RPP Heater Replacement Work
ITP Tittle Heater Replacement and piping ITP No. 412-DAB-ITP-008 Revision: B
1 Documentation
Procedures /
1.3 NDT procedures ASME Sec. V H R - -
2 Material Receiving
Material Receiving Inspections
ASME Sec II
2.1 (Heater, pipes, etc…) H W -
DAR AL BALAD FOR CONTRACTING AND OPERATION COMPANY Ltd.
INSPECTION AND TEST PLAN
RPP Heater Replacement Work
ITP Tittle Heater Replacement and piping ITP No. 412-DAB-ITP-008 Revision: B
5 Extraction steam pipe, drain pipe, feed water pipe and other piping work
H
5.7 PWHT(if applicable) PWHT Procedure R
VT procedure
5.8 Support Visual inspection and NDT NDT procedures H R
Page | 4
5.10 Air leak test & Hydrostatic Test M.S and Procedure H W WR
6 Paint
7 Insulation
Page | 5
7.1 Surface Inspection Method of statement H S -
8 Completion Documents
Page | 6
LEGEND:
H: Hold Point (the part has to perform this check and it needs to be successful in order to proceed to the next stage of the construction
W: Witness Point (the part e.g. Owner has to be informed that a test is being performed but its presence and signature is obligatory to
move on to the next stage).
R: Document Review (the part has only to review the record/document that the check has been done and passed).
S: Surveillance (random attendance at site, no signature required on the Request for Inspection and Testing or its accompanying
documentation.
Page | 7
Procedures H
2.1 Wire Type and size check S -
Procedures H
2.2 Fixation check for connection S -
Procedures H
2.3 Continuity Check S -
3
Procedures H
3.1 Visual Check for touch up paint S -
Procedures H
3.2 Piping route and support check S -
Procedures H
3.3 Fitting tightness Check W -
Procedures H
5.1 Piping route and support check S -
Procedures H
5.2 Fitting tightness check S -
Procedures H
5.3 Weld visual Inspection S -
Procedures H R
5.4 Pressure Test or Air Leak Test W
6 Local Instrument
Page | 9
6.3 Individual calibration check Procedures H S - -
Procedures H R
7.1 Individual calibration check W
8 Completion Documents
LEGEND:
H: Hold Point (the part has to perform this check and it needs to be successful in order to proceed to the next stage of the construction
W: Witness Point (the part e.g. Owner has to be informed that a test is being performed but its presence and signature is obligatory to
move on to the next stage).
R: Document Review (the part has only to review the record/document that the check has been done and passed).
S: Surveillance (random attendance at site, no signature required on the Request for Inspection and Testing or its accompanying
documentation.