TRAINING SYLLABUS

KO4 DIPLOMA IN QUALITY ASSURANCE


TECHNOLOGY

i
First Edition April 2007

Second Edition July 2010

Third Edition July 2015

Department of Manpower Training Institution

http://www.jtm.gov.my/kurikulum

All Rights Reserved. This document is classified as LIMITED. Not allowed to produce any
part of the training syllabus content in any form without permission from the Manpower
Department (JTM).

Syllabus of K04 QUALITI ASSURANCE TECHNOLOGY is a document that outlines the


skills to be acquired by a graduates in Printing Technology. This syllabus format is
developed according to the format of Manpower Department (JTM) and has taken into
account The National Occupational Skills Standards (NOSS) developed by the
Department of Skills Development (DSD). This syllabus also considered all Competency
Units (CU) and Work Activities (WA) in accordance with the requirements of current
technology and to meet certification standards.

Code of Approval : SFB/K04/12010/P2(12016)

Date of Approval : 14 June 2016

ii
ENDORSEMENT OF CURRICULUM STEERING COMMITTEE
CLUSTER OF ENGINEERING SERVICE

It is hereby notified that the syllabus of Quality Assurance , has been reviewed and
CONFIRMED by the Curriculum Steering Committee, Department of Human Resources in
the 1/2016 meeting held on the 14th June 2016. Consequently, the syllabus must be
used effective July 2016 throughout ILJTM.

.................................................. ...................................................
(Azkar Albar bin Abu Bakar) (SYED MOHAMAD NOOR BIN SYED MAT ALI)
Chairman of Cluster Chairman of the Curriculum Steering
Committee

iii
CONTENTS

1. PRELIMINARY ........................................................................................................ vii

1.1. Introduction ...................................................................................................... vii


1.2. Objective .......................................................................................................... vii
1.3. Pre-Requisites ................................................................................................. vii
1.4. Training Methods ............................................................................................ viii
1.4.1 Syllabus Structure ............................................................................... viii
1.5. Course Synopsis ............................................................................................. viii

2. COMMITTEE MEMBERS ........................................................................................... i

3. TRAINING STRUCTURE.............................................................................................. 3

3.1 Competency Profile Chart (Whole Semester) ...................................................... 3


3.2 Training Pathway (Whole Semester) ............................................................... 14
K04 DIPLOMA TEKNOLOGI JAMINAN KUALITI SEMESTER 2 ............................ 17
3.3 MAPPING CHART : NOSS VERSUS JTM MODULE (Whole Semester) ........ 32

4. SEMESTER 1 .......................................................................................................... 46

4.1 COMPETENCY PROFILE CHART .................................................................... 46


4.2 TRAINING PATHWAY CHART SEMESTER 1 ................................................ 48
4.3 MAPPING CHART SEMESTER 1 ..................................................................... 51
4.4 TABLE OF CONTACT HOURS DISTRIBUTION SEMESTER 1 ..................... 54
4.5 SYLIBUS PROFILE SEMESTER 1 ................................................................. 56
K04-01-11 METROLOGY AND MEASUREMENT........................................... 56
K04-01-12 PRODUCT INSPECTION .............................................................. 61
K04-01-13 INTRODUCTION TO QUALITY ..................................................... 68
K04-01-14 TECHNICAL DRAWING .............................................................. 73
K04-01-15 WORKSHOP TECHNOLOGY ..................................................... 78

5. SEMESTER 2 .......................................................................................................... 83

5.1 COMPETENCY PROFILE CHART SEMESTER 2 .......................................... 83


5.2 TRAINING PATHWAY CHART SEMESTER 2 ............................................... 85
5.3 MAPPING CHART SEMESTER 2 ..................................................................... 88
5.4 TABLE OF CONTACT HOURS DISTRIBUTION SEMESTER 2 ..................... 89
5.5 SYLIBUS PROFILE SEMESTER 2 .................................................................... 91
K04-02-11 TESTING AND INSPECTION........................................................ 91
K04-02-11 TESTING AND INSPECTION........................................................ 92
K04-02-11 TESTING AND INSPECTION ....................................................... 93
K04-02-11 TESTING AND INSPECTION........................................................ 94
K04-02-12 INTRODUCTION TO STATISTICAL PROCESS CONTROL (SPC) ..
.......................................................................................................... 97
K04-02-13 DIMENSIONAL METROLOGY 100
K04-02-14 MACHINING PROCESS ............................................................ 104

iv
K04-02-15 ENGINEERING DRAWING ........................................................ 108
K04-02-16 ELECTRIC & ELECTRONIC ...................................................... 113

6. SEMESTER 3 ....................................................................................................... 119

6.1 COMPETENCY PROFILE CHART ............................................................... 119


6.2 TRAINING PATHWAY CHART SEMESTER 3 .............................................. 123
6.3 MAPPING CHART SEMESTER 3................................................................. 126
6.4 TABLE OF CONTACT HOURS DISTRIBUTION SEMESTER 3 ................... 129
6.5 SYLIBUS PROFILE SEMESTER 3 ............................................................... 131
K04-03-11 OCCUPATIONAL SAFETY AND HEALTH .................................. 131
K04-03-12 QUALITY SYSTEM ..................................................................... 135
K04-03-13 INDUSTRIAL MANAGEMENT ..................................................... 142
K04-03-14 PROJECT MANAGEMENT ......................................................... 146
K04-03-15 ADVANCED METROLOGY ......................................................... 152
K04-03-16 CNC PRGRAMMING ................................................................... 157

7. SEMESTER 4 ........................................................................................................ 162

7.1 COMPETENCY PROFILE CHART SEMESTER 4 ........................................... 162


7.2 TRAINING PATHWAY CHART SEMESTER 4 ................................................ 167
7.3 MAPPING CHART SEMESTER 4 .................................................................. 173
7.4 TABLE OF CONTACT HOURS DISTRIBUTION SEMESTER 4 ...................... 181
7.5 SYLIBUS PROFILE ......................................................................................... 183
K04-04-11 MEASURING CALIBRATION ...................................................... 183
K04-04-11 QUALITY SYSTEM ..................................................................... 184
K04-04-13 PRODUCT ANALYSIS ............................................................... 197
K04-04-14 PRODUCT QUALITY CONTROL ................................................ 203
K04-04-15 LEAN MANUFACTURING .......................................................... 210
K04-04-16 SUPERVISORY .......................................................................... 215

8. SEMESTER 5 ........................................................................................................ 222

8.1 COMPETENCY PROFILE CHART .................................................................. 222


8.2 TRAINING PATHWAY CHART ....................................................................... 225
8.3 MAPPING CHART ........................................................................................... 229
8.4 TABLE OF CONTACT HOURS DISTRIBUTION ............................................. 233
8.5 SYLIBUS PROFILE ......................................................................................... 235
K04-05-12 MEASUREMENT SYSTEM ANALYSIS (MSA) ........................... 242
K04-05-13 QUALITY AUDIT ........................................................................ 246
K04-05-14 PRODUCT QUALITY PLANNING .............................................. 250
K04-04-14 PRODUCT QUALITY PLANNING .............................................. 253
K04-05-15 FUNDAMENTAL OF EXPERIMENTAL DESIGN (DOE) .............. 255
K04-05-16 SUPPLIER QUALITY MANAGEMENT ........................................ 260

v
LIST OF ABBREVIATIONS

L Lecture
D Demo
P Practice
PT Practical Test
PR Project
A Assignment
OT Oral Test
WT Written Test
O Observation
SP Special Project
WIM Written Instructional Material
IS Information Sheet
AS Assignment Sheet
WS Work Sheet
CU Competency Unit
WA Work Activities

vi
1. PRELIMINARY

1.1. Introduction

The training syllabus is a document that outlines the matters to be obtained by a


student in the field of Quality Assurance. All modules contained in this training syllabus
will be assessed based on skills to ensure that every student competent and capable
of performing the modules in accordance with the level of skills learned.

This training syllabus format developed by the Department of Manpower Training


Institute (ILJTM) and has taken into account the National Occupational Skills
Standards(National Occupational Skills Standards-NOSS) made by the Department of
Skill Development (DSD). This training syllabus also considers the addition of all duties
and tasks in accordance with the requirements of current technology and to meet
certification standards.

1.2. Objective

The objective of this training syllabus is to assist lecturers in providing training


learning skills so that uniformity of training can be done in all courses ILJTM for Quality
Assurance Technology.

1.3. Pre-Requisites

Quality Assurance Technology course is a course for diploma technology level


which is conducted by the Manpower Department (JTM). Admission requirements for
this course are candidates must be Malaysian citizens aged between 17 and 35years
old and have the following academic qualifications:

SPM/SPMV – passed in three subjects

a) Malay Language

b) Mathematics/ Additional Mathematics; and

c) Science/ Additional Science/ Applied Science/ Technical Subjects

d) English

vii
Duration of full-time training for this course is 2 years and 3 months for On Job
Training (OJT).

1.4. Training Methods

ILJTM training method for the certificate level is based on skills, which is 70%
practical or laboratory and 30% lectures.

1.4.1 Syllabus Structure

Syllabus structures that have been used in Quality Assurance Technology


is as below:

Table 1.1 : Syllabus Structure for Quality Assurance Technology

Semester ILJTMSyllibus NOSS

1 K04 Quality Assurance Technology

2 K04 Quality Assurance Technology MC-041-23:2012

3 K04 Quality Assurance Technology Industrial Quality Assurance


(Manufacturing)

4 K04 Quality Assurance Technology MC-041-45:2012

5 K04 Quality Assurance Technology Industrial Quality Assurance

6 Industrial Training

1.5. Course Synopsis

After completion of Level 3 certification (SKM), students have the opportunity to


further their education at diploma level (DKM) in training centers such as ADTEC
(public institution) or other related private institutions.

viii
Upon graduation, graduates will become Quality Assurance Technician and
Quality Control Technician.

ix
2. COMMITTEE MEMBERS

Syllabus Development Committee

DIPLOMA of Quality Assurance Technology

1. En Azkar Albar Bin Abu Bakar ADTEC Bintulu

(Cluster Chairman)

2. Cik Sharifah Dora Binti Syed Abd Bahri (Ketua) ADTEC Shah Alam

(Coordinator)

3. En Nawaini B. Ismail ADTEC Shah Alam

4. En. Mohd Azre B. Azmi ADTEC Taiping

5. En. Roslani B. Ramely ADTEC Taiping

Facilitator

1. Ieliza Binti Johari Headquarters, JTM


2. Hamed Bin Yaacob Headquarters, JTM

i
Syllabus Development Sessions

DIPLOMA IN QUALITY ASSURANCE TECHNOLOGY

Session 1 :
Date : 22 - 25 Mei 2016
Venue : IPG Kampus Pendidikan Teknik Bandar Enstek, Negeri Sembilan

Session 2 :
Date : 31 Mei – 02 Jun 2016
Venue : ADTEC TAIPING

ii
3. TRAINING STRUCTURE

3.1 Competency Profile Chart (Whole Semester)

Prepare incoming, in
Identify
PRODUCT / Identify incoming process and outgoing Set work area for
product/process Conduct incoming
PROCESS inspection activities inspection tools, incoming
inspection inspection
INSPECTION requirements equipment, procedure inspection
procedures
and guideline
C01 01 L2 02 L2 03 L2 04 L2 05 L2

Confirm Report product/


Execute in process Conduct outgoing Conduct sampling
product/process process inspection
inspection quality inspection inspection
inspection result activities

06 L2 07 L2 08 L2 09 L2 10 L2

PROCESS Identify process Select process


Implement in process Confirm problem Confirm
QUALITY quality improvement quality improvement
improvement categorization improvement area
IMPROVEMENT field (scope) tools

C02 01 L2 02 L2 03 L2 04 L2 05 L2

Contribute in Confirm process


Report process quality
employee scheme quality improvement
improvement activities
suggestion activities

06 L2 07 L2 08 L2
Record measuring
MEASURING Identify measuring Prepare measuring Execute measuring Confirm measuring
equipment
EQUIPMENT equipment handling equipment handling equipment handling equipment handling
handling work
HANDLING requirements work activities work activities result
activities
C03 01 L2 02 L2 03 L2 04 L2 05 L2

TECHNICAL Construct Perform freehand Construct projection


DRAWING geometrical drawing (sketching) technique drawing

E01 01 L2 02 L2 03 L2

WORKSHOP Identify industrial Bench work and


Fabrication process
TECHNOLOGY safety fitting

E02 01 L2 02 L2 03 L2

DIMENSIONAL Identify metrology Execute metrology Record metrology


METROLOGY works and activities works and activities works and activities

E03 01 L2 02 L2 03 L2

Identify Geometrical
ENGINEERING Construct details Execute Detail
Dimensional Record Drawing
DRAWING drawing Drawing
Tolerance Activities

E04 01 L2 02 L2 03 L2 04 L2
MACHINING Identify machining Execute machining Record machining
PROCESS process process progress

E05 01 L2 02 L2 03 L2

ELECTRICAL &
Identify Electric and Execute Electric and Record Electric and
ELECTRONIC
Electronic Electronic Electronic
PRINCIPLES

E06 01 L2 02 L2 03 L2

QUALITY
ASSURANCE Identify inspection & Confirm inspection
Plan inspection & Develop inspection Summaries
STANDARD testing procedure & testing procedure
testing procedure checklist based on inspection
OPERATING preparation preparation result
preparation checklist requirement information
PROCEDURE requirements
PREPARATION
C01 01 L3 02 L3 03 L3 04 L3 05 L3

Report inspection &


testing procedure
preparation
activities
06 L3

STATISTICAL
Identify (SPC) Establish statistical Confirm SPC result
PROCESS Plan SPC application
application Apply SPC tools control points
CONTROL (SPC) procedures
requirements requirements
APPLICATION
C02 01 L3 02 L3 03 L3 04 L3 05 L3
Report SPC
activities

06 L3

Identify record Check record


RECORD Categories quality Apply record Implement storage
control handling control handling
CONTROL record identification document
requirement result

C03 01 L3 02 L3 03 L3 04 L3 05 L3

Record control
handling activities

06 L3

Identify measuring
MEASURING Prepare measuring Prepare work area Confirm measuring
equipment Execute calibration
EQUIPMENT equipment calibration for measuring equipment
calibration activities
CALIBRATION tools and equipments equipment calibration calibration result
requirements
C04 01 L3 02 L3 03 L3 04 L3 05 L3

Report measuring
equipment
calibration activities

06 L3
Check shopfloor
SHOP FLOOR Identify shop floor Prepare shopfloor Execute shopfloor Report shopfloor
quality
QUALITY quality improvement quality improvement improvement quality
improvement
IMPROVEMENT requirements tools and equipments activities improvement
activities
activities
C05 01 L3 02 L3 03 L3 04 L3 05 L3

PRODUCT/PROCE Identify
SS NON- product/process Plan non Segregate non Execute non Conduct corrective
CONFORMANCE non conformance conformance control conformance conformance action meeting
CONTROL control parts activity product/process product disposition
requirements
C06 01 L3 02 L3 03 L3 04 L3 05 L3

Report
Monitor corrective product/process non
action effectiveness conformance control
activities
06 L3 07 L3

Execute product
PRODUCT Identify product Identified process Check product
quality acceptance Determine quality
QUALITY quality acceptance deviation calculated quality test index
due to process acceptance criteria
ACCEPTANCE requirements and test index result
abnormality
C07 01 L3 02 L3 03 L3 04 L3 05 L3

Report product
quality acceptance
activities

06 L3
Identify customer Analysis customer
CUSTOMER Prepare customer Execute customer Report customer
feedback/response/ feedback/
FEEDBACK/RESPO feedback/response/ feedback/response/ feedback/response
survey response/ survey
NSE/SURVEY survey activity survey activities / survey result
requirements result/data
C08 01 L3 02 L3 03 L3 04 L3 05 L3

Identify process Prepare subordinate


SUPERVISORY supervision administrative Administer personnel Execute in-house
Conduct section
FUNTIONS requirement and information, data and appraisal training
meeting
specification forms
C09 01 L3 02 L3 03 L3 04 L3 05 L3

Report supervision
administrative
activities

06 L3

Determine overall Promote safety,


Report safety at
SAFETY AT WORK safety, health and health and Confirm industrial
work place
PLACE PRACTICE environmental environmental accidents
environmental
parameters practice awareness
C10 01 L3 02 L3 03 L3 04 L3

CNC Perform basic


Apply basic CNC
PROGRAMMING program for CNC
programming
Lathe and Milling

E01 01 L3 02 L3
ADVANCED
Conduct Multi- Conduct 3D
METROLOGY
Gauging Inspection measurement

E01 01 L3 02 L3

Prepare customer
CUSTOMER Identify customer Address customer Evaluate customer Report customer
needs, requirement
REQUIREMENT needs, requirement needs, requirements requirement requirement
and specification
ESTABLISHMENT and specification and specification fulfillment activities
guidelines
C01 01 L4 02 L4 03 L4 04 L4 05 L4

PRODUCT Identify product Develop product


Identify Critical to Plan critical control Establish critical
CONTROL PLAN control plan control plan
Quality (CTQ) point point establishment control point
ESTABLISHMENT requirement

C02 01 L4 02 L4 03 L4 04 L4 05 L4

Report product
Evaluate control
control plan
plan completeness
development
activities
06 L4 07 L4

MANUFACTURING Identify audit Prepare audit


Identify types of Prepare audit Execute audit
/ SYSTEM procedure and schedule and
audit document activities
AUDITING requirement checklist

C03 01 L4 02 L4 03 L4 04 L4 05 L4
Evaluate audit
Report of auditing
finding completion
activities
and accuracy

06 L4 07 L4

CONTINOUS Execute Value


Identify quality Prepare quality
QUALITY Identify activities of Added Value Review product and
improvement improvement plan
IMPROVEMENT CQI programme
guidelines activity
Engineering process capabilities
(CQI) (VA/VE)

C04 01 L4 02 L4 03 L4 04 L4 05 L4

Execute Quality Report quality


Conduct Design of Organize quality
Function improvement
Experiment (DOE) improvement
Deployment (QFD) activities

06 L4 07 L4 08 L4 09 L4

MEASUREMENT Identify MSA Evaluate MSA


Execute MSA Report MSA
SYSTEM specification and Plan MSA activities accuracy /
activities activities
ANALYSIS (MSA) requirements uncertainty

C05 01 L4 02 L4 03 L4 04 L4 05 L4
Identify process non Confirm method of Classify non Confirm product Evaluate non
NON CONFORMITY
conformity non conformity conformity non conformity conformity
ASSESSMENT
assessment assessment assessment assessment assessment result

C06 01 L4 02 L4 03 L4 04 L4 05 L4

Report non
conformity
assessment finding

06 L4

Evaluate Corrective
CUSTOMER Plan method of Analyse customer Propose problem
Identify customer and Preventive
FEEDBACK customer feedback feedback solving customer
feedback category Action (CAPA)
ANALYSIS rectification information/survey feedback
effectiveness

C07 01 L4 02 L4 03 L4 04 L4 05 L4

Evaluate customer Report customer


feedback feedback analysis
satisfaction timely

06 L4 07 L4
QUALITY Identify record and Evaluate record Report and record
Plan quality Execute quality
ASSURANCE document control and document document control
assurance document assurance document
DOCUMENT coordination control coordination coordination work
control control activities
CONTROL requirement work activities activities

C08 01 L4 02 L4 03 L4 04 L4 05 L4

STATISTICAL
Confirm control item Evaluate process Report SPC
PROCESS Identify SPC Monitor SPC
characteristic/parame capability and effectiveness
CONTROL (SPC) requirement activities
ter stability corrective action
ANALYSIS

C09 01 L4 02 L4 03 L4 04 L4 05 L4

SUPPLIER Identify supplier Confirm supplier


Plan supplier Execute supplier Evaluate supplier
QUALITY performance evaluation and
performance activity assessment performance quality
ASSURANCE requirement selection

C10 01 L4 02 L4 03 L4 04 L4 05 L4

Report supplier
performance
activities

06 L4
PRODUCT Identify product Execute product Evaluate product
Confirm method of Evaluate product
LIABILITY liability services liability services work liability services
product containment liability analysis
ANALYSIS requirement activities work activities

E11 01 L4 02 L4 03 L4 04 L4 05 L4

Report product
liability services
activities

06 L4
3.2 Training Pathway (Whole Semester)

K04 – DIPLOMA TEKNOLOGI JAMINAN KUALITI SEMESTER 1

MULA Identify measuring equipment


handling requirements

03.01 1/5

Prepare measuring equipment


METROLOGY AND handling work activities
MEASUREMENT
03.02 2/5
K04-01-11
Execute measuring equipment
handling work activities

03.03 3/5

Confirm measuring equipment


handling result
03.04 4/5

Record measuring equipment data

03.05 5/5

Identify incoming inspection


activities requirements
PRODUCT
INSPECTION 01.01 1/9

K04-01-12
Identify product/process
inspection procedures

01.02 2/9

Prepare incoming, in process and


A outgoing inspection tools,
equipment, procedure and
guideline
01.03 3/9
A
Set work area for incoming
inspection

01.04 4/9

Conduct incoming inspection

01.05 5/9

Execute in process inspection

01.06 6/9

Conduct outgoing quality


inspection

01.07 7/9

Conduct sampling inspection

01.08 8/9

Confirm product / process


inspection result

01.09 9/9

Identify process quality


improvement field (scope)

02.01 1/8

Select process quality improvement


INTRODUCTION TO tools
QUALITY
02.02 2/8
K04-01-13
Implement in process
improvement

02.03 3/8

Confirm problem categorisation

B 02.04 4/8
B Confirm improvement area

02.05 5/8

Contribute in employee scheme


suggestion
02.06 6/8

Confirm process quality


improvement result

02.07 7/8

Report process quality


improvement activities

02.08 8/8

Construct geometrical drawing

TECHNICAL E01.01 1/3


DRAWING
Perform freehand (sketching)
K04-01-14 techniques
E01.02 2/3

Construct projection drawing

E01.03 3/3

Identify industrial safety


WORKSHOP
TECHNOLOGY E02.01 1/3

K04-01-15 Bench work and fitting

E02.02 2/3

TAMAT
Fabrication process

E02.03 3/3
K04 DIPLOMA TEKNOLOGI JAMINAN KUALITI SEMESTER 2

MULA Identify inspection & testing


procedure preparation
requirements
01.01 1/6

TESTING AND Plan inspection & testing procedure


INSPECTION preparation checklist
K04-02-11 01.02 2/6

Develop inspection checklist based


on requirement
01.03 3/6

Summaries inspection information

01.04 4/6

Confirm inspection & testing


procedure preparation result
01.05 5/6

Report inspection & testing


procedure preparation activities
01.06 6/6

Identify SPC application requirement


INTRODUCTION TO
STATISTICAL PROCESS 02.01 1/6
CONTROL (SPC)
Plan SPC application procedures
K04-02-12
02.02 2/6

Apply SPC tools

02.03 3/6
A
A
Establish statistical control points
requirements
02.04 4/6

Confirm SPC result

02.05 5/6

Report SPC activities

02.06 6/6

Identify Metrology Works and Activities

E03.01 1/3

DIMENSIONAL Execute Metrology Works and Activities


TECHNOLOGY
E03.02 2/3
K04-02-13
Record Metrology Works and Activities

E03.03 3/3

Identify Machining Process

E04.01 1/3
MACHINING PROCESS
K04-02-14 Execute Machining Process
E04.02 2/3

Record Machining Progress


E04.03 3/3
B
B
Identify Geometrical Dimensional
Tolerance
E05.01 1/4

Conduct Detail Drawing

ENGINEERING DRAWING E05.02 2/4

K04-02-15 Execute Detail Drawing

E05.03 3/4

Record Drawing Activities

E05.04 4/4

Identify Electric and Electronic


Concepts

06.01 1/3

Execute Electric and Electronic


Circuits
ELECTRIC & ELECTRONIC
06.02 2/3
K04-02-16
Record Electric and Electronic
Activities
06.03 3/3
TAMAT
K04 DIPLOMA JAMINAN KUALITI SEMESTER 3

MULA
Determine overall safety, health and
environment parameters
10.01 1/4
OCCUPATIONAL SAFETY
AND HEALTH Promote safety, health and
environmental practice awareness
K04-03-11
10.02 2/4

Confirm industrial accidents

10.03 3/4

Report safety at work place


environmental
10.04 4/4

Identify record and document control


coordination requirement

C08.01 1/5
QUALITY SYSTEM

Plan quality assurance document control


K04-03-12

C08.02 2/5

Execute quality assurance document


control activities
C08.03 3/5

Evaluate document control coordination


work activities
C08.04 4/5

Report and record document control


coordination work activities
A C08.05 4/5
A
Apply production planning and control
(PPC) principles

E01.01 1/2
INDUSTRIAL MANAGEMENT
Conduct process and time study
K04-03-13
E01.02 2/2

Identify shop floor quality improvement


requirements
05.01 1/5

PROJECT MANAGEMENT
C Prepare shop floor quality improvement
tools and equipment’s
K04-03-14
05.02 2/5

Execute shop floor improvement


activities

05.03 3/5

Check shop floor quality improvement


activities

05.04 4/5

Report shop floor quality improvement


activities

05.05 5/5

B
B

Conduct multi gauging inspection

E02.01 1/2
ADVANCED METROLOGY
Conduct three-dimensional (3d)
K04-03-15 measurement

E02.02 2/2

TAMAT
K04 DIPLOMA JAMINAN KUALITI SEMESTER 4

Identify measuring equipment


calibration requirements

04.01 1/6
MULA
Prepare measuring equipment
calibration tools and equipments

MEASURING CALIBRATION 04.02 2/6

K04-04-11 Prepare work area for measuring


equipment calibration

04.03 3/6

Execute calibration activities

04.04 4/6

Confirm measuring equipment


calibration result
04.05 5/6

Report measuring equipment


calibration activities
04.06 6/6

Identify customer needs, requirement


and specification guidelines
C01.01 1/5

Evaluate customer requirement


fulfillment
CUSTOMER SERVICE
MANAGEMENT C01.02 2/5

K04-04-12 Analyses customer feedback


information/survey improvement
activities
C01.03 4/5

Report customer satisfaction


A
C01.04 4/5

Report customer satisfaction

C01.05 5/5
Identify customer feedback category

A C07.01 1/7

Plan method of customer feedback


rectification
C07.02 2/7

Analyse customer feedback


information/survey
C07.03 4/7

Propose problem solving customer


feedback
C07.04 4/7

Evaluate Corrective and Preventive


Action (CAPA) effectiveness
C07.05 5/7

Evaluate customer feedback satisfaction

C07.06 5/7

Report customer feedback analysis


timely
C07.07 5/7

Identify process non conformity


assessment

06.01 1/6
PRODUCT ANALYSIS
Confirm method of non conformity
assessment
K04-03-13
06.02 2/6

Classify non conformity assessment

B 06.03 3/6

Confirm product non conformity


assessment
06.04 4/6
Evaluate non conformity assessment
result
B
06.05 5/6

Report non conformity assessment


finding

06.06 6/6

Identify product liability services


requirement

11.01 1/6

Confirm method of product containment

11.02 2/6

Execute product liability services work


activities
11.03 3/6

Evaluate product liability services work


activities

11.04 4/6

Evaluate product liability analysis

11.05 5/6

Report product liability service activities

11.06 6/6
PRODUCT QUALITY
CONTROL
Identify product/process non
K04-04-14 conformance control requirements
06.01 1/7

