SMART CITY: HUBBALLI- DHARWAD

Project Overview
Area Profile (ABD)

• Total 37 Projects
• ABD - 26 Projects (1410
Cr.)
• PAN City - 11 Projects (
252 Cr.)

Financial Plan

Major Junctions of ABD


FUND ALLOCATION (PROJECT WISE)
Fund Allocation (in Cr.)

Sl. Name of the project Project Type


Estimated Cost GoI/Go
SCM PPP
(Total) K

1 Solid Waste Management – Litter Free Zones 0.54 0.24 -- 0.3 ABD

2 Electric Crematorium -- -- -- -- ABD

3 IPT Connectivity (PBS) 4.75 4.75 -- -- ABD

4 e-Toilets 0.96 0.96 -- -- ABD

5 Rain water harvesting 2 1 -- 1 ABD

6 Storm Water Drains 5 2.5 -- 2.5 ABD

7 LED street Lighting 6.86 6.2 -- 0.66 PAN City

8 Roof top Solar 128.76 12.9 77.3 38.6 ABD

9 Multi Level Car Parking 66.1 59.5 6.6 -- ABD

10 Renovation of Core city market area 114.78 114.8 -- -- ABD


FUND ALLOCATION (PROJECT WISE) .. Contd.

Fund Allocation (in Cr.)


Sl. Name of the project Estimated Cost GoI/Go Project Type
SCM PPP
(Total) K
11 Smart IT-Solid Waste Management System 31 31 -- -- PAN City
12 Wi-fi Corridor -- -- PAN City
13 Integrated Command and Control Centre -- -- PAN City
14 Cashless and Paperless office at HDMC -- -- PAN City
15 Smart Property taxes management system 130 -- -- 130.1 PAN City
Smart Public Advertisement Management System
16 -- -- PAN City

17 Smart Public Works Management System -- -- PAN City


18 People Empowerment Platform/One stop Solution 84 50.4 -- 33.6 PAN City

19 Street Scape Redesign, footpath improvement, underground ducting 83 83 -- -- ABD


20 Junction Improvement 21.75 21.75 -- -- ABD
21 Underground Drainage System 18.64 9.3 -- 9.3 ABD
22 Underground Ducting of electrical /data with Electrical Smart Metering 190 190 -- -- ABD
23a Nehru Stadium -- -- ABD
23b Nalla Renovation & Green Corridor -- -- ABD
89.65 89.65
23c MG Park -- -- ABD
23d Tolankere -- -- ABD
FUND ALLOCATION (PROJECT WISE) .. Contd.

Fund Allocation (in Cr.)


Sl. Name of the project Estimated Cost GoI/Go Project Type
SCM PPP
(Total) K
24 Green Corridor 10 -- -- 10 ABD
25 Supermarket at Dharwad N/A N/A ABD
Affordable Housing
26 103.32 41.3 -- 62 ABD

27 Railway Station Redevelopment 54.45 -- 54.5 -- ABD


28 Smart Parking and Payment System -- -- -- -- ABD
29 Smart Poles -- -- -- -- ABD
30 SPV Website -- -- -- PAN City
31 NMT Zones 4 4 -- -- ABD

32 Industrial Development 99.32 -- -- 99.32 ABD

33 Upgradation of SME 72.27 -- -- -- ABD

34 Ropeway to Hillock -- -- -- -- ABD

35 Intelligent Transport Management System -- -- -- -- PAN City

36 24x7 Water Supply 24.39 24.39 ABD

37 Transport Terminal Hub 316.49 284.8 31.6 ABD


PROJECT STATUS AS ON 31ST OCT 2017
FR DPR RFP
Sl. Name of the project
Estimated Cost Submitted Submitted Submitted
(Total) (Yes/No) (Yes/No) (Yes/No)
SMALL SCALE PROJECTS (To be Approved in SPV level as per recent G.O. No.) – below 5 Cr.
1 Solid Waste Management – Litter Free Zones 0.54 Prepared Prepared Under Process
2 Electric Crematorium 1.8 Prepared Prepared Under Process
3 IPT Connectivity (PBS) 4.75 Prepared Prepared Under Process
4 e-Toilets 0.96 Prepared Prepared Under Process
5 Rain water harvesting 2 Prepared Prepared Under Process
6 Storm Water Drains 5 Prepared Under Process Under Process
PROJECTS CLEARED BY TECH. COMMITTEE, AWAITING IDD APPROVAL (DUE TO PPP PROJECT)
7 LED street Lighting 6.86 As per instructions provided in KUIDFC Yes
tech. committee meeting, FR & DPR not
8 Roof top Solar 128.76 required for these projects Yes
PROJECTS AWAITING TECH. COMMITTEE(KUIDFC) APPROVAL
9 Multi Level Car Parking 66.1 Prepared Under Process Under Process
10 Renovation of Core city market area 114.78 Prepared Under Process Under Process
ICT PROJECTS
11 Smart IT-Solid Waste Management System 31 Under Process
12 Wi-fi Corridor Draft DPR Under Process
13 Integrated Command and Control Centre As per instructions Prepared and Under Process
14 Cashless and Paperless office at HDMC provided in KUIDFC Submitted to Under Process
tech. committee
15 Smart Property taxes management system 130 KUIDFC Under Process
meeting, FR not
Smart Public Advertisement Management System required for these Technical
16 Under Process
projects Committee for
17 Smart Public Works Management System Scrutiny Under Process
18 People Empowerment Platform/One stop Solution 84 Under Process
PROJECT STATUS (…Contd.)

