ST00 ST01 ST02 ST03 ST04 ST05 ST06 ST07 ST08 ST09 ST10 ST11 ST12 ST13 ST14

% % % % % % % % % % % % % %
1p 7642.3 7642.3 0.90 6878.1 0.73 5578.9 0.63 4814.6 0.53 4050.4 0.38 2904.1 0.28 2139.8 0.16 1222.8 0.06 458.5 0.01 76.4 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0
1s 7640.0 7640.0 0.90 6876.0 0.73 5577.2 0.63 4813.2 0.53 4049.2 0.38 2903.2 0.28 2139.2 0.16 1222.4 0.06 458.4 0.01 76.4 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0
2p 9250.1 9250.1 0.90 8325.1 0.79 7307.6 0.68 6290.1 0.58 5365.1 0.48 4440.0 0.38 3515.0 0.28 2590.0 0.18 1665.0 0.13 1202.5 0.07 647.5 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0
2s 9255.0 9255.0 0.90 8329.5 0.78 7218.9 0.68 6293.4 0.58 5367.9 0.48 4442.4 0.38 3516.9 0.28 2591.4 0.18 1665.9 0.13 1203.2 0.07 647.9 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0
3p 9291.7 9291.7 0.90 8362.5 0.90 8362.5 0.75 6968.8 0.64 5946.7 0.58 5389.2 0.48 4460.0 0.40 3716.7 0.31 2880.4 0.25 2322.9 0.19 1765.4 0.09 836.3 0.00 0.0 0.00 0.0 0.00 0.0
3s 9299.9 9299.9 0.90 8369.9 0.90 8369.9 0.74 6881.9 0.63 5858.9 0.58 5393.9 0.48 4463.9 0.40 3719.9 0.31 2883.0 0.25 2325.0 0.19 1767.0 0.08 744.0 0.00 0.0 0.00 0.0 0.00 0.0
4p 9126.9 9126.9 0.90 8214.2 0.73 6662.6 0.64 5841.2 0.54 4928.5 0.39 3559.5 0.29 2646.8 0.17 1551.6 0.07 638.9 0.01 91.3 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0
4s 9266.0 9266.0 0.90 8339.4 0.73 6764.2 0.64 5930.2 0.54 5003.6 0.39 3613.7 0.29 2687.1 0.16 1482.6 0.07 648.6 0.01 92.7 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0
5p 9458.7 9458.7 0.90 8512.8 0.79 7472.4 0.69 6526.5 0.59 5580.6 0.49 4634.8 0.39 3688.9 0.30 2837.6 0.20 1891.7 0.16 1513.4 0.07 662.1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0
5s 8894.4 8894.4 0.90 8005.0 0.79 7026.6 0.69 6137.1 0.59 5247.7 0.49 4358.3 0.39 3468.8 0.30 2668.3 0.20 1778.9 0.15 1334.2 0.07 622.6 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0
6p 9114.5 9114.5 0.90 8203.0 0.90 8203.0 0.74 6744.7 0.64 5833.2 0.60 5468.7 0.50 4557.2 0.42 3828.1 0.30 2734.3 0.27 2460.9 0.19 1731.7 0.14 1276.0 0.00 0.0 0.00 0.0 0.00 0.0
6s 8447.0 8447.0 0.90 7602.3 0.90 7602.3 0.74 6250.8 0.64 5406.1 0.60 5068.2 0.50 4223.5 0.42 3547.7 0.30 2534.1 0.27 2280.7 0.19 1604.9 0.14 1182.6 0.00 0.0 0.00 0.0 0.00 0.0
sp 1666.0 1666.0 0.70 1166.2 0.70 1166.2 0.70 1166.2 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0
ss 1648.9 1648.9 0.70 1154.2 0.70 1028.0 0.70 1028.0 0.00 1028.0 0.00 1028.0 0.00 1028.0 0.00 1028.0 0.00 1028.0 0.00 1028.0 0.00 1028.0 0.00 1028.0 0.00 1028.0 0.00 0.0 0.00 0.0

