FORMAT NO.:9560/NBEL/FORM/MECH/01, REV.0
Page 5 of 93
GAS (QW - 408 ) ELECTRICAL CHARACTERISTICS ( QW - 409 )
Percenatge Composition (Amps&volts
Current : range should be recorded
Polarity : for each
electrode size,position and thickness.This
Gas(es) Mixture Flow rate information may be listed in a tabular form similar to
Tungsten
that shownelectrode
below ) size :
Shielding : Mode of metal transfer :
Trailing : for GMAW :
Electrode Wire feed
Backing : :
speed range
TECHNIQUE (QW - 410 )
Stringe or weave bead :
Orifice or gas cup size :
Intial and interpass cleaning :
Method of back gouging :
Oscillation :
Contact tube to work distance :
Multiple or single pass (per side ) :
Multiple or single electrode :
Travel speed range :
Peening :
Others :
Filler metal Current Travel
Weld Layer(s) Process speed Remarks
Class / Dia Type Polarity Amps range range
Sign
Name
Date
Page 6 of 93
Format No:-9560/NBEL/FORM/MECH/02, REV.0
Joint Design :
Backing :
Method of preparation :
BASE METAL (QW - 403) POST WELD HEAT TREATMENT (QW - 407 )
Material specification : Temperature :
Type of grade : Time :
Chemical analysis : Others :
Thickness of test coupon: Others :
Diameter of test coupon : Rate of Heating :
Others : Rate of cooling :
FILLER METALS (QW - 404 ) GAS (QW - 408 )
SFA Specification :
AWS Specification : PERCENT COMPOSITION
Page 7 of 93
Format No:-9560/NBEL/FORM/MECH/02, REV.0
QW - 483 ( BACK )
TENSILE TEST ( QW - 150 )
Ultimate
Ultimate
Width Thickness in Tensile
Specimen No Area in SQ.MM Total Load in Type of failure and Location
in MM MM Stressin
KN
N/MM2
OTHER TESTS
Type of test :
Deposite Analysis :
Other :
We certify that the statement in this record are correct and the test welds prepared,welded and tested in accordance
with the requirements in Section IX of the ASME code.
Manufacturer :
By :
Sign
Name
Date
SUBCONTRACTOR NBEL/SPREA MISR
Page 8 of 93
Format No:-9560/NBEL/FORM/MECH/03, REV.0
Visual Inspection :
Clearance given for Radiography :
Test to be conducted : Macro/Mechanical/Radiography
Sign :
Name :
Date :
Page 9 of 93
Format No:-9560/NBEL/FORM/MECH/04, REV.0
Qualification
Range Date Signature
SL WPS Posi- Filler
Meterial of SUB
NO NO. tion Dia Thk metal NBEL SPREA MISR
Test CONTRACTOR
REMARKS:
Page 10 of 93
Format No:-9560/NBEL/FORM/MECH/05, REV.0
Name of the Project :500 TPD Sulphuric Acid Plant with 5.0 MW Power Generations,EGYPT
Client :SPREA MISR
EPC Contractor : NUBERG ENGINEERING LIMITED
We certify that the statement in this record are correct and the test coup[on were prepared, welded , and tested in accordance with the requirements of Section IX of ASME
code
As the welder has completed the performance qualification test and the result were found satisfactory
Date :
Sign:
Name:
Page 11 of 93
Format No:-9560/NBEL/FORM/MECH/06, REV.0
Sign :
Name:
Date :
Page 12 of 93
Format No:-9560/NBEL/FORM/MECH/07, REV.0
Sign :
Name :
Date :
Subcontractor NBEL/SPREA MISR
Page 13 of 93
Format No:-9560/NBEL/FORM/MECH/08, REV.0
LEGEND * G - BUTT WELD, S - SOCKET WELD, B - BRANCH WELD, M - MITER WELD , ( ** ) - PIPE, ELBOW, REDUCER, FLANGE etc,SW - Shop Weld, FW-Field Weld..
Sign:
Name:
Date:
Page 14 of 93
Format No:-9560/NBEL/FORM/MECH/09, REV.0
LEGEND * G - BUTT WELD, S - SOCKET WELD, B - BRANCH WELD, M - MITER WELD , SW - SHOP WELD , FW - FIELD WELD
Sign :
Name:
Date :
Subcontractor NBEL/SPREA MISR
Page 15 of 93
Format No:-9560/NBEL/FORM/MECH/010,REV.0
LEGENDS:
G : For Butt Joints S : For Socket joints B : For Branch Joints MT :For Miter Joints
Comments:-
Sign :
Name :
Date :
Subcontractor NBEL/SPREA MISR
Page 16 of 93
Format No:-9560/NBEL/FORM/MECH/011,REV.0
Comments:-
Sign :
Name:
Date:
Subcontractor NBEL/SPREA MISR
Page 17 of 93
Format No:-9560/NBEL/FORM/MECH/011,REV.0
Page 18 of 93
Format No:-9560/NBEL/FORM/MECH/012,REV.0
Joint Welder
Sl no. Line No/Tank No/Str Dia Thk. X-Ray No. Segment Observation Result REMARKS
No. No.