Plan non conformance control parts


activity
C 06.02 2/7
C
Segregate non conformance
product/process

06.03 3/7

Execute non conformance product


disposition

06.04 4/7

Conduct corrective action meeting

06.05 5/7

Monitor corrective action


effectiveness
06.06 6/7

Report product/process non


conformance control activities

06.07 7/7

Identify product quality acceptance


requirements
07.01 1/6

Execute product quality acceptance


due to process abnormality
07.02 2/6

Determine quality acceptance criteria

07.03 3/6

Identified process deviation


calculated and test index

07.04 4/6

Check product quality test index


E result
07.05 5/6

Report product quality acceptance


activities

07.06 6/6
E
Identify activities of CQI programme

04.01 1/9

Identify quality improvement guideline

04.02 2/9

LEAN MANUFACTURING Prepare quality improvement plan


activity
K04-04-15 04.03 3/9

Execute value added/ value


engineering(VA/VE)
04.04 4/9

Review product and process capabilities

04.05 5/9

Execute quality function deployment


(QFD)
04.07 7/9

Organiza quality improvement

04.08 8/9

Report quality improvement activities

04.08 9/9

F
Identify process supervision
F requirement and specification
09.01 1/6

Prepare subordinate administrative


information,data and forms
SUPERVISORY
09.02 2/6
K04-04-16
Administer personnel appraisal

09.03 3/6

Execute in-house training

09.04 4/6

Conduct section meeting

09.05 5/6

Report supervision administrative


activities
09.06 6/6

TAMAT
K04 DILOMA JAMINAN KUALITI SEMESTER 5

Identify SPC Requirement


MULA
09.01 1/5

Conduct Control Item


Characteristic/Parameter
APPLICATION
STATISTICAL PROCESS 09.02 2/5
CONTROL (SPC)
Monitoring SPC Activities
K04-05-11

09.03 3/5

Evaluate Process Capability and


Stability
09.04 4/5

Report SPC Effectiveness Corrective


Action
09.05 5/5

Identify MSA specification and


requirements

05.01 1/5

Plan MSA Activities


MEASUREMENT SYSTEM
ANALYSIS (MSA) 05.02 2/5

K04-05-12 Execute MSA Activities


05.03 3/5

Evaluate MSA accuracy/ uncertainty


05.04 4/5

Report MSA Activities


05.05 5/5
A
Identify types of audit

03.01 1/7
A
Identify audit procedure and
requirement
03.02 2/7

Prepare audit schedule and checklist


QUALITY AUDIT
03.03 3/7
K04-05-13
Prepare audit document
03.04 4/7

Execute audit activities


03.05 5/7

Evaluate audit finding completion and


accuracy
03.06 6/7

Report of auditing activities

03.07 7/7

Identify critical to quality (CTQ) point

PRODUCT QUALITY 02.01 1/7


PLANNING
Identify product control plan
K04-05-14 requirement
02.02 2/7

Plan critical control point establishment

02.03 3/7

Establish critical control point

02.04 4/7

Develop product control plan


B
02.05 5/7

Evaluate control plan completeness

02.06 6/7

Report product control plan


development activities
02.07 7/7
B

FUNDAMENTAL OF
Conduct design of experimental (DOE)
EXPERIMENTAL DESIGN
(DOE)
04.06 6/9
K04-05-15

Identify supplier performance


requirement
10.01 1/6

Plan supplier performance activity

10.02 2/6
SUPPLIER QUALITY
MANAGEMENT Confirm supplier evaluation and
selection

K04-05-16 10.03 3/6

Execute supplier assessment


10.04 4/6

Evaluate supplier performance quality

10.05 5/6

Report supplier performance activities


10.06 6/6

TAMAT
3.3

CODE

C01L2
COCU
CU. WA

CO CU

PROCESS
PRODUCT/

INSPECTION

inspection
inspection
inspection
requirements

and guideline
TASK

inspection tools,
Identify incoming

Set work area for

quality inspection
Conduct outgoing

Conduct sampling
Conduct incoming

Execute in process
inspection activities
MODULE CODE

incoming inspection
Prepare incoming, in
process and outgoing
WORK ACTIVITIES/

equipment, procedure
inspection procedures
Identify product/process
MODULE NAME

NO.
WORK

C01.08
C01.07
C01.06
C01.05
C01.04
C01.03
C01.02
C01.01
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
MAPPING CHART : NOSS VERSUS JTM MODULE (Whole Semester)

K04-01-12 PRODUCT INSPECTION


K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
CODE

C03L2
COCU
CU. WA

T
CO CU

QUALITY
PROCESS

HANDLING
EQUIPMENT
area
(scope)

activities
Confirm

improvement

MEASURING requirements
categorization
TASK

C02L2 IMPROVEMEN Confirm problem


product/process
inspection result

improvement field

improvement tools

Identify measuring
improvement result

Prepare measuring
scheme suggestion

equipment handling
inspection activities
MODULE CODE

Implement in process

Confirm improvement
Select process quality

improvement activities
Report process quality
Identify process quality
WORK ACTIVITIES/

Contribute in employee

Confirm process quality

equipment handling work


Report product /process
NO. MODULE NAME
WORK

C03.02
C03.01
C02.08
C02.07
C02.06
C02.05
C02.04
C02.03
C02.02
C02.01
C01.10
C01.09
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
CODE

C01L3
COCU
CU. WA

N
CO CU

QUALITY

STANDARD
OPERATING
ASSURANCE

PROCEDURE
PREPARATIO
result

checklist

information
requirement
work activities
work activities
TASK

testing procedure
testing procedure

testing procedure
preparation result
Record measuring

checklist based on
Confirm measuring

Develop inspection
Execute measuring

equipment handling

Report inspection &


Identify inspection &
equipment handling
equipment handling

preparation activities
MODULE CODE

Confirm inspection &


Summaries inspection
procedure preparation
WORK ACTIVITIES/

Plan inspection & testing


preparation requirements
NO. MODULE NAME
WORK

C01.06
C01.05
C01.04
C01.03
C01.02
C01.01
C03.05
C03.04
C03.03
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
CODE

C04L3
C03L3
C02L3
COCU
CU. WA

(SPC)
CO CU

RECORD
PROCESS

CONTROL
CONTROL

APPLICATION

activities
document
procedures

identification
Apply record

CALIBRATION requirements
requirements
requirements

control points

handling result
TASK

Apply SPC tools

MEASURING Identify measuring


Implement storage
Establish statistical

Confirm SPC result


MODULE CODE

Check record control


Plan SPC application

handling requirement
Report SPC activities

EQUIPMENT equipment calibration


Identify record control
WORK ACTIVITIES/

Record control handling


Categories quality record
STATISTICAL Identify (SPC) application
NO. MODULE NAME
WORK

C04.01
C03.06
C03.05
C03.04
C03.03
C03.02
C03.01
C02.06
C02.05
C02.04
C02.03
C02.02
C02.01
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
CODE
COCU
CU. WA

T
CO CU

QUALITY
result

activities
activities
calibration

C05L3 IMPROVEMEN improvement


requirements
TASK

and equipment’s
Report measuring

Prepare shop floor

Execute shop floor


Confirm measuring
Execute calibration
Prepare measuring
MODULE CODE

equipment calibration
equipment calibration
equipment calibration

measuring equipment
Prepare work area for
tools and equipment’s

improvement activities
improvement activities
improvement activities
WORK ACTIVITIES/

Check shop floor quality

Report shop floor quality


SHOP FLOOR Identify shop floor quality

quality improvement tools


NO. MODULE NAME
WORK

C04.02

C05.05
C05.04
C05.03
C05.02
C05.01
C04.06
C04.05
C04.04
C04.03
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
CODE

C07L3
COCU
CU. WA

NON-
CO CU

QUALITY
PROCESS

PRODUCT
CE CONTROL

meeting

activities
Segregate

effectiveness
C06L3 CONFORMAN requirements
TASK

product/process
nonconformance

Determine quality
acceptance due to

acceptance criteria
product disposition
control parts activity

ACCEPTANCE process abnormality


MODULE CODE

Plan nonconformance

Identify product quality


WORK ACTIVITIES/

Report product/process

Execute product quality


PRODUCT/ Identify product/process

nonconformance control
nonconformance control

Monitor corrective action

acceptance requirements
Conduct corrective action
Execute nonconformance
NO. MODULE NAME
WORK

C07.03
C07.02
C07.01
C06.07
C06.06
C06.05
C06.04
C06.03
C06.02
C06.01
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
CODE

C08L3
COCU
CU. WA

CO CU

SURVEY
FEEDBACK/
CUSTOMER

RESPONSE/

SUPERVISOR

forms
test index

survey result

administrative
survey activity
test index result

Identify process
TASK

survey activities

Report customer

and specification
Identify customer
Identified process

survey result/data
Prepare customer

Execute customer

Analysis customer

feedback/response/
feedback/response/
feedback/response/
feedback/response/
feedback/response/
survey requirements

C09L3 Y FUNTIONS Prepare subordinate


MODULE CODE

acceptance activities

information, data and


Check product quality

Report product quality


WORK ACTIVITIES/

supervision requirement
deviation calculated and
NO. MODULE NAME
WORK

C09.02
C09.01
C08.05
C08.04
C08.03
C08.02
C08.01
C07.06
C07.05
C07.04
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
CODE

C01L4
COCU
CU. WA

NT
CO CU

CUSTOMER

ESTABLISHME
SUPERVISION
appraisal

accidents
parameters

specification
specification
TASK

REQUIREMEN requirement and


requirement and

requirements and
Confirm industrial
WORK PLACE and environmental

Evaluate customer
Report supervision

C10L3 PRACTICE practice awareness

place environmental
MODULE CODE

Administer personnel

Report safety at work

requirement fulfillment
SAFETY AT Promote safety, health
WORK ACTIVITIES/

administrative activities

specification guidelines
Identify customer needs,
Conduct section meeting

Determine overall safety,


health and environmental

Prepare customer needs,


Execute in-house training

Address customer needs,


NO. MODULE NAME
WORK

C01.04
C01.03
C01.02
C01.01
C10.04
C10.03
C10.02
C10.01
C09.06
C09.05
C09.04
C09.03
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
CODE

C03L4
C02L4
COCU
CU. WA

ENT
PLAN

RING/
CO CU

SYSTEM
AUDITING
CONTROL
PRODUCT

ESTABLISHM

plan
point

activities
(CTQ) point

and checklist
establishment

completeness
Report customer
TASK

and requirement
plan requirement

plan development
requirement activities
MODULE CODE

Evaluate control plan

Identify types of audit

Evaluate audit finding


Report product control
Identify product control

Execute audit activities


WORK ACTIVITIES/

MANUFACTU Prepare audit schedule


Establish critical control

Identify audit procedure


Develop product control

Prepare audit document


Plan critical control point
Identify Critical to Quality

completion and accuracy


NO. MODULE NAME
WORK

C03.06
C03.05
C03.04
C03.03
C03.02
C03.01
C02.07
C02.06
C02.05
C02.04
C02.03
C02.02
C02.01
C01.05
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
CODE

C05L4
C04L4
COCU
CU. WA

(MSA)
CO CU

NT (CQI)

ANALYSIS
S QUALITY
IMPROVEME
CONTINUOU (VA/VE)
activities

programme

Identify MSA
improvement

NT SYSTEM requirements
Report quality
Identify quality

Prepare quality
TASK

Organize quality

MEASUREME specification and


Report of auditing

Value Engineering

Experiment (DOE)
Conduct Design of

Deployment (QFD)
process capabilities

Plan MSA activities


Review product and
MODULE CODE

Execute Value Added

improvement activities

Execute MSA activities


WORK ACTIVITIES/

Identify activities of CQI

improvement guidelines

Execute Quality Function


improvement plan activity
NO. MODULE NAME
WORK

C05.03
C05.02
C05.01
C04.09
C04.08
C04.07
C04.06
C04.05
C04.04
C04.03
C04.02
C04.01
C03.07
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
CODE

C07L4
COCU
CU. WA

NON
CO CU

ANALYSIS
FEEDBACK
CUSTOMER
C06L5 CONFORMITY

feedback
uncertainty

assessment
TASK

Identify customer

Preventive Action
Analyze customer
assessment result

information/survey
feedback category

customer feedback
assessment finding
Identify process non
MODULE CODE

ASSESSMENT Confirm product non

feedback rectification

(CAPA) effectiveness
Report MSA activities

Report non conformity


conformity assessment
conformity assessment
conformity assessment
WORK ACTIVITIES/

Classify non conformity


Confirm method of non-

Evaluate Corrective and


Evaluate non conformity

Propose problem solving


Plan method of customer
Evaluate MSA accuracy /
NO. MODULE NAME
WORK

C07.05
C07.04
C07.03
C07.02
C07.01
C06.06
C06.05
C06.04
C06.03
C06.02
C06.01
C05.05
C05.04
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
CODE

C09L4
C08L4
COCU
CU. WA

(SPC)
CO CU

QUALITY

ANALYSIS
PROCESS
CONTROL
CONTROL
DOCUMENT

STATISTICAL
activities
activities

Identify SPC
requirements
Execute quality
TASK

ASSURANCE control activities


Report customer

Evaluate process
document control
document control
document control
document control

coordination work
coordination work

Report and record


Evaluate customer

Identify record and

Confirm control item


Evaluate record and
MODULE CODE

assurance document
feedback satisfaction

capability and stability


Monitor SPC activities
Plan quality assurance
WORK ACTIVITIES/

characteristic/parameter
feedback analysis timely

coordination requirement
NO. MODULE NAME
WORK

C09.04
C09.03
C09.02
C09.01
C08.05
C08.04
C08.03
C08.02
C08.01
C07.07
C07.06
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
E01L4
CODE

C10L4
COCU
CU. WA

CO CU

QUALITY

LIABILITY
ANALYSIS
PRODUCT
SUPPLIER
action

analysis
assessment
Report SPC

Plan supplier

Report supplier
Identify supplier
TASK

ASSURANCE Execute supplier


Confirm supplier

Evaluate supplier

services activities
Confirm method of
performance quality
performance activity

product containment
MODULE CODE

services requirement
performance activities

Report product liability


Identify product liability

services work activities


services work activities
WORK ACTIVITIES/

effectiveness corrective

Execute product liability


evaluation and selection

Evaluate product liability


Evaluate product liability
performance requirement
NO. MODULE NAME
WORK

C09.05

C011.06
C011.05
C011.04
C011.03
C011.02
C011.01
C010.06
C010.05
C010.04
C010.03
C010.02
C010.01
ACTIVITIES

METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-01-13 INTRODUCTION TO QUALITY
K04-01-14
SEMESTER 1

TECHNICAL DRAWING

K04-01-15 WORKSHOP TECHNOLOGY

K04-02-11 TESTING AND INSPECTION

K04-02-12 INTRODUCTION TO SPC

K04-02-13 DIMENSIONAL METROLOGY

K04-02-14 ENGINEERING DRAWING


SEMESTER 2

K04-02-15 MACHINING PROCESS

K04-02-16 ELECTRIC & ELECTRONIC

K04-03-11 OCCUPATIONAL SAFETY


AND HEALTH
K04-03-12 QUALITY SYSTEM

K04-03-13 INDUSTRIAL MANAGEMENT

K04-03-14 PROJECT MANAGEMENT


SEMESTER 3

K04-03-15 ADVANCED METROLOGY

K04-03-16 CNC PROGRAMMING

K04-04-11 MEASURING CALIBRATION

K04-04-12 CUSTOMER SERVICE


MANAGEMENT
K04-04-13
PRODUCT ANALYSIS

K04-04-14 PRODUCT QUALITY


CONTROL
SEMESTER 4

K04-04-15 LEAN MANUFACTURING

K04-04-16 SUPERVISORY

K04-05-11 APPLICATION SPC

K04-05-12 MEASURREMENT SYSTEM


ANALYSIS (MSA)
K04-05-13 QUALITY AUDIT

K04-05-14 PRODUCT QUALITY


PLANNING
SEMESTER 5

K04-05-15 FUNDAMENTAL OF
EXPERIMENTAL DESIGN
K04-05-16 SUPPLIER QUALITY
MANAGEMENT
SEMESTER 1
4. SEMESTER 1

4.1 COMPETENCY PROFILE CHART

Prepare incoming, in
Identify
PRODUCT / Identify incoming process and outgoing Set work area for
product/process Conduct incoming
PROCESS inspection activities inspection tools, incoming
inspection inspection
INSPECTION requirements equipment, procedure inspection
procedures
and guideline
C01 01 L2 02 L2 03 L2 04 L2 05 L2

Confirm Report product/


Execute in process Conduct outgoing Conduct sampling
product/process process inspection
inspection quality inspection inspection
inspection result activities

06 L2 07 L2 08 L2 09 L2 10 L2

PROCESS Identify process Select process


Implement in process Confirm problem Confirm
QUALITY quality improvement quality improvement
improvement categorization improvement area
IMPROVEMENT field (scope) tools

C02 01 L2 02 L2 03 L2 04 L2 05 L2

Contribute in Confirm process


Report process quality
employee scheme quality improvement
improvement activities
suggestion activities

06 L2 07 L2 08 L2
Record measuring
MEASURING Identify measuring Prepare measuring Execute measuring Confirm measuring
equipment
EQUIPMENT equipment handling equipment handling equipment handling equipment handling
handling work
HANDLING requirements work activities work activities result
activities
C03 01 L2 02 L2 03 L2 04 L2 05 L2

TECHNICAL Construct Perform freehand Construct projection


DRAWING geometrical drawing (sketching) technique drawing

E01 01 L2 02 L2 03 L2

WORKSHOP Identify industrial Bench work and


Fabrication process
TECHNOLOGY safety fitting

E02 01 L2 02 L2 03 L2
4.2 TRAINING PATHWAY CHART SEMESTER 1

MULA
Identify measuring equipment
handling requirements

03.01 1/5

Prepare measuring equipment


METROLOGY AND handling work activities
MEASUREMENT
03.02 2/5
K04-01-11
Execute measuring equipment
handling work activities

03.03 3/5

Confirm measuring equipment


handling result
03.04 4/5

Record measuring equipment data

03.05 5/5

Identify incoming inspection


activities requirements
PRODUCT
INSPECTION 01.01 1/9
K04-01-12
Identify product/process
inspection procedures

01.02 2/9

Prepare incoming, in process and


A outgoing inspection tools,
equipment, procedure and
guideline
01.03 3/9
A
Set work area for incoming
inspection

01.04 4/9

Conduct incoming inspection

01.05 5/9

Execute in process inspection

01.06 6/9

Conduct outgoing quality


inspection

01.07 7/9

Conduct sampling inspection

01.08 8/9

Confirm product / process


inspection result

01.09 9/9

Identify process quality


improvement field (scope)

02.01 1/8

Select process quality improvement


INTRODUCTION TO tools
QUALITY
02.02 2/8
K04-01-13
Implement in process
improvement

02.03 3/8

Confirm problem categorisation

B 02.04 4/8
B Confirm improvement area

02.05 5/8

Contribute in employee scheme


suggestion
02.06 6/8

Confirm process quality


improvement result

02.07 7/8

Report process quality


improvement activities

02.08 8/8

Construct geometrical drawing

TECHNICAL E01.01 1/3


DRAWING
Perform freehand (sketching)
K04-01-14 techniques
E01.02 2/3

Construct projection drawing

E01.03 3/3

Identify industrial safety


WORKSHOP
TECHNOLOGY E02.01 1/3

K04-01-15 Bench work and fitting

E02.02 2/3

TAMAT
Fabrication process

E02.03 3/3
4.3 MAPPING CHART SEMESTER 1

K04 - DIPLOMA TEKNOLOGI JAMINAN KUALITI - SEMESTER 1

METROLOGY & MAESUREMENT


SILIBUS

INTRODUCTION TO QUALITY

WORKSHOP TECHNOLOGY
TAJUK MODUL
(JTM)

PRODUCT INSPECTION

TECHNICAL DRAWING
PROFIL PEKERJAAN
(NOSS)

MODUL 4
MODUL 1

MODUL 2

MODUL 3

MODUL 5
COCU NO.
CU/DUTI WORK ACTIVITIES/TASK
CODE TASK

Identify incoming
inspection activities C01.01
requirements

Identify product/process
C01.02
inspection procedures

Prepare incoming, in
process and outgoing
C01.03
inspection tools, equipment,
procedure and guideline
PRODUCT/
C01L2 PROCESS Set work area for incoming
C01.04
INSPECTION inspection

Conduct incoming
C01.05
inspection

Execute in process
C01.06
inspection

Conduct outgoing quality


C01.07
inspection
Conduct sampling
C01.08
inspection

Confirm product/process
C01.09
inspection result
METROLOGY & MAESUREMENT
SILIBUS

INTRODUCTION TO QUALITY

WORKSHOP TECHNOLOGY
TAJUK MODUL
(JTM)

PRODUCT INSPECTION

TECHNICAL DRAWING
PROFIL PEKERJAAN
(NOSS)

MODUL 4
MODUL 1

MODUL 2

MODUL 3

MODUL 5
COCU NO.
CU/DUTI WORK ACTIVITIES/TASK
CODE TASK

Report product /process


C01.10
inspection activities

Identify process quality


C02.01
improvement field (scope)

Select process quality


C02.02
improvement tools

Implement in process
C02.03
improvement

PROCESS QUALITY Confirm problem


C02L2 C02.04
IMPROVEMENT categorization

Confirm improvement area C02.05

Contribute in employee
C02.06
scheme suggestion
Confirm process quality
C02.07
improvement result
Report process quality
C02.08
improvement activities
Identify measuring
equipment handling C03.01
requirements
Prepare measuring
MEASURING equipment handling work C03.02
C03L2 EQUIPMENT activities
HANDLING Execute measuring
equipment handling work C03.03
activities
Confirm measuring
C03.04
equipment handling result
CODE
COCU
(NOSS)

CU/DUTI
PROFIL PEKERJAAN

activities
Record measuring
SILIBUS
(JTM)

equipment handling work


WORK ACTIVITIES/TASK

TAJUK MODUL
NO.
TASK

C03.05

MODUL 1 METROLOGY & MAESUREMENT

MODUL 2 PRODUCT INSPECTION

MODUL 3 INTRODUCTION TO QUALITY

MODUL 4 TECHNICAL DRAWING

MODUL 5 WORKSHOP TECHNOLOGY


4.4 TABLE OF CONTACT HOURS DISTRIBUTION SEMESTER 1

K04-DIPLOMA TEKNOLOGI JAMINAN KUALITI / TAHAP 2 SEM 1

TASK (A) JAM KREDIT = A/ (PEMBERAT (1.5) X 18)


KOD JAM JAM JUMLAH
TAJUK MODUL TEORI AMALI
MODUL KREDIT KREDIT JAM KREDIT
(JAM) (JAM)
TEORI AMALI KREDIT

K04-01-11 METROLOGY AND MEASUREMENT 30 51 0.9 2.1 3.0 3

K04-01-12 PRODUCT INSPECTION 30 51 0.9 2.1 3.0 3

K04-01-13 INTRODUCTION TO QUALITY 30 51 0.9 2.1 3.0 3

K04-01-14 TECHNICAL DRAWING 22 32 0.6 1.4 2.0 2

K04-01-15 WORKSHOP TECHNOLOGY 22 32 0.6 1.4 2.0 2

PERATUS LATIHAN 40% 60%

JUMLAH LATIHAN (SUBJEK TERAS) 134 217 13

MT-1121 MATHEMATICS 1 27 - 1.0 - 1.0 1.0


PH-1081 PHYSICS 1 27 - 1.0 - 1.0 1.0

TE-1091 TECHNICAL ENGLISH 27 - 1.0 - 1.0 1.0


IT-1061 APLIKASI KOMPUTER 1 27 - 1.0 - 1.0 1.0
TASK (A) JAM KREDIT = A/ (PEMBERAT (1.5) X 18)
KOD JAM JAM JUMLAH
TAJUK MODUL TEORI AMALI
MODUL KREDIT KREDIT JAM KREDIT
(JAM) (JAM)
TEORI AMALI KREDIT
PI-1031 ISLAMIC STUDIES 1
27 - 1.0 - 1.0 1.0
PM-1041 MORAL STUDIES 1

CORE ABILITIES 27 - - - -

KK-1071 KO-KURIKULUM 1 - 27 HW
JUMLAH LATIHAN (SUBJEK UMUM) 162 27 5

JUMLAH KESELURUHAN LATIHAN 540 18


4.5 SYLIBUS PROFILE SEMESTER 1

SYLIBUS PROFILE
Course Code : K04 Theory Hours : 30Hrs
Course : QUALITY ASSURANCE TECHNOLOGY Practical Hours : 51Hrs
Semester : 1 Total Hours : 81Hrs
NOSS Code : MC-041-1-C03 Credit Hours :3
Terminal Performance Objective:
Perform basic metrology and measurement activities by using various types of measuring tools, equipment and techniques, handle measuring
equipment and keep measuring equipment safe so that the measurement of product can be obtained, technique of handling equipment and can be
performed, and the measurement tools accuracy can be confirmed in accordance with the specification and standard requirement.

K04-01-11 METROLOGY AND MEASUREMENT


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05 / L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY ONE DIMENSIONAL (1D) MEASURING EQUIPMENT (C03.01, C03.02 / L2)


5 L WT IS
1.1 Type of measuring equipment AS
1.2 Measuring equipment handling requirement
1.3 Measuring equipment handling work scope
K04-01-11 METROLOGY AND MEASUREMENT
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05 / L2

WIM
Learning Activities

Theory Hours Practical Hours

1.4 Determine type of measuring equipment 10 D PT WS


1.5 Interpret measuring equipment handling P
requirement
1.6 Determine measuring equipment handling
work scope

LA 2. APPLY MEASURING EQUIPMENT TECHNIQUES (C03.03, C03.04 / L2)

L WT IS
AS
2.1 Measuring equipment availability 7
2.2 Measuring equipment standard
2.3 Measuring equipment handling work activities master
schedule

2.4 Confirm measuring equipment availability 10


2.5 Confirm measuring equipment standard
2.6 Determine measuring equipment handling
work activities master schedule
K04-01-11 METROLOGY AND MEASUREMENT
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05 / L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 3. CONDUCT ONE DIMENSIONAL (1D) MEASURING EQUIPMENT (C03.03, C03.04 / L2)


12
L WT IS
3.1 Basic metrology principle
AS
3.2 5S Practices
3.3 Measuring equipment categorization of handling work
activities
3.4 Measuring equipment handling method, storage and
maintenance
3.5 Assessment effectiveness of process improvement
3.6 Accuracy of measurement data
3.7 Equipment storage condition

3.8 Apply measuring equipment handling 24


method
3.9 Carry out measuring equipment storage
3.10 Conduct measuring equipment
maintenance D
PT WS
3.11 Assess effectiveness of basic measuring P
equipment handling
3.12 Check accuracy of measurement data
3.13
K04-01-11 METROLOGY AND MEASUREMENT
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05 / L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 4. RECORD MEASURING EQUIPMENT DATA (C03,05/L2)

4.1 Assessment effectiveness of process improvement 6


4.2 Accuracy of measurement data L WT IS
4.3 Equipment storage condition AS
4.4 Record measuring equipment handling work
activities
4.5 Measuring equipment handling activities reporting
format, reporting criteria and handling report
4.6 Record keeping procedures

4.7 Asses effectiveness of basic measuring 7 D PT WS


equipment handling P
4.8 Check accuracy of measurement data
4.9 Determine measuring equipment handling
activities reporting format.
4.10 Determine measuring equipment handling
reporting criteria and handling report
4.11 Adhere to record keeping procedures
Total Hours 30 51
1. Linear measurement tools
2. Angular measurement tools
3. Comparator measurement tools
Tools/ Equipment/ Materials : 4. Components / Parts Specification
5. Reference standard
6. Check list and check sheet
7. Calculator
1. Metrology – In short by Preben Howart and Fiona Redgrave
2. Teknologi Bengkel Mesin by Ibrahim Che Muda dan N.Ramudaram, Koperasi DBP Berhad
References:
3. Metrology and measurement by Anand K Bewoor And Vinay A Kulkarni, Tata McGraw-Hill
(3-5 references, valid years ± 5)
Education
4. Fundamentals of Dimensional Metrology Connie Dotson, Delmar Cengage Learning
Manuals :
Core Abilities :
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 30Hrs
Course : QUALITY ASSURANCE TECHNOLOGY Practical Hours : 51Hrs
Semester : 1 Total Hours : 81Hrs
NOSS Code : MC-041-1-C01 Credit Hours :3

Terminal Performance Objective :


This course provides knowledge and skills for students to testing and inspection activities on products. Students will conduct inspection procedure
using measuring and test instrument, component/part specification, reference standard, check list and check sheet so that product inspection work in
accordance with established inspection plan. This subject is designed mainly to give a comprehensive knowledge of testing and inspection activities to
the students.