TOTAL 110001.3 110001.3 98338.2 88340.2 75686.7 63666.0 53203.9 42535.3 32007.1 21265.8 16007.4 10477.1 5066.8 1028.0 0.0 0.0
% 100.0 100.0 89.4 80.3 68.8 57.9 48.4 38.7 29.1 19.3 14.6 9.5 4.6 0.9 0.0 0.0

RATE 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 2500 1500 1000 150
ST00 ST01 ST02 ST03 ST04
% % % % %
FPTH 0.0 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00
FPTL 1636.5 169.0 0.00 169.0 0.00 169.0 0.00 169.0 0.00 169.0 0.00
1p 2696.0 0.0 0.11 296.6 0.11 296.6 0.32 862.7 0.42 1132.3 0.53
1s 2696.0 0.0 0.11 296.6 0.11 296.6 0.32 862.7 0.42 1132.3 0.53
2p 2711.7 0.0 0.11 298.3 0.11 298.3 0.32 867.7 0.42 1138.9 0.53
2s 2711.7 0.0 0.11 298.3 0.11 298.3 0.32 867.7 0.42 1138.9 0.53
3p 2698.9 0.0 0.11 296.9 0.21 566.8 0.32 863.7 0.42 1133.5 0.53
3s 2698.9 0.0 0.11 296.9 0.21 566.8 0.32 863.7 0.42 1133.5 0.53
4p 2698.9 0.0 0.12 323.9 0.21 566.8 0.32 863.7 0.43 1160.5 0.53
4s 2528.9 170.0 0.10 422.9 0.16 574.6 0.32 979.3 0.42 1232.1 0.53
5p 2668.5 0.0 0.10 266.9 0.21 560.4 0.31 827.2 0.43 1147.5 0.53
5s 2668.5 0.0 0.10 266.9 0.21 560.4 0.31 827.2 0.42 1120.8 0.52
6p 2656.8 0.0 0.20 531.4 0.34 903.3 0.44 1169.0 0.50 1328.4 0.60
6s 2851.9 0.0 0.20 570.4 0.34 969.7 0.19 541.9 0.35 998.2 0.45
APT -4.1 9.0 0.10 8.6 0.00 9.0 0.00 9.0 0.00 9.0 0.00

TOTAL 33919 348 4343 6636 10574 13975


% 100.0 0.0 11.8 18.5 30.1 40.2
ST05 ST06 ST07 ST08 ST09 ST10 ST11
% % % % % %
0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0
169.0 0.00 169.0 0.00 169.0 0.00 169.0 0.00 169.0 0.00 169.0 0.00 169.0
1428.9 0.64 1725.4 0.75 2022.0 0.85 2291.6 0.90 2426.4 0.96 2588.1 1.00 2696.0
1428.9 0.64 1725.4 0.75 2022.0 0.85 2291.6 0.90 2426.4 0.96 2588.1 1.00 2696.0
1437.2 0.64 1735.5 0.75 2033.7 0.85 2304.9 0.90 2440.5 0.96 2603.2 1.00 2711.7
1437.2 0.64 1735.5 0.75 2033.7 0.85 2304.9 0.90 2440.5 0.96 2603.2 1.00 2711.7
1430.4 0.64 1727.3 0.75 2024.2 0.85 2294.1 0.90 2429.0 0.96 2591.0 1.00 2698.9
1430.4 0.64 1727.3 0.75 2024.2 0.85 2294.1 0.90 2429.0 0.96 2591.0 1.00 2698.9
1430.4 0.64 1727.3 0.74 1997.2 0.85 2294.1 0.90 2429.0 0.95 2564.0 1.00 2698.9
1510.3 0.64 1788.5 0.74 2041.4 0.85 2319.6 0.90 2446.0 0.95 2572.5 1.00 2698.9
1414.3 0.63 1681.2 0.74 1974.7 0.85 2268.3 0.90 2401.7 0.95 2535.1 1.00 2668.5
1387.6 0.63 1681.2 0.72 1921.3 0.85 2268.3 0.90 2401.7 0.95 2535.1 1.00 2668.5
1594.1 0.68 1806.6 0.77 2045.8 0.88 2338.0 0.95 2524.0 0.98 2603.7 1.00 2656.8
1283.4 0.55 1568.6 0.66 1882.3 0.76 2167.5 0.83 2367.1 0.87 2481.2 0.91 2595.3
9.0 0.00 9.0 0.00 9.0 0.00 9.0 0.00 9.0 0.00 9.0 0.00 9.0

