Professional Documents
Culture Documents
BQ For Jawi Hall-2
BQ For Jawi Hall-2
Bill No. 1 Allow for mobilization, preliminaries, insurance's cleaning up upon completion of
Lump
the contract and handling over of completed works.
Sum
A BUILDING WORKS
Bill No. 2 Supply, construct and complete piling works to details as per drawings and any Lump
other works not specified but required for the completion of the works. Sum
Bill No. 3 Supply, construct, complete and maintain pile-cap and substructure works to
details as per drawings and any other works not specified but required for the
completion of the works and supply, construct, complete and maintain ground
floor structure of the proposed building complete with R.C. ground beams and Lump
slabs, cement rendering, apron slab, hardcore, back-filling with approved earth Sum
and etc. to detail as per drawings and any other works not specified but
required for the completion of the works
Bill No. 4 & 5 Supply, construct, complete and maintain roof floor structure of the proposed
building complete with R.C. beams, slabs and R.C. columns, to detail as per Lump
drawings and any other works not specified but required for the completion of Sum
the works.
Bill No. 6 Supply, construct, complete and maintain roof floor structure of the proposed
building complete R.C. roof beams, roof and slabs, R.C. columns, waterproofed
Lump
R.C. to detail as per drawings and any other works not specified but required for
Sum
the completion of the works.
Bill No. 7 Supply, construct, complete and maintain roofing of the proposed building to
details as per drawings and any other works not specified but required for the Lump
completion of the works. Sum
Bill No. 8 Supply, construct, complete and maintain brickworks, door frame of the
proposed building to details as per drawings and any other works not specified Lump
but required for the completion of the works. Sum
Bill No. 9 Supply, construct, complete and maintain doors & windows of the proposed
building to details as per drawings and any other works not specified but Lump
required for the completion of the works. Sum
Bill No. 10 Supply, construct, complete and maintain wall plastering & finishes of the
proposed building to details as per drawings and any other works not specified Lump
but required for the completion of the works. Sum
Bill No. 11 Supply, construct, complete and maintain floor finishes of the proposed building
to details as per drawings and any other works not specified but required for Lump
the completion of the works. Sum
Bill No. 12 Supply, construct, complete and maintain ceiling finishes of the proposed
building to details as per drawings and any other works not specified but Lump
required for the completion of the works. Sum
Bill No 13 Supply, construct, complete and maintain the INTERNAL water and sanitary
pipe works including fitting to details as per drawings and any other works not
specified but required for the completion of the works. (both external & Lump
internal) All works whether stated or not shall be deemed to comply all Sum
requirements of the relevant authorites (PBA etc) and all cost included.
Bill No 14 Supply, construct, complete and maintain the EXTERNAL water and sewer
recticulation to details as per drawings and any other works not specified but
required for the completion of the works. (both external & internal) All works Lump
whether stated or not shall be deemed to comply all requirements of the Sum