K04-01-12 PRODUCT INSPECTION


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY PROCESS INSPECTION ACTIVITIES REQUIREMENT AND PROCEDURES (C01.01, C01.02 / L2)
6 L WT IS
1.1 Incoming material requirements AS
1.2 Product specifications
1.3 Incoming inspection work scope and workflow
Purposes of product/process procedure
1.4 Applicable product/process inspection procedure
1.5 Product/process inspection sheet
K04-01-12 PRODUCT INSPECTION
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2

WIM
Learning Activities

Theory Hours Practical Hours

1.6 Interpret incoming materials requirement 8 D PT WS


1.7 Determine product specification P
1.8 Determine incoming inspection workflow
1.9 Determine purposes of product/process
procedure
1.10 Determine applicable product/process
inspection procedure
1.11 Determine product/process inspection
sheet

LA 2. PREPARE INCOMING, INPROCESS AND OUTGOING INSPECTION TOOLS (1.03, 1.04 / L2)

2.1 Types of incoming and outgoing check sheet 9 L WT IS


2.2 Types of incoming and outgoing tools and equipment AS
2.3 Function ability of incoming and outgoing tools and
equipment
2.4 Types of incoming and outgoing procedure and
guidelines documentation
2.5 Product inspection schedule
2.6 Inspection work area
2.7 Work area housekeeping
2.8 Work area for incoming inspection
2.9 Adhere safety procedure to setting work area for
incoming inspection
K04-01-12 PRODUCT INSPECTION
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2

WIM
Learning Activities

Theory Hours Practical Hours

2.10 Obtain incoming and outgoing check 8 D PT WS


sheet P
2.11 Arrange incoming and outgoing tools and
equipment
2.12 Test function ability of tools and
equipment
2.13 Study incoming and outgoing procedure
and guidelines documentation
2.14 Interpret product inspection schedule
2.15 Determine inspection work area
2.16 Clean work area
2.17 Arrange work area for incoming
inspection

LA 3. CONDUCT QUALITY INSPECTION AND SAMPLING (C01.05, C01.06, C01.07, C01.08 / L2)

12 L WT IS
3.1 Product measurement tolerance AS
3.2 Type of product defects
3.3 Segregation of raw material
3.4 Labeling of incoming material
3.5 Inspection of material condition
3.6 Procedure of measuring product dimension
3.7 Technique of product dimension
3.8 Inspection check sheet
K04-01-12 PRODUCT INSPECTION
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2

WIM
Learning Activities

Theory Hours Practical Hours

3.9 Outgoing/final inspection and testing manual


3.10 Arrangement of product pre- delivery inspection
3.11 Outgoing product defects
3.12 Procedure of outgoing product inspection
3.13 Marking and labeling inspection part
3.14 List of inspection tool
3.15 Sampling table (AQL)
3.16 Product measurement method
3.17 Refer incoming inspection check sheet 26 D PT WS
3.18 Determine product measurement tolerance P
3.19 Determine type of product defects
3.20 Segregate raw material
3.21 Label incoming material
3.22 Inspect material condition
3.23 Measure product dimension
3.24 Update inspection check sheet
3.25 Refer outgoing/final inspection check sheet
3.26 Arrange product pre- delivery inspection
3.27 Determine outgoing product defects
3.28 Inspect outgoing product
3.29 Mark and label inspection part
3.30 Refer sampling table
3.31 Determine type of sampling inspection
3.32 Measure and test sampling product
K04-01-12 PRODUCT INSPECTION
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 4. REPORT PROCESS INSPECTION RESULT AND ACTIVITIES (C01.09, C01.10 / L2)


3
4.1 Measurement accuracy within tolerance L WT IS
4.2 Product quality according to specification AS
4.3 Assessment method of product appearance according
to requirement
4.4 Assessment method of inspection
4.5 Report product /process inspection activities
4.6 Product/process inspection activities reporting format
4.7 Product/process inspection reporting criteria
4.8 Procedure to write inspection report
4.9 Record keeping procedures
4.10 Check inspection measurement accuracy 9
within tolerance
4.11 Check product quality according to
specification D
PT WS
4.12 Asses product appearance according to P
requirement
4.13 Asses inspection completeness
K04-01-12 PRODUCT INSPECTION
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2

WIM
Learning Activities

Theory Hours Practical Hours

4.11 Determine product/process inspection


activities reporting format
4.12 Determine product/process inspection
reporting criteria
4.13 Determine procedure to write inspection
report
4.14 Adhere to record keeping procedures
Total Hours 30 51
1. Measuring and Test Instruments
2. Components / Parts Specification
Tools/ Equipment/ Materials : 3. Reference standard
4. Checklist and check sheet
5. Calculator

1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN
0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN 0-
07-033176-6

Manuals :
Core Ability
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 30Hrs
Course : QUALITY ASSURANCE TECHNOLOGY Practical Hours : 51Hrs
Semester : 1 Total Hours : 81Hrs
NOSS Code : MC-041-1-C01 Credit Hours :3

Terminal Performance Objective :


The course provides the knowledge for students to the basic fundamental and concepts of quality assurance. This subject is designed mainly for
students to understand basic quality concepts, performance, certification, tools and method to generate ideas. Students able to apply quality system
concept regarding to quality fundamental, quality concepts and quality management system for continuous improvement needs. Students able to apply
quality improvement tools by using quality improvement technique such as basic quality control tools for the need to improve the quality problems.

K04-01-13 INTRODUCTION TO QUALITY


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07, C02.08 / L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY PROCESS QUALITY IMPROVEMENT (C02.01, C02.02, C02.03 / L2)


1.1 Process quality improvement requirement 12 L WT IS
1.2 Process improvement workflow AS
1.3 Process quality improvement check sheet
1.4 Arrangement process quality improvement tools
and equipment
1.5 Function ability of tools and equipment
1.6 Process quality improvement procedure and
guidelines documentation
1.7 Improvement method
1.8 Area of improvementSetting of improvement target
K04-01-13 INTRODUCTION TO QUALITY
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07, C02.08 / L2

WIM
Learning Activities

Theory Hours Practical Hours

1.9 Gathering of customer feedback


1.10 Improvement information
1.11 Non conformances report
1.12 Process improvement suggestion method
improvement tools and technique
1.13 Determine process quality improvement 18 D PT WS
requirement P
1.14 Determine process improvement workflow
1.15 Set improvement target
1.16 Obtain process quality improvement check
sheet
1.17 Arrange process quality improvement tools
and equipment
1.18 Test function ability of tools and equipment
1.19 Study process quality improvement
procedure and guidelines documentation
1.20 Gather customer feedback
1.21 Gather improvement information
1.22 Refer non conformances report
1.23 Suggest process improvement
1.24 Apply improvement tools and technique
K04-01-13 INTRODUCTION TO QUALITY
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07, C02.08 / L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 2. EXECUTE PROCESS QUALITY IMPROVEMENT (C02.04, C02.05, C02.06 / L2)

2.1 Classification of improvement category 14 L WT IS


2.2 Problem severity observation AS
2.3 Confirm improvement area
2.4 Improvement segment
2.5 Acquisition of improvement data
2.6 Contribute in employee scheme suggestion
2.7 Type of suggestion scheme
2.8 Suggestion scheme evaluation
2.9 Benefit improvements to organization
2.10 Classify improvement category 24 D PT WS
2.10.1 Manpower P
2.10.2 Machine
2.10.3 Method
2.10.4 Material
2.10.5 Money
2.11 Observe problem severity
2.12 Determine improvement segment
2.13 Acquire improvement data
2.14 Determine suggestion scheme
2.15 Observe to evaluation scheme
2.16 Participate improvement changes
K04-01-13 INTRODUCTION TO QUALITY
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07, C02.08 / L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 3. REPORT PROCESS QUALITY IMPROVEMENT RESULTS (C02.07, C02.08 / L2)

3.1 Confirm process quality improvement result 4 L WT IS


3.2 Assessing effectiveness of process improvement AS
3.3 Accuracy of improvement data
3.4 Report process quality improvement activities
3.5 Product/process inspection activities reporting
format
3.6 Product/process inspection reporting criteria
3.7 Procedure to write inspection report
3.8 Record keeping procedures
3.9 Asses effectiveness of process 9 D PT WS
improvement area P
3.10 Check accuracy of improvement data
3.11 Determine product/process inspection
activities reporting format
3.12 Determine product/process inspection
reporting
3.13 Determine procedure to write inspection
report
3.14 Explain to record keeping procedures
Total Hours 30 51
1. Reference Standard
2. Calculator
3. 7 Basic QC Tools
Tools/ Equipment/ Materials : 4. 7 New Tools
5. PDCA Cycle
6. Failure Mode Effect Analysis (FMEA)
7. 5S

1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-
0-87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way,
ISBN 0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN
0-07-033176-6

Manuals :
Core Ability
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 22Hrs
Course : QUALITY ASSURANCE TECHNOLOGY Practical Hours : 32Hrs
Semester : 1 Total Hours : 54Hrs
NOSS Code : MC-041-1-E01 Credit Hours :2

Terminal Performance Objective :


Perform Technical drawing activities using standard (symbols, lettering, scale),draw a geometrical construction with a proper techniques, draw basic
orthographic, isometric, draw parts/object by free hand sketching, drawing instrument and applying basic principle of engineering drawing so that
actual shape and visualized is obtained.

K04-01-14 TECHNICAL DRAWING


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03 / L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. CONSTRUCT GEOMETRICAL DRAWING (E01.01/L2)


10 L WT IS
1.1 Alphabet of lines (thick or thin) AS
1.2 Paper sizes & standard layouts
1.3 The metric system (symbol & SI units)
1.4 Types of projection and projectors
1.5 Various types of line and scale
K04-01-14 TECHNICAL DRAWING
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03 / L2

WIM
Learning Activities

Theory Hours Practical Hours

1.6 Various geometrical shapes & sizes.


1.7 Geometrical construction technique
1.8 Technique and placement dimensioning
1.9 Rules of dimensioning

1.10 Provide standard layout & title block 12 D PT WS


1.11 Write freehand letters by using lettering
technique
1.12 Draw various line types according to the
drawing standard
1.13 Draw line, angle, arcs & circle of specified
size using drawing instrument draw scale
1.14 Use geometrical construction techniques to
solve the geometrical problem.
1.15 Draw various types of lines, angle and arcs
tangents
1.16 Use dimension and extension lines
1.17 Draw arrowheads, leaders and scale
K04-01-14 TECHNICAL DRAWING
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03 / L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 2. PERFORM FREEHAND (SKETCHING) TECHNIQUES (E01.02 / L2)

4
2.1 Basic sketching tools
L WT IS
2.2 Freehand and measured sketch techniques.
AS
2.3 Sketch parallel, perpendicular and evenly 7
spaced line.
2.4 Sketch a circle and arc.
2.5 Use sketching techniques to keep the sketch
D PT WS
Proportionate.
2.6 Sketch an object on isometric grid paper.
2.7 Sketch the primary views of an orthographic

LA 3. CONSTRUCT PROJECTION DRAWING (E01.03/L2)


3.1 Orthographic drawing 8
3.2 Principles of drawing projection
3.2.1 1st angle
3.2.2 3rd angle
K04-01-14 TECHNICAL DRAWING
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03 / L2

WIM
Learning Activities

Theory Hours Practical Hours

3.3 Type of view


3.3.1 Front View
3.3.2 Side view
3.3.3 Top view
3.4 Isometric drawing
3.4.1 Collecting data
3.4.2 3D object
3.4.3 Drawing sheet IS
L WT
3.4.4 Real object AS
3.5 Isometric drawing
3.5.1 Isometric drawing method
3.5.2 Isometric drawing techniques

3.6 Interpret 3D data and drawing sheet 13


3.6.1 Size
3.6.2 Object
3.6.3 Scale
3.7 Construct drawing projection
3.7.1 1st Angle
3.7.2 3rd Angle
K04-01-14 TECHNICAL DRAWING
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03 / L2

WIM
Learning Activities

Theory Hours Practical Hours

D PT WS
3.8 Apply views creating technique
3.9 Interpret data
3.9.1 3D data
3.9.2 Drawing sheet
3.9.3 Real object
3.10 Apply isometric drawing method.
3.11 Apply isometric drawing techniques.
Total Hours 22 32

1. Drafting instrument and equipment


2. Models
Tools/ Equipment/ Materials :
3. Freehand sketch
4. Drawing paper
Reference Books (Tittle, Atr, Publisher) : 13th Edition Technical Drawing, Pearson International Edition
Manuals :
Core Abilities :
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 22 Hrs.
Course : QUALITY ASSURANCE TECHNOLOGY Practical Hours : 32 Hrs.
Semester : 1 Total Hours : 54 Hrs.
NOSS Code : MC-041-1-E02 Credit Hours :2
Terminal Performance Objective:
The course provides the knowledge for student to the industrial safety, material properties, characteristic, processes and basic production processes.
This subject will develop competency for student in workshop technology. Students are able to explain the production process, shop layout and safety.
Students able to explain material properties, characteristics and processes. Student also able to perform fitting and fabrication works

K04-01-15 WORKSHOP TECHNOLOGY


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY INDUSTRIAL SAFETY (E01.01/L2)


1.1 Introduction 5 L WT IS
1.2 Objective of industrial safety AS
1.3 Safety equipment/Personnel Protective Equipment
(PPE) appropriately"
1.4 Accident
1.5 Cause and type of accident
1.6 Effect of accident
K04-01-15 WORKSHOP TECHNOLOGY
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

1.7 Safety signs and symbol 6 D PT WS


1.8 Safety and measure in construction work
1.9 Safety in material handling
1.10 Safety measures against electric shocks
1.11 Fire prevention and protection
1.12 Fire-fighting equipment
1.13 Grades of fire extinguisher
1.14 Fire extinguisher and Hose reel
1.15 Method of safety
1.16 First aid treatment

LA 2. BENCHWORK AND FITTING (E01.02/L2)

2.1 Introduction 7 L WT IS
2.2 Classification of materials AS
K04-01-15 WORKSHOP TECHNOLOGY
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

2.3 Fitting tools 14 D PT WS


2.4 Clamping tools
2.5 Measuring and marking tools
2.6 Method of marking
2.7 Cutting tools
2.8 Striking tools
2.9 Miscellaneous tools
2.10 Drilling
2.11 Tapping

LA 3. FABRICATION PROCESS (E01.03/L2)

3.1 Introduction 10
3.2 Basic fabrication
3.3 Classifications of welding
3.4 Commonly welded base metals
3.5 Advantages and disadvantages of welding
3.6 Welding as compared to riveting and casting
K04-01-15 WORKSHOP TECHNOLOGY
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

3.7 Applications of welding 12


3.8 Types of welding joints
3.9 Edge preparations
3.10 Welding Positions
3.11 Basic welding symbols
3.12 Supplementary metal symbols
3.13 Standard location of element of welding
symbol
Total Hours 22 32

1. Personal Protective Equipment (PPE)


2. Fitting tools
Tools/ Equipment/ Materials : 3. Drilling machine
4. Tap and die accessories
5. Arc welding machine
1. Occupational Safety And Health Act And Regulations
ISBN 967 - 70 - 0850 - 1
Reference Books (Tittle, Atr, Publisher) : 2. Teknologi Bengkel Mesin (IBRAHIM CHE MUDA. N.RAMUDARAM)
Dewan Bahasa Dan Pustaka Kuala Lumpur
ISBN 983-62-1233-7
Manuals :
Core Abilities:
SEMESTER 2
5. SEMESTER 2

5.1 COMPETENCY PROFILE CHART SEMESTER 2

DIMENSIONAL Identify metrology Execute metrology Record metrology


METROLOGY works and activities works and activities works and activities

E03 01 L2 02 L2 03 L2

Identify Geometrical
ENGINEERING Construct details Execute Detail
Dimensional Record Drawing
DRAWING drawing Drawing
Tolerance Activities

E04 01 L2 02 L2 03 L2 04 L2

MACHINING Identify machining Execute machining Record machining


PROCESS process process progress

E05 01 L2 02 L2 03 L2

ELECTRICAL &
Identify Electric and Execute Electric and Record Electric and
ELECTRONIC
Electronic Electronic Electronic
PRINCIPLES

E06 01 L2 02 L2 03 L2
QUALITY
ASSURANCE Identify inspection & Confirm inspection
Plan inspection & Develop inspection Summaries
STANDARD testing procedure & testing procedure
testing procedure checklist based on inspection
OPERATING preparation preparation result
preparation checklist requirement information
PROCEDURE requirements
PREPARATION
C01 01 L3 02 L3 03 L3 04 L3 05 L3

Report inspection &


testing procedure
preparation
activities
06 L3

STATISTICAL
Identify (SPC) Establish statistical Confirm SPC result
PROCESS Plan SPC application
application Apply SPC tools control points
CONTROL (SPC) procedures
requirements requirements
APPLICATION
C02 01 L3 02 L3 03 L3 04 L3 05 L3

Report SPC
activities

06 L3
5.2 TRAINING PATHWAY CHART SEMESTER 2

MULA Identify inspection & testing


procedure preparation
requirements
01.01 1/6

TESTING AND Plan inspection & testing procedure


INSPECTION preparation checklist
K04-02-11 01.02 2/6

Develop inspection checklist based


on requirement
01.03 3/6

Summaries inspection information

01.04 4/6

Confirm inspection & testing


procedure preparation result
01.05 5/6

Report inspection & testing


procedure preparation activities
01.06 6/6

Identify SPC application requirement


INTRODUCTION TO
STATISTICAL PROCESS 02.01 1/6
CONTROL (SPC)
Plan SPC application procedures
K04-02-12
02.02 2/6

Apply SPC tools

02.03 3/6
A
A
Establish statistical control points
requirements
02.04 4/6

Confirm SPC result

02.05 5/6

Report SPC activities

02.06 6/6

Identify Metrology Works and Activities

E03.01 1/3

DIMENSIONAL Execute Metrology Works and Activities


TECHNOLOGY
E03.02 2/3
K04-02-13
Record Metrology Works and Activities

E03.03 3/3

Identify Machining Process

E04.01 1/3
MACHINING PROCESS
K04-02-14 Execute Machining Process
E04.02 2/3

Record Machining Progress


E04.03 3/3
B
B
Identify Geometrical Dimensional
Tolerance
E05.01 1/4

Conduct Detail Drawing

ENGINEERING DRAWING E05.02 2/4

K04-02-15 Execute Detail Drawing

E05.03 3/4

Record Drawing Activities

E05.04 4/4

Identify Electric and Electronic


Concepts

06.01 1/3

Execute Electric and Electronic


Circuits
ELECTRIC & ELECTRONIC
06.02 2/3
K04-02-16
Record Electric and Electronic
Activities
06.03 3/3
TAMAT
5.3 MAPPING CHART SEMESTER 2

K04- DIPLOMA TEKNOLOGI JAMINAN KUALITI/TAHAP 2-SEMESTER 2

INTRODUCTION TO STATISTICAL
SILIBUS

DIMENSIONAL METROLOGY
TESTING AND INSPECTION

PROCESS CONTROL (SPC)

ELECTRIC & ELECTRONIC


ENGINEERING DRAWING
(JTM)

TAJUK MODUL

MACHINING PROCESS
PROFIL PEKERJAAN
(NOSS)

MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
NO.
NO DUTI CU/DUTI WORK ACTIVITIES/TASK
TASK

Identify inspection & testing


procedure preparation C01.01
requirements
Plan inspection & testing
procedure preparation C01.02
QUALITY checklist
ASSURANCE Develop inspection checklist
STANDARD C01.03
C01L3 based on requirement
OPERATING
PROCEDURE Summaries inspection
C01.04
PREPARATION information
Confirm inspection & testing
C01.05
procedure preparation result
Report inspection & testing
procedure preparation C01.06
activities
Identify (SPC) application
C02.01
requirements
Plan SPC application
C02.02
STATISTICAL procedures
PROCESS Apply SPC tools C02.03
C02L3
CONTROL (SPC)
APPLICATION Establish statistical control
C02.04
points requirements
Confirm SPC result C02.05
Report SPC activities C02.06
5.4 TABLE OF CONTACT HOURS DISTRIBUTION SEMESTER 2

K04-DIPLOMA TEKNOLOGI JAMINAN KUALITI / TAHAP 2-SEMESTER 2

TASK (A) JAM KREDIT = A/ (PEMBERAT (1.5) X 18)


KOD MODUL TAJUK MODUL TEORI AMALI JAM KREDIT JAM KREDIT JUMLAH JAM
KREDIT
(JAM) (JAM) TEORI AMALI KREDIT

K04-02-11 TESTING AND INSPECTION 30 51 0.9 2.1 3 3

INTRODUCTION TO STATISTICAL
K04-02-12 22 32 0.6 1.4 2 2
PROCESS CONTROL (SPC)

K04-02-13 DIMENSIONALMETROLOGY 30 51 0.9 2.1 3 3

K04-02-14 MACHINING PROCESS 22 32 0.6 1.4 2 2

K04-02-15 ENGINEERING DRAWING 22 32 0.6 1.4 2 2

K04-02-16 ELECTRIC & ELECTRONIC 22 32 0.6 1.4 2 2

PERATUS LATIHAN 40% 60%

JUMLAH LATIHAN (SUBJEK TERAS) 148 230 14

MT 2121 MATHEMATICS 2 27 - 1.0 - 1.0 1.0

PH 2081 PHYSICS 2 27 - 1.0 - 1.0 1.0


TASK (A) JAM KREDIT = A/ (PEMBERAT (1.5) X 18)
KOD MODUL TAJUK MODUL TEORI AMALI JAM KREDIT JAM KREDIT JUMLAH JAM
KREDIT
(JAM) (JAM) TEORI AMALI KREDIT

TE 2091 TECHNICAL ENGLISH 2 27 - 1.0 - 1.0 1.0

PI 2031 / ISLAMIC STUDIES 2 / 27 - 1.0 - 1.0 1.0


PM 2041 MORAL STUDIES 2

CORE ABILITIES 27 - - - - -

KK 2071 CO-CURICULUM 2 - 27 HW

JUMLAH LATIHAN (SUBJEK UMUM) 135 27 4

JUMLAH KESELURUHAN LATIHAN 540 18


5.5 SYLIBUS PROFILE SEMESTER 2

SYLIBUS PROFILE
Course Code : K04 Theory Hours : 30 Hrs
Course : QUALITY ASSURANCE Practical Hours : 51 Hrs
Semester : 2 Total Hours : 81 Hrs
NOSS Code : MC-041-2 Credit Hours :3
Terminal Performance Objective:

Perform Testing and Inspection using various method of analysis , test standard and appropriate testing equipment and procedure so that appropriate
testing method can be determined, interpretation of results meet the required standard and the recommend action according to the standard
requirement and SOP.

Module : 1.8. K04-02-11 TESTING AND INSPECTION

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01/L3, C01.01, C01.02, C01.03, C01.04, C01.05, C01.06

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY TESTING METHOD AND EQUIPMENT (C01.01)

1.1 Test and testing method


1.1.1 Visual IS
6 L WT
1.1.2 Destructive Testing (DT) AS
1.1.3 Non-Destructive Testing (NDT)
Module : 1.9. K04-02-11 TESTING AND INSPECTION

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01/L3, C01.01, C01.02, C01.03, C01.04, C01.05, C01.06

WIM
Learning Activities

Theory Hours Practical Hours

1.2 Interpret testing method


1.2.1 Visual
1.2.2 Destructive Testing (DT) 6 D PT WS
1.2.3 Non-Destructive Testing (NDT)

LA 2. CARRY OUT DESTRUCTIVE TESTING (C01.02, C01.03)

2.1 Visual surface inspection technique


2.2 Acceptance and rejection criteria
2.3 Physical and mechanical properties of materials
2.4 Type of hardness test procedure and hardness charts
2.5 Strength of materials and tensile strength principles
2.6 Type of impact test and load A IS
7 L
2.7 Material grain structure and mounting material WT AS
2.8 Fine cutting and polishing
2.9 Type of etching chemical, metal deformation and
loading pattern
2.10 Method on improving fatigue performance
2.11 Posses adequate eye vision

2.12 Determine metal condition under impact


load
2.13 Propose remedial actions
Module : 1.10. K04-02-11 TESTING AND INSPECTION

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01/L3, C01.01, C01.02, C01.03, C01.04, C01.05, C01.06

WIM
Learning Activities

Theory Hours Practical Hours

2.14 Prepare test specimen


2.15 Interpret hardness conversion chart
2.16 Apply stress and strain diagrams
2.17 Interpret breaking area and measure
elongation
2.18 Calculate yield, tensile, proof, elongation of 22 D PT WS
strength and reduction of area
2.19 Perform impact test, macro etching test and
fatigue test
2.20 Perform type of surface defects and
material damages
LA 3. EXECUTE NON-DESTRUCTIVE TESTING (C01.04, C01.05)
3.1 Standard codes and procedure
3.2 Principles of Dye Penetrants testing
3.3 Principles of Magnetic Particles testing
3.4 Principles of Ultrasonic testing IS
10 L WT
AS
3.5 Principles of Eddy current testing
3.6 Principles of Radioactive testing
3.7 Related equipment and accessories
Module : 1.11. K04-02-11 TESTING AND INSPECTION

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01/L3, C01.01, C01.02, C01.03, C01.04, C01.05, C01.06

WIM
Learning Activities

Theory Hours Practical Hours

3.8 Interpret standard codes and procedure


3.9 Determine of Dye Penetrants Testing
3.10 Determine of Magnetic Particles
3.11 Determine of Ultrasonic testing 16 D PT WS
3.12 Determine of Eddy current testing
3.13 Determine of Radioactive testing
3.14 Apply equipment and accessories

LA 4. REPORT DESTRUCTIVE AND NON-DESTRUCTIVE TESTING (C01.06)

5.5 Process destructive and non-destructive testing


reporting format
5.6 Process destructive and non-destructive testing IS
7 L WT
reporting criteria AS
5.7 Procedure to write testing report
5.8 Record keeping procedures

5.9 Perform test according testing procedures,


technique and standard
5.10 Interpret and evaluate the test results 7
5.11 Prepare and record test result
5.12 Prepare test report

Total Hours 30 51
Eddy current test equipment, Copland, Calibration block, Test procedure, Code and standard, Cleaning
Tools/ Equipment/ Materials :
material, Test pieces, Checklist
1) Analysis of Stress and Deformation, Introduction To Contact Mechanics, Elastic Indentation Stress
Fields, Chapter 5, pp. 116-117.(Not Prior Art Based on Date).
2) S.P. Timoshenko and J.N. Goodier, The Propagation of Waves in Elastic Solid Media, Theory of
Elasticity, Third Edition, Chapter 14, pp. 485-504.
3) H. Kolsky, Plastic Waves and Shock Waves, Stress Waves in Solids, Chapter VII, pp. 163-182.
Reference Books (Title, Atr, Publisher) : 4) Antonio C. Rufin, ASME (Jun. 1-4, 1992), Extending the Fatigue Life of Aircraft Engine Components
by Hole Cold Expansion Technology, International Gas Turbine and Aeroengine Congress and
Exposition, Cologne, Germany, (9 pages).
5) Joseph L. Phillips, (Oct. 16-18, 1973), Fatigue Improvement by Sleeve Coldworking, National
Aerospace Engineering and Manufacturing Meeting, Los Angeles, California, (13 pages).