FR DPR RFP
Sl. Name of the project
Estimated Cost Submitted Submitted Submitted
(Total) (Yes/No) (Yes/No) (Yes/No)

TECHNICAL SCRUTINY IS DONE BY KUIDFC FOR THE FOLLOWING PROJECTS ON 27 SEPT,2017

Street Scape Redesign, footpath improvement, underground


19 83 Prepared Under Process Under Process
ducting

20 Junction Improvement 21.75 Prepared Under Process Under Process

21 Underground Drainage System 18.64 Prepared Under Process Under Process

Underground Ducting of electrical /data with Electrical Smart


22 190 Prepared Under Process Under Process
Metering

23a Nehru Stadium Prepared Under Process Under Process

23b Nalla Renovation & Green Corridor Prepared Under Process Under Process
89.65
23c MG Park Prepared Under Process Under Process

23d Tolankere Prepared Under Process Under Process

24 Green Corridor 10 Prepared Under Process Under Process

25 Supermarket at Dharwad 212 Prepared Under Process Under Process


PROJECT STATUS (…Contd.)
Fund Allocation
FR DPR RFP
(in Cr.)
Sl. Name of the project
Estimated Cost Submitted Submitted Submitted
(Total) (Yes/No) (Yes/No) (Yes/No)
OTHER PPP PROJECTS
Affordable Housing
26 103.32 Prepared Under Process Under Process

27 Railway Station Redevelopment 54.45 Under Process Under Process Under Process
Draft DPR
28 Smart Parking and Payment System Under Process FR Not reqd Under Process
Prepared
Draft DPR
29 Smart Poles Under Process FR Not reqd Under Process
Prepared
OTHER PROJECTS
30 SPV Website -- Project Complete. Website launched on 7th Oct 2017

31 NMT Zones 4 Prepared Under Process Under Process


32 Industrial Development 99.32
Under Process
33 Upgradation of SME 72.27
Survey under process with NOC from Forest Dept &
34 Ropeway to Hillock -- KSPCB
35 Intelligent Transport Management System -- Being implemented by BRTS project
36 24x7 Water Supply 24.39 Being implemented by Water Project ILFS Company
37 Transport Terminal Hub 316.49 Being implemented by DULT, Discussion in progress
• Locations: ICCC at Hosur Junction • Locations: Akshay Park Bus Stop, MG Park, CBT.
• Proposed ICONIC Building to cater ICCC control room Tolankere, HDMC office
• Components: Automatic payment & Cleaning,
• Components ICCC: Smart SWM, Transport, Public Safety, 1 Remote Monitoring, Sensor enabled interior
Utilities management, traffic management
• Components E-GOV: Cashless &
Paperless office, Smart property taxes 6
management system, Smart Public ICT PACKAGE
works management system, Smart 1. ICCC E-TOILET
advertisement management system (by 3rd Week of Nov)
2. E-GOV
(DPR by 1st Week of Nov
Need Govt. Approval)
• Locations: Harischandraghat
• Components: AWL Cremator,
Combustion Air Supply, Wet
Scrubber, Stack, Control Panel
PROJECTS
2
TO BE ELECTRICAL
PUBLIC BIKE
• 30 Docking Stations CREMATORIUM
SHARING TENDERED (by 3rd Week of Nov)
(by 3rd Week of Nov)
5 SOON

RAIN WATER LITTER FREE


HARVESTING ZONE
(by 3rd Week of Nov)
(by 3rd Week of Nov)
3• Locations: Major Junctions (54 Nos), All Bus Stops
• Locations: HDMC buildings (170 Nos), HDMC market area, Dharwad market area
Components: Storage Pits, Storage Tanks, Recharge 4
• Components: RFID Tagged Bins, Mobile App, Sign
Trenches, Percolation Tanks, Recharging of Bore Wells &
Boards
Dug Wells
CITIZEN ENGAGEMENT ON SMART CITY PROJECTS
• Date: 7 Oct 2017
• Venue: Kannada Bhavan, Hubli
• Smart City Website was launched by Hn. Dist. Minister Shri
Vinay Kulkarni , GoK
• Citizen Engagement Brochure was released
• Key Experts from PMC explained the projects to the citizen
• Questions and Suggestions were taken and being
considered in applicable projects

Citizen Engagement Brochure Release of Brochure

Social Media Links Are created:


http://www.facebook.com/hubballidharwa
dsmartcityltd

http://twitter.com/hdsmartcity

http://www.Instagram.com/hubballidharw
adsmartcity/

http://hubballidharwadsmartcity.com/
Citizen Engagement Workshop
MAJOR SMART CITY PROJECT DIAGRAMS

MLCP
Janta Bazar

Smart Solid Waste Management

MG Market

Smart Poles
MAJOR SMART CITY PROJECT DIAGRAMS

Nehru Stadium

Tolankere