relevant authorites (PBA, IWK etc) and all cost included.
Bill No 16 Supply, construct, complete and maintain the external roads work, fencing &
gates of the proposed building to details as per drawings and any other works Lump
not specified but required fo the completing of the works. Sum
Name Name
Desgination Desgination
I/C.: I/C.:
A Initial piles in 12.00m length (40 feet) (In nos. 231) m 2772
TO COLLECTION
A Mild steel extension head and base cap plates No. 231
including coated heavily with bituminous compound
END OF PILING
TO COLLECTION -
A Initial piles in 12.00m length (40 feet) (In nos. 231) m 2772
TO COLLECTION
A Mild steel extension head and base cap plates No. 231
including coated heavily with bituminous compound
END OF PILING
TO COLLECTION -
B2-Piling-1
B2-Piling-2
B2-Piling-3
B2-Piling-4
TO SUMMARY
E In pile caps m3 29
G In ground beams m2 92
M 25mm diameter Kg 0
N 10mm diameter Kg 0
TO COLLECTION
In column stumps
C 20mm diameter Kg 71
E 32mm diameter Kg 0
In ground beams
In column stumps
K 12mm diameter Kg 0
In ground beams
L R8 Kg 1656
M R10 Kg 551
N R12 Kg 113
N R16 Kg 147
TO COLLECTION
END OF FOUNDATION
TO COLLECTION
B3-WBGFL-1
B3-WBGFL-2
B3-WBGFL-3
TO SUMMARY -
A Beams m3 83
B Columns m3 53
In beams
In columns
M 32mm diameter Kg 0
TO COLLECTION
In beams
A 6mm diameter Kg 0
In columns
G 12mm diameter Kg 0
TO COLLECTION
TO SUMMARY -
B4-Frame-1
B4-Frame-2
B5-Upper Floor
TO SUMMARY -
A Roof beams m3 31
Sawn formwork, to
In roof beams
In roof slabs
TO SUMMARY
In Roof Beams
K BRC A8 kg 4564
M BRC B5 kg 3601
N BRC B6 kg 308
O BRC B7 kg 610
P Supply and cosntruct the structural steel roof truss Ton 51.08
members complete with its gusset plate, black bolts,
purlin & sag rod as per the drawing
TO SUMMARY
C Gutters, m2 1584
E Gutters, m2 1584
RAINWATER GOODS
TO SUMMARY
SRI & SRI'S ASSOCIATES SDN. BHD. (206983-P) B7-Roof Finishes & RW-3
ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)
END BRICKWORK
TO SUMMARY
NOTE
LINTOL
WINDOWS
DOORS
SRI & SRI'S ASSOCIATES SDN. BHD. (206983-P) B9-Doors & Windows-1
ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)
IRONMONGERIES
INTERNAL DOORS
NOTE
The tenderer shall refer to the Door Schedule for the types of
ironmongeries and finishes to be used.
LINTOL
INTERNAL DOORS
B Double leaf solid timber door overall size 2000mm x 2100mm high
no 4
(D1)
C Single leaf solid timber door overall size 1000mm x 2100mm high
no 26
(D20 (Fire Door)
D Single leaf PVC door overall size 950mm x 2100mm high (D3). no 10
IRONMONGERIES
Description Amount
COLLECTION
BQ9-Pg 1-2
BQ9-Pg 2-2
SRI & SRI'S ASSOCIATES SDN. BHD. (206983-P) B9-Doors & Windows-2
ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)
NOTE
E To sides of wall. m2
Description Amount
COLLECTION
BQ10-Pg 1-1
WALL FINISHES
SRI & SRI'S ASSOCIATES SDN. BHD. (206983-P) B10-Wall Plastering & Finishes
ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)
NOTE
C To floor m2 101 m2
G To floor m2
I To floor. m2
Description Amount
COLLECTION
BQ11-Pg 1-1 -
FLOOR FINISHES -
NOTE
B To ceiling m2
Prepare and apply one sealer and two finishing coats of ICI or
equivalent weathershield paint
C To external ceiling m2
E To ceiling m2
B To ceiling m2
Prepare and apply one sealer and two finishing coats of ICI
or equivalent emulsion paint
C To internal ceiling m2
Description Amount
COLLECTION
BQ12-Pg 1-2 -
BQ12-Pg 2-2 -
CEILING FINISHES -
PRELIMINARIES
PILING Piling-Collection