1. BS 5166: 1974, Method for Metallographic Replica Technique Of Surface Examination (= ISO 3057
: 1074), British Standard Institution, London.
2. BS 5289: 1983, Code of Practice, Visual Inspection of Fusion Weld Joints, British Standard
Manuals :
Institution, London.
3. BS 5165: 1974, Guide to the Selection of Low-Power Magnifiers Used In Visual Inspection, British
Standard Institution, London.

Core abilities :
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 22 Hrs
Course : QUALITY ASSURANCE Practical Hours : 32 Hrs
Semester : 2 Total Hours : 54 Hrs
NOSS Code : MC-041-2-C02 Credit Hours :2

Terminal Performance Objective :

Apply statistical technique using various quality tools and document so that manufacturing process implemented in accordance with quality
improvement guidelines.

Module : K04-02-12 INTRODUCTION TO STATISTICAL PROCESS CONTROL (SPC)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02/L3, C02.01, C02.02, C02.03, C02.04, C02.05

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY SPC APPLICATION REQUIREMENT (C02.01, C02.02)

1.1 Type of SPC Chart


1.2 SPC Chart locations
1.3 Determine product manufacturing line
1.4 Determine SPC application work scope
1.5 SPC application data IS
1.6 List of SPC chart 5 L WT
AS
1.7 SPC application technique and method
1.8 Application work area
1.9 SPC charting timeline
Module 1.12.
: K04-02-12 INTRODUCTION TO STATISTICAL PROCESS CONTROL (SPC)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02/L3, C02.01, C02.02, C02.03, C02.04, C02.05

WIM
Learning Activities

Theory Hours Practical Hours

1.10 Determine type of SPC Chart


1.11 Determine SPC Chart application locations
1.12 Determine product manufacturing line
1.13 Determine SPC application work scope
1.14 Prepare SPC application data
1.15 Prepare SPC chart 8 D PT WS
1.16 Determine SPC application technique and
method
1.17 Confirm SPC application work area
1.18 Confirm SPC charting timeline

LA 2: APPLY SPC TOOLS (C02.03, C02.04)

2.1 Type of SPC software


2.2 Analyse data
2.3 Knowledge of computer literature
2.4 Types of statistical tools for SPC
11
2.5 Process Controlling
2.6 Product criteria
2.7 Product functioning
Module 1.13.
: K04-02-12 INTRODUCTION TO STATISTICAL PROCESS CONTROL (SPC)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02/L3, C02.01, C02.02, C02.03, C02.04, C02.05

WIM
Learning Activities

Theory Hours Practical Hours

2.8 Key in inspection data 20


2.9 Interpret data analysis
2.10 Print data result
L IS
2.11 Apply SPC tools WT
AS
2.12 Interpret product drawing
2.13 Determine product workability

LA3 : REPORT SPC ACTIVITIES (C02.05,C02.06)

3.1 SPC Chart plotting technique


3.2 Assessing of SPC effectiveness
3.3 SPC trend and effect analysis
6
3.4 Reporting format
3.5 Report writing skills
3.6 Record keeping procedures
Module 1.14.
: K04-02-12 INTRODUCTION TO STATISTICAL PROCESS CONTROL (SPC)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02/L3, C02.01, C02.02, C02.03, C02.04, C02.05

WIM
Learning Activities

Theory Hours Practical Hours

3.7 Check SPC Chart plotting completeness


3.8 Asses SPS effectiveness
3.9 Review SPC trend
4 D PT WS
3.10 Determine reporting format
3.11 Record SPC application activities
3.12 Follow record keeping procedures

Total Hours 22 32

1. Graph paper
Tools/ Equipment/ Materials :
2. TQM Handbooks
1. Total Quality Management, S. Rajaram Dreamtech Press, 2008, R. S. Naagarazan-New Age
International, 2005
Reference Books (Tittle, Atr, 2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN
Publisher) : 0-02-916682-9
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN 0-13-
952433-9
Manuals : Reference Manuals
Core Abilities :
SYLIBUS PROFILE

Course Code : K04 Knowledge Training Hours : 30Hrs


Course : QUALITY ASSURANCE Practical Training : 51Hrs
Semester : 2 Total Training Hours : 81Hrs
NOSS Code : MC-041-2-C02 Credit :3

Terminal Performance Objective :

Perform metrology activities and works using non contact measuring instrument, two dimensional, various type of pneumatic gauges, manual,
standard and schedule so that the actual profile, size and measurement of component is obtained as per specification, the measuring tools accuracy
meets the standard requirement and the machine tools calibration activities can be carried out according to the standard requirement.

Module : K04-02-13 DIMENSIONAL METROLOGY

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY METROLOGY WORKS AND ACTIVITIES (E01.01)

1.1 Types of non-contact measuring instrument


1.2 Two-dimensional measurement equipment
1.3 Principle of two-dimensional measurement IS
7 L WT
AS
1.4 Types of pneumatic gauge
1.5 Types of electro-pneumatic indicators and meters
Module : K04-02-13 DIMENSIONAL METROLOGY

Delivery Methods

Assessment
Methods
1.15. CU.WA No./ Level : E01.01, E01.02, E01.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

1.6 Determine types of non-contact measuring


instrument
1.7 Determine two-dimensional measurement
equipment
1.8 Interpret principle of two-dimensional 9 D PT WS
measurement
1.9 Determine types of pneumatic gauge
1.10 Determine types of electro-pneumatic indicators
and meters

LA 2. EXECUTE METROLOGY WORKS AND ACTIVITIES (E01.02)

2.1 Measuring instrument principles


2.2 Measure work piece methods
2.3 Non-contact measuring IS
19 L WT
2.4 Two-dimensional measuring AS
2.5 Pneumatic and electro-pneumatic gauging
measuring
Module : K04-02-13 DIMENSIONAL METROLOGY

Delivery Methods

Assessment
Methods
1.16. CU.WA No./ Level : E01.01, E01.02, E01.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

2.6 Apply measuring instrument principles


2.7 Conduct measuring work piece methods
2.8 Apply non-contact measuring
37 D PT WS
2.9 Carry out two-dimensional measuring
2.10 Carry out pneumatic and electro-pneumatic
gauging measuring

LA 3. RECORD METROLOGY WORKS AND ACTIVITIES (E01.03)

3.1 Metrology activities reporting format


3.2 Metrology activities reporting criteria IS
4 L WT
3.3 Procedure to write inspection record AS
3.4 Record keeping procedures
3.5 Determine metrology activities reporting format
3.6 Determine metrology activities reporting criteria
3.7 Procedure to write inspection record 5 D PT WS
3.8 Verify record
3.9 Write and compile results

Total Hours 30 51
1. Profile Projector
2. Toolmaker Microscope
3. Laser Auto Clinometers
4. Laser Dimension Sensor
5. Optical Projector
Tools/ Equipment/ Materials : 6. Surface Texture Instrument
7. Roundness Measuring Machine
8. Contour Tracing Machine
9. Pneumatic gauge and accessories
10. Electro-Pneumatic Gauge
11. CMM (2D measurement only)

1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-87389-
745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN 0-
Reference Books (Tittle, Atr, 02-916682-9
Publisher) : 3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN 0-13-
952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN 0-07-
033176-6

Manuals :

Core Abilities :
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 22Hrs
Course : QUALITY ASSURANCE Practical Hours : 32Hrs
Semester : 2 Total Hours : 54Hrs
NOSS Code : MC-041-1-E02 Credit Hours :2

Terminal Performance Objective:

Perform basic machining using lathe, milling and grinding machine and other related equipment so that the cutting tools technology are applied, basic
turning operation, basic milling operation and basic grinding operation are carried out according to specifications.

Delivery Methods
Module : K04-02-14 MACHINING PROCESS

Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY MACHINING PROCESS (E02.01)


1.1 Type and accessories of lathe, milling and grinding
machine
1.2 Type of lathe, milling and grinding process IS
5 L WT
1.3 Type of grinding wheel AS
1.4 Cutting tools
1.5 Cutting speed and feed
1.6 Interpret type and accessories of lathe,
milling and grinding machine
7 D PT WS
1.7 Determine type of lathe, milling and grinding
process
Delivery Methods
Module : K04-02-14 MACHINING PROCESS

Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

1.8 Determine type of grinding wheel


1.9 Determine cutting tools
1.10 Calculate cutting speed and feed

LA 2. EXECUTE MACHINING PROCESS (E02.02)

2.1 Work piece on machine


2.2 Basic turning operation
2.3 Vertical and horizontal milling
2.4 Facing, step turning, grooving, tapering, threading
and knurling IS
13 L WT
2.5 Vertical and horizontal milling AS
2.6 Boring and drilling operation
2.7 Balance grinding wheel
2.8 Surface grinding operation
2.9 Work piece to specification and accuracy

2.10 Set up work piece on machine


2.11 Perform basic turning operation
2.12 Determine vertical and horizontal milling
2.13 Carry out facing, step turning, grooving, 23 D PT WS
tapering, threading and knurling
2.14 Perform vertical and horizontal milling
2.15 Carry out boring and drilling operation
Module : K04-02-14 MACHINING PROCESS

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

2.16 Set up balance grinding wheel


2.17 Perform surface grinding operation
2.18 Check and inspect work piece to
specification and accuracy

LA 3. RECORD MACHINING PROGRESS (E02.03)

3.1 Machining activities reporting format


3.2 Machining inspection reporting criteria IS
4 L WT
3.3 Procedure to write machining report AS
3.4 Record keeping procedures
3.5 Determine machining activities reporting
format
3.6 Determine machining inspection reporting
criteria 2 D PT WS
3.7 Determine procedure to write machining
report
3.8 Adhere record keeping procedures

Total Hours 22 32
1. Lathe machine and accessories
2. Milling machine and accessories
3. Grinding machine and accessories
4. Grinding wheel
Tools/ Equipment/ Materials : 5. Safety gears
6. Holder
7. Tool bit
8. Blueprint
9. Work piece

1. Manufacturing Processes & Systems 9th Edition Philip F Ostwald and Jairo Munoz ISBN 0-
471-04741-4, Chapter 9 Page 205 to 222, Chapter 11 Page 223 to 257, Chapter 12 Page 263
to 284.
2. Processes and Material of Manufacture 4th Edition (1990) Roy A. Lindberg ISBN 0-205-11817
– 8 Chapter 6 Pages 234 to 263, Chapter 8 Page 305 to 345, and Chapter 9 Page 347 to 389.
Reference Books (Title, Atr, Publisher) : 3. Material and Processes in Manufacturing 5th Edition (1979), E Paul Degarmo ISBN 0 – 02 –
978760 – 2 Part 3 Page 583 to to 635, Page 647 to 673.
4. S.Kalpakjian Steven R.Schnid. Manufacturing Engineering and Technology (4th Edition).
Prentice – Hall Int.Inc. (2001). ISBN0-210-36131-0.
5. Advanced Manufacturing Technology TH Allegri, P.E ISBN 0-8306-2746-4.
6. Grinding Operating Manual Model Kuroda GS-64NC.

Manuals :

Core Abilities :
SYLIBUS PROFILE
Course Code : K04 Theory Hours :22Hrs
Course : QUALITY ASSURANCE Practical Hours :32Hrs
Semester : 2 Total Hours :54 Hrs
NOSS Code : MC-041-1-E03 Credit Hours :2
Terminal Performance Objective:

Perform drawing activities including draw part, detail and assembly drawing using stationeries, drawing folder, client standard, work instructions,
instrument diagram, office equipment, CAD software, computer and plotter so that the actual geometrical dimensional tolerance and allowances
requirement for a given work can identified and interpreted, 2D and 3D drawing are construction and printer out according to the sizes for intended
use.

Module 1.17.
: K04-02-15 ENGINEERING DRAWING

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E03.01, E03.02, E03.03, E03.04/L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY GEOMETRICAL DIMENSIONAL TOLERANCE (E03.01)


1.1 Limits and fits
1.2 Basic holes and shaft systems
IS
1.3 Geometrical tolerances and allowances 5 L WT
AS
1.4 Standard and specification of geometrical
tolerances and allowances
1.5 Understand and interpret various types of
limits and fits
1.6 Use ISO Chart 4 D PT WS
1.7 Interpret geometrical tolerances and
allowances
Module : K04-02-15 ENGINEERING DRAWING

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E03.01, E03.02, E03.03, E03.04/L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 2. CONDUCT DETAIL DRAWING (E03.02)

2.1 CAD systems


2.2 Basic drawing command
2.3 Part of drawing
2.3.1 Data collection
2.3.2 3D part
2.3.3 Drawing sheet IS
8 L WT
2.3.4 Method AS
2.3.5 Technique
2.4 Model diagram specification
2.5 Type of 3D model drawing equipment
2.6 Type of section view
2.7 Unsanctioned Features

2.8 Determine type of 3D part and required


drawing
2.9 Apply part drawing creating method and
12 D PT WS
techniques
2.10 Construct part modeling
2.11 Follow model specification obtain procedure
Module : K04-02-15 ENGINEERING DRAWING

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E03.01, E03.02, E03.03, E03.04/L2

WIM
Learning Activities

Theory Hours Practical Hours

2.12 Interpret diagram specification


2.13 Determine type of drawing equipment
2.14 Operate the CAD systems

LA 3. EXECUTE DETAIL DRAWING (E03.03)

3.1 Direction of cutting plane


3.1.1 Placement of cutting-plane lines
3.1.2 Applications of the different cutting-plane line
styles
3.2 Type of hatch pattern
3.2.1 Angle
3.2.2 Island IS
8 L WT
3.2.3 Selection AS
3.3 Generate drawing information
3.4 Drawing specification gathering
3.5 Determine Drawing information
3.5.1 Code
3.5.2 Symbols
3.5.3 General Dimension
Module : K04-02-15 ENGINEERING DRAWING

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E03.01, E03.02, E03.03, E03.04/L2

WIM
Learning Activities

Theory Hours Practical Hours

3.6 Choose correct section view


3.6.1 Application
3.6.2 Paper size
3.6.3 Specifications
3.7 Create section view
1.7.1 Full
1.7.2 Half
1.7.3 Offset
1.7.4 Aligned
1.7.5 Unsanctioned Features Intersections
in sections
1.7.6 Conventional revolutions 14 D PT WS
1.7.7 Broken-Out sections
3.8 Auxiliary sections
3.8.1 Conventional breaks
3.8.2 Revolved sections
3.8.3 Removed section
3.9 Apply direction of cutting plane
3.9.1 Use cutting-plane lines to designate
location of section
3.10 Direction of cutting plane
3.11 Apply of hatch pattern
3.12 Operate the CAD systems
Module : K04-02-15 ENGINEERING DRAWING

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E03.01, E03.02, E03.03, E03.04/L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 4. RECORD DRAWING ACTIVITIES (E03.04)

4.1 Drawing activities reporting format


4.2 Drawing reporting criteria IS
1 L WT
4.3 Procedure to write drawing report AS
4.4 Record keeping procedures

4.5 Determine drawing activities reporting format


4.6 Determine drawing reporting criteria
2 D PT WS
4.7 Determine procedure to write drawing report
4.8 Adhere to record keeping procedures

TOTAL HOURS 22 32

Tools/ Equipment/ Materials : Computer with CAD System, plotter, paper, CAD instruction manual

The Geometrical Toleance Desk Reference, Paul Green / 13th Edition Technical Drawing, Pearson
Reference Books (Title, Atr, Publisher) :
International Edition

Manuals :

Core Abilities:
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 22 Hrs.
Course : QUALITY ASSURANCE Practical Hours : 32Hrs.
Semester : 2 Total Hours : 54 Hrs.
NOSS Code : MC-041-1-E04 Credit Hours :2

Terminal Performance Objective :

Carry out fundamental electrical and electronic testing using test equipment so that the product will meet standard requirement.

Module 1.18.
: K04-02-16 ELECTRIC & ELECTRONIC

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E04.01, E04.02, E04.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY ELECTRIC AND ELECTRONIC CONCEPTS (E04.01)

1.1 Concepts of current, voltage, resistance and power


1.1.1 Energy Source
1.1.2 AC current principles
1.1.3 DC current principles
1.2 Electric and electronic units IS
5 L WT
1.3 Ohm’s Law AS
1.4 Series, parallel and combination circuits
1.5 Simple Kirchhoff’s law
1.6 Types of electric and electronic measurement
equipments
Module 1.19.
: K04-02-16 ELECTRIC & ELECTRONIC

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E04.01, E04.02, E04.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

1.7 Calculate and verification by using Ohm’s law


1.8 Calculate, assembly and test the series
parallel circuits
1.9 Solve problem by using voltage and current 6 D PT WS
divider method and Kirchhoff’s law
1.10 Apply electric and electronic measurement
equipments

LA 2. EXECUTE ELECTRIC AND ELECTRONIC CIRCUITS (E04.02)

2.1 Passive and active components


2.2 Identify code, polarity and rating of the components
2.3 Identify simple electronic circuits and diagrams
2.3.1 Power supply
2.3.2 Timer
2.3.3 Running light IS
14 L WT
2.4 Processes involve in developing veroboard or printed AS
circuit board (PCB)
2.4.1 Sketching
2.4.2 Test on breadboard
2.4.3 Etching
2.4.4 Soldering
Module : K04-02-16 ELECTRIC & ELECTRONIC

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E04.01, E04.02, E04.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

2.5 Multimeter principle and usage


2.5.1 Ohmmeter
2.5.2 Voltmeter
2.6 Oscilloscope and Frequency counter principles and
usage
IS
2.7 Electrical wiring types, calibration testing system L WT
AS
2.8 Electric measurement equipments and tools in single
phase wiring
2.8.1 Ohmmeter
2.8.2 Galvanometer
2.8.3 ELCB tester
2.9 Determine passive and active components
2.10 Determine code, polarity and rating of the
components
2.11 Construct simple electronic circuits
2.11.1 Power supply
2.11.2 Timer
23 D PT WS
2.11.3 Running light
2.12 Sketching, soldering and testing circuit on
board
2.12.1 Veroboard
2.12.2 PCB board
2.12.3 Breadboard
Module : K04-02-16 ELECTRIC & ELECTRONIC

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E04.01, E04.02, E04.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

2.13 Verify multimeter principle and usage


2.13.1 Ohmmeter
2.13.2 Voltmeter
2.14 Verify oscilloscope and frequency counter
2.15 Construct simple electric wiring
2.15.1 Extension plug wiring
2.15.2 Surface wiring
2.15.3 Conduit wiring
2.16 Testing using measurement equipments

LA 3. RECORD ELECTRIC AND ELECTRONIC ACTIVITIES (E04.03)

3.1 Electrical and electronics measuring and testing


principles
3.2 Electric and electronic activities reporting format IS
3 L WT
3.3 Electric and electronic reporting criteria AS
3.4 Procedure to write electric and electronic report
3.5 Record keeping procedures state analyzers

3.6 Determine electrical and electronics


measuring and testing principles
3 D PT WS
3.7 Determine electric and electronic activities
reporting format
Module : K04-02-16 ELECTRIC & ELECTRONIC

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E04.01, E04.02, E04.03/L2

WIM
Learning Activities

Theory Hours Practical Hours

3.8 Determine electric and electronic reporting


criteria
3.9 Determine procedure to write electric and
electronic report
3.10 Adhere record keeping procedures

22 32

1. Resistors, Capacitors, Inductors, Power supply unit, Function generator, Breadboard, Wires,
Multimeter, Oscilloscope, Circuit diagram, Semiconductor passive and active component
2. Etching solution, PCB transfer (including etching pen), Drilling tool and accessories, Lacquer,
Tools/ Equipment/ Materials :
Etching tray, Solder and disolder tools and accessories, Pliers, PCB processor, Cutters, Tweezers
3. Voltmeter, Ammeter, Ohmmeter, Analogue multimeter, Digital multimeter, Wattmeter, Galvano meter,
Oscilloscope and Frequency counter.
1. Zam Zam Khairani, Prinsip Elektrik, IBS Sdn Bhd, ISBN 967-950-082-9.
2. Thomas L. Floyd, Electronics Fundamentals, Circuits, Devices and Application Prentice Hall
Reference Books (Title, Atr, Publisher) : International, ISBN 0-13-758434-2.
3. William David Cooper, Electronic Instrumentation and measurement Techniques, Prentice Hall
International, ISBN 0-13-251801-5.

Manuals :

Core Abilities:
SEMESTER 3
6. SEMESTER 3

6.1 COMPETENCY PROFILE CHART

Identify record Check record


RECORD Categories quality Apply record Implement storage
control handling control handling
CONTROL record identification document
requirement result

C03 01 L3 02 L3 03 L3 04 L3 05 L3

Record control
handling activities

06 L3

Identify measuring
MEASURING Prepare measuring Prepare work area Confirm measuring
equipment Execute calibration
EQUIPMENT equipment calibration for measuring equipment
calibration activities
CALIBRATION tools and equipments equipment calibration calibration result
requirements
C04 01 L3 02 L3 03 L3 04 L3 05 L3

Report measuring
equipment
calibration activities

06 L3
Check shopfloor
SHOP FLOOR Identify shop floor Prepare shopfloor Execute shopfloor Report shopfloor
quality
QUALITY quality improvement quality improvement improvement quality
improvement
IMPROVEMENT requirements tools and equipments activities improvement
activities
activities
C05 01 L3 02 L3 03 L3 04 L3 05 L3

Determine overall Promote safety,


Report safety at
SAFETY AT WORK safety, health and health and Confirm industrial
work place
PLACE PRACTICE environmental environmental accidents
environmental
parameters practice awareness
C10 01 L3 02 L3 03 L3 04 L3

CNC Perform basic


Apply basic CNC
PROGRAMMING program for CNC
programming
Lathe and Milling

E01 01 L3 02 L3

MANUFACTURING Identify audit Prepare audit


Identify types of Prepare audit Execute audit
/ SYSTEM procedure and schedule and
audit document activities
AUDITING requirement checklist

C03 01 L4 02 L4 03 L4 04 L4 05 L4

Evaluate audit
Report of auditing
finding completion
activities
and accuracy

06 L4 07 L4
Execute Value
CONTINUOUS Identify quality Prepare quality
Identify activities of Added Value Review product and
QUALITY CQI programme
improvement improvement plan
Engineering process capabilities
IMPROVEMENT (CQI) guidelines activity
(VA/VE)

C04 01 L4 02 L4 03 L4 04 L4 05 L4

Execute Quality Report quality


Conduct Design of Organize quality
Function improvement
Experiment (DOE) improvement
Deployment (QFD) activities

06 L4 07 L4 08 L4 09 L4

Identify process non Confirm method of Classify non Confirm product Evaluate non
NON CONFORMITY
conformity non conformity conformity non conformity conformity
ASSESSMENT
assessment assessment assessment assessment assessment result

C06 01 L4 02 L4 03 L4 04 L4 05 L4

Report non
conformity
assessment finding

06 L4

Evaluate Corrective
CUSTOMER Plan method of Analyse customer Propose problem
Identify customer and Preventive
FEEDBACK feedback category
customer feedback feedback solving customer
Action (CAPA)
ANALYSIS rectification information/survey feedback
effectiveness

C07 01 L4 02 L4 03 L4 04 L4 05 L4
Evaluate customer Report customer
feedback feedback analysis
satisfaction timely

06 L4 07 L4

QUALITY Identify record and Evaluate record Report and record


Plan quality Execute quality
ASSURANCE document control and document document control
assurance document assurance document
DOCUMENT coordination
control control activities
control coordination coordination work
CONTROL requirement work activities activities

C08 01 L4 02 L4 03 L4 04 L4 05 L4
6.2 TRAINING PATHWAY CHART SEMESTER 3

MULA
Determine overall safety, health and
environment parameters
10.01 1/4
OCCUPATIONAL SAFETY
AND HEALTH Promote safety, health and
environmental practice awareness
K04-03-11
10.02 2/4

Confirm industrial accidents

10.03 3/4

Report safety at work place


environmental
10.04 4/4

Identify record and document control


coordination requirement

QUALITY SYSTEM C08.01 1/5

Plan quality assurance document control


K04-03-12

C08.02 2/5

Execute quality assurance document


control activities
C08.03 3/5

Evaluate document control coordination


work activities
C08.04 4/5

Report and record document control


coordination work activities
A C08.05 4/5
A
Apply production planning and control
(PPC) principles

E01.01 1/2
INDUSTRIAL MANAGEMENT
Conduct process and time study
K04-03-13
E01.02 2/2

Identify shop floor quality improvement


requirements
05.01 1/5

PROJECT MANAGEMENT
C Prepare shop floor quality improvement
tools and equipment’s
K04-03-14
05.02 2/5

Execute shop floor improvement


activities

05.03 3/5

Check shop floor quality improvement


activities

05.04 4/5

Report shop floor quality improvement


activities

05.05 5/5

B
B

Conduct multi gauging inspection

E02.01 1/2
ADVANCED METROLOGY
Conduct three-dimensional (3d)
K04-03-15 measurement

E02.02 2/2

TAMAT
6.3 MAPPING CHART SEMESTER 3

K04 –DIPLOMA TEKNOLOGI JAMINAN KUALITI / TAHAP 3 SEMESTER 3

OCCUPATIONAL SAFETY AND

INDUSTRIAL MANAGEMENT

ADVANCED METROLOGY
PROJECT MANAGEMENT
SILIBUS

TAJUK MODUL

CNC PROGRAMMING
(JTM)

