Date: January 26, 2022

Main Plant Operational Procedure: Heaters, Drains & Vent System


1. System Description: The Heaters, Drains and Vents System collects drainage from the HP, IP
and LP sections of the steam turbine and drain it to the ___?

A. Condenser B. Plant Drain Flash Tank C. Blowdown Tank D. Condenser Pit


ANSWER: B. Plant Drain Flash Tank

2. Precautions: All site safety and health manuals shall be followed during operation of unit
only.

TRUE FALSE
ANSWER: FALSE

3. Precautions: A through Job Safety Briefing (JSB) shall be completed after beginning of work.

TRUE FALSE
ANSWER: FALSE

4. Pre-Start: VERIFY Plant Drains Flash Tank has ___ to support start-up of the Heaters,
Drains, and Vent System.

A. Sufficient Volume B. Empty C. Full D. 10%

ANSWER: A. Sufficient Volume

5. Pre-Start: VERIFY applicable lockouts and/or tagouts have been REMOVED.


TRUE FALSE
ANSWER: TRUE

6. Start-up: ENSURE all pre-start checks/inspections have been Completed.


TRUE FALSE
ANSWER: TRUE
7. Start-up: VERIFY that ALL alarms are present for the system.
TRUE FALSE
ANSWER: FALSE

8. Start-up: RECORD system operational data per Operator Rounds before system readings have
stabilized.
TRUE FALSE
ANSWER: FALSE

9. Shutdown: VERIFY Heaters, Drains and Vent System can’t be removed from service.
TRUE FALSE
ANSWER: FALSE

10. General Knowledge: During unit start-up Heaters are to be ON-SERVICE during.

A. Unit Synchronized B. TAL Valve Close C. 135MW Load D. 40MW Load


ANSWER: D. 40MW Load

Prepared by: Jonas S. Gabac


Checked by: Lourd Martin Agbay

You might also like