17391 20808 24201 27615 29339 31034 32378


50.2 60.3 70.3 80.4 85.5 90.5 94.4
ST12 ST13 ST14
% % %
0.00 0.0 0.00 0.0 1.00 0.0
0.56 1085.4 0.72 1347.3 1.00 1805.5
1.00 2696.0 1.00 2696.0 1.00 2696.0
1.00 2696.0 1.00 2696.0 1.00 2696.0
1.00 2711.7 1.00 2711.7 1.00 2711.7
1.00 2711.7 1.00 2711.7 1.00 2711.7
1.00 2698.9 1.00 2698.9 1.00 2698.9
1.00 2698.9 1.00 2698.9 1.00 2698.9
1.00 2698.9 1.00 2698.9 1.00 2698.9
1.00 2698.9 1.00 2698.9 1.00 2698.9
1.00 2668.5 1.00 2668.5 1.00 2668.5
1.00 2668.5 1.00 2668.5 1.00 2668.5
1.00 2656.8 1.00 2656.8 1.00 2656.8
0.91 2595.3 1.00 2851.9 1.00 2851.9
0.00 9.0 0.00 9.0 1.00 4.9

33295 33813 34267


97.1 98.7 100.0
PORT : WHITEGATE, IRELAND
DISCHARGE PLAN CARGO: OUKHIBOME BLEND
MT GEMINI SUN
BERTH : WHITEGATE MARINE TERMINAL RATE: 3000 Cub.M
API / DENS. 40.4 / 0.8233 AVG TEMP: 28.5 Deg C
STAGE STAGE 0 100% STAGE 1 89% STAGE 2 80% STAGE 3 69% STAGE 4 58%
HRS Initial Stage / 0 Hrs Normal Stage / 3.9 Hrs Normal Stage / 7.2 Hrs Normal Stage / 11.4 Hrs Normal Stage / 15.4 Hrs
TANKS ULL VOL ULL VOL ULL VOL ULL VOL ULL VOL

1P 3.11 7642 4.81 6878 7.70 5579 10.21 4815 11.76 4050
1S 3.12 7640 4.82 6876 7.70 5577 10.22 4813 11.77 4049
2P 3.34 9250 5.04 8325 6.91 7308 9.38 6290 10.97 5365
2S 3.32 9255 5.02 8330 7.07 7219 9.39 6293 10.98 5368
3P 3.34 9292 5.04 8363 5.04 8363 8.65 6969 10.23 5947
3S 3.33 9300 5.03 8370 5.03 8370 9.33 6882 10.82 5859
4P 3.64 9127 5.31 8214 8.15 6663 10.43 5841 11.96 4929
4S 3.38 9266 5.07 8339 7.96 6764 10.45 5930 11.97 5004
5P 3.02 9459 4.75 8513 6.66 7472 9.25 6527 10.84 5581
5S 4.06 8894 5.69 8005 7.48 7027 9.88 6137 11.38 5248
6P 2.95 9114 4.62 8203 4.62 8203 8.57 6745 10.04 5833
6S 4.18 8447 5.72 7602 5.72 7602 8.58 6251 10.06 5406
SLP 5.53 1666 9.02 1166 8.99 1166 20.82 1166 20.82 0
SLS 5.66 1649 9.09 1154 9.09 1028 10.00 1028 10.00 1028
1)Start No.1 COP and discharge
4W's COT Initially at slow
rate.Terminal to be informed 1)Continue discharging bulk cargo 1)Continue discharging bulk cargo
1)Continue discharging bulk cargo 1)Continue discharging bulk cargo
commenced discharge. Monitor the from COT's -1W,2W,3W,4W,5W, from COT's -1W,2W,3W,4W,5W &
from COT's -1W,2W,3W,4W,5W, from COT's -1W,2W,3W,4W,5W,
CCR readouts to confirm that 6W using No.1 , No. 2 & No.3 6W using No.1 , No. 2 & No.3
6W using No.1 , No. 2 & No.3 6W using No.1 , No. 2 & No.3
cargo is flowing out from the COP. COP.
Remarks-Cargo COP. COP.
FIRST nominated tanks 4W’s COT 2)Maintain Manifold 2)Maintain Manifold
2)Maintain Manifold 2)Maintain Manifold
only. 2)After getting readiness from Pressure/Discharge rate as Pressure/Discharge rate as
Pressure/Discharge rate as Pressure/Discharge rate as
the terminal to increase to agreed. 3) Fill Slop S up to ullage agreed.
agreed. agreed.
maximum then Start No.2 & No.3 10 m, for eductor medium.
COP.Open Cargo Tanks-
1W,2W,3W,4W,5W,6W.

