IKK Asphalt Batch Plant Recommissioning Checklist - May 2022
IKK Asphalt Batch Plant Recommissioning Checklist - May 2022
Drier
Air Baffles, check condition
Trunnion Bearing, check condition, grease
Thrust Roller, check for wear
Bucket Flights, check for loose or worn flights
Mixing Flights, check build up, loose, worn flights
Discharge Paddles, check adjustment
Thermocouple, Infrared temp. sensor, check
Aggregate Scale
Clearances, Is the scale hanging freely?
Discharge gate, check operation
Hot Elevator
Gear Box, check for leaking seals, change oil
Burner
Cones, check for loose brick or mortar
Nozzle, clean and unobstructed
Spinner, check for proper operation
Turbo fan, check for proper operation
Aggregate Screen / Scalping Screen
Screens, check for wear and or damage
Bearings, check condition, grease if necessary
Springs, check for breaks & alignment
Hot Bins
Gates, check condition & operation
Overflow Chute, check condition and operation
Batcher Hydraulic System
Valves, check operation
Cylinders, check condition and operation
Door Seals, check condition
Top Door Limits, check operation
Dust System
Zero speed sensors, check operation
Motor & Wiring, check condition and operation
Baghouse
Thermocouple, check condition & operation
Exhaust Fan, check condition and operation
Damper, check condition and operation
Asphalt Cement Storage / Delivery System
Strainer, clean or replace
Three-way valve, check operation
9. ENVIRONMENTAL ISSUES
HAZARDOUS MATERIAL
11 WASTE MANAGEMENT
AIR QUALITY
18.10 Are there any foul smell / odors in the area?
18.11 Is the order of smoke from the stacks abnormal?
1.
3. ELECTRICITY SAFETY
8. COMPRESSED GASES
11. LADDERS
Emergency Safe Work Procedure (SWP) has been completed for the installation Yes ☐ No ☐ NA ☐
Management of plant/equipment.
Are training, work practice and supervision changes required? If yes Yes No ☐ NA ☐
identify the requirements Yes ☐ No ☐ NA ☐
Have all staff who require training in the use of the plant/equipment Yes ☐ No ☐ NA ☐
Information and
completed it prior to commissioning?
Training Yes ☐ No ☐ NA ☐
Are Staff training records completed and uploaded into perform?
Has the contractor company and individual workers completed the Curtin
H&S Contractor induction?
Work Is a HAZOP required for this equipment? (Do for high risk / complex Yes ☐ No ☐ NA ☐
Environment plant)
and Planning
Pressure Yes ☐ No ☐ NA ☐
Has the Pressure Vessel Compliance Checklist been completed?
Vessels
Specific Emergency Plan and relevant procedures/equipment in Yes ☐ No ☐ NA ☐
Plant Rooms
place.
Noise If required, health surveillance and testing programs in place. Yes ☐ No ☐ NA ☐
Guarding & In place and working as designed. Yes ☐ No ☐ NA ☐
Emergency
Stops
Electrical Have all electrical wiring and supply issues been resolved? Yes ☐ No ☐ NA ☐
Gas Have all gas storage and supply issues been resolved? Yes ☐ No ☐ NA ☐
Maintenance of Has a maintenance plan and contract for scheduled maintenance Yes ☐ No ☐ NA ☐
Plant/Equipment and breakdown been arranged prior to commissioning?
Commissioning review: Completed form to be signed off by the relevant Supplier/Installer and
Manager/Supervisor.
Where multiple items have been purchased and arrive at different times, it is the responsibility of the company to
maintain an accurate record of commissioning of the plant and equipment.
Supplier/Installer: All hazards and H&S issues have been identified and control measures have been initiated
and/or implemented.
Name: Position: Company: Date:
Signature: Comments:
Manager/Supervisor Authorisation: All hazards and H&S issues have been identified and control measures have
been initiated and/or implemented.
Signature: Comments: