Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

11,000

1,850

1,500

1,000 7,700

9,090

1,500

1,850
4,000

2,000

0,500

1. LAY OUT 1:50

GSPublisherVersion 0.10.100.100
+3,800
2 Atap

+0,300
1 Lantai
±0,000
0 MT
-0,300
-1 Pedestal
-0,600
-2 Pile cap

DEPAN 1:50

GSPublisherVersion 0.10.100.100
+3,800
2 Atap

+0,300
1 Lantai

±0,000
0 MT

-0,300
-1 Pedestal

KANAN 1:50

GSPublisherVersion 0.10.100.100
+3,800
2 Atap

+0,300
1 Lantai

±0,000
0 MT

-0,300
-1 Pedestal

KIRI 1:50

GSPublisherVersion 0.10.100.100
+3,800
2 Atap

+0,300
1 Lantai

±0,000
0 MT

-0,300
-1 Pedestal

BELAKANG 1:50

GSPublisherVersion 0.10.100.100
GSPublisherVersion 0.10.100.100
GSPublisherVersion 0.10.100.100
GSPublisherVersion 0.10.100.100
GSPublisherVersion 0.10.100.100
GSPublisherVersion 0.10.100.100
GSPublisherVersion 0.10.100.100
SCHEDULE PEKERJAAN
PEKERJAAN MATERIAL VOLUME LUAS JUMLAH
ATAP SCHEDULE JENDELA
GENTENG ONDULINE 7,74 52,38 2 ELEMENT ID JENDELA DEPAN JENDELA LOKET
DINDING JUMLAH 2 4
BATU BATA 3,09 30,75 7 UKURAN 1,800×1,500 0,500×1,500
CAT MOWILEX PUTIH 0,16 61,43 14
PLASTER/ADUKAN 1,2,3 0,78 61,50 14
KOLOM DUDUKAN TIANG BESI 2D Symbol
BETON K-175 0,80 --- 8
LAMPU LED
LAMPU LED 0,16 --- 10
LANTAI POS
BETON K-175 3,18 12,74 1
GRANITE PUTIH 0,13 12,74 1 1,500 1,500
3D Back View
PASIR PASANG 0,25 12,74 1
PENGGUNAAN MATERIAL
PLASTER/ADUKAN 1,2,3 0,25 12,74 1
NAMA MATERIAL VOLUME 1,800
PASANGAN BATA TAMAN 0,500
--- 0,00
BATU BATA 0,10 0,92 6
BATU BATA 3,19
PIPA PENGKAIT ANTAR TIANG LAMPU
BETON K-175 13,74
Steel 0,00 0,48 12
CAT MOWILEX PUTIH 0,16
PLATE DAG
BETON K-175 3,11 18,49 7
GENTENG ONDULINE 7,74 SHEDULE JENDELA
GRANITE PUTIH 0,08 8,36 2
GRANITE PUTIH 0,21 -
LAMPU LED 0,16
PASIR PASANG 0,16 8,36 2
PASIR PASANG 0,41
PLASTER/ADUKAN 1,2,3 0,16 8,36 2
PIPA BESI 4 " 0,08
PONDASI SCHEDULE PINTU
PLASTER/ADUKAN 1,2,3 1,19
BETON K-175 1,80 --- 6 ELEMENT ID OPENINGAN PINTU WC
RUMAH LAMPU LED 0,44
RUMAH LAMPU JUMLAH 1 1
Steel 0,00
RUMAH LAMPU LED 0,44 --- 4 UKURAN 0,800×2,100 0,700×2,100
ST BALOK Orientation R
BETON K-175 1,43 12,31 11
ST KOLOM SCHEDULE MATERIAL
BETON K-175 2,70 --- 14 -
2D Symbol
STRUKTUR LAMPU
BETON K-175 0,72 --- 4
TEXT LOGO
--- 0,00 --- 6
TIANG BESI
PIPA BESI 4 " 0,08 --- 8
2,100 2,100
3D Back View

SCHEDULE PEKERJAAN
0,800 0,700
-

SCHEDULE PINTU
-

GSPublisherVersion 0.10.100.100

You might also like