TOTAL-M3 110001 98338 88340 75687 63666


RATE-M3 3000 3000 3000 3000
DRAFTS
FWD-m 13.25 12.34 10.75 8.34 7.80
AFT-m 13.25 12.67 12.93 10.50 10.38
TRIM-m 0.00 0.33 2.18 2.16 2.59
S.F. (%@FR) 31 Fr: 60 30 Fr: 60 19 Fr: 60 22 Fr: 45 24 Fr: 45
B.M.(%@FR) 26 Fr: 161 21 Fr: 169 31 Fr: 185 27 Fr: 104 30 Fr: 107
GoM-m 4.94 4.32 4.99 7.76 8.67
UKC-m 0.85 1.43 1.17 3.60 3.72
MANIFOLD HT.-m 10.15 10.90 11.56 13.98 14.31
BALLAST (SOUNDING IN METRES)
FPK H 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
FPK L 2.02 169 2.02 169 2.02 169 0.00 169 0.00 169
1P 0.00 0 0.84 297 0.84 297 2.34 863 3.94 1132
1S 0.00 0 0.84 297 0.84 297 2.34 863 3.94 1132
2P 0.00 0 0.50 298 0.50 298 1.50 868 1.96 1139
2S 0.00 0 0.50 298 0.50 298 1.50 868 1.96 1139
3P 0.00 0 0.48 297 0.94 567 1.44 864 1.90 1134
3S 0.00 0 0.48 297 0.94 567 1.44 864 1.90 1134
4P 0.00 0 0.48 324 0.94 567 1.44 864 1.94 1161
4S 0.26 170 0.70 423 0.94 575 1.44 979 1.90 1232
5P 0.00 0 0.54 267 1.02 560 1.54 827 2.18 1147
5S 0.00 0 0.42 267 1.02 560 1.62 827 2.18 1121
6P 0.44 0 1.08 531 1.76 903 2.78 1169 3.60 1328
6S 0.60 0 1.16 570 1.88 970 1.52 542 2.28 998
APK 1.50 9 1.52 9 1.00 9 1.00 9 1.00 9
TOTAL -M3 348 4343 6636 10574 13975
RATE-M3 1998 1147 1969 1700
1.START BALLASTING BY
1.BALLASTING BY GRAVITY. 1.BALLASTING BY GRAVITY. 1.BALLASTING BY GRAVITY. 1.BALLASTING BY GRAVITY.
Remarks- GRAVITY.
2.LIST CORRECTION USING 2.LIST CORRECTION USING 2.LIST CORRECTION USING 2.LIST CORRECTION USING
Ballast 2.LIST CORRECTION USING
6W's WBT 6W's WBT 6W's WBT 6W's WBT
6W's WBT.
DISCHARGE PLAN MT GEMINI SUN

C/OFF 2/OFF 3/OFF MASTER


PORT : WHITEGATE, IRELAND
DISCHARGE PLAN CARGO: OUKHIBOME BLEND
MT GEMINI SUN
BERTH : WHITEGATE MARINE TERMINAL RATE: 3000 Cub.M
API / DENS. 40.4 / 0.8233 AVG TEMP: 28.5 Deg C
STAGE STAGE 5 48% STAGE 6 39% STAGE 7 29% STAGE 8 19% STAGE 9 15%
HRS Normal Stage / 18.9 Hrs Normal Stage / 22.5 Hrs Normal Stage / 26 Hrs Normal Stage / 29.6 Hrs Critical Stage / 31.3 Hrs
TANKS ULL VOL ULL VOL ULL VOL ULL VOL ULL VOL