Sign:
Name:
Date:
Page 19 of 93
Format No:-9560/NBEL/FORM/MECH/012,REV.0
AKS AKT
Page 20 of 93
Format No.:-9560/NBEL/FORM/MECH/013,REV.0
%age of Radiography-
%age of MPT /LPT- LOOP NO.:
Line No. : Piping Class- Date :
NAME :
Page 21 of 93
Format No:-9560/NBEL/FORM/MECH/014,REV.0
1
2
3
4
5
6
7
8
9
10
11
12
Sign
Name
Date
Page 22 of 93
Format No:-9560/NBEL/FORM/MECH/015,REV.0
Sign
Name
Date
Page 23 of 93
Format No:9560/NBEL/FORM/MECH/016,REV.0
CLEARANCE
SL NO. ACTIVITY CHECK Subcontractor NBEL/SPREA
Sign Date Sign Date
1.1 Mechanical Clearance
a Mechanical clearance conformity with drawings
b Material as per Piping Class and PMS
c Fit up Check
1.2 Coating and Wrapping
a Surface preparation
b Primer application
c Coating, wrapping and peel test
d Holiday Check
1.3 Laying
a Trench Leveling
b Lowering
c Spacing ,alignment, slope of pipe line
Checking for damages in wrapping and coating,
d
their repair, Holiday testing, etc.
e Backfilling
1.4 Welding and NDT clearance
a Visual checks of completed welds
b DPI Checks
c Radiography clearance
d PWHT and Hardness clearance
2 Testing medium
a Pressure …………………………Kg/Cm2
3(a) Preparatory arrangement for flushing / testing
3(b) Clearance for flushing and testing
4 Hydro Test witnessing
5 Draining and Drying
6 Box Up
7 Manhole / Catch basin location
8 Bottom slab top level
10 Others
Signature:
Name:
Date:
Page 24 of 93
Format No:-9560/NBEL/FORM/MECH/017,REV.0
Sign
Name
Date
Page 25 of 93
Format No:-9560/NBEL/FORM/MECH/018,REV.0
Sign
Name
Date
SUBCONTRACTOR NBEL/SPREA
Page 26 of 93
Format No:-9560/NBEL/FORM/MECH/019,REV.0
Sign:
Name:
Date:
SUBCONTRACTOR NBEL/SPREA MISR
Page 27 of 93
Format No:9560/NBEL/FORM/MECH/020,REV.0
Isometric No.
4 Vents Closed
6 Test Completed at
7 Water drained at
Sign
Name
Date
Page 28 of 93
Format No:-9560/NBEL/FORM/MECH/021,REV.0
Joint Detail
SL No Line No: Area Zone W.No Observation Result
NO Size Type
Abbreviations
L : Linear Indication ACC : Accept
A:Found Indications Rep : Repair
MSD :MG Significent defect CO: Cut out
Sign
Name
Date
Page 29 of 93
Format No:-9560/NBEL/FORM/MECH/022,REV.0
Total Nos.
Check for Correct Studs & nuts-dia.,length,Material, Uniform Protrusion of Studs,Anti Seize
Compound
Page 30 of 93
Format No:-9560/NBEL/FORM/MECH/022,REV.0
Page 31 of 93
Format No:-9560/NBEL/FORM/MECH/022,REV.0
b) Spring Support
i) Verify tag no. and check data as per data sheet/spring set
ii) Check for locking arrangement and any damage durring transit,etc.
iii) Check for completeness of installation as per drg. Including welding of mounting
cleat/bracket
iv) Check for locking durring installation and pressure test
c) Bracket support & Inserts with Anchor Fasteners
i)Check for members dimensions and materials
ii)Check for welding
iii)Check for bolting
iv)Check for appearance/damage
15 Vents/Drains
As per drg.