QUALITY SYSTEM
HEALTH
PROFIL PEKERJAAN
(NOSS)

MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
NO
CU/DUTI WORK ACTIVITIES/TASK NO. WA
DUTI

Identify record control


C03.01
handling requirement

Categories quality record C03.02

Apply record identification C03.03


RECORD
03 CONTROL Implement storage
C03.04
document

Check record control


C03.05
handling result

Record control handling


C03.06
activities
Identify shop floor quality
improvement requirements C05.01

Prepare shop floor quality


improvement tools and C05.02
equipment’s
SHOP FLOOR
Execute shop floor
05 QUALITY C05.03
improvement activities
IMPROVEMENT

Check shop floor quality


improvement activities C05.04

Report shop floor quality


improvement activities C05.05
OCCUPATIONAL SAFETY AND

INDUSTRIAL MANAGEMENT

ADVANCED METROLOGY
PROJECT MANAGEMENT
SILIBUS

TAJUK MODUL

CNC PROGRAMMING
(JTM)

QUALITY SYSTEM
HEALTH
PROFIL PEKERJAAN
(NOSS)

MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
NO
CU/DUTI WORK ACTIVITIES/TASK NO. WA
DUTI

Determine overall safety,


health and environmental C10.01
parameters
Promote safety, health and
SAFETY AT environmental practice C10.02
WORK PLACE awareness
10
PRACTICE
SUPERVISION Confirm industrial
C10.03
accidents
Report safety at work
place environmental C10.04
K04 –DIPLOMA TEKNOLOGI JAMINAN KUALITI / TAHAP 4 SEMESTER 3

OCCUPATIONAL SAFETY AND

INDUSTRIAL MANAGEMENT

ADVANCED METROLOGY
PROJECT MANAGEMENT
SILIBUS

TAJUK MODUL

CNC PROGRAMMING
(JTM)

QUALITY SYSTEM
HEALTH
PROFIL PEKERJAAN
(NOSS)

MODUL 2
MODUL 1

MODUL 3

MODUL 4

MODUL 5

MODUL 6
NO WORK
CU/DUTI NO. WA
DUTI ACTIVITIES/TASK

Identify record and


document control
coordination C08.01
requirement
Plan quality assurance
document control C08.02

Execute quality
QUALITY ASSURANCE assurance document
C08.03
8 DOCUMENT CONTROL control activities

Evaluate record and


document control
C08.04
coordination work
activities
Report and record
document control
C08.05
coordination work
activities
6.4 TABLE OF CONTACT HOURS DISTRIBUTION SEMESTER 3

K04 –DIPLOMA TEKNOLOGI JAMINAN KUALITI / TAHAP 3 SEMESTER 3

TASK (A) JAM KREDIT = A/ (PEMBERAT (1.5) X 18)


KOD JAM JAM JUMLAH
TAJUK MODUL TEORI AMALI
MODUL KREDIT KREDIT JAM KREDIT
(JAM) (JAM)
TEORI AMALI KREDIT

K04-03-11 OCCUPATIONAL SAFETY AND HEALTH 22 32 0.8 1.2 2.0 2

K04-03-12 QUALITY SYSTEM 22 32 0.8 1.2 2.0 2

K04-03-13 INDUSTRIAL MANAGEMENT 32 49 1.2 1.8 3.0 3

K04-03-14 PROJECT MANAGEMENT 32 49 1.2 1.8 3.0 3

K04-03-15 ADVANCED METROLOGY 32 49 1.2 1.8 3.0 3

K04-03-16 CNC PROGRAMMING 22 32 0.8 1.2 2.0 2

PERATUS LATIHAN 40% 60%

JUMLAH LATIHAN (SUBJEK TERAS) 162 243 15

MT 3121 MATHEMATICS 3 27 - 1.0 1.0 1

ES 3111 ENGINEERING SCIENCE 27 - 1.0 1.0 1


TASK (A) JAM KREDIT = A/ (PEMBERAT (1.5) X 18)
KOD JAM JAM JUMLAH
TAJUK MODUL TEORI AMALI
MODUL KREDIT KREDIT JAM KREDIT
(JAM) (JAM)
TEORI AMALI KREDIT

PI 3031 / ISLAMIC STUDIES 3 /


27 - 1.0 - 1.0 1
PM 3041 MORAL STUDIEC 3

JUMLAH LATIHAN (SUBJEK UMUM) 81 - 3

JUMLAH KESELURUHAN LATIHAN 486 18


6.5 SYLIBUS PROFILE SEMESTER 3

SYLIBUS PROFILE
Course Code : K04 Theory Hours : 22Hrs.
Course : QUALITY ASSURANCE Practical HOURS : 32Hrs.
Semester : 3 Total Hours : 54Hrs.
NOSS Code : MC-041-3-C10 Credit Hours :2
Terminal Performance Objective :
Organize Industrial Safety, Health And Environment (SHE) activity using SHE standard, company guideline and audit plan so that industrial accidents
can be prevented, the parameters are continuously adhered and improved and awareness on SHE will be improved.

K04-03-11 OCCUPATIONAL SAFETY AND HEALTH


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : CU10.01/L3, CU10.02/L3, CU10.03/L3, CU10.4/L3

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. DETERMINE OVERALL SAFETY, HEALTH AND ENVIRONMENT PARAMETERS (C10.1/L3)

7
1.1 Department safety needs L WT IS
1.2 Department OHSAS 18001 factors AS
1.3 OHSAS 18001 instruction /manual OHSAS 18001
parameter
K04-03-11 OCCUPATIONAL SAFETY AND HEALTH
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : CU10.01/L3, CU10.02/L3, CU10.03/L3, CU10.4/L3

WIM
Learning Activities

Theory Hours Practical Hours

1.4 Interpret department safety needs


1.5 Identify department OHSAS 18001 factors 11 D PT WS
1.6 Establish OHSAS 18001
instruction/manual
1.7 Review OHSAS 18001 parameter

LA 2. PROMOTE SAFETY, HEALTH AND ENVIRONMENTAL PRACTICE AWARENESS(C10.02/L3)

2.1 Area for OHSAS 18001 L WT IS


2.2 Training to the group leaders 7 AS
2.3 Launch the awareness
2.4 Execute the awareness
2.5 Review the awareness
2.6 Recognize area for OHSAS 18001
2.7 Cascade down safety training to subordinate 11 D PT WS
2.8 Coordinate safety, health and environmental
practice awareness promotion
2.9 Report promotion effectiveness to superior

LA 3. CONFIRM INDUSTRIAL ACCIDENTS (C10.03/L3)


K04-03-11 OCCUPATIONAL SAFETY AND HEALTH
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : CU10.01/L3, CU10.02/L3, CU10.03/L3, CU10.4/L3

WIM
Learning Activities

Theory Hours Practical Hours

3.1 Occupational safety accidents data and info 4 L WT IS


3.2 Classification type of accidents AS
3.3 Investigation technique

5
3.4 Obtain occupational safety accidents
information
3.5 Classify type of accidents
3.6 Brainstorm on probable causes D PT WS
3.7 Present industrial accident report

LA 4. REPORT SAFETY AT WORK PLACE ENVIRONMENTAL (C10.04/L3)


4.1 Assessment effectiveness of process improvement
4.2 Accuracy of measurement data IS
4 L WT
4.3 Equipment storage condition AS

4.4 Determine report formats of accident data 5 D PT WS


collections
4.5 Record occupational accidents activities
4.6 Adhere to record keeping procedure
Total Hours 22 32
Tools/ Equipment/ Materials : SHE handbook (Training Guide) , Malaysian Occupational Safety & Health Act, Company SHE Guidelines, For reference
(ISO 1400 & OHSAS 1800 )

1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-87389-745-7
References: (3-5 references, valid yrs ± 2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN 0-02-916682-9
5)
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN 0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN 0-07-033176-6
Manuals :
Core Ability :
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 22 Hrs.
Course : QUALITY ASSURANCE Practical HOURS : 32 Hrs.
Semester : 3 Total Hours :54Hrs.
NOSS Code : MC-041-3-C3/L3, MC-041-4 -C8/L4 Credit Hours :2
Terminal Performance Objective :
Manage document and record control using standard operation procedure, reference standard, check list and check sheet so that document
storage to meet company’s Standard Operating Procedure (SOP) and required company quality.

K04-03-12 QUALITY SYSTEM


Modul:

Delivery Methods

Assessment
CU. WA No./ Level: C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,

Methods
C08.03/L4, C08.04/L4, C08.05/L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY RECORD AND DOCUMENT CONTROL HANDLING REQUIREMENT (C03.01/L3, C03.02/L3, C03.03/L3, C03.04/L3, C08.01
/L4)

1.1 Document control handling requirements


1.2 Category of documents 5
1.3 Document location
1.4 Document filing system
L WT IS
1.5 Quality document hierarchy
AS
1.5.1 Policy
1.5.2 Procedure
1.5.3 Work instructions
1.5.4 Quality record
1.5.5
K04-03-12 QUALITY SYSTEM
Module :

Delivery Methods

Assessment
CU. WA No./ Level : C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,

Methods
C08.03/L4, C08.04/L4, C08.05/L4

WIM
Learning Activities

Theory Hours Practical Hours

1.6 Documents recipients list


1.7 Document distribution list
1.8 Record and document revision status
1.9 Quality records compilation
1.10 Document list and status
1.11 Document identification list
1.12 Arrangement of QA availability record
1.13 Document designated area
1.14 Interpret document control handling
requirements
1.15 Determine category of documents
1.16 Determine document location
1.17 Determine document filing system
1.18 Differentiate document category
1.19 Determine documents recipients
D PT WS
1.20 Determine document distribution list 8
1.21 Determine record and document revision status
1.22 Compile quality records
1.23 Update document list and status
1.24 Refer document identification list
1.25 Arrange QA availability record in order
1.26 Locate document and record at registered place
K04-03-12 QUALITY SYSTEM
Module :

Delivery Methods

Assessment
CU. WA No./ Level : C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,

Methods

WIM
C08.03/L4, C08.04/L4, C08.05/L4

Learning Activities

Theory Hours Practical Hours

LA 2. CHECK RECORD CONTROL HANDLING RESULT AND ACTIVITIES (C03.05/L3, C03.06/L3)

2.1 Document storage location 5 L WT IS


2.2 Check document retrievable AS
2.3 Asses effectiveness of document control
2.4 Review document availability
2.5 Recording format
2.6 Report writing technique
2.7 Record and data keeping procedure
2.8 Record and document control coordination
requirements
2.9 Record and document coordination purposes
2.10 Document and record work activity flow

2.11 Check document storage location 8 D PT WS


2.12 Check document retrievable
2.13 Asses effectiveness of document control
2.14 Review document availability
2.15 Determine recording format
2.16 Record document control handling activities
2.17 Adhere to recording procedure
K04-03-12 QUALITY SYSTEM
Module :

Delivery Methods

Assessment
CU. WA No./ Level : C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,

Methods

WIM
C08.03/L4, C08.04/L4, C08.05/L4

Learning Activities

Theory Hours Practical Hours

2.18 Determine record and document control


coordination requirements.
2.19 Determine record and document coordination
purposes
2.20 Determine document and record work activity
flow

LA 3. PLAN QUALITY ASSURANCE DOCUMENT CONTROL AND EXECUTE QUALITY ASSURANCE DOCUMENT CONTROL ACTIVITIES
(C08.02 /L4, C08.03 /L4 )
3.1 Document control coordination procedures 6 L WT IS
3.2 Qualified personnel arrangement AS
3.3 Prepare document control work activity facilities
3.4 Document control classification procedure
3.5 Document distribution list
3.6 Quality control document master list
3.7 Document control record status

3.8 Confirm document control coordination 8 D PT WS


procedures
3.9 Assign appointed personnel
K04-03-12 QUALITY SYSTEM
Module :

Delivery Methods

Assessment
CU. WA No./ Level : C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,

Methods

WIM
C08.03/L4, C08.04/L4, C08.05/L4

Learning Activities

Theory Hours Practical Hours

3.10 Prepare document control work activity


facilities
3.11 Classify document control procedure
categories
3.12 Control document distribution
3.13 Control document master list
3.14 Update document control record

LA 4. EVALUATE DOCUMENT CONTROL COORDINATION WORK ACTIVITIES (C08.04/L4, C08.05 /L4)

4.1 Document control compliance L WT IS


4.2 Document control accessibility and traceability AS
4.3 Document and data control effectiveness
4.4 List of reporting format 6
4.5 Document and data keeping procedure

4.6 Asses document control compliance 8 D PT WS


4.7 Asses document control accessibility and
traceability
4.8 Asses document and data control Effectiveness
K04-03-12 QUALITY SYSTEM
Module :

Delivery Methods

Assessment
CU. WA No./ Level : C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,

Methods

WIM
C08.03/L4, C08.04/L4, C08.05/L4

Learning Activities

Theory Hours Practical Hours

4.9 Determine reporting format


4.10 Adhere document and data keeping procedure

Total Hours 22 32
1. Policy standard
2. Reference procedure
3. Computer
4. Work instruction
5. ISO 9000
Tools/ Equipment/ Materials :
6. QS 9000
7. ISO/TSM 16949
8. Gantt Chart
9. Organization structure
10. Business Plan

1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN
978-0-87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive
Reference Books (Tittle, Atr, Publisher) : Handbook, ISBN 0-02-916682-9
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese
Way, ISBN 0-13-952433-9

Manuals :
Core Ability
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 32Hrs.
Course : QUALITY ASSURANCE Practical HOURS : 49Hrs.
Semester : 3 Total Hours :81Hrs.
NOSS Code : E01 Credit Hours :3
Terminal Performance Objective :
Perform industrial management using production and planning control (PPC), process and time study procedure and techniques so that various
production activities is in line with organizational objective.

K04-03-13 INDUSTRIAL MANAGEMENT

Delivery Methods

Assessment
Methods
CU. WA No./ Level: E01/L3

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. APPLY PRODUCTION PLANNING AND CONTROL (PPC) PRINCIPLES (E01.01/L3)

1.1 Production target


1.2 Production element 14
1.3 Production process
1.4 Bill of Material (BOM)
1.5 Material of requirement planning
1.6 Line balancing
L WT IS
1.7 Principle of improvement and motion economy
AS
1.8 Calculation of the performance of production
elements and activities
K04-03-13 INDUSTRIAL MANAGEMENT

Assessment Methods
Module :

Delivery Methods
CU. WA No./ Level : E01/L3

WIM
Learning Activities

Hours Practical Hours


Theory
1.9 Determine production planning principles 15
1.10 Determine production control principles D
PT WS
1.11 Evaluate production performance P

LA 2. CONDUCT PROCESS AND TIME STUDY (E01.02/L3)


2.1 Types of manufacturing flow and symbols 18
2.2 Fundamentals motion element and symbols
2.3 Travel motion element and symbol
2.4 Man, machine chart
2.5 Analysing manufacturing flow and motion
2.5.1 Critical Path Method (CPM)
2.5.2 Program Evaluation Review Technique
(PERT) L WT IS
2.5.3 Line Balancing AS
2.6 Principle of improvement
2.7 Principle of motion economy
2.8 Objective and types of time study
2.9 Procedures for stop watch time study
2.10 Requirement for stop watch time study
2.11 Element of standard time
2.12 Performance Time study
K04-03-13 INDUSTRIAL MANAGEMENT
Module :

Delivery Methods

Assessment
Methods
CU. WA No./ Level : E01/L3

WIM
Learning Activities

Theory Hours Practical Hours

2.13 Prepare analysis chart using symbols 34


2.14 Analyse various chart
2.15 Conduct manufacturing flow and motion
analysis
2.16 Formulate improvement plan
D
2.17 Prepare stop watch time analysis chart PT WS
P
2.18 Determine work element to be measured using
stop watch
2.19 Conduct time study
2.20 Establish standard time

Total Hours 32 49
Analysis Chart and symbols, stop watch, production schedule, data and reference, operation
Tools/ Equipment/ Materials :
management, Handbook, process flow chart

1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN
0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN 0-
07-033176-6

Manuals :
Core Ability
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 32Hrs.
Course : QUALITY ASSURANCE Practical Hours : 49Hrs.
Semester : 3 Total Hours : 81Hrs.
NOSS Code : MC-041-3-C05 Credit hours :3
Terminal Performance Objective :
Perform and supervise quality improvement project and process activities using references and documented proposal so that the project can be
identified and can be approved according to SOP to meet company’s requirement.

K04-03-14 PROJECT MANAGEMENT


Module :

Assessment
Methods

Methods
Delivery
CU.WA No./ Level :C05 /L3

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY SHOPFLOOR QUALITY IMPROVEMENT REQUIREMENTS

1.1 Type of improvement 5 L WT IS


1.1.1 Inspection technique AS
1.1.2 Cycle time reduction
1.1.3 Line ergonomic
1.2 Company quality improvement guideline
Delivery Methods
Module : K04-03-14 PROJECT MANAGEMENT

Assessment
Methods
CU.WA No./ Level :C05 /L3

WIM
Learning Activities

Theory Hours Practical Hours

10 D PT WS
1.3 Determine improvement area P
1.4 Determine shop floor quality improvement
guidelines
1.5 Determine product requirements
1.6 Refer process flow
1.7 Determine quality improvement target

LA 2. PREPARE SHOPFLOOR QUALITY IMPROVEMENT TOOLS AND EQUIPMENTS

2.1 Quality improvement schedule 11 L WT IS


2.2 Quality improvement elements AS
2.3 Quality improvement team arrangement
2.4 Quality improvement tools
2.4.1 Check sheet
2.4.2 Pareto diagram
2.4.3 Cause and effect diagram
2.4.4 Histogram
2.4.5 Stratification
2.4.6 Scatter diagram
2.4.7 Graph or chart
Delivery Methods
Module : K04-03-14 PROJECT MANAGEMENT

Assessment
Methods
CU.WA No./ Level :C05 /L3

WIM
Learning Activities

Theory Hours Practical Hours

2.5 Produce quality improvement schedule


2.6 Itemise quality improvement elements PT
2.7 Arrange quality improvement team D WS
2.8 Confirm quality improvement tools 16 P

LA 3. EXECUTE AND CHECK SHOP FLOOR IMPROVEMENT ACTIVITIES

3.1 Non-conformance report 11 L WT IS


3.2 Shop floor quality improvement data AS
3.3 Gathering of customer feedback data
3.4 Data collection of line improvement
3.5 Product/process improvement categorisation
3.6 Quality improvement tools application
3.7 Asses effectiveness of shop floor quality
improvement activities
3.8 Asses application of improvement tools
3.9 Review improvement achievement result
K04-03-14 PROJECT MANAGEMENT

Delivery Methods
Module :

Assessment
Methods
CU.WA No./ Level :C05/L3:

WIM
Learning Activities

Theory Hours Practical Hours

3.10 Refer to non-conformance report 18


3.11 Refer to shop floor quality improvement data
3.12 Gather customer feedback
3.13 Gather line improvement information
3.14 Categorise product/process improvement
3.15 Apply quality improvement tools
3.16 Asses effectiveness of shop floor quality
improvement activities
3.17 Asses application of improvement tools
3.18 Review improvement achievement result
LA 4. REPORT SHOP FLOOR QUALITY IMPROVEMENT ACTIVITIES

6.6 Recording format 5 L WT IS


6.7 Recording of improvement result AS
6.8 Record and data keeping procedure
Module : K04-03-14 PROJECT MANAGEMENT

Delivery Methods

Assessment
Methods
CU.WA No./ Level :C05 /L3

WIM
Learning Activities

Theory Hours Practical Hours

6.9 Determine recording format 5 D PT WS


6.10 Record improvement result P
6.11 Adhere to record and data keeping procedure

TOTAL HOURS 32 49
1. Computer
2. Software
Tools/ Equipment/ Materials : 3. Customer requirement sheet
4. Measuring and Test Instruments
5. Components/Parts Specification

1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN
978-0-87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive
Handbook, ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese
Way, ISBN 0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook,
ISBN 0-07-033176-6

Manuals :

Core Abilities:
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 32 Hrs.
Course : QUALITY ASSURANCE Practical HOURS : 49 Hrs.
Semester : 3 Total Hours : 81Hrs.
NOSS Code : MC-041-3-E02/L3 Credit Hours :3
Terminal Performance Objective :
Advanced Metrology using work holding fixtures, electronic probes , manual probe head, auto probe head, scanning probe head, dial gauges,
CMM and accessories, work piece and master block so that types of inspection gauges and fixture are identified, multi gauging fixture are designed
and fabricated, inspection gauges are setup to fixtures, work piece is measured and scanned using manual and auto probing for reverse
engineering conducted by three-dimensional (3D) measurement, types of three-dimensional measurement are identified according to specification.

K04-03-15 ADVANCED METROLOGY


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E02/L3

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. CONDUCT MULTI GAUGING INSPECTION (E02.01/L3)

12 L WT IS
1.1 Types of inspection gauges
AS
1.2 Types of inspection fixtures
1.3 Fundamental of multi gauging fixtures design
1.4 Types of gauging fixtures
1.5 Inspection gauges feature and limitation
1.6 Metric –imperial conversion chart
Module : K04-03-15 ADVANCED METROLOGY

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E02/L3

WIM
Learning Activities

Theory Hours Practical Hours

1.7 Principal direct and indirect reading


1.8 Reading of instrument
1.9 Collecting and recording data method
1.10 Select suitable type of gauges to working 24 D PT WS
environment P
1.11 Set up fixtures for inspection
1.12 Select suitable inspection fixtures
1.13 Construct and set-up gauging fixtures
1.14 Read blueprint
1.15 Use proper hand tools
1.16 Read metric and imperial reading
1.17 Read direct and indirect reading for
confirmation
1.18 Compare actual reading to specified standard
1.19 Verify data and its usage
1.20 Write and compile record
Module : K04-03-15 ADVANCED METROLOGY

Delivery Methods

Assessment
Methods
CU.WA No./ Level :E02/L3

WIM
Learning Activities

Theory Hours Practical Hours

LA 2. CONDUCT THREE-DIMENSIONAL (3D) MEASUREMENT (E02.02/L3)


2.1 Principal of three-dimensional measurement 20 L WT IS
2.2 Technique of measurement AS
2.3 CMM part programming
2.4 Types of probe and sensors
2.5 Effective work piece set-up
2.6 Scanning technique
2.7 Reverse engineering technique
2.8 Collecting and recording data method

2.9 Operate CMM machine 25 D PT WS


2.10 Verify measurement result of work piece to P
standard
2.11 Program part programming for a given three
dimensional work piece
2.12 Run part program
2.13 Rectify part programming fault
2.14 Verify measurement result of work piece to
standard
Module : K04-03-15 ADVANCED METROLOGY

Assessment
Methods

Methods
Delivery
CU.WA No./ Level : E02/L3

WIM
Learning Activities

Theory Hours Practical Hours


2.15 Set up work piece for scanning
2.16 Convert data to other application software
2.17 Verify data and its usage
2.18 Write and compile record
Total Hours 32 49
1. Multi-gauging fixture
2. Work holding fixture
3. Electronic probe,
4. Manual probe head
5. Auto probe head
6. Scanning probe head
7. Dial gauges
Tools/ Equipment/ Materials : 8. Work piece
9. Hand Tools
10. CMM with accessories
11. Master block
12. Components/Parts Specification
13. Test procedure
14. Code and standard
15. Test pieces
16. Checklist
1. Inspection and Measurement for Engineering Craftman, Published by Engineering Industry
Training Board, Module H26.
Reference Books (Tittle, Atr, Publisher) :
2. JFW Gayler C.R. Shot bolt, Metrology for Engineers.
3. Keith Brooker, Manual Of British Standards In Engineering Metrology

Manuals :

Core Abilities:
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 22 Hrs.
Course : QUALITY ASSURANCE Practical Hours : 32 Hrs.
Semester : 3 Total Hours : 54 Hrs.
NOSS Code : MC-041-3-E03 Credit Hours :2
Terminal Performance Objective :
Carry out Basic CNC turning operation using CNC lathe machine, CNC Milling Machine, machine operating manual, cutting tools (CNC lathe),
measuring instrument, tool holder (CNC lathe), chuck, gauge, tool setter, part drawing, work piece material so that part drawing interpreted,
CNC lathe machine is setup, CNC programming generated, work piece is setup, CNC turning process executed and finished part confirmed in
accordance with standard operating procedure and drawing specification.

K04-03-16 CNC PRGRAMMING


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E03/L3

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. APPLY BASIC CNC PROGRAMMING (E03.01/L3)


L WT IS
1.1 Types of CNC machines and their function. 4 AS
1.2 Functions of the various controls and button on
controller panel.
1.3 Method of obtaining co-ordinates
1.4 Absolute and incremental program
K04-03-16 CNC PRGRAMMING
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E03/L3

WIM
Learning Activities

Theory Hours Practical Hours

1.5 Address, codes (G-codes, M-code), canned cycles and


miscellaneous function
1.6 Method of programming in sequence
1.7 Cutting speed and feed
1.8 Program on CNC controller panel

1.9 Obtain co-ordinates based upon 12 D PT WS


Cartesian Co-Ordinate System. P
1.10 Write absolute and incremental
program
1.11 Able to simulate program on controller
machine

LA 2. PERFORM BASIC PROGRAM FOR CNC LATHE AND MILLING (E03.02/L3)

L WT IS
2.1 Identify different control system
AS
2.1.1 Type of control system use on CNC and Various
5
type of CNC Control
2.1.2 Character of CNC program
2.1.3 Safety precaution related to handling of CNC
Machine
K04-03-16 CNC PRGRAMMING
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E03/L3

WIM
Learning Activities

Theory Hours Practical Hours

L WT IS
2.2. Determine machining process. 13 AS
2.2.1 Type of machining processes and sequence
2.2.2 Machine code such as G, M , F , S and T
2.2.3 Sub program

2.3 Edit program


2.3.1 Function on control panel features
2.3.2 Type of controller system
2.3.3 System language and instruction
2.3.4 Absolute and incremental programming
2.3.5 Cutting feed and speed

2.5 Determine machining process 20


2.5.1 Identify machining process
2.6 Edit program
2.6.1 Write absolute and incremental
program
2.6.2 Key in program at control panel
2.6.3 Store and retrieve data safely
K04-03-16 CNC PRGRAMMING
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : E03/L3

WIM
Learning Activities

Theory Hours Practical Hours

2.7 Perform machining D PT WS


2.7.1 Operate CNC machine P
2.7.2 Identify and rectify errors
2.7.3 Adhere to safety precaution
22 32
Total Hours

1 CNC milling machine


2 CNC lathe machine
Tools/ Equipment/ Materials :
3 CNC program format
4 Computer with CAD software
1. Phillip F Ostwald and Jairo Munoz (1997), Manufacturing Processes and Systems, 9th Edition,
ISBN 0-471-04741- 4 Chapter 28 Page 666 to 681.
2. R L Timings (1998), Manufacturing Technology ISBN 0-582-35693 – 8 Chapters 5 Page 171 to
Reference Books (Tittle, Atr, Publisher) :
196.
3. Roy A. Lindberg (1990), Processes and Material of Manufacture 4th Edition ISBN 0-205-11817 – 8
Chapter 3 Page 62 to 81.