1P 14.08 2904 15.63 2140 17.56 1223 18.11 459 18.12 76


1S 14.09 2903 15.64 2139 17.57 1222 19.37 458 20.38 76
2P 12.57 4440 14.16 3515 15.75 2590 17.36 1665 18.20 1203
2S 12.57 4442 14.16 3517 15.75 2591 17.35 1666 18.19 1203
3P 11.02 5389 12.61 4460 13.87 3717 15.46 2880 16.25 2323
3S 11.57 5394 13.06 4464 14.25 3720 15.75 2883 16.49 2325
4P 14.25 3559 15.78 2647 17.80 1552 19.50 639 20.42 91
4S 14.26 3614 15.79 2687 17.80 1483 19.49 649 20.41 93
5P 12.42 4635 14.01 3689 15.59 2838 17.19 1892 18.02 1513
5S 12.88 4358 14.37 3469 15.87 2668 17.38 1779 18.17 1334
6P 10.78 5469 12.27 4557 13.48 3828 15.34 2734 15.82 2461
6S 10.80 5068 12.29 4224 13.49 3548 15.35 2534 15.83 2281
SLP 20.82 0 20.82 0 20.82 0 20.82 0 20.82 0
SLS 10.00 1028 10.00 1028 10.00 1028 10.00 1028 10.00 1028

1)Continue discharging bulk cargo


from COT's -1W,2W,3W,4W,5W,
1)Continue discharging bulk cargo 1)Continue discharging bulk cargo 1)When GR-1 Empty.
6W using No.1 , No. 2 & No.3 1)Continue discharging bulk cargo
from COT's -1W,2W,3W,4W,5W & from COT's -1W,2W,3W,4W,5W & Start COW for 4W COT using
COP. from COT's -1W,2W,3W,4W,5W,
6W using No.1 , No. 2 & No.3 6W using No.1 , No. 2 & No.3 NO.1 COP as per COW Plan.Refer
2)Maintain Manifold 6W using No.1 , No. 2 & No.3
COP. COP. COW/Discharge plan.
Remarks-Cargo Pressure/Discharge rate as COP.
2)Maintain Manifold 2)Maintain Manifold 2)Continue discharging bulk cargo
agreed. 2)Maintain Manifold
Pressure/Discharge rate as Pressure/Discharge rate as from Gr-2 & Gr-3 COT-
3)Ensure AUS is lined up for All Pressure/Discharge rate as
agreed. agreed. 2W,3w,5W,6W using No. 2 & No.3
COP's at Ullage-16 m agreed.
COP.
4)CALL C/OFF AT ULLAGE-19.0
M