Orientation of valve handles
Clearance for hose
16 Earthing:
Page 32 of 93
Format No:-9560/NBEL/FORM/MECH/022,REV.0
d. Equipment Nozzles
e. Others
Page 33 of 93
Format No:-9560/NBEL/FORM/MECH/022,REV.0
Sign
with
date
Name:
SUBCONTRACTOR NBEL/SPREA MISR
Page 34 of 93
Format No:-9560/NBEL/FORM/MECH/022,REV.0
Sign
with
date
Name:
Page 35 of 93
Format No:-9560/NBEL/FORM/MECH/023,REV.0
Sign :
Name:
Date:
Page 36 of 93
Format No:-9560/NBEL/FORM/MECH/024,REV.0
Accept
S.No Items to check
SUBCONTRACTOR NBEL/SPREA MISR
1 Field Installation Checklist Prior to Hydrotest Signed
2 Punch list prepared
3 Pre-Hydrotest Punch items Cleared
4 Accessibilty to Inspection/Witness Locations (Weld Joint etc)
5 Capicity of pressurizing pump checked
6 Cordon off area for high pressure testing, as required
7 Pre-hydrotest flushing carried out
8 IBR/Others test Witnessing Required
9 System Released for Pressure Testing:
ACTIVITY Date Time
10 Water Filling and Venting startred at
11 Water Filling Completed
12 Vents Closed at:
13 Isolation Of Pressurizing pump
14 Test Completed
15 Water drained
16 Air flushing
17 Temp Blinds Removed
18 Checked for reinstallation of
19 a.Control & Safety valves
20 b. Online Instuments
21 c. Rupture disks
22 d. Deblinding
23 e. Others
24 Cold setting of spring supports carried out
Remarks:-
Sign:
Date:
Name:
Page 37 of 93
Format No:-9560/NBEL/FORM/MECH/025,REV.0
Accept
Sl no. Items to check
SUBCONTRACTOR NBEL/SPREA
1 Field Installation Checklist Prior to Pressure test
2 Punch list prepared
3 Pre-Pneumatic test Punch items Cleared
4 Accessibilty to Inspection/Witness Locations (Weld Joint etc)
5 Capicity of pressurizing compressor checked
6 Cordon off area for high pressure testing, as required
7 Pre-pneumatic test flushing carried out
8 IBR/Others test Witnessing Required
9 System Released for Pressure Testing:
ACTIVITY Date Time
10 Air Filling and Venting startred at
11 Air Filling Completed
12 Isolation Of Pressurizing compressor
13 Test Completed
14 Air released
15 Temp Blinds Removed
16 Checked for reinstallation of
17 a.Control & Safety valves
18 b. Online Instuments
19 c. Rupture disks
20 d. Deblinding
21 e. Others
22 Cold setting of spring supports carried out
Remarks:-
Sign:
Date:
Name:
Page 38 of 93
Format No:-9560/NBEL/FORM/MECH/026,REV.0
Sign
Name
Date
Page 39 of 93
Format No:9560/NBEL/FORM/MECH/027,REV.0
Name of the Project : 500 TPD Sulphuric Acid Plant with 5.0 MW Power Generations,EGYPT Report No:-
Sign:
Name:
Date:
Page 40 of 93
Format No:-9560/NBEL/FORM/MECH/028,REV.0
Sign
Name
Date
Page 41 of 93
Format No:9560/NBEL/FORM/MECH/029,REV.0
Special care to be taken for tapped hole and it is to be certified by contractor that full engagement of stud is there to tapped hole. FJHT-Flange Joint Hydrotested FJNHT-Flange Joint Not Hydrotested
Sign :
Name :
Date :
SUBCONTRACTOR NBEL/SPREA MISR
Page 42 of 93
Format No:-9560/NBEL/FORM/MECH/030,REV.0
Sign
Name
Date
SUBCONTRACTOR NBEL/SPREA MISR
Page 43 of 93
Format No.:9560/NBEL/FORM/MECH/031,REV.0
2 DATE OF TESTING
4 MATERIAL
4A TECHNIQUE
7 RADIATION SOURCE
9 GEOMETRIC RELATIONSHIP(ug)
12 EXPOSURE TIME
13 PROCESSING
14 DENSITY
15 SENSITIVITY
Page 44 of 93
Format No:-9560/NBEL/FORM/MECH/032,REV.0
Sign:
Name:
Date:
SUBCONTRACTOR NBEL/SPREA MISR
Page 45 of 93
