Example of Hydraulic Design Calculation


( applying HDPE DWCP at gradient 1 : 275 )

d Pipe Computation Manhole and Level Computation


MH No of PE PE Cumulative Average Peak Peak Cumulative Diameter Length Gradient Full Full Fall Ground Invert Depth MH
To Units per PE Flow Flow Flow Peak 1:n Pipe Pipe Level Level Type
MH unit Factor Flow n= Velocity Flow of Pipe Drop
(1) (2a) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) MH=1
MH No. (PE) (PE) (l/s) (l/s) (l/s) (mm) (m) (m/s) (m3/s) (m) (m) (m)
1 4.000 2.800 1.200
6 5 30 30 0.08 6.91 0.54 0.54 225 42 250 0.845 0.034 0.17
2 4.498 2.632 1.866
5 5 25 55 0.14 6.47 0.93 0.93 225 42 250 0.845 0.034 0.17
3 4.498 2.464 2.034
11 5 55 110 0.29 5.99 1.72 1.72 225 30 136 1.151 0.046 0.22
4 4.000 2.243 1.757
ext
4 4.000 2.800 1.200
13 5 65 65 0.17 6.35 1.07 1.07 225 60 250 0.845 0.034 0.24
5 4.000 2.560 1.440
0 5 0 65 0.17 6.35 1.07 1.07 225 80 250 0.845 0.034 0.32
9 4.000 2.240 1.760

6 4.500 3.300 1.200


14 5 70 70 0.18 6.30 1.15 1.15 225 60 250 0.845 0.034 0.24
7 4.500 3.060 1.440
0 5 0 70 0.18 6.30 1.15 1.15 225 30 250 0.845 0.034 0.12
8 4.500 2.940 1.560
0 5 0 70 0.18 6.30 1.15 1.15 225 50 71 1.599 0.064 0.70
9 4.000 2.236 1.764

9 4.000 2.240 1.760


0 5 0 245 0.64 5.49 3.50 3.50 225 45 250 0.845 0.034 0.18
10 4.500 2.060 2.440
0 5 0 245 0.64 5.49 3.50 3.50 225 29 250 0.845 0.034 0.12
22 4.500 1.944 2.556
17 5 85 330 0.86 5.31 4.56 4.56 225 77 250 0.845 0.034 0.31
20 3.500 1.636 1.864

30 4.750 3.550 1.200


12 5 60 60 0.16 6.40 1.00 1.00 225 78 250 0.845 0.034 0.31
29 4.740 3.238 1.502
0 5 0 60 0.16 6.40 1.00 1.00 225 33 250 0.845 0.034 0.13
28 4.752 3.106 1.646
0 5 0 60 0.16 6.40 1.00 1.00 225 49.5 250 0.845 0.034 0.20
27 4.500 2.908 1.592
0 5 0 60 0.16 6.40 1.00 1.00 225 50 250 0.845 0.034 0.20
26 4.500 2.708 1.792
11 5 55 115 0.30 5.96 1.79 1.79 225 80 250 0.845 0.034 0.32
25 4.000 2.388 1.612
0 5 0 115 0.30 5.96 1.79 1.79 225 20 250 0.845 0.034 0.08
24 4.000 2.308 1.692
6 5 30 145 0.38 5.81 2.19 2.19 225 53 250 0.845 0.034 0.21
23 4.000 2.096 1.904
0 5 0 145 0.38 5.81 2.19 2.19 225 24.5 250 0.845 0.034 0.10
21 3.512 1.998 1.514
0 5 0 145 0.38 5.81 2.19 2.19 225 33 91 1.411 0.056 0.36
20 3.500 1.635 1.865
2
Example of Hydraulic Design Calculation
( applying HDPE DWCP at gradient 1 : 275 )

d Pipe Computation Manhole and Level Computation


MH No of PE PE Cumulative Average Peak Peak Cumulative Diameter Length Gradient Full Full Fall Ground Invert Depth MH
To Units per PE Flow Flow Flow Peak 1:n Pipe Pipe Level Level Type
MH unit Factor Flow n= Velocity Flow of Pipe Drop
(1) (2a) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) MH=1
MH No. (PE) (PE) (l/s) (l/s) (l/s) (mm) (m) (m/s) (m3/s) (m) (m) (m)
20 3.500 1.635 1.865
0 5 0 475 1.24 5.10 6.31 6.31 225 49 84 1.469 0.058 0.58
17 3.000 1.052 1.948
0 5 0 475 1.24 5.10 6.31 6.31 225 57.5 250 0.845 0.034 0.23
18 3.000 0.822 2.178
0 5 0 475 1.24 5.10 6.31 6.31 225 61 250 0.845 0.034 0.24
19 3.000 0.578 2.422