WORK BELOW GROUND FLOOR LEVEL WBGFL-Collection
FRAME Frame-Collection
UPPER FLOORS B4-Upper Floor
ROOF CONSTRUCTION B5-Roof
ROOF FINISHES & RAINWATER GOODS B6-Roof Finishes & RW
BRICKWORK B7-Brickwork
TOTAL RM -
Signature Witness
Name Name
Desgination Desgination
I/C.: I/C.:
A Landing beams m3 -
B Staircase m3 -
C 100mm landings m2 -
Sawn formwork, to
F Soffit of landings m2 -
I 16mm diameter Kg -
J 12mm diameter Kg -
K 10mm diameter Kg -
L 12mm diameter Kg -
M 10mm diameter Kg -
TO SUMMARY -
WINDOWS
TO SUMMARY -
C Store m2 31.743 -
Office m2 69.69
step(infront) m2 23.93
wall m2 1326.14
TO SUMMARY -
C Store m2 31.743 -
G Office m2 69.69 -
step(infront) m2 23.93
Painting
N Prepare and apply sealer two, undercoats and one m2 1326.14 -
finishing coat of weather bond paint
TO SUMMARY -
TO SUMMARY -
FLOOR FINISHES
AREA
Tiles
200mm x 200mm ceramic polish tiles inclusive of
cement/sand (1:3) to receive the tiles
A Preparation Room (180.94 sq.ft.) m2 16.81 -
Cement Rending
B Room 2 ( 108.28 sg.ft) m2 10.06 -
Timber flooring
Q stage (1821.69 sq.ft) m2 169.24 -
TO SUMMARY -
STAIRCASE FINISHES
Plastering
19mm thick cement and sand 1:3 screed to receive
ceramic non-slip tiles
Staircase (right)
Staircase (left)
Steps (back)
Steps (infront)
Staircase (right)
Staircase (left)
TO COLLECTION -
Tiling
200 x 200mm ceramic non-slip tiles inclusive laying
Staircase (right)
Staircase (left)
Steps (back)
Steps (infront)
TO COLLECTION -
Parquet finishes
A) 183mm treads m -
B) 225mm risers m -
TO COLLECTION -
Painting
Preparea and apply sealer, two undercoats and one
finish coat of emulsion paint
Staircase (right)
Staircase (left)
TO COLLECTION -
A) Staircase m -
B) Staircase m -
C) Staircase m -
TO COLLECTION -
Page 21
Page 22
Page 23
Page 24
Page 25
TO SUMMARY -
CEILING FINISHES
AREA
TO SUMMARY #REF!
E) 25mm Ditto No -
F) 19mm Ditto No -
G) 13mm Ditto No -
TO COLLECTION -
T Meter No -
U Testing Item
TO COLLECTION -
Page 28
Page 29
TO SUMMARY -
P) Testing Item
TO SUMMARY -
SANITARY FITTINGS
A) Pedestal W.C. No -
B) Squatting W.C. No 12 -
C) Urinal bowl No 2 -
E) Sink No 7 -
F) Shower No 6 -
G) Tap No 47 -
TO SUMMARY -
SEWER RETICULATION
TO SUMMARY -
DRAIN
CULVERT
TO COLLECTION -
SUMP
TO COLLECTION -
Page 34
Page 35
TO SUMMARY -
TO SUMMARY -
TURFING
FENCING
GATE
TO SUMMARY -
SUNDRIES
RETAINING WALL
A) Walls m2 -
B) Walls m3 -
Sawn formwork, to
C) Sides of walls m2 -
D) 12mm diameter kg -
E) 10mm diameter kg -
CONCRETE WALLS
Sawn formwork, to
G) Sides of walls m2 -
BALCONY
H) Handrail m -
I) Balustrade m -
J) Baluster m -
Micelleneous
L) MS Cat ladder LS
END OF SUNDRIES
TO SUMMARY -
PRELIMINARIES
PILING PAGE 3
WORK BELOW GROUND FLOOR LEVEL PAGE 7
FRAME PAGE 10
UPPER FLOORS PAGE 11
ROOF CONSTRUCTION PAGE 12
STAIRCASE CONSTRUCTION (INCLUDING STEPS) PAGE 13
ROOF FINISHES & RAINWATER GOODS PAGE 14
BRICKWORK PAGE 15
DOORS AND WINDOWS PAGE 16
INTERNAL AND EXTERNAL WALL PLASTERING PAGE 17
INTERNAL AND EXTERNAL WALL PAINTING PAGE 18
INTERNAL WALL FINISHES PAGE 19
FLOOR FINISHES PAGE 20
STAIRCASE FINISHES PAGE 26
CEILING FINISHES PAGE 27
COLD WATER SERVICES PAGE 30
SOIL, WASTE AND VENT PIPE PAGE 31
SANITARY FITTINGS PAGE 32
SOIL DRAINAGE AND MANHOLE PAGE 33
SURFACE WATER DRAINAGE PAGE 36
ROAD & CAR PARK PAGE 37
TURFING, FENCING & GATE PAGE 38
SUNDRIES PAGE 39
TOTAL RM -
Signature Witness
Name Name
Desgination Desgination
I/C.: I/C.:
Excel 97-2003
Compatibility Report for BQ - EASTGATE.xls
Run on 23/12/2014 15:21
Excel 97-2003
Excel 97-2003