TOTAL-M3 53204 42535 32007 21266 16007


RATE-M3 3000 3000 3000 3000 3000
DRAFTS
FWD-m 7.09 6.62 6.04 5.55 5.20
AFT-m 10.45 10.27 10.20 10.03 10.07
TRIM-m 3.36 3.65 4.16 4.48 4.87
S.F. (%@FR) 21 Fr: 165 22 Fr: 165 25 Fr: 165 36 Fr: 60 39 Fr: 60
B.M.(%@FR) 34 Fr: 114 39 Fr: 116 44 Fr: 121 48 Fr: 121 52 Fr: 126
GoM-m 11.94 12.62 13.24 13.65 13.78
UKC-m 3.65 3.83 3.90 4.07 4.03
MANIFOLD HT.-m 14.63 14.96 15.28 15.61 15.77
BALLAST (SOUNDING IN METRES)
FPK H 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
FPK L 0.00 169 0.00 169 0.00 169 0.00 169 0.00 169
1P 6.44 1429 9.92 1725 13.58 2022 16.88 2292 18.50 2426
1S 6.44 1429 9.92 1725 13.58 2022 16.88 2292 18.50 2426
2P 2.98 1437 5.42 1735 9.96 2034 14.24 2305 16.38 2440
2S 2.98 1437 5.42 1735 9.96 2034 14.24 2305 16.38 2440
3P 2.76 1430 5.06 1727 9.56 2024 14.00 2294 16.22 2429
3S 2.76 1430 5.06 1727 9.56 2024 14.00 2294 16.22 2429
4P 2.76 1430 5.06 1727 9.12 1997 14.00 2294 16.22 2429
4S 2.76 1510 5.06 1789 9.12 2041 14.00 2320 16.22 2446
5P 3.18 1414 5.46 1681 9.82 1975 14.62 2268 16.82 2402
5S 3.16 1388 5.64 1681 9.16 1921 14.76 2268 16.90 2402
6P 4.94 1594 6.10 1807 7.54 2046 9.58 2338 11.24 2524
6S 3.64 1283 5.06 1569 6.78 1882 8.56 2167 10.04 2367
APK 1.00 9 1.00 9 1.00 9 1.00 9 1.00 9
TOTAL -M3 17391 20808 24201 27615 29339
RATE-M3 1708 1708 1696 1707 862
1.START WBP NO.1 OR NO.2 1.CONTINUE BALLASTING 1.CONTINUE BALLASTING 1.CONTINUE BALLASTING 1.CONTINUE BALLASTING
Remarks- FOR BALLASTING USING WBP NO.1 OR 2 USING WBP NO.1 OR 2 USING WBP NO.1 OR 2 USING WBP NO.1 OR 2
Ballast 2.LIST CORRECTION USING 2.LIST CORRECTION USING 2.LIST CORRECTION USING 2.LIST CORRECTION USING 2.LIST CORRECTION USING
6W's WBT 6W's WBT 6W's WBT 6W's WBT 6W's WBT
DISCHARGE PLAN MT GEMINI SUN

C/OFF 2/OFF 3/OFF MASTER


PORT : WHITEGATE, IRELAND
DISCHARGE PLAN CARGO: OUKHIBOME BLEND
MT GEMINI SUN
BERTH : WHITEGATE MARINE TERMINAL RATE: 3000 Cub.M
API / DENS. 40.4 / 0.8233 AVG TEMP: 28.5 Deg C
STAGE STAGE 10 10% STAGE 11 5% STAGE 12 1% STAGE 13 0% STAGE 14 0%
HRS Critical Stage / 33.2 Hrs Critical Stage / 35.3 Hrs Critical Stage / 38 Hrs Critical Stage / 39.1 Hrs Final Stage / 39.6 Hrs
TANKS ULL VOL ULL VOL ULL VOL ULL VOL ULL VOL

1P 20.82 0 20.82 0 20.82 0 20.82 0 20.82 0


1S 20.82 0 20.82 0 20.82 0 20.82 0 20.82 0
2P 19.27 648 20.82 0 20.82 0 20.82 0 20.82 0
2S 19.26 648 20.82 0 20.82 0 20.82 0 20.82 0
3P 17.21 1765 18.55 836 20.82 0 20.82 0 20.82 0
3S 17.40 1767 18.68 744 20.82 0 20.82 0 20.82 0
4P 20.82 0 20.82 0 20.82 0 20.82 0 20.82 0
4S 20.82 0 20.82 0 20.82 0 20.82 0 20.82 0
5P 19.25 662 20.82 0 20.82 0 20.82 0 20.82 0
5S 19.34 623 20.82 0 20.82 0 20.82 0 20.82 0
6P 16.97 1732 18.39 1276 20.82 0 20.82 0 20.82 0
6S 16.98 1605 18.40 1183 20.82 0 20.82 0 20.82 0
SLP 20.82 0 20.82 0 20.82 0 20.82 0 20.82 0
SLS 10.00 1028 10.00 1028 10.00 1028 20.82 0 20.82 0