Manuals :
Core Abilities
SEMESTER 4
7. SEMESTER 4

7.1 COMPETENCY PROFILE CHART SEMESTER 4

QUALITY
ASSURANCE Identify inspection & Confirm inspection
Plan inspection & Develop inspection Summaries
STANDARD testing procedure & testing procedure
testing procedure checklist based on inspection
OPERATING preparation preparation result
preparation checklist requirement information
PROCEDURE requirements
PREPARATION
C01 01 L3 02 L3 03 L3 04 L3 05 L3

Report inspection &


testing procedure
preparation
activities
06 L3

Identify measuring
MEASURING Prepare measuring Prepare work area Confirm measuring
equipment Execute calibration
EQUIPMENT equipment calibration for measuring equipment
calibration activities
CALIBRATION tools and equipments equipment calibration calibration result
requirements
C04 01 L3 02 L3 03 L3 04 L3 05 L3

Report measuring
equipment
calibration activities

06 L3
PRODUCT/PROCE Identify
SS NON- product/process Plan non Segregate non Execute non Conduct corrective
CONFORMANCE non conformance conformance control conformance conformance action meeting
CONTROL control parts activity product/process product disposition
requirements
C06 01 L3 02 L3 03 L3 04 L3 05 L3

Report
Monitor corrective product/process non
action effectiveness conformance control
activities
06 L3 07 L3

Execute product
PRODUCT Identify product Identified process Check product
quality acceptance Determine quality
QUALITY quality acceptance deviation calculated quality test index
due to process acceptance criteria
ACCEPTANCE requirements and test index result
abnormality
C07 01 L3 02 L3 03 L3 04 L3 05 L3

Report product
quality acceptance
activities

06 L3

Identify customer Analysis customer


CUSTOMER Prepare customer Execute customer Report customer
feedback/response/ feedback/
FEEDBACK/RESPO feedback/response/ feedback/response/ feedback/response
survey response/ survey
NSE/SURVEY survey activity survey activities / survey result
requirements result/data
C08 01 L3 02 L3 03 L3 04 L3 05 L3
Identify process Prepare subordinate
SUPERVISORY supervision administrative Administer personnel Execute in-house
Conduct section
FUNTIONS requirement and information, data and appraisal training
meeting
specification forms
C09 01 L3 02 L3 03 L3 04 L3 05 L3

Report supervision
administrative
activities

06 L3

Prepare customer
CUSTOMER Identify customer Address customer Evaluate customer Report customer
needs, requirement
REQUIREMENT needs, requirement needs, requirements requirement requirement
and specification
ESTABLISHMENT and specification and specification fulfillment activities
guidelines
C01 01 L4 02 L4 03 L4 04 L4 05 L4

CONTINUOUS Execute Value


Identify quality Prepare quality
QUALITY Identify activities of Added Value Review product and
improvement improvement plan
IMPROVEMENT CQI programme Engineering process capabilities
guidelines activity
(CQI) (VA/VE)

C04 01 L4 02 L4 03 L4 04 L4 05 L4

Execute Quality Report quality


Conduct Design of Organize quality
Function improvement
Experiment (DOE) improvement
Deployment (QFD) activities

06 L4 07 L4 08 L4 09 L4
Identify process non Confirm method of Classify non Confirm product Evaluate non
NON CONFORMITY
conformity non conformity conformity non conformity conformity
ASSESSMENT
assessment assessment assessment assessment assessment result

C06 01 L4 02 L4 03 L4 04 L4 05 L4

Report non
conformity
assessment finding

06 L4

Evaluate Corrective
CUSTOMER Plan method of Analyse customer Propose problem
Identify customer and Preventive
FEEDBACK customer feedback feedback solving customer
feedback category Action (CAPA)
ANALYSIS rectification information/survey feedback
effectiveness

C07 01 L4 02 L4 03 L4 04 L4 05 L4

Evaluate customer Report customer


feedback feedback analysis
satisfaction timely

06 L4 07 L4
PRODUCT Identify product Execute product Evaluate product
Confirm method of Evaluate product
LIABILITY liability services liability services work liability services
product containment liability analysis
ANALYSIS requirement activities work activities

E11 01 L4 02 L4 03 L4 04 L4 05 L4

Report product
liability services
activities

06 L4
7.2 TRAINING PATHWAY CHART SEMESTER 4

Identify measuring equipment


calibration requirements
04.01 1/6
MULA
Prepare measuring equipment
calibration tools and equipments

04.02 2/6
MEASURING CALIBRATION
Prepare work area for measuring
K04-04-11 equipment calibration
04.03 3/6

Execute calibration activities

04.04 4/6

Confirm measuring equipment


calibration result
04.05 5/6

Report measuring equipment


calibration activities
04.06 6/6

Identify inspection & testing


procedure preparation
requirements
01.01 1/6

Plan inspection & testing


procedure preparation
checklist
01.02 2/6

Develop inspection checklist


based on requirement
01.03 3/6

Summaries inspection
information
01.04 4/6

Confirm inspection & testing


procedure preparation result
01.05 5/6

A Report inspection & testing


procedure preparation activities
01.06 6/6
Identify customer needs, requirement
and specification guidelines
C01.01 1/5

Evaluate customer requirement


fulfillment
CUSTOMER SERVICE
MANAGEMENT C01.02 2/5

K04-04-12 Analyses customer feedback


information/survey improvement
activities
C01.03 4/5

Report customer satisfaction

C01.04 4/5

Report customer satisfaction

C01.05 5/5

Identify customer feedback category

C07.01 1/7

Plan method of customer feedback


rectification
C07.02 2/7

Analyse customer feedback


information/survey
C07.03 4/7

Propose problem solving customer


feedback
C07.04 4/7

Evaluate Corrective and Preventive


Action (CAPA) effectiveness
C07.05 5/7

Evaluate customer feedback satisfaction

C07.06 5/7

Report customer feedback analysis


B timely
C07.07 5/7
Identify process non conformity
assessment
06.01 1/6

PRODUCT ANALYSIS Confirm method of non conformity


assessment

K04-03-13 06.02 2/6

Classify non conformity assessment

06.03 3/6

Confirm product non conformity


assessment
06.04 4/6

Evaluate non conformity assessment


result
06.05 5/6

Report non conformity assessment


finding

06.06 6/6

Identify product liability services


requirement

11.01 1/6

Confirm method of product


containment
11.02 2/6

Execute product liability services


work activities
11.03 3/6

Evaluate product liability services


work activities

11.04 4/6

Evaluate product liability analysis

11.05 5/6

Report product liability service


activities
C 11.06 6/6
C Identify product/process non
conformance control requirements
06.01 1/7

Plan non conformance control parts


activity
PRODUCT QUALITY
CONTROL 06.02 2/7

K04-04-14
Segregate non conformance
product/process

06.03 3/7

Execute non conformance product


disposition

06.04 4/7

Conduct corrective action meeting

06.05 5/7

Monitor corrective action


effectiveness
06.06 6/7

Report product/process non


conformance control activities

06.07 7/7

Identify product quality acceptance


requirements
07.01 1/6

Execute product quality acceptance


due to process abnormality
07.02 2/6
D
Determine quality acceptance criteria

07.03 3/6

Identified process deviation


calculated and test index

07.04 4/6
Check product quality test index
D result
07.05 5/6

Report product quality acceptance


activities

07.06 6/6

Identify activities of CQI programme

04.01 1/9

Identify quality improvement guideline

04.02 2/9

LEAN MANUFACTURING Prepare quality improvement plan


activity
K04-04-15 04.03 3/9

Execute value added/ value


engineering(VA/VE)
04.04 4/9

Review product and process capabilities

04.05 5/9

Execute quality function deployment


(QFD)
04.07 7/9

Organiza quality improvement

04.08 8/9

Report quality improvement activities

04.08 9/9

E
Identify process supervision
F requirement and specification
09.01 1/6

Prepare subordinate administrative


information,data and forms
SUPERVISORY 09.02 2/6

K04-04-16 Administer personnel appraisal

09.03 3/6

Execute in-house training

09.04 4/6

Conduct section meeting

09.05 5/6

Report supervision administrative


activities
09.06 6/6

TAMAT
7.3 MAPPING CHART SEMESTER 4

K04-DIPLOMA TEKNOLOGI JAMINAN KUALITI/TAHAP 3 SEMESTER 4

PRODUCT QUALITY CONTROL


MEASURING CALIBRATION

LEAN MANUFACTURING
SILIBUS

CUSTOMER SERVICE

PRODUCT ANALYSIS
(JTM)

TAJUK MODUL

SUPERVISORY
MANAGEMENT
PROFIL PEKERJAAN
(NOSS)

MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK WA

Identify inspection &


testing procedure C01.01
preparation requirements

Plan inspection & testing


procedure preparation C01.02
checklist

QUALITY Develop inspection


ASSURANCE checklist based on C01.03
STANDARD requirement
C01L3
OPERATING
PROCEDURE
Summaries inspection
PREPARATION C01.04
information

Confirm inspection &


testing procedure C01.05
preparation result

Report inspection &


testing procedure C01.06
preparation activities
Identify measuring
equipment calibration C04.01
requirements
C04L3 MEASURING
CALIBRATION Prepare measuring
equipment calibration C04.02
tools and equipment
PRODUCT QUALITY CONTROL
MEASURING CALIBRATION

LEAN MANUFACTURING
SILIBUS

CUSTOMER SERVICE

PRODUCT ANALYSIS
(JTM)

TAJUK MODUL

SUPERVISORY
MANAGEMENT
PROFIL PEKERJAAN
(NOSS)

MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK WA

Prepare work area for


measuring equipment C04.03
calibration
Execute calibration
C04.04
activities
Confirm measuring
equipment calibration C04.05
result
Report measuring
equipment calibration C04.06
activities

Identify product/process
non-conformance control C06.01
requirements

Plan non-conformance
control parts activity C06.02

Segregate non-
conformance C06.03
PRODUCT/PROCE product/process
SS NON-
C06L3 CONFORMANCE Execute non-conformance C06.04
CONTROL product disposition
Conduct corrective action
C06.05
meeting
Monitor corrective action
effectiveness C06.06

Report product/process
non-conformance control
C06.07
activities
PRODUCT QUALITY CONTROL
MEASURING CALIBRATION

LEAN MANUFACTURING
SILIBUS

CUSTOMER SERVICE

PRODUCT ANALYSIS
(JTM)

TAJUK MODUL

SUPERVISORY
MANAGEMENT
PROFIL PEKERJAAN
(NOSS)

MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK WA

Identify product quality


acceptance requirements C07.01

Execute product quality


acceptance due to C07.02
process abnormality

Determine quality
PRODUCT C07.03
acceptance criteria
C07L3 QUALITY
ACCEPTANCE Identified process
deviation calculated and C07.04
test index

Check product quality test


C07.05
index result
Report product quality
C07.06
acceptance activities
Identify customer
feedback/response/ C08.01
survey requirements
Prepare customer
feedback/response/ C08.02
survey activity
CUSTOMER Execute customer
C08L3 FEEDBACK/RESPO feedback/response/ C08.03
NSE/SURVEY survey activities
Analysis customer
feedback/response/ C08.04
survey result/data
Report customer
feedback/response/ C08.05
survey result
PRODUCT QUALITY CONTROL
MEASURING CALIBRATION

LEAN MANUFACTURING
SILIBUS

CUSTOMER SERVICE

PRODUCT ANALYSIS
(JTM)

TAJUK MODUL

SUPERVISORY
MANAGEMENT
PROFIL PEKERJAAN
(NOSS)

MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK WA

Identify process
supervision requirement C09.01
and specification
Prepare subordinate
administrative information, C09.02
data and forms
SUPERVISORY Administer personnel
C09L3 C09.03
FUNTIONS appraisal
Execute in-house training
C09.04

Conduct section meeting


C09.05

Report supervision
C09.06
administrative activities
K04 –DIPLOMA TEKNOLOGI JAMINAN KUALITI / TAHAP 4 SEMESTER 4

MEASURING CALIBRATION

LEAN MANUFACTURING
SILIBUS

CUSTOMER SERVICE

PRODUCT ANALYSIS
TAJUK MODUL

PRODUCT QUALITY
(JTM)

SUPERVISORY
MANAGEMENT

CONTROL
PROFIL PEKERJAAN
(NOSS)

MODUL 2
MODUL 1

MODUL 3

MODUL 4

MODUL 5

MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK TASK

Identify customer
needs, requirement
C01.01
and specification

Prepare customer
needs, requirement
and specification C01.02
guidelines
CUSTOMER
REQUIREMENT
C01L4 Address customer
ESTABLISHMENT
needs, requirements
C01.03
and specification

Evaluate customer
requirement fulfilment C01.04

Report customer
requirement activities C01.05

Identify activities of CQI


programme C04.01

Identify quality
improvement guidelines C04.02
CONTINUOUS
QUALITY
C04L4 Prepare quality
IMPROVEMENT
(CQI) improvement plan
C04.03
activity

Execute Value Added


Value Engineering
C04.04
(VA/VE)
MEASURING CALIBRATION

LEAN MANUFACTURING
SILIBUS

CUSTOMER SERVICE

PRODUCT ANALYSIS
TAJUK MODUL

PRODUCT QUALITY
(JTM)

SUPERVISORY
MANAGEMENT

CONTROL
PROFIL PEKERJAAN
(NOSS)

MODUL 2
MODUL 1

MODUL 3

MODUL 4

MODUL 5

MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK TASK

Review product and


process capabilities C04.05

Conduct Design of
C04.06
Experiment (DOE)
Execute Quality
Function Deployment C04.07
(QFD)
Report quality
improvement activities C04.08

Identify process non


conformity assessment C06.01

Confirm method of non-


conformity assessment C06.02

Classify non conformity


assessment C06.03
NON
C06L4 CONFORMITY
ASSESSMENT Confirm product non
conformity assessment C06.04

Evaluate non conformity


assessment result C06.05

Report non conformity


assessment finding C06.06

CUSTOMER Identify customer


C07L4 FEEDBACK feedback category C07.01
ANALYSIS
MEASURING CALIBRATION

LEAN MANUFACTURING
SILIBUS

CUSTOMER SERVICE

PRODUCT ANALYSIS
TAJUK MODUL

PRODUCT QUALITY
(JTM)

SUPERVISORY
MANAGEMENT

CONTROL
PROFIL PEKERJAAN
(NOSS)

MODUL 2
MODUL 1

MODUL 3

MODUL 4

MODUL 5

MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK TASK

Plan method of
customer feedback
C07.02
rectification

Analyse customer
feedback
C07.03
information/survey

Propose problem
solving customer
C07.04
feedback

Evaluate Corrective and


Preventive Action
C07.05
(CAPA) effectiveness

Evaluate customer
feedback satisfaction C07.06

Report customer
feedback analysis timely C07.07

Identify product liability


services requirement E01.01

Confirm method of E01.02


product containment
PRODUCT
E11L4 LIABILITY
ANALYSIS Execute product liability E01.03
services work activities

Evaluate product liability E01.04


services work activities
NO
DUTI
(NOSS)

CU/DUTI
PROFIL PEKERJAAN

analysis
WORK

services activities
SILIBUS
(JTM)

ACTIVITIES/TASK

Report product liability


Evaluate product liability

TAJUK MODUL
NO.
TASK

E01.06
E01.05

MODUL 1 MEASURING CALIBRATION

CUSTOMER SERVICE
MODUL 2
MANAGEMENT

MODUL 3 PRODUCT ANALYSIS

PRODUCT QUALITY
MODUL 4 CONTROL

MODUL 5 LEAN MANUFACTURING

MODUL 6 SUPERVISORY
7.4 TABLE OF CONTACT HOURS DISTRIBUTION SEMESTER 4

K04 –DIPLOMA TEKNOLOGI JAMINAN KUALITI / TAHAP 3 SEM 4

TASK (A) JAM KREDIT = A/ (PEMBERAT (1.5) X 18)


KOD JAM JAM JUMLAH
TAJUK MODUL TEORI AMALI
MODUL KREDIT KREDIT JAM KREDIT
(JAM) (JAM)
TEORI AMALI KREDIT

K04-04-11 MEASURING CALIBRATION 32 49 1.2 1.8 3.0 3

K04-04-12 CUSTOMER SERVICE MANAGEMENT 32 49 1.2 1.8 3.0 3

K04-04-13 PRODUCT ANALYSIS 32 49 1.2 1.8 3.0 3

K04-04-14 PRODUCT QUALITY CONTROL 32 49 1.2 1.8 3.0 3

K04-04-15 LEAN MANUFACTURING 32 49 1.2 1.8 2.0 3

K04-04-16 SUPERVISORY 22 32 0.8 1.2 2.0 2

PTA4011 FINAL YEAR PROJECT 1 1.0 1

PERATUS LATIHAN 40% 60%


JUMLAH LATIHAN (SUBJEK TERAS) 182 277 18

CORE ABILITIES 27 -
TASK (A) JAM KREDIT = A/ (PEMBERAT (1.5) X 18)
KOD JAM JAM JUMLAH
TAJUK MODUL TEORI AMALI
MODUL KREDIT KREDIT JAM KREDIT
(JAM) (JAM)
TEORI AMALI KREDIT
JUMLAH LATIHAN (SUBJEK UMUM) 27

JUMLAH KESELURUHAN LATIHAN 513 18


7.5 SYLIBUS PROFILE

SYLIBUS PROFILE
Course Code : K04 Theory Hours : 32Hrs
Course : QUALITY ASSURANCE Practical Hours : 49Hrs
Semester : 4 Total Hours : 81Hrs
NOSS Code : MC-041-3-C04/L3 Credit Hours :3
Terminal Performance Objective :
Perform calibration on measuring equipment and machine tools using suitable calibration equipment and reference standard so that the
calibration on machine tool and equipment are performed and accuracy of the machine tools are maintained accordance with Standard
Operating Procedure (SOP).

K04-04-11 MEASURING CALIBRATION


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04/L3

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. SET UP WORK AREA FOR CALIBRATION C04.01/ L3,C04.02/ L3, C04.03 / L3

L WT IS
1.1 Types of measuring equipment
12 AS
1.2 Measuring equipment
K04-04-11 MEASURING CALIBRATION
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04/L3

WIM
Learning Activities

Theory Hours Practical Hours

1.3 Calibration schedule


1.4 Quantity on calibrated equipment
1.5 Measuring equipment calibration tools and
equipment’s availability
1.6 In-house calibration technique
1.7 In-house calibration manpower allocation
1.8 In-house master calibration tool
19 D PT
1.9 Determine types of measuring equipment
P
1.10 Determine measuring equipment calibration
requirements
1.11 Determine calibration schedule
1.12 Determine quantity on calibrated equipments
WS
1.13 Determine measuring equipment calibration
tools and equipments availability
1.14 Confirm in-house calibration technique
1.15 Assign in-house calibration manpower
1.16 Arrange in-house master calibration tools
K04-04-11 MEASURINGCALIBRATION
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04/L3

WIM
Learning Activities

Theory Hours Practical Hours

LA 2. CONDUCT CALIBRATION C04.04/ L3, C04.05/ L3, C04.06 /L3

2.1 Product inspection schedule


2.2 Inspection work area
2.3 Work area housekeeping
2.4 Work area for incoming inspection
2.5 Calibration equipment location
2.6 Equipment calibration schedule
2.7 Calibration equipment physical conditions
2.8 Measuring equipment arrangement 16 IS
L WT
2.9 Calibration result report AS
2.10 Equipment calibration result
2.11 Calibration equipment physical conditions
2.12 Equipment calibration status
2.13 Equipment calibration schedule
2.14 Calibration recording format
2.15 Report writing skills
2.16 Record keeping procedure
K04-04-11 MEASURINGCALIBRATION
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04/L3

WIM
Learning Activities

Theory Hours Practical Hours

2.17 Measuring equipment calibration tools and 24


equipments work area
2.18 Calibration area temperature and humidity
2.19 Determine equipment location
2.20 Update equipment calibration schedule
2.21 Check calibration equipment physical
conditions
2.22 Arrange measuring equipment in order
2.23 Analyse calibration result IS
L WT
2.24 Check calibration result AS
2.25 Check calibration equipment physical
conditions
2.26 Check calibration status
2.27 Update equipment calibration schedule
2.28 Determine calibration recording format
2.29 Record measuring equipment calibration
activities
2.30 Adhere record keeping procedure

LA 3:PREPARE STANDARD OPERATING PROCEDURE C01.01/ L3,C01.02/ L3, C01.03 / L3,C01.04/ L3, C01.05/ L3, C01.06 /L3

3.1 Product technical specifications and drawing 4


3.2 Inspection & testing procedure preparation
workflow
3.3 Quality assurance sop preparations timeline
K04-04-11 MEASURINGCALIBRATION
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04/L3

WIM
Learning Activities

Theory Hours Practical Hours

3.4 List of inspection and testing equipment


3.5 Inspection and testing instruction manual
3.6 SOP preparations guidelines
3.7 Inspection checklist schedule
3.8 Type of items characteristic
3.9 Inspection work area
3.10 Work area housekeeping
3.11 Work area for inspection checklist based on
requirement
3.12 Knowledge of inspection
3.13 Knowledge of specification IS
L WT
3.14 Part functional AS
3.15 Inspection measurement accuracy within
tolerance
3.16 Product quality according to specification
3.17 Product appearance according to requirement
3.18 Inspection & testing procedure preparation
result
3.19 Inspection & testing activities reporting format
3.20 Inspection & testing reporting criteria
3.21 Procedure to write inspection report
3.22 Record keeping procedures
K04-04-11 MEASURINGCALIBRATION
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04/L3

WIM
Learning Activities

Theory Hours Practical Hours

3.23 Interpret product technical specifications 6


3.24 Determine inspection & testing procedure
preparation workflow
3.25 Determine quality assurance SOP
preparations timeline
3.26 Prepare inspection& testing procedure
preparation checklist
3.27 Retrieve SOP preparations guidelines
3.28 Determine inspection & testing procedure
IS
preparation checklist L WT
AS
3.29 Interpret inspection checklist schedule
3.30 Interpret items characteristic
3.31 Determine inspection work area
3.32 Clean work area
3.33 Arrange work area for inspection checklist
3.34 Interpret process flow
3.35 Draft inspection check sheet
3.36 Customer specific inspection
K04-04-11 MEASURING CALIBRATION
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level :C04/L3

WIM
Learning Activities

Theory Hours Practical Hours

3.37 Confirm inspection measurement accuracy


within tolerance
3.38 Confirm product quality according to
specification
3.39 Asses product appearance according to
requirement
3.40 Asses inspection completeness D
PT WS
3.41 Determine inspection & testing procedure P
preparation activities
3.42 Determine inspection & testing reporting 30
criteria
3.43 Determine procedure to write inspection report
3.44 Adhere to record keeping procedures

Total Hours 32 49
1. Calibration schedule
2. Master calibration tools
Tools/ Equipment/ Materials :
3. Measuring and Test Instruments
4. Components/Parts Specification
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN 0-
13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN 0-
07-033176-6
Manuals :
Core Abilities:
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 32Hrs.
Course : QUALITY ASSURANCE Practical Hours : 49Hrs.
Semester : 4 Total Hours : 81Hrs.
NOSS Code : MC-041-3/4-C01/L4,C07/L4, C08/L3 Credit Hours :3
Terminal Performance Objective :
Handle customer service by establish customer requirements and analyze feedback survey in accordance with customer requirement and
classification feedback. The personnel who are competent in customer requirement and feedback shall be able to address customer requirements,
analyze and propose problem solving on customer feedback in order to meet required quality.

Module : K04-04-12 CUSTOMER SERVICE MANAGEMENT

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01/L4, C07/L4,C08/L3

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY CUSTOMER NEEDS, REQUIREMENT AND SPECIFICATION GUIDELINES (C01/L4)

1.1 Product specification 7 L WT IS


1.2 Product delivery schedule AS
1.3 Packaging requirement
1.4 Product manufacturing flow
1.5 Customer needs, requirements and
specification
1.6 Applicable product standard
Module : K04-04-12 CUSTOMER SERVICE MANAGEMENT

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01/L4, C07/L4,C08/L3

WIM
Learning Activities

Theory Hours Practical Hours

1.7 Determine product specification


1.8 Determine delivery schedule
1.9 Identify packaging style
1.10 Determine manufacturing process flow 9 D PT WS
1.11 Confirm customer requirements P
1.12 Interpret applicable specification and
requirement

LA 2. EVALUATE CUSTOMER REQUIREMENT FULFILMENT (C01/L4)


2.1 Recording format 7 L WT IS AS
2.2 File and record keeping procedures
2.3 Checklist
2.4 Quality Function Deployment (QFD)
2.5 Product / process interpretation technique
2.6 Information accuracy checklist
2.7 Customer requirements
2.8 Customer relation
Module : K04-04-12 CUSTOMER SERVICE MANAGEMENT

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C01/L4, C07/L4,C08/L3

Learning Activities

Hour
Theory Practical Hours
s
2.9 Check the information accuracy 10 D PT WS
2.10 Assess the customer requirement adequacy P
2.11 Determine recording format
2.12 Adhere to file and record keeping
procedures
2.13 Compile customer requirement

LA 3. ANALYSE CUSTOMER FEEDBACK INFORMATION / SURVEY (C07/L4, C08/L3)


3.1 Type of customer companies 10 L WT IS
3.2 Customer feedback workflow AS
3.3 Customer suggestion
3.4 Method to rectify customer feedback
3.5 Customer feedback information/ survey data
3.6 Customer feedback information/ survey data
location
3.7 Customer feedback information/ survey
analysing technique
Module : K04-04-12 CUSTOMER SERVICE MANAGEMENT

Assessment
Methods

Methods
Delivery
CU.WA No./ Level : C01/L4, C07/L4,C08/L3

WIM
Learning Activities
Theory Hours Practical Hours
3.8 Determine type of customer companies 18 D PT WS
3.9 Determine customer suggestion P
3.10 Determine customer feedback workflow
3.11 Confirm method to rectify customer feedback
3.12 Identify customer feedback information/
survey data
3.13 Obtain customer feedback information/
survey
3.14 Analyse customer feedback information/
survey
3.15 Suggest problem solving customer feedback
LA 4. REPORT CUSTOMER SATISFACTION MEASUREMENT (C07/L4,C08/L3)
4.1 Customer feedback analysis timely activities 8 L WT IS
reporting format AS
4.2 Customer feedback analysis timely reporting
criteria
4.3 Procedure to write Customer feedback
analysis timely report
4.4 Record keeping procedures
4.5 Customer feedback satisfaction accuracy
within tolerance
Module : K04-04-12 CUSTOMER SERVICE MANAGEMENT

Assessment
Methods

Methods
Delivery
CU.WA No./ Level : C01/L4, C07/L4,C08/L3

WIM
Learning Activities
Theory Hours Practical Hours
4.6 Customer feedback satisfaction according to
specification
4.7 Customer feedback satisfaction appearance
according to requirement
4.8 Customer feedback satisfaction completeness

4.9 Determine customer feedback analysis timely 12 D PT WS


activities reporting format P
4.10 Determine customer feedback analysis timely
reporting criteria
4.11 Determine procedure to write customer
feedback analysis timely report
4.12 Adhere to record keeping procedures
4.13 Confirm customer feedback satisfaction
accuracy within tolerance
4.14 Confirm customer feedback satisfaction
according to specification
4.15 Asses customer feedback satisfaction
appearance according to requirement
4.16 Asses customer feedback satisfaction
completeness
TOTAL HOURS 32 49
SHE handbook (Training-Guide), Company SHE Guidelines, Training Material, Audit reporting format,
Tools/ Equipment/ Materials : Feedback format, Computer, Failure analysis report, Customer feedback form, Standard Operating
Procedure, Schedule, Feedback form.
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-87389-
745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN 0-
Reference Books (Tittle, Atr, 02-916682-9
Publisher) : 3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN 0-
13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN 0-07-
033176-6
Manuals :
Core Ability :
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 32 Hrs.
Course : QUALITY ASSURANCE Practical Hours : 49 Hrs.
Semester : 4 Total Hours : 81 Hrs.
NOSS Code : MC-041-4 /C06/L4, E01/L4 Credit Hours :3
Terminal Performance Objective :
Perform non conformity assessment and product liability analysis using standard operating procedure, specification, data/engineering analysis,
product shelf life requirements, product technical specification and, schedule and timeline so that process, method and assessment is confirmed,
non conformity assessment result is evaluated, product liability services requirement and product containment is identified, and product liability
service work activities is evaluated accordance to process conformity assessment and product liability requirement.