11 4.000 2.650 1.350


20 5 100 100 0.26 6.05 1.58 1.58 225 57 250 0.845 0.034 0.23
12 4.000 2.422 1.578
20 5 100 200 0.52 5.61 2.92 2.92 225 72 250 0.845 0.034 0.29
13 4.000 2.134 1.866
0 5 0 200 0.52 5.61 2.92 2.92 225 50 51 1.890 0.075 0.98
14 3.000 1.154 1.846

16a 3.000 1.650 1.350


20 5 100 100 0.26 6.05 1.58 1.58 225 58 250 0.845 0.034 0.23
15 3.000 1.418 1.582
18 5 90 190 0.49 5.64 2.79 2.79 225 65 250 0.845 0.034 0.26
14 3.000 1.158 1.842

14 3.000 1.158 1.842


0 5 0 390 1.02 5.21 5.29 5.29 225 29 50 1.909 0.076 0.58
19 3.000 0.578 2.422

19
to 0 5 0 865
stp

total 865 1464.5 0

Note :
For MH 9 to MH 10 and MH 28 to MH 27 are 225 diameter Ductile Iron Pipe.
3
Ref : 0053/01

Ref : 0081/01

comparison of sewer excavation comparison of sewer depth

remarks MH vcp depth extra depth extra E/W DROP MH MH depth extra depth
type A unless To of (m) =
otherwise MH sewer pipe 1
specified (1)
MH No. (m) (m) (m) (m) (m) (m)
1 1.200 0.000 1.200 0.000
-7.636
B 2 1.260 -0.606 1.260 -0.606
-17.262
C 3 1.270 -0.764 1.270 -0.764
-9.725
E 4 1.440 -0.317 1.440 -0.317

4A 1.200 0.000 1.200 0.000


-1.260
C 4B 1.370 -0.070 1.370 -0.070
-9.360
E 4 1.440 -0.320 1.440 -0.320

4 1.440 0.240 1.440 0.240


4.860
C 5 1.470 0.030 1.470 0.030
3.150
C 6 1.880 0.320 1.880 0.320

E 6A 1.200 -0.564 1.200 -0.564

E 6 1.880 0.120 1.880 0.120

D 6 1.880 -0.560 1.880 -0.560


-7.099
D 7 2.300 -0.256 2.300 -0.256
10.164
E 8 2.560 0.696 2.560 0.696
0.000
9 2.950 1.750 2.950 1.750

D 9A 1.200 -0.302 1.200 -0.302


-7.207
D 9B 1.220 -0.426 1.220 -0.426
-11.553
D 9C 1.240 -0.352 1.240 -0.352
-10.860
D 9F 1.420 -0.372 1.420 -0.372

D 9D 1.200 -0.412 1.200 -0.412


-4.944
D 9E 1.280 -0.412 1.280 -0.412
-14.246
C 9F 1.420 -0.484 1.420 -0.484

D 9F 1.42 -0.094 1.42 -0.094


9.814
E 9 2.950 1.085 2.950 1.085
4
Ref : 0053/01

Ref : 0081/01

comparison of sewer excavation comparison of sewer depth

remarks MH vcp depth extra depth extra E/W DROP MH MH depth extra depth
type A unless To of (m) =
otherwise MH sewer pipe 1
specified (1)
MH No. (m) (m) (m) (m) (m) (m)
E 10A 1.200 -0.665 1.200 -0.665
-16.072
D 10B 1.520 -0.428 1.520 -0.428
-16.503
B 10C 1.650 -0.528 1.650 -0.528
-12.090
E 10D 2.290 -0.132 2.290 -0.132

10 3.000 1.650 3.000 1.650

E 12 1.200 -0.646 1.200 -0.646


0.000
13 2.360 1.010 2.360 1.010
38.593
B 14 2.790 1.208 2.790 1.208
45.162
E 15 2.950 1.108 2.950 1.108
0.000
E 16 3.190 1.348 3.190 1.348
30.589
E 17 4.590 2.168 4.590 2.168

17A 1.200 1.200 1.200 1.200


0.000
17B 2.410 2.410 2.410 2.410

total 68 -3.485 0 #REF!

saving per manhole #REF!