1)When GR-2 Empty.STOP NO.2


1)After completing COW for 4W COP. Start COW for 5W COT 1)When GR-3 Empty.STOP NO.3
COT. Continue educting GR-1 using NO.1 COP as per COW COP.Start Educting of Group-3
COT's for atleast 3 times USING Plan.Refer COW/Discharge plan. COT using NO.1 COP.
NO.1 COP 2)Continue discharging bulk cargo 2)After completion educting of all Cargo Lines / Pumps Stripping by
Remarks-Cargo Departure Condition
2)Continue discharging bulk cargo from Gr-3 using No.3 COP. tanks.Start discharging Slop S Stripping Pump
from Gr-2 & Gr-3 COT- 3)After COW/Educting 5W using NO.1 COP.
2W,3w,5W,6W using No. 2 & No.3 COT'S.Continue educting GR-2 3)Start stripper p/p for lines/pumps
COP. COT's for atleast 3 times USING stripping
NO.1 COP

TOTAL-M3 10477 5067 1028 0 0


RATE-M3 3000 2500 1500 1000 150
DRAFTS
FWD-m 5.18 4.93 5.42 5.72 6.00
AFT-m 9.71 9.54 8.65 8.18 8.00
TRIM-m 4.53 4.61 3.23 2.46 2.00
S.F. (%@FR) 44 Fr: 60 48 Fr: 60 57 Fr: 60 48 Fr: 57 50 Fr: 58
B.M.(%@FR) 56 Fr: 122 60 Fr: 121 68 Fr: 127 65 Fr: 130 68 Fr: 135
GoM-m 14.25 14.90 15.60 15.76 15.61
UKC-m 4.39 4.56 5.45 5.92 6.10
MANIFOLD HT.-m 15.96 16.17 16.37 16.45 16.40
BALLAST (SOUNDING IN METRES)
FPK H 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
FPK L 0.00 169 0.00 169 6.50 1085 7.80 1347 10.10 1806
1P 20.44 2588 21.68 2696 21.68 2696 21.68 2696 21.68 2696
1S 20.44 2588 21.68 2696 21.68 2696 21.68 2696 21.68 2696
2P 18.96 2603 20.68 2712 20.68 2712 20.68 2712 20.68 2712
2S 18.96 2603 20.68 2712 20.68 2712 20.68 2712 20.68 2712
3P 18.86 2591 20.64 2699 20.64 2699 20.64 2699 20.64 2699
3S 18.86 2591 20.64 2699 20.64 2699 20.64 2699 20.64 2699
4P 18.42 2564 20.64 2699 20.64 2699 20.64 2699 20.64 2699
4S 18.42 2572 20.64 2699 20.64 2699 20.64 2699 20.64 2699
5P 19.00 2535 21.20 2669 21.20 2669 21.20 2669 21.20 2669
5S 19.06 2535 21.20 2669 21.20 2669 21.20 2669 21.20 2669
6P 12.06 2604 12.60 2657 12.60 2657 12.60 2657 12.60 2657
6S 11.06 2481 12.20 2595 12.20 2595 14.94 2852 14.94 2852
APK 1.00 9 1.00 9 1.00 9 1.00 9 1.00 5
TOTAL -M3 31034 32378 33295 33813 34267
RATE-M3 847 672 458 259 227
1.CONTINUE BALLASTING 1.CONTINUE BALLASTING 1.CONTINUE BALLASTING 1.CONTINUE BALLASTING
Remarks- USING WBP NO.1 OR 2 USING WBP NO.1 OR 2 USING WBP NO.1 OR 2 USING WBP NO.1 OR 2 FINAL DEPARTURE BALLAST
Ballast 2.LIST CORRECTION USING 2.LIST CORRECTION USING 2.LIST CORRECTION USING 2.LIST CORRECTION USING CONDITION
6W's WBT 6W's WBT 6W's WBT 6W's WBT
DISCHARGE PLAN MT GEMINI SUN

C/OFF 2/OFF 3/OFF MASTER


DISCHARGE / CRUDE OIL WASHING PLAN (CONVENTIONAL TANKER)

BALLASTING / DEBALLASTING INSTRUCTIONS


Vessel: GEMINI SUN Voyage No.: 106 Port: WHITEGATE, IRELAND Date: Monday, May 9, 2022