K04-04-13 PRODUCT ANALYSIS


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C06/L4, E01/L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 1.CONFIRM PROCESS, PRODUCT, METHOD, ASSESSMENT OF NON CONFORMITY


1.1 Process non conformity assessment material
requirement
1.2 List of product specifications
1.3 Process non conformity assessment work scope
1.4 Incoming process non conformity assessment
IS
workflow 10 L WT
AS
1.5 Purposes and applicable of non-conformity
assessment procedure
1.6 Product/process non conformity assessment sheet
1.7 Non conformity assessment sheet and location
1.8 Method and technique of non-conformity assessment
K04-04-13 PRODUCT ANALYSIS
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C06/L4, E01/L4

WIM
Learning Activities

Theory Hours Practical Hours

1.9 Interpret incoming materials process


non conformity assessment requirement
1.10 Refer product specification
1.11 Determine process non conformity
assessment work scope and workflow
1.12 Determine applicable and purposes of
product and process non conformity D
17 PT WS
procedure P
1.13 Determine non conformity assessment
sheet and procedure
1.14 Obtain non conformity assessment
sheet and location
1.15 Obtain method and technique of non-
conformity assessment

LA 2. EVALUATE NON CONFORMITY ASSESSMENT RESULT

2.1 Non conformity accuracy, specification and appearance


within tolerance and requirement
2.2 Non conformity result IS
3 L WT
2.3 Non conformity report, format, criteria and record AS
keeping procedure
2.4 Critical control points
2.5 Critical control items technique
K04-04-13 PRODUCT ANALYSIS
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C06/L4, E01/L4

WIM
Learning Activities

Theory Hours Practical Hours

2.6 Confirm non conformity accuracy,


specification and requirement
2.7 Asses non conformity result
completeness D
4 PT WS
2.8 Determine non conformity activities P
reporting, format, writing procedure and
record keeping procedure

LA 3. IDENTIFY PRODUCT LIABILITY SERVICES REQUIREMENT AND PRODUCT CONTAINMENT


3.1 Product liability services activity and shelf life
requirement
3.2 Product technical specification
IS
3.3 Product liability services activity requirements workflow 6 L WT
AS
3.4 Method of containment
3.5 Product liability services work activities procedure, tools
and equipments, facilities and, work schedule
K04-04-13 PRODUCT ANALYSIS
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C06/L4, E01/L4

WIM
Learning Activities

Theory Hours Practical Hours

3.6 Determine product liability services


activities and product shelf life
requirement
3.7 Interpret product technical specifications
3.8 Determine product liability services activity
requirements workflow
3.9 Confirm method of product containment 7 D PT WS
3.10 Ascertain product liability services work
activity procedure
3.11Prepare applicable tools and equipments
3.12 Confirm product liability services facilities
3.13 Arrange product liability work schedule
and timeline
LA 4. EVALUATE PRODUCT LIABILITY SERVICE WORK ACTIVITIES
4.1 Field failure investigation and analysis
4.2 Corrective and preventive action technique
4.3 Assessment of customer satisfaction related to product
liability
K04-04-13 PRODUCT ANALYSIS
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C06/L4, E01/L4

WIM
Learning Activities

Theory Hours Practical Hours

4.4 Assessment of corrective and preventive action


effectiveness
4.5 Supplier delivery, quality performance, product IS
13 L WT
conformances and performance chart AS
4.6 Reporting format, supplier performances and, record
and data control procedure
4.7 Conduct field failure investigation and
analysis
4.8 Apply corrective and preventive action
technique
4.9 Asses customer satisfaction related to
product liability
D
4.10 Asses effectiveness of corrective and 21 PT WS
P
preventive action
4.11 Asses supplier delivery, quality
performances
4.12 Review supplier product conformances
and update supplier performance chart
4.13 Record product liability services activities

32 49
Total Hours
1. Standard Operating
2. Procedures
3. Specification
Tools/ Equipment/ Materials : 4. Data/engineering analysis
5. Product shelf life requirements
6. Product technical specifications
7. schedule and timeline

1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN
0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN 0-
07-033176-6
Manuals :
04.08 Develop and negotiate staffing plans.
04.09 Prepare project/work plans.
04.10 Utilize science and technology to achieve goals.
Core Abilities 05.03 Allocate and record usage of financial and physical resources.
05.04 Delegate responsibilities and/ or authority.
05.05 Coordinate contract and tender activities.
06.08 Identify and analyze effect of technology on the environment.
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 32Hrs.
Course : QUALITY ASSURANCE Practical Hours : 49Hrs.
Semester : SEMESTER 4 Total Hours : 81Hrs.
NOSS Code : MC-041-3-C06, C07 Credit hours :3
Terminal Performance Objective :
Carry out acceptance of product quality and control non conformance element in accordance with product quality manual and company’s SOP.

K04-04-14 PRODUCT QUALITY CONTROL


Modul:

Delivery Methods

Assessment
CU. WA No./ Level: C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,

Methods
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY PRODUCT QUALITY ACCEPTANCE REQUIREMENTS (C07.01/L3,C07.02 /L3, C07.03/L3)

1.1 Product quality acceptance requirement


3
1.2 Process acceptance requirements L WT IS
1.3 Product quality acceptance test index AS
1.4 Quality acceptance criteria according to SOP
1.5 Machine breakdown checklist and report

1.6 Determine product quality acceptance


requirement
D PT WS
1.7 Determine process acceptance requirements 5
1.8 Determine product quality acceptance test index
K04-04-14 PRODUCT QUALITY CONTROL
Module :

Delivery Methods

Assessment
CU. WA No./ Level : C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,

Methods
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,

WIM
Learning Activities

Theory Hours Practical Hours

1.9 Interpret quality acceptance criteria list/


specification
1.10 Carry out product quality acceptance from
machine breakdown

LA 2. CHECK PRODUCT QUALITY TEST INDEX RESULT (C07.04/L3,C07.05/L3, C07.06/L3)

2.1 Process deviation report 4


2.2 SPC tools
2.3 Statistical calculation formula and technique
2.4 Product quality test index result IS
L WT
2.5 Product physical condition AS
2.6 Equipment physical condition
2.7 Report product quality acceptance activities
K04-04-14 PRODUCT QUALITY CONTROL
Module :

Delivery Methods

Assessment
CU. WA No./ Level : C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,

Methods

WIM
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,

Learning Activities

Theory Hours Practical Hours

2.8 Prepare / determine process deviation report 8 D PT WS


2.9 Gather process deviation report
2.10 Interpret process deviation report
2.11 Investigate problems
2.12 Calculate process deviation using SPC tools
2.13 Asses product quality test index result
2.14 Asses product physical condition
2.15 Observe equipment physical condition
2.16 Determine procedure to write product quality
acceptance report

LA 3. PLAN PRODUCT/PROCESS NON CONFORMANCE CONTROL REQUIREMENTS (C06.01/L3,C06.02/L3)

3.1 Type of product/process non conformances 5 L WT IS


3.2 Product /process specifications and AS
requirements
3.3 Product/process non conformance area
3.4 Product/process non-conformances
3.5 Non-conformance control parts status
3.6 Procedure of controlling of non conformance
parts
3.7 Non conformance working schedule
3.8 Non-conformance control parts manpower
allocation
K04-04-14 PRODUCT QUALITY CONTROL
Module :

Delivery Methods

Assessment
CU. WA No./ Level : C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,

Methods

WIM
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,

Learning Activities

Theory Hours Practical Hours

3.9 Determine type of non-conformances 9 D PT WS


3.10 Determine product/process non conformance
area
3.11 Classify product/ process non-conformances
3.12 Determine type of product/process deviation
3.13 Determine non conformance control parts status
3.14 Determine procedure of controlling of non
conformance parts
3.15 Determine non conformance working schedule

LA 4. EXECUTE NON CONFORMANCE PRODUCT/PROCESS NON CONFORMANCE CONTROL REQUIREMENTS (C06.03/L3,C06.04/L3)

4.1 Sort non conformance parts containment 10 L WT IS


4.2 Separate good and bad product/process AS
4.3 Quarantine non conformance product/part
4.4 Track conformance product/part movements
4.5 Disposition category
4.6 Quarantine disposition item
4.7 Disposition item specification
K04-04-14 PRODUCT QUALITY CONTROL
Module :

Delivery Methods

Assessment
CU. WA No./ Level : C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,

Methods

WIM
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,

Learning Activities

Theory Hours Practical Hours

4.8 Sort non conformance parts containment 13 D PT WS


4.9 Separate good and bad product/process
4.10 Quarantine non conformance product/part
4.11 Track conformance product/part movements
4.12 Determine disposition category
4.13 Quarantine disposition item
4.14 Conform disposition item specification

LA 5. CONDUCT CORRECTIVE ACTION (C06.05/L3,C06.06 /L3, C06.07/L3)

5.1 Product/process non conformance data collection 10 L WT IS


technique AS
5.2 Root cause of problem investigation technique
5.3 Effective corrective action flowchart
5.4 List of conformances status
5.5 Non conformance product/part segregation
guidelines
5.6 Assessment of non conformance product/part
corrective action effectiveness
5.7 Report product/process non conformance control
activities
K04-04-14 PRODUCT QUALITY CONTROL
Module :

Delivery Methods

Assessment
CU. WA No./ Level : C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,

Methods

WIM
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,

Learning Activities

Theory Hours Practical Hours

5.8 Gather product / process non conformance 14


data
5.9 Investigate root cause of problem
5.10 Initiate process deviation correction
5.11 Initiate corrective action
5.12 Asses non conformances status
D PT WS
5.13 Asses non conformance product/part
segregation
5.14 Asses non conformance product/part corrective
action effectiveness
5.15 Record product/process non conformance
control activities

Total Hours 32 49
1. SPC Tools
2. Calculator
Tools/ Equipment/ Materials :
3. Measuring and test instrument
4. Components/Part

4. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2 J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3 Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way,
ISBN 0-13-952433-9
4 J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN
0-07-033176-6

Manuals :
Core Ability
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 32 Hrs.
Course : QUALITY ASSURANCE Practical Hours : 49 Hrs.
Semester : 4 Total Hours : 81 Hrs.
NOSS Code : MC-041-4 C04/L4 Credit Hours :3
Terminal Performance Objective :
Continuous quality improvement (CQI) is to quality improvement in accordance with quality requirements. The personnel who are competent in quality improvement shall be able to
execute Value Added / Value Engineering (VA/VE), review product and process capabilities to meet organisation policy.

K04-04-15 LEAN MANUFACTURING


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04/L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY ACTIVITIES OF CQI PROGRAMME (C04.01,C04.02/L4)


1.1 List of continuous quality improvement 8 L WT IS
1.2 Improvement guidelines and flow AS
1.3 Improvement scope

1.4 Determine activation of CQI


1.5 Determine area improvement
1.6 Determine improvement dateline
K04-04-15 LEAN MANUFACTURING
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04/L4

WIM
Learning Activities

Theory Hours Practical Hours

1.7 Determine improvement guidelines and 10 D PT WS


flow
1.8 Determine improvement scope

LA 2. PREPARE QUALITY IMPROVEMENT PLAN ACTIVITY(C04.03/L4)


8
2.1 Quality improvement tools
2.2 Suitable improvement activity
2.3 Area of improvement

2.4 Determine quality improvement tools 10 D PT WS


2.5 Decide suitable improvement activity
2.6 Confirm area of improvement

LA 3. EXECUTE VALUE ADDED VALUE ENGINEERING (VA/VE) (C04.04, C04.05/L4)

3.1 VA/VE elements


3.2 VA/VE task force
K04-04-15 LEAN MANUFACTURING
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04/L4

WIM
Learning Activities

Theory Hours Practical Hours

3.3 VA/VE technique L WT IS


3.4 Reject réduction programme AS
3.5 Process capability 12
3.6 Calculation technique
3.7 Equipment capability
3.8 Capability index table

3.9 Determine VA/VE elements


3.10 Form VA/VE task force
3.11 Apply VA/VE technique 21 D PT WS
3.12 Conduct reject reduction programme P
3.13 Apply process capability
3.14 Calculation technique
3.15 Calculate equipment capability
3.16 Refer capability index table

LA 4. EXECUTE QUALITY FUNCTION DEPLOYMENT (QFD) C04.07, C04.08, C04.09 / L4

4.1 QFD technique


4.2 Operating characteristic of product against customer
needs
K04-04-15 LEAN MANUFACTURING
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04/L4

WIM
Learning Activities

Theory Hours Practical Hours

4.3 Effectiveness of improvement activities L WT IS


4.4 Product / process improvement result 4 AS

4.5 Apply QFD technique


4.6 Compare operating characteristic of 8
product against customer needs D PT WS
4.7 Assess effectiveness of improvement
activities
4.8 Check product / process improvement
4.9 Compare improvement result

TOTAL HOURS
32 49
1. Application software
2. Total Preventive Maintenance reference book
Tools/ Equipment/ Materials :
3. Organisational chart
4. Process control chart

1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-
0-87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) : 3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way,
ISBN 0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN
0-07-033176-6

1. Kaizen manual
Manuals : 2. QCC manual

Core Abilities
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 22Hrs.
Course : QUALITY ASSURANCE Practical Hours : 32Hrs.
Semester : 4 Total Hours : 54Hrs.
NOSS Code : MC-041-3-C09/L3 Credit Hours :2
Terminal Performance Objective :
Supervisory functions is to monitor and supervise process activities in accordance with company SOP, company policy, OSHA, The personnel who are
competent in process supervision shall be able to determine subordinate functions, monitoring of subordinate, develop skills, subordinate training,
appraisal of subordinate and reporting to superior according to SOP

K04-04-16 SUPERVISORY
Module :

Assessment
Methods

Methods
Delivery
CU.WA No./ Level : C09/L3

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY PROCESS SUPERVISION REQUIREMENT AND SPECIFICATION(C09.01/L3)

1.1 Types supervision administrative 3 L WT IS


1.2 Objective of supervision administrative AS
1.3 Scope of supervision administrative works
1.4 Determine supervision administrative scope of
responsibility
1.5 Determine supervision administrative 8 D PT WS
1.6 Determine objective of supervision administrative
1.7 Determine scope of works
1.8 Determine scope of responsibility
Module : K04-04-16 SUPERVISORY

Assessment
Methods

Methods
Delivery
CU.WA No./ Level :C09/L3

WIM
Learning Activities

Theory Hours Practical Hours

LA 2. PREPARE SUBORDINATE ADMINISTRATIVE INFORMATION, DATA AND FORMS(C09.02)


1.1 Types of subordinate administrative information, data 6 D PT WS
and forms
1.2 Procedure on acquiring subordinate administrative
information, data and forms
1.3 Company SOP on personnel appraisal
1.4 Personnel appraisal form format
1.5 Subordinate job description
1.6 Personnel appraisal evaluation criteria
1.7 Method of briefing
1.8 Checking personnel appraisal form completion
1.9 Subordinate performance and achievement
assessment

1.10 Determine types of subordinate administrative 8


information, data and forms
1.11 Follow procedure on acquiring subordinate
administrative information, data and forms
1.12 Arrange subordinate administrative
information, data and forms
Module : K04-04-16 SUPERVISORY

Assessment
Methods

Methods
Delivery
CU.WA No./ Level : C09/L3

WIM
Learning Activities

Theory Hours Practical Hours

1.13 Determine personnel appraisal evaluation


criteria
1.14 Brief subordinate on filling personnel
appraisal form
1.15 Check personnel appraisal form
1.16 Completion
1.17 Assess subordinate conformance and
achievement
1.18 Forward personnel appraisal form to superior

LA 3. EXECUTE IN-HOUSE TRAINING (C09.03, C09.04/L3)


1.19 Company SOP on in-house training 5 L WT IS
1.20 Title on in-house training AS
1.21 Training material preparation
1.22 Arrangement of in-house training location/class
1.23 Procedure of in-house training
1.24 In-house training achievement survey form

1.25 Refer to company SOP on in-house training 8


1.26 Determine title on in-house training
1.27 Determine participant of training
Module : K04-04-16 SUPERVISORY

Assessment
Methods

Methods
Delivery
CU.WA No./ Level : C09/L3

WIM
Learning Activities

Theory Hours Practical Hours

1.28 Arrange training material D PT WS


1.29 Arrange in-house training location/class
1.30 Conduct in-house training
1.31 Collect in-house training achievement survey
form

LA 4. CONDUCT SECTION MEETING (C09.05.C09.06/L3)

4.1 Company SOP on section meeting 8 L WT IS


4.2 Title of section meeting AS
4.3 Members of meeting
4.4 Meeting memorandum format
4.5 Minute of meeting format
4.6 Arrangement of meeting venue
4.7 Section meeting procedure
4.8 Apparel company organization charts
4.9 Supervision administrative activities reporting criteria
4.10 Procedure of reporting supervision administrative
activities
K04-04-16 SUPERVISORY
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level :C09

WIM
Learning Activities

Theory Hours Practical Hours

4.11 Refer to company SOP on section meeting 8 D PT WS


4.12 Determine title of section meeting
4.13 Determine members of meeting
4.14 Distribute meeting memorandum
4.15 Distribute previous minute of meeting
4.16 Arrange meeting venue
4.17 Apply section meeting procedure
4.18 Confirm minute of meeting taken
4.19 Determine reporting personnel on
supervision administrative activities
4.20 Determine supervision administrative
activities reporting criteria
4.21 Report supervision administrative activities

TOTAL HOURS 22 32
Tools/ Equipment/ Materials : Audio visual aids, Hand outs,Venue, SOP, Code of Practice

1 Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-87389-745-7
Reference Books (Tittle, Atr, Publisher) :
J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN 0-02-916682-9

Manuals :

Core Abilities:
SEMESTER 5
8. SEMESTER 5

8.1 COMPETENCY PROFILE CHART

STATISTICAL
Identify (SPC) Establish statistical Confirm SPC result
PROCESS Plan SPC application
application Apply SPC tools control points
CONTROL (SPC) procedures
requirements requirements
APPLICATION
C02 01 L3 02 L3 03 L3 04 L3 05 L3

Report SPC
activities

06 L3

STATISTICAL
Confirm control item Evaluate process Report SPC
PROCESS Identify SPC Monitor SPC
characteristic/parame capability and effectiveness
CONTROL (SPC) requirement activities
ter stability corrective action
ANALYSIS

C09 01 L4 02 L4 03 L4 04 L4 05 L4
MEASUREMENT Identify MSA Evaluate MSA
Execute MSA Report MSA
SYSTEM specification and Plan MSA activities accuracy /
activities activities
ANALYSIS (MSA) requirements uncertainty

C05 01 L4 02 L4 03 L4 04 L4 05 L4

PRODUCT Identify product Develop product


Identify Critical to Plan critical control Establish critical
CONTROL PLAN control plan control plan
Quality (CTQ) point point establishment control point
ESTABLISHMENT requirement

C02 01 L4 02 L4 03 L4 04 L4 05 L4

Report product
Evaluate control
control plan
plan completeness
development
activities
06 L4 07 L4

MANUFACTURING Identify audit Prepare audit


Identify types of Prepare audit Execute audit
/ SYSTEM procedure and schedule and
audit document activities
AUDITING requirement checklist

C03 01 L4 02 L4 03 L4 04 L4 05 L4

Evaluate audit
Report of auditing
finding completion
activities
and accuracy

06 L4 07 L4
CONTINOUS Execute Value
Identify quality Prepare quality
QUALITY Identify activities of Added Value Review product and
improvement improvement plan
IMPROVEMENT CQI programme Engineering process capabilities
guidelines activity
(CQI) (VA/VE)

C04 01 L4 02 L4 03 L4 04 L4 05 L4

Execute Quality Report quality


Conduct Design of Organize quality
Function improvement
Experiment (DOE) improvement
Deployment (QFD) activities

06 L4 07 L4 08 L4 09 L4

Identify supplier Confirm supplier


SUPPLIER QUALITY Plan supplier Execute supplier Evaluate supplier
performance evaluation and
ASSURANCE requirement
performance activity
selection
assessment performance quality

C10 01 L4 02 L4 03 L4 04 L4 05 L4

Report supplier
performance
activities

06 L4
8.2 TRAINING PATHWAY CHART

Identify SPC application requirement


MULA 02.01 1/6

Plan SPC application procedures


02.02 2/6
APPLICATION
STATISTICAL PROCESS
CONTROL (SPC) Apply SPC tools

K04-05-11 02.03 3/6

Establish statistical control points


requirements
02.04 4/6

Confirm SPC result

02.05 5/6

Report SPC activities

02.06 6/6

Identify SPC Requirement

09.01 1/5

H Conduct Control Item


Characteristic/Parameter
09.02 2/5

Monitoring SPC Activities

09.03 3/5

Evaluate Process Capability and


Stability
09.04 4/5

Report SPC Effectiveness Corrective


Action
09.05 5/5
H
Identify MSA specification and
requirements

05.01 1/5

Plan MSA Activities

MEASUREMENT SYSTEM 05.02 2/5


ANALYSIS (MSA)
Execute MSA Activities
K04-05-12
05.03 3/5

Evaluate MSA accuracy/ uncertainty


05.04 4/5

Report MSA Activities


05.05 5/5

Identify types of audit

03.01 1/7

Identify audit procedure and


requirement
03.02 2/7
QUALITY AUDIT
Prepare audit schedule and checklist
K04-05-13 03.03 3/7

Prepare audit document


03.04 4/7

Execute audit activities


03.05 5/7
I
Evaluate audit finding completion and
accuracy
03.06 6/7

Report of auditing activities

03.07 7/7
I
Identify critical to quality (CTQ) point

02.01 1/7

PRODUCT QUALITY Identify product control plan


PLANNING requirement
02.02 2/7
K04-05-14
Plan critical control point establishment

02.03 3/7

Establish critical control point

02.04 4/7

Develop product control plan

02.05 5/7

Evaluate control plan completeness

02.06 6/7

Report product control plan


development activities
02.07 7/7

FUNDAMENTAL OF
EXPERIMENTAL DESIGN Conduct design of experimental (DOE)
(DOE)

K04-05-15 04.06 6/9

J
J

Identify supplier performance


requirement
10.01 1/6

Plan supplier performance activity

10.02 2/6
SUPPLIER QUALITY Confirm supplier evaluation and
MANAGEMENT selection
10.03 3/6
K04-05-16
Execute supplier assessment
10.04 4/6

Evaluate supplier performance quality

10.05 5/6

Report supplier performance activities


10.06 6/6

TAMAT
8.3 MAPPING CHART

K04 - DIPLOMA TEKNOLOGI JAMINAN KUALITI - SEMESTER 5

PRODUCT QUALITY PLANNING


SILIBUS

PROCESS CONTROL (SPC)


APPLICATION STATISCAL

MEASUREMENT SYSTEM

EXPERIMENTAL DESIGN
(JTM)

TAJUK MODUL

SUPPLIER QUALITY
FUNDAMENTAL OF
ANALYSIS (MSA)

QUALITY AUDIT

MANAGEMENT
PROFIL PEKERJAAN
(NOSS)

MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
COCU WORK ACTIVITIES NO.
CU/DUTI
CODE /TASK TASK

Identify (SPC) application


C02.0
requirements
1

Plan SPC application C02.0


procedures 2

C02.0
STATISTICAL Apply SPC tools
3
PROCESS
C02L3
CONTROL (SPC)
APPLICATION Establish statistical control C02.0
points requirements 4

C02.0
Confirm SPC result
5

C02.0
Report SPC activities
6

1. Identify SPC
requirement
STATISTICAL
PROCESS 2. Confirm control item
C09L4
CONTROL (SPC) characteristic/ parameter
ANALYSIS

3. Monitor SPC activities


PRODUCT QUALITY PLANNING
SILIBUS

PROCESS CONTROL (SPC)


APPLICATION STATISCAL

MEASUREMENT SYSTEM

EXPERIMENTAL DESIGN
(JTM)

TAJUK MODUL

SUPPLIER QUALITY
FUNDAMENTAL OF
ANALYSIS (MSA)

QUALITY AUDIT

MANAGEMENT
PROFIL PEKERJAAN
(NOSS)

MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
COCU WORK ACTIVITIES NO.
CU/DUTI
CODE /TASK TASK

4. Evaluate process
capability and stability

5. Report SPC
effectiveness corrective
action

1. Identify MSA
specification and
requirements

2. Plan MSA activities


C05L4
MEASUREMENT
SYSTEM ANALYSIS
(MSA) 3. Execute MSA activities

4. Evaluate MSA
accuracy / uncertainty
5. Report MSA activities

1. Identify Critical To
Quality (CTQ) point
2. Identify product control
plan requirement
PRODUCT
3. Plan critical control point
C02L4 CONTROL PLAN
establishment
ESTABLISHMENT
4. Establish critical control
point
5. Develop process control
plan
PRODUCT QUALITY PLANNING
SILIBUS

PROCESS CONTROL (SPC)


APPLICATION STATISCAL

MEASUREMENT SYSTEM

EXPERIMENTAL DESIGN
(JTM)

TAJUK MODUL

SUPPLIER QUALITY
FUNDAMENTAL OF
ANALYSIS (MSA)

QUALITY AUDIT

MANAGEMENT
PROFIL PEKERJAAN
(NOSS)

MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
COCU WORK ACTIVITIES NO.
CU/DUTI
CODE /TASK TASK

6. Evaluate control plan


completeness

7. Report product control


plan development activities
1. Identify types of audit
2. Identify audit procedure
and requirement

3. Prepare audit schedule


and checklist
MANUFACTURING /
C03L4 4. Prepare audit document
SYSTEM AUDITING

5. Execute audit activities

6. Evaluate audit finding


completion and accuracy
7. Report of auditing
activities

1. Identify activities of CQI


programme

2. Identify quality
CONTINUOUS improvement guidelines
QUALITY
C04L4
IMPROVEMENT
(CQI) 3. Prepare quality
improvement plan activity

4. Execute Value Added


Value Engineering (VA/VE)
PRODUCT QUALITY PLANNING
SILIBUS

PROCESS CONTROL (SPC)


APPLICATION STATISCAL

MEASUREMENT SYSTEM

EXPERIMENTAL DESIGN
(JTM)

TAJUK MODUL

SUPPLIER QUALITY
FUNDAMENTAL OF
ANALYSIS (MSA)

QUALITY AUDIT

MANAGEMENT
PROFIL PEKERJAAN
(NOSS)

MODUL 1

MODUL 2

MODUL 3

MODUL 4

MODUL 5

MODUL 6
COCU WORK ACTIVITIES NO.
CU/DUTI
CODE /TASK TASK

5. Review product and


process capabilities

6. Conduct Design of
Experiment (DOE)

7. Execute Quality
Function Deployment
(QFD)

8. Organise quality
improvement

9. Report quality
improvement activities

1. Identify supplier
performance requirement

2. Plan supplier
performance activity

3. Confirm supplier
evaluation and selection
SUPPLIER QUALITY
C10L4
ASSURANCE
4. Execute supplier
assessment

5. Evaluate supplier
performance quality

6. Report supplier
performance activities
8.4 TABLE OF CONTACT HOURS DISTRIBUTION

K0414 DIPLOMA TEKNOLOGI JAMINAN KUALITI / TAHAP 4 SEMESTER 5

TASK (A) JAM KREDIT = A/ (PEMBERAT (1.5) X 18)


KOD JAM JAM JUMLAH
TAJUK MODUL TEORI AMALI
MODUL KREDIT KREDIT JAM KREDIT
(JAM) (JAM)
TEORI AMALI KREDIT

APPLICATION STATISTICAL PROCESS


K04-05-11 32 49 1.2 1.8 3 3
CONTROL (SPC)

K04-05-12 MEASUREMENT SYSTEM ANALYSIS (MSA) 32 49 1.2 1.8 3 3

K04-05-13 QUALITY AUDIT 32 49 1.2 1.8 3 3

K04-05-14 PRODUCT QUALITY PLANNING 22 32 0.8 1.2 2 2

K04-05-15 FUNDAMENTAL OF EXPERIMENTAL DESIGN 22 32 0.8 1.2 2 2

K04-05-16 SUPPLIER QUALITY MANAGEMENT 22 32 0.8 1.2 2 2

PTA5025 FINAL YEAR PROJECT 2 5 5

PERATUS LATIHAN 40% 60%


TASK (A) JAM KREDIT = A/ (PEMBERAT (1.5) X 18)
KOD JAM JAM JUMLAH
TAJUK MODUL TEORI AMALI
MODUL KREDIT KREDIT JAM KREDIT
(JAM) (JAM)
TEORI AMALI KREDIT

JUMLAH LATIHAN (SUBJEK TERAS) 162 243 20

CORE ABILITIES 27 - - - -
JUMLAH LATIHAN (SUBJEK UMUM) 27 0 0
JUMLAH KESELURUHAN LATIHAN 567 20
8.5 SYLIBUS PROFILE

SYLIBUS PROFILE
Course Code : K04-05-11 Theory Hours : 32 Hrs
Course : DIPLOMA IN QUALITY ASSURANCE TECHNOLOGY Practical Hours : 49 Hrs
Semester : 5 Total Hours : 81 Hrs
NOSS Code : MC-041-4-C09 Credit Hours :3

Terminal Performance Objective:

Statistical Process Control (SPC) Analysis is to produce dough in accordance with SPC requirements. The personnel who are competent in analysis
shall be able to monitor SPC activities to meet required quality.

