILTRATE-2(DIP)

In some cases the paint drops are not remove in ultra


filtration-1, so the components are dip into the normal water
to completely wash out the components in this stage.

STAGE NO: - 16
ED-RCDM(DIP)

ED-RCDM is (ELECTRO-DIPOSITION OF RE-CIRCULATION WATER).

It is dipping process in which electrically conductive


Substrate is immersed in a waterborne paint and the paint
Dispersed in water is electrically deposited on the
Substrate to form a uniform & water insoluble film.
Depending on the charge on polymer functional group,
The deposition takes place either at cathode or at anode.
STAGE NO: - 17
FLASH OFF ZONE

Under this process the components are passing through the


normal temperature to ready the Owen process.

STAGE NO: - 18
CURNING (OVEN)

The components are baked at 180-190 οC , so that paint


particles get cling to the surface of components firmly.

STAGE NO: - 19
UNLOADING

The components are dispatched to sub assembly shop.


INSPECTION

The components are visually inspected & manually observed


so that the major defects can be analysed & remedies. If
components are defected then they send for rework.

DISPATCH FOR SUB ASSEMBLY


After the paint and inspection components are dispatch for
sub assembly.

You might also like