Professional Documents
Culture Documents
1a. BMC Brunei Recommendation Report
1a. BMC Brunei Recommendation Report
1a. BMC Brunei Recommendation Report
THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF
MITSUBISHI HEAVY INDUSTRIES ASIA PACIFIC PTE. LTD.. (HEREINAFTER “MHIAP”) AND THE COPYRIGHT THEREIN IS VESTED
IN MHIAP.
NO PART OF THIS DOCUMENT, DATA OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER
OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF MHIAP.
For Approval
Recommendation Report
NG Booster Compressor Drive Turbine (K-1101T) and
Synthesis Gas LP Compressor (K-1301LP)
DISTRIBUTION
CLIENT E
PM E
QA/QC -
COST -
REVISIONS
SCHEDULE -
PROC. -
LOGISTIC -
PROCESS E
EQUIP. -
APPROVED
BRUNEI METHANOL COMPANY SDN. BHD. ELEC. -
CIVIL -
PROJECT CONST -
J05-29348 Rev.A 0
DRAWN DATE February 11, 2021 TOTAL 5E
A3× - Sheets
A4× 19 Sheets Total 19 Sheets (Including Cover) Plant No. W-0392
Plan Record
Technical Service Group
See next page.
Customer Service Division
Approved M. Katagake
M. Katagake
Checked
T. Karasawa
Prepared
Ⓐ J05-29348
WORD FORM DATE ISSUED
J05-29348 0/
CONTENTS
PAGES
1. General 2
1. General
The maintenance of following machines was carried out, and it was completed owing to your excellent
management and cooperation on us.
We thank you most warmly for your hospitality extended to our Technical Field Advisors during their stay
at your site.
Based on the findings during maintenance work, we would like to give some recommendations for the
successful continuous operation and complete preparation toward next maintenance.
In addition to this recommendation, please refer to Service Report, which is separately issued.
Service Report Drawing Number; J07-17825
Duration of Technical Field Advisors at Site; from Jun.18,2021 to Jul.11,2021
[Scope of Maintenance]
Service Equipment Item No. Type Work Activity
NG-Booster Turbine K-1101 T 3CL-4 Major Overhaul
SynGas LP Compressor K-1301 LP 5V-6B Major Overhaul
In addition to the spare parts, an availability of spare rotor is very important to minimize a recovery period
in the case of unexpected trouble.
Therefore, it is highly recommended to send the used rotors as early as possible to MCO workshop
and/or MCO certified local workshop for the inspection and refurbishment.
End
J05-29348 3/
Attachment-1 : Recommended Spare Parts List
1 2nd stage labyrinth packing 780-14261 502 2911-14 1set out of design >100%
2 Vapor hood Exh side Labyrinth packing 780-14261 56 2911-11 1set out of design >100%
3 O ring 764-4B043 93 n/a 1 TTV
4 O ring 764-4B043 94 n/a 1 TTV
5 O ring 764-4B043 95 n/a 1 TTV
6 O ring 764-4B043 96 n/a 1 TTV
7 Back up ring 790-42759 21 5711-21 1 hub replacement
8 O ring 790-42759 22 5711-22 1 hub replacement
9 O ring 790-42759 23 5711-23 1 hub replacement
10 Back up ring 790-42759 24 5711-24 1 hub replacement
J05-29348 4/
Situation
Explanation and Picture or Figure
Customer did not have a open end flogging spanner to safely open the GV nuts around the spring can location.
Finding a alternative spanner caused 4-5 days delay to disassembly of the GV. After the PT inspection/ blue
check with a good result - customer decided to not proceed with a further disassembly of the valve. This to avoid
any possible time delay.
Remarks
The spanner for GV nut is not included as special tool supplied from MCO.
Reused as it is
Countermeasure
Recommended parts
Parts name Main Parts No. Remarks Quantity
J05-29348 13/
Situation
Explanation and Picture or Figure
Accumulated fouling was observed on inlet guide (2S) and 4th stage impeller.
Remarks
Recommended parts
Parts name Main Parts No. Remarks Quantity
J05-29348 14/
Situation
Explanation and Picture or Figure Damaged threaded hole
Remarks
It was hard to remove DE side shaft seal labyrinth due to a damaged threaded hole. Therefore the head had to
be removed with the Laby still installed. This could be problem for a minor overhaul.
Countermeasure
Recommended parts
Parts name Main Parts No. Remarks Quantity
Shaft seal labyrinth (DE side) 4811-51 31 MCO DWG : 790-16853 1 pc
Attachment-4 : Additional Proposal for Reliable Operation J05-29348 15/
Sermalon Coating
© Mitsubishi Heavy Industries Compressor Corp. ALL Rights Reserved
J05-29348 16/
Introduction
Anti-Fouling Technology
Internal Coating
Typical Fouling Condition To avoid the accumulation of polymer on
for Charge Gas Compressors the surface of compressor internal for
minimum efficiency decrease.
PTFE
Metal Comp.
Ceramic
SUBSTRATE
Water Injection
To avoid the fouling, keeping Oil Injection
low gas temperature by water To clean the compressor internals to retain
vaporization. high performance without overhaul.
© Mitsubishi Heavy Industries Compressor Corp. ALL Rights Reserved 3
J05-29348 17/ E
Introduction
SERMALON COATING
(Developed by Sermatech., USA)
Product Description
Sermalon is a three-layer coating system
PTFE
Metal Comp.
Ceramic