Module : K04-05-11 APPLICATION STATISTICAL PROCESS CONTROL (SPC)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05,C02.06/L3,C09.01, C09.02, C09.03, C09.04, C09.05/L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY SPC REQUIREMENT (C02.01/L3,C09.01/L4)

1.1 Type of SPC Chart


1.2 SPC Chart locations IS
6 L WT
1.3 Determine product manufacturing line AS
1.4 Determine SPC application work scope
Module : K04-05-11 APPLICATION STATISTICAL PROCESS CONTROL (SPC)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05,C02.06/L3,C09.01, C09.02, C09.03, C09.04, C09.05/L4

WIM
Learning Activities

Theory Hours Practical Hours

1.5 Incoming SPC material requirements


1.6 List of SPC specifications D
1.7 Incoming SPC work scope 10 PT WS
P
1.8 Incoming SPC workflow
1.9 Determine type of SPC Chart
1.10 Determine SPC Chart application locations
1.11 Determine product manufacturing line
1.12 Determine SPC application work scope
1.13 Interpret SPC materials requirement
1.14 Refer SPC specification
1.15 Determine SPC work scope
1.16 Determine SPC workflow
LA 2. PLAN AND CONDUCT CONTROL ITEM CHARACTERISTIC/PARAMETER AND MONITORING SPC ACTIVITIES
(C02.02/L3,C02.03/L3, C02.04/L3, C09.02/L4, C09.03L4)
2.1. SPC application data
2.2. List of SPC chart
2.3. SPC application technique and method
IS
2.4 SPC charting timeline 11 L WT
AS
2.5 Area of application
Module : K04-05-11 APPLICATION STATISTICAL PROCESS CONTROL (SPC)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05,C02.06/L3,C09.01, C09.02, C09.03, C09.04, C09.05/L4

WIM
Learning Activities

Theory Hours Practical Hours

2.4. Type of SPC software


2.5. Analyse data
2.6. Knowledge of computer literature
2.7. Types of statistical tools for SPC
2.7.1. X bar
2.7.2. R bar
2.7.3. CP/CPK
2.7.4. CM/CMK
2.7.5. N chart
17 D PT WS
2.7.6. P chart
2.8 Process Controlling
2.9 Product criteria
2.10 Product functioning
2.11 Control item parameter
2.12 Statistical activities workflow
2.13 Statistical chart process capability review
2.14 Process performance trend
2.15 Implement corrective action
Module : K04-05-11 APPLICATION STATISTICAL PROCESS CONTROL (SPC)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05,C02.06/L3,C09.01, C09.02, C09.03, C09.04, C09.05/L4

WIM
Learning Activities

Theory Hours Practical Hours

2.6 Prepare SPC application data


2.7 Prepare SPC chart
2.8 Determine SPC application technique and
method
2.9 Confirm SPC application work area
2.10 Confirm SPC charting timeline
2.11 Key in inspection data
2.12 Interpret data analysis
2.13 Print data result
2.14 Apply SPC tools
2.15 Interpret product drawing
2.16 Determine product workability
2.17 Determine applicable statistical technique
2.18 Determine area of application
2.19 Decide control item parameter selection
2.20 Confirm Statistical Process Control
method/tools (X-R chart, U chart, T chart
and etc
Module : K04-05-11 APPLICATION STATISTICAL PROCESS CONTROL (SPC)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05,C02.06/L3,C09.01, C09.02, C09.03, C09.04, C09.05/L4

WIM
Learning Activities

Theory Hours Practical Hours

2.21 Produce statistical activities workflow


2.22 Refer statistical chart
2.23 Arrange process capability
2.24 Overview process performance trend
2.25 Analyse SPC trend
2.26 Implement corrective action

LA 3. EXECUTE PROCESS CAPABILITY AND STABILITY (C02.05/L3, C09.04/L4)

3.1 SPC Chart plotting technique


3.2 Assessing of SPC effectiveness
3.3 SPC trend and effect analysis
3.4 Assessment of suitability application of statistical IS
11 L WT
technique AS
3.5 Assessment of process and equipment capabilities
3.6 Process performance indexes
3.7 Evaluate effectiveness of corrective action
Module : K04-05-11 APPLICATION STATISTICAL PROCESS CONTROL (SPC)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05,C02.06/L3,C09.01, C09.02, C09.03, C09.04, C09.05/L4

WIM
Learning Activities

Theory Hours Practical Hours

3.8 Check SPC Chart plotting completeness


3.9 Asses SPS effectiveness
3.10 Review SPC trend
3.11 Determine asses suitable application of
statistical technique D
17 PT WS
3.12 Carry out asses process and equipment P
capabilities
3.13 Review process performance indexes
3.14 Determine asses effectiveness of
corrective action
LA 4. REPORT SPC EFFECTIVENESS CORRECTIVE ACTION (C02.06/L3,C09.05/L4)
4.1 SPC effectiveness corrective action activities
reporting format
4.2 SPC effectiveness corrective action reporting criteria IS
4 L WT
4.3 Procedure to write SPC effectiveness corrective AS
action report
4.4 Record keeping procedures
4.5 Determine SPC effectiveness corrective
action activities reporting format
4.6 Determine SPC effectiveness corrective
action reporting criteria
Module : K04-05-11 APPLICATION STATISTICAL PROCESS CONTROL (SPC)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05,C02.06/L3,C09.01, C09.02, C09.03, C09.04, C09.05/L4

WIM
Learning Activities

Theory Hours Practical Hours

4.7 Determine procedure to write SPC


effectiveness corrective action report D
4.8 Adhere to record keeping procedures 5 PT WS
P

Total Hours 32 49

1. Control plan format


2. QS 9000 APQP and control plan reference manual
Tools/ Equipment/ Materials : 3. Process flow chart
4. Process and measurement characteristic
5. AOL manual
5. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
6. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
References: ISBN 0-02-9166829
(3-5 references, valid years ± 5) 7. K04oru IshiK04wa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way,
ISBN 0-13-952433-9
8. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN 0-
07-033176-6
Manuals :
Core Abilities :
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 32Hrs
Course : QUALITY ASSURANCE Practical Hours : 49Hrs
Semester : 1 Total Hours : 81Hrs
NOSS Code : MC-041-4-C05 Credit Hours :3

Terminal Performance Objective :


Measurement System Analysis (MSA) is to produce in accordance with quality requirements. The personnel who are competent in MSA shall be
able to execute MSA activities to meet organization policy

Module : K04-05-12 MEASUREMENT SYSTEM ANALYSIS (MSA)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : (C05.01, C05.02, C05.03, C05.04, C05.05/L4)

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY MSA SPECIFICATION AND REQUIREMENTS (C05.01)

1.1 MSA manual


1.2 MSA definition terms and requirement
IS
1.3 Type of error 5 L WT
AS
1..3.1 Systematic error
1..3.2 Random error
Delivery Methods
Module : K04-05-12 MEASUREMENT SYSTEM ANALYSIS (MSA)

Assessment
Methods
CU.WA No./ Level : (C05.01, C05.02, C05.03, C05.04, C05.05/L4)

WIM
Learning Activities

Theory Hours Practical Hours

1.4 Obtain MSA manual


1.5 Interpret MSA definition terms and
8 D PT WS
requirement
1.6 Determine type of error

LA 2. EXECUTE MSA ACTIVITIES (C05.02, C05.03, C05.04)

2.1 List of MSA activities


2.2 MSA timeline and schedule
2.3 Type of calculation method
2.3.1 ANOVA method
2.3.2 Tabular method
2.4 Facilities and materials IS
24 L WT
2.5 GR&R calculation method AS
2.6 GR&R software
2.7 Plan, Do, Check, Action (PDCA) cycle
2.8 Variance Method (ANOVA)
2.9 Result comparison technique
2.10 Variance table
Delivery Methods
Module : K04-05-12 MEASUREMENT SYSTEM ANALYSIS (MSA)

Assessment
Methods
CU.WA No./ Level : (C05.01, C05.02, C05.03, C05.04, C05.05/L4)

WIM
Learning Activities

Theory Hours Practical Hours

2.11 Arrange MSA activities


2.12 Produce MSA timeline and schedule
2.13 Determine calculation method
2.14 Prepare facilities and materials
2.15 Calculate and analyse Gauge
Repeatable and Reproducibility(GR&R)
2.16 Apply GR&R software 36 D PT WS
2.17 Determine Plan, Do, Check, Action
(PDCA) cycle
2.18 Analyse ANOVA result
2.19 Compare results of two type of
calculations
2.20 Examine the variance

LA 3. REPORT MSA ACTIVITIES (C05.05)

3.1 MSA reporting format


3.2 Process MSA reporting criteria IS
3 L WT
3.3 Procedure to write testing report AS
3.4 Record keeping procedures
Delivery Methods
Module : K04-05-12 MEASUREMENT SYSTEM ANALYSIS (MSA)

Assessment
Methods
CU.WA No./ Level : (C05.01, C05.02, C05.03, C05.04, C05.05/L4)

WIM
Learning Activities

Theory Hours Practical Hours

3.5 Determine MSA reporting format


3.6 Determine process MSA reporting criteria
3.7 Determine procedure to write testing 5 D PT WS
report
3.8 Determine record keeping procedures

Total Hours 32 49

1. MSA procedure and schedule


Tools/ Equipment/ Materials : 2. Statistical handbook
3. MSA data forms

1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-87389-
745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN
References: 0-02-916682-9
(3-5 references, valid years ± 5) 3. K04oru IshiK04wa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN
0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN 0-07-
033176-6

Manuals :
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 32Hrs
Course : QUALITY ASSURANCE Practical Hours : 49Hrs
Semester : 5 Total Hours : 81Hrs
NOSS Code : MC-041-4-C03 Credit Hours :3

Terminal Performance Objective :


This course provides the knowledge of overview of quality auditing principles and technique stressing methods for obtaining quality products and
services through quality standards.

K04-05-13 QUALITY AUDIT


Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05, C03.06, C03.07 / L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY TYPES OF AUDIT (C03.01, C03.02, C03.03, C03.04 / L4)

18 L WT IS
1.1 Type of audits AS
1.2.1 Internal quality audit
1.2.2 Supplier audit
1.2.3 Third party audit
1.3 Product / process flow
1.4 Audit process flow
1.5 Audit procedure
1.6 Audit requirement
1.7 Area to be audited
K04-05-13 QUALITY AUDIT
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05, C03.06, C03.07 / L4

WIM
Learning Activities

Theory Hours Practical Hours

1.8 Audit schedule


1.9 List of auditors
1.10 Audit checklist
1.11 Items and criteria
1.12 Audit documents
1.13 Document location
1.14 Audit samples
1.15 Determine type of audit D PT WS
1.16 Determine product / process to be audit
1.17 Determine audit flow
1.18 Determine audit procedure
1.19 Interpret audit requirement
1.20 Determine the area to be audited
1.21 Confirm audit schedule
1.22 Arrange auditor / audited
16
1.23 Produce audit checklist
1.24 Items and criteria to be audit
1.25 Previous audit concern
1.26 Acquire audit document
1.27 Arrange document location
1.28 Identify audit samples
K04-05-13 QUALITY AUDIT
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05, C03.06, C03.07 / L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 2. EXECUTE AUDIT ACTIVITIES (C03.05 / L4)

2.1 Audit notification


2.2 Audit opening meeting procedure IS
5 L WT
2.3 Audit technique AS
2.4 Classification of non conformance
2.5 Notify auditee
2.6 Conduct audit opening meeting
2.7 Observe audit findings 15 D PT
2.8 Classify audit non conformance
2.9 Conduct audit closing meeting

LA 3. EVALUATE AUDIT FINDING COMPLETION AND ACCURACY (C03.06 / L4)

3.1 Product / process audit compliance 5


3.2 Type of non conformance L WT IS
3.3 Audit completion AS
3.4 Audit reporting
3.5 Assess number of non conformance
3.6 Assess audit compliance 10 D PT WS
3.7 Check audit completion

LA 4. REPORT OF AUDITING ACTIVITIES (C04.07 / L4)


K04-05-13 QUALITY AUDIT
Module :

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05, C03.06, C03.07 / L4

WIM
Learning Activities

Theory Hours Practical Hours

4.1 Reporting format IS


4.2 Supplier performance 4 L WT AS
4.3 Record and data control procedure
4.4 Determine reporting format 8 D PT WA
4.5 Record supplier performance
4.6 Adhere to record keeping procedure
Total Hours 32 49

8. Reference Standard
9. Calculator
10. Calibration tools
Tools/ Equipment/ Materials : 11. Measuring and Test Instrument
12. Components/Part Specification
13. Checklist and Check sheet
14. Calibration tools
5. J.Luis Guasch, Makhtar Diop, Jean-Louis Racine, Isabel Sanchez, Quality Systems and
References: Standard for A Competitive Edge (2007), The World Bank
(3-5 references, valid years ± 5) 6. Vincent K. Omachonu, Ph.D. Joel E. Ross,Ph.D, Principles of Total Quality 3rd Edition, CRC
Press
Manuals :
Core Abilities :
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 22Hrs
Course : QUALITY ASSURANCE Practical Hours : 32Hrs
Semester : 1 Total Hours : 54Hrs
NOSS Code : MC-041-4-C02 Credit Hours :2
Terminal Performance Objective :
Product Quality Planning is to develop control plan in accordance with product control and development . The student who are competent in plan
development should be able to establish critical control point and develop product control plan to meet organization policy.

Module : K04-05-14 PRODUCT QUALITY PLANNING

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07/L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY CRITICAL TO QUALITY (CTQ) POINT AND PRODUCT CONTROL PLANNING (C02.01, C02.02)

1.1 Product requirement


1.2 Critical control workflow
1.3 Manufacturing process workflow IS
4 L WT
1.4 Advance Product Quality Planning (APQP) AS
1.5 Scope of product control plan
1.6 Various product control plan
Module : K04-05-14 PRODUCT QUALITY PLANNING

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07/L4

WIM
Learning Activities

Theory Hours Practical Hours

1.7 Interpret product requirement


1.8 Determine critical control workflow
1.9 Determine manufacturing process workflow
1.10 Interpret Advance Product Quality Planning 6 D PT WS
(APQP)
1.11 Determine scope of product control plan
1.12 Identify various product control plan

LA 2. PREPARE PLANNING CRITICAL CONTROL POINT ESTABLISHMENT (C09.03, C09.04)

2.1 Control plan format


2.2 Method and technique to be applied
IS
2.3 Control items availability 7 L WT
AS
2.4 Critical control points
2.5 Critical control items technique

2.6 Determine control plan format


2.7 Determine method and technique to be
applied
10 D PT WS
2.8 Arrange control items availability
2.9 Summarize critical control points
2.10 Apply critical control items
Module : K04-05-14 PRODUCT QUALITY PLANNING

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07/L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 3. EVALUATE PROCESS CONTROL PLAN (C09.05, C09.06)

3.1 Product control plan


3.2 Critical data
3.3 Control items comprehensive
3.4 Data accuracy
IS
3.5 Arrange critical data 9 L WT
AS
3.5.1 Accuracy
3.5.2 Safety
3.5.3 Health
3.6 Producing product control plan

3.7 Determine product control plan


3.8 Evaluate critical data
3.9 Confirm control items comprehensive
3.10 Set up data accuracy
3.11 Carry out arrange critical data 13 D PT WS
1.11.1 Accuracy
1.11.2 Safety
1.11.3 Health
3.12 Determine produce product control plan
Module : K04-04-14 PRODUCT QUALITY PLANNING

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07/L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 4. REPORT PRODUCT CONTROL PLAN DEVELOPMENT ACTIVITIES (C02.07)

4.1 Determine recording format


4.2 Write control plan activities report 2 L WT
4.3 Document and record keeping

4.4 Determine recording format


4.5 Write control plan activities report 3 D PT
4.6 Adhere to document and record keeping

Total Hours 22 32

1. Control plan format


2. QS 9000 APQP and control plan reference manual
Tools/ Equipment/ Materials : 3. Process flow chart
4. Process and measurement characteristic
5. AOL manual
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
References: ISBN 0-02-916682-9
(3-5 references, valid years ± 5) 3. K04oru IshiK04wa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way,
ISBN 0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN 0-
07-033176-6
Manuals :
Core Abilities :
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 22 Hrs
Course : QUALITY ASSURANCE Practical Hours : 32 Hrs
Semester : 5 Total Hours : 54 Hrs
NOSS Code : MC-041-4-C04 Credit Hours :2

Terminal Performance Objective :


This course provides the knowledge of overview of fundamentals of experimental design to meet organization policy.

Module : K04-05-15 FUNDAMENTAL OF EXPERIMENTAL DESIGN (DOE)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04.06 / L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY FUNDAMENTAL OF EXPERIMENTAL DESIGN (DOE) (C04.06/L4)


1.1 Introduction to Design of Experiment 7
1.2 Purpose of Design of Experiment
1.3 History of Design of Experiment
1.4 General Model of a Process/System IS
1.5 Objective of the Experiment L WT
AS
Module : K04-05-15 FUNDAMENTAL OF EXPERIMENTAL DESIGN (DOE)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04.06 / L4

WIM
Learning Activities

Theory Hours Practical Hours

1.6 DOE Problem Area 9


1.6.1 Comparative
1.6.2 Screening / Characterize
1.6.3 Modeling
1.6.4 Optimizing
1.7 Quality Improvement hierarchy
1.7.1 Inspection (Level 4)
1.7.2 Process Control (Level 3)
1.7.3 MC & Process Capability (Level 2)
1.7.4 DFM (Level 2)

LA 2. CONFIRM PDCA AND TERMINOLOGY (C04.06/L4)

2 L WT
2.1 Identify PDCA Cycle
2.2 Terminology DOE Model
2.2.1 System
2.2.2 Input
2.2.3 Output
2.2.4 Factors
2.2.5 Levels
2.2.6 Uncontrollable factors

2.3 Create DOE example 3 D PT IS


AS
Module : K04-05-15 FUNDAMENTAL OF EXPERIMENTAL DESIGN (DOE)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04.06 / L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 3. PLANNING AND MANAGING THE PROCESS OF EXPERIMENTS

3.1 Identify Experiment steps


3.1.1 Problem Statement
3.1.2 Selection of factors and levels IS
3.1.3 Selection of experiment 5 L WT AS
3.1.4 Performing the experiment
3.1.5 Statistical analysis
3.1.6 Conclusions and Recommendations

3.2 Data Collection and Analysis


3.2.1 Identify data
3.2.2 Identify types of population
3.2.3 Identify types of data
3.2.4 Measure of central tendency
3.2.4.1 Mean, Mode, Median, Range, 11
D PT WS
Standard Deviation
3.2.5 Stem and Leaf Plot
3.2.6 Histogram
3.2.7 Box Plot
Module : K04-05-15 FUNDAMENTAL OF EXPERIMENTAL DESIGN (DOE)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04.06 / L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 4. EVALUATE FULL FACTORIAL DESIGN (2k model)

4.1 Introduction to Factorial Designs 8


4.2 Introduction to 2k Factorial Design
4.3 Process capability IS
L WT
4.4 Calculation technique AS
4.5 Equipment capability
4.6 Capability index table
4.7 Terminology (recap)
4.7.1 Identify factor and example
4.7.2 Identify level and example
4.7.3 Identify response and
example
4.8 Identify 2k Factorial Design (one
factor) and coding
4.9 Identify 2k Factorial Design (two 9 D PT WS
factor) and coding
4.10 Interpret example data into design
matrix
4.11 Interpret example data into geometric
view
4.12 Conduct DOE 2k Factorial Design
(manual calculation)
Module : K04-05-15 FUNDAMENTAL OF EXPERIMENTAL DESIGN (DOE)

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C04.06 / L4

WIM
Learning Activities

Theory Hours Practical Hours

4.13 Apply process capability


4.14 Calculation technique
4.15 Calculate equipment capability
5.16 Refer capability index table

Total Hours 22 32

8. Application software
9. Total Preventive Maintenance reference book
10. Organizational chart
Tools/ Equipment/ Materials :
11. Process control chart
12. Kaizen manual
13. QCC manual
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN
References: 0-02-916682-9
(3-5 references, valid years ± 5) 3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN 0-
13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN 0-07-
033176-6
Manuals :
Core Abilities :
SYLIBUS PROFILE
Course Code : K04 Theory Hours : 22Hrs
Course : QUALITY ASSURANCE Practical Hours : 32Hrs
Semester : 5 Total Hours : 54Hrs
NOSS Code : MC-041-4-C10 Credit Hours :2

Terminal Performance Objective :


Supplier Quality Management is to perform quality in accordance with supplier performance procedure. The student who are competent in
performing quality should be able to execute supplier assessment to meet required quality.

Module : K04-05-16 SUPPLIER QUALITY MANAGEMENT

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C010.01, C10.02, C10.03,C10.04, C10.05, C10.06 / L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 1. IDENTIFY SUPPLIER PERFORMANCE REQUIREMENT AND ACTIVITY (C10.01, C10.02 / L4)

1.1 Supplier evaluation objective 7 L WT IS


1.2 Current supplier capability AS
1.3 Supplier evaluation, assessment and selection
requirements
1.4 Supplier monitoring chart
1.5 Refer supplier monitoring chart
1.6 Supplier evaluation timeline and schedule
Module : K04-05-16 SUPPLIER QUALITY MANAGEMENT

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C010.01, C10.02, C10.03,C10.04, C10.05, C10.06 / L4

WIM
Learning Activities

Theory Hours Practical Hours

1.7 Determine supplier evaluation objective


1.8 Determine current supplier capability
1.9 Interpret supplier evaluation, assessment
and selection requirements
2.0 Refer supplier monitoring chart
12 D PT WS
2.1 Determine refer supplier monitoring
chart
2.2 Confirm refer supplier monitoring chart
2.3 Produce supplier evaluation timeline

LA 2. CONFIRM SUPPLIER EVALUATION AND SELECTION (C10.03 / L4)

2.1 Supplier evaluation documents


2.2 Supplier track record IS
2.3 Supplier quality system 4 L WT
AS

2.4 Obtain supplier evaluation documents


2.5 Observe supplier track record
2.6 Overview supplier quality system
5 D PT
Module : K04-05-16 SUPPLIER QUALITY MANAGEMENT

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C010.01, C10.02, C10.03,C10.04, C10.05, C10.06 / L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 3. EXECUTE SUPPLIER ASSESSMENT (C10.04, C10.05 / L4)

4.1 Supplier assessment criteria


4.2 Supplier performance evidence
4.3 Provision of objective measure of supplier
performance
4.4 Monitoring of supplier performance 8 IS
L WT
4.5 Supplier delivery performance AS
4.6 Supplier quality performance
4.7 Supplier product conformances
4.8 Supplier performance chart
4.9 Refer supplier assessment criteria
4.10Collect supplier performance
evidence
4.11Provide objective measure of supplier
performance
4.12 Monitor supplier performance
11 D PT WS
5.3 Asses supplier delivery performance
5. 4 Asses supplier quality performance
5.5 Review supplier product
conformances
5.6 Update supplier performance chart
Module : K04-05-16 SUPPLIER QUALITY MANAGEMENT

Delivery Methods

Assessment
Methods
CU.WA No./ Level : C010.01, C10.02, C10.03,C10.04, C10.05, C10.06 / L4

WIM
Learning Activities

Theory Hours Practical Hours

LA 4. REPORT SUPPLIER PERFORMANCE ACTIVITIES (C10.06 / L4)

4.1 Reporting format


4. 2 Supplier performance 3 L WT
4.3 Record and data control procedure

4. 4 Determine reporting format


4.4 Record supplier performance 4 D PT
4.5 Adhere to record keeping procedure

Total Hours 22 32

1. Standard Operating Procedure


2. Check Sheet
Tools/ Equipment/ Materials :
3. Summary format
4. Schedule
1 Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2.J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
References: ISBN 0-02-916682-9
(3-5 references, valid years ± 5) 3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way,
ISBN 0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Juran’s Quality Control Handbook, ISBN
0-07-033176-6
Manuals :
Core Abilities :

You might also like