TANKS FOR COW


FULL WASH : S.No. GRADE API /DENS. TEMP QUANTITY CARGO TANKS TO BE DISCHARGED
METHOD OF COW

4W

ANGLE : 150 - 0-60 1 ALBA CRUDE OIL 19.4 / 0.9372 39.5 Deg.C 70053 m3 1W, 2W, 3W, 4W, 5W, 6W
BOTTOM WASH :
1W/2W /SLOP S/ 5W / 3W /
6W

ANGLE : 60 - 0- 60

STAGE / ARRIVAL STAGE 1 STAGE 2 STAGE 3 STAGE 4 STAGE 5 STAGE 6 STAGE 7 STAGE 8 STAGE 9 STAGE 10 STAGE 11 STAGE 12 STAGE 13 DEPARTURE
HRS 0.0 HRS 3.9 HRS 7.2 HRS 11.4 HRS 15.4 HRS 18.9 HRS 22.5 HRS 26.0 HRS 29.6 HRS 31.3 HRS 33.2 HRS 35.3 HRS 38.0 HRS 39.1 HRS 39.6 HRS

Cargo Tanks USED FOR COW DISCH SLOP (S)

No 1 COP
DISCHARGING

No 2 COP

No 3 COP

STR P/P LINE STRIPPING

COW TANKS

TOP 4W
CYCLE

BOTTOM 4W 5W

BALLAST TANKS BY GRAVITY BY PUMP

FPK L

No 1 P/S
Ballasting No 1 WBP

No 2 P/S

No 3 P/S

No 4 P/S

No 5 P/S

No 6 P/S

FPK L

No 1 P/S
Ballasting No 2 WBP

No 2 P/S

No 3 P/S

No 4 P/S

No 5 P/S

No 6 P/S

APK

SF (%) 31 30 19 22 24 21 22 25 36 39 44 48 57 48 50
STRESS
MAX

BM (%) 26 21 31 27 30 34 39 44 48 52 56 60 68 65 68

GoM (m) 4.94 4.32 4.99 7.76 8.67 11.94 12.62 13.24 13.65 13.78 14.25 14.90 15.60 15.76 15.61

FORE (m) 13.25 12.34 10.75 8.34 7.80 7.09 6.62 6.04 5.55 5.20 5.18 4.93 5.42 5.72 6.00
DRAFT

AFT (m) 13.25 12.67 12.93 10.50 10.38 10.45 10.27 10.20 10.03 10.07 9.71 9.54 8.65 8.18 8.00

TRIM (m) 0.00 0.33 2.18 2.16 2.59 3.36 3.65 4.16 4.48 4.87 4.53 4.61 3.23 2.46 2.00

ADDITIONAL INSTRUCTIONS
1) Vessel Nominated to Disch. All cargo at this port. PERSONS EMPLOYED ON OPERATIONS
WATCH
2) Maintain Manifold Pressure/Discharge rate as agreed. DUTY OFFICER SEAMAN
3) Slop S COT will be used as washing medium.
4) Refer Stagewise Disch. Plan and COW Plans.
5) Min Trim:4.20 m required for COW as per COW Manual.
A/B ALFRED : (0000-0400) & (1200-1600)
6) Max Depth: 31.00 m (No Restrictions)
0000-0600 / 1200-1800 : 2/O UTKARSH MATHUR A/B SUNIL : (0400-0600) & (1600-1800)
DTR SHIVA : (0000-0600) & (1200-1800)

BALLASTING / DEBALLASTING INSTRUCTIONS A/B NIEL : (0800-1200) & (2000-2400)


0600-1200 / 1800-2400 : 3/O ARTEM A/B SUNIL : (0600-0800) & (1800-2000)
BALLASTING BY PUMP BALLASTING BY GRAVITY OS EDUARD : (0600-1200) & (1800-2400)

1) Follow ballasting sequence as given in stage wise plan. OVERALL INCHARGE OF OPERATIONS : CHIEF OFFICER
BOSUN, P/MAN STANDBY FOR CRITICAL STAGES OF OPERATIONS

BUNKERING INSTRUCTIONS
3/O 2/O C/O
NONE

P/M C/E VERIFIED & APPROVED BY MASTER