Rumus Kebutuhan Cat

Menetukan DFT

WFT * %VS
DFT =
100%

250 * 65
DFT =
100%

DFT = 162.5 µm

Quantity Paint for application on surface

Qty Paint = Luas Area (m2) * DFT


10 * VS * Efficiency
Efficiency : 100% - loss factor (%)
VS : Volume Solid Jenis cat (lihat data sheet c
138.6 * 75 DFT : Thickness cat yang dibutuhkan
Qty Paint =
10 * 63 * 1 10 : Factor

Qty Paint = 16.5 ltr

Dead Volume ( surface Roughness)

Luas Area (m2) * DV * 100 Efficiency : 100% - loss factor (%)


Volume (ltr) =
VS * Efficiency VS : Volume Solid Jenis cat (lihat data sheet c
DV : Dead Volume (lihat standard Surface rou
138.6 * 0.02 * 100
Volume (ltr) =
63 * 1 Raoughness, microns
30
45
Volume (ltr) = 4.4 ltr 60
75
90
105
L. web I beam = 4200000 mm2 4200 m2
L. Flange I beam = 4200000 mm2 4200 m2
oss factor (%) Luas penampang 1 I beam 12M 8400 m2
Solid Jenis cat (lihat data sheet cat) 11 92400 m2
s cat yang dibutuhkan

4.2 8.4
4.2
12.6 138.6

oss factor (%)


Solid Jenis cat (lihat data sheet cat)
lume (lihat standard Surface roughness)

Dead Volume, I/m2


0.02
0.03
0.04
0.05
0.06
0.07