Format No:-9560/NBEL/FORM/MECH/033,REV.0
Page 46 of 93
Format No:-9560/NBEL/FORM/MECH/034,REV.0
Sign:
Name:
Date:
SUBCONTRACTOR NBEL/SPREA MISR
Page 47 of 93
Format No:-9560/NBEL/FORM/MECH/035,REV.0
Acceptance Criteria: ASME Sec - VIII, Div-1 App- 12 Technique: PULSE ECHO CONTACT
Equipment: EINSTEIN OF MODSONICS Calibration Block: IIW-V2 Surface Condition/ Temperature: SMOOTH & AMBIENT
Sign :
Name:
Date:
SUBCONTRACTOR NBEL/SPREA MISR
Page 48 of 93
Format No:-9560/NBEL/FORM/MECH/036,REV.0
Sign:
Name:
Date:
SUBCONTRACTOR NBEL/SPREA MISR
Page 49 of 93
Format No:-9560/NBEL/FORM/MECH/037,REV.0
Sign
Name
Date
SUBCONTRACTOR NBEL/SPREA MISR
Page 50 of 93
Format No:-9560/NBEL/FORM/MECH/038,REV.0
Sign:
Name:
Date:
SUBCONTRACTOR NBEL/SPREA MISR
Page 51 of 93
Format No:-9560/NBEL/FORM/MECH/039,REV.0
Sign:
Name:
Date:
SUBCONTRACTOR NBEL/SPREA MISR
Page 52 of 93
Format No.:9560/NBEL/FORM/MECH/040,REV.0
2 DATE OF TESTING
3 MATERIAL
7 BATCH NO
8 MAGNETISING METHOD
12 MAGNETISING TECHNIQUE
13 MEDIUM
14 MAGNETISING CURRENT
15 POLE SPACING
16 LIFTING CAPACITY
OBSERVATIONS:
Sign :
Name :
Date :
AGENCY SUBCONTRACTOR NBEL/SPREA MISR
Page 53 of 93
Format No:-9560/NBEL/FORM/MECH/041,REV.0
Sign
Name
Date
SUBCONTRACTOR NBEL/SPREA MISR
Page 54 of 93
Format No:-9560/NBEL/FORM/MECH/042,REV.0
Applied Pressure in
Sl no. Tank No./Line No. Joint No. Check for leaks by Soap Bubble Test Remarks
PSI / Kg/Cm2
Sign:
Name:
Date :
SUBCONTRACTOR NBEL/SPREA MISR
Page 55 of 93
Format No:-9560/NBEL/FORM/MECH/043,REV.0
1 Isometric Index
3 Line Schedule
4 Isometric Drawing
10 NDT Summary
11 PMI Report
19 Calibration Certificate/Reports
Sign:
Name:
Date :
Page 56 of 93
Format No:-9560/NBEL/FORM/MECH/044,REV.0
Sign
Name
Date
Page 57 of 93
Format No:9560/NBEL/FORM/MECH/045,REV.0
NOS. OF SIGNATURE
TOTAL NO
SL NO. LOOP NO. ATTACHMENT NDT REQUIRED LINE NO JOINT NO REPORT NO. DATE RESULT REMARKS
OF JOINTS SUBCONTRA
WELD JOINT NBEL
CTOR
Sign:
Name:
Date:
SUBCONTRACTOR NBEL
Page 58 of 93
Format No:9560/NBEL/FORM/MECH/046,REV.0
NOS. OF SIGNATURE
TOTAL NO NDT
SL NO. LOOP NO. BRANCH LINE NO JOINT NO REPORT NO. DATE RESULT REMARKS
OF JOINTS REQUIRED SUBCONTRA
WELD JOINT NBEL
CTOR
Sign:
Name:
Date:
SUBCONTRACTOR NBEL
Page 59 of 93
Format No:9560/NBEL/FORM/MECH/047,REV.0
Sign:
Name:
Date:
SUBCONTRACTOR NBEL
Page 60 of 93
Format No:9560/NBEL/FORM/MECH/048,REV.0
NOS. OF SIGNATURE
BUTT TOTAL NO NDT
SL NO. LOOP NO. LINE NO JOINT NO REPORT NO. DATE RESULT REMARKS
WELD OF JOINTS REQUIRED SUBCONTRA
JOINT NBEL
CTOR
Sign:
Name:
Date:
SUBCONTRACTOR NBEL
Page 61 of 93
Format no.:-9560/NBEL/FORM/MECH/049,REV.0
Sign:
Date:
Name:
SUBCONTRACTOR NBEL/SPREA MISR
Page 62 of 93
Format No:-9560/NBEL/FORM/MECH/050, Rev-0
1.Quantity verified and found in order 2. Material condition appears to be good 3.Heat/Batch/Tag No. mentioned on the material
4.Color coding done as applicable 5. Site identification marks on material 6.Correlation w.r.t. IRN/MTC/Lab Tests report
7.TC verification w.r.t. IRN/Spec/QAP,etc.
Sign :
Name:
Date:
SUBCONTRACTOR NBEL SPREA MISR
Page 63 of 93
Format No: 9560/NBEL/FORM/MECH/051,REV.0
Name of the Project : 500 TPD Sulphuric Acid Plant with 5.0 MW Power Generations,EGYPT REPORT NO:
Client : SPREA MISR DATE:
EPC Contractor : NUBERG ENGINEERING LIMITED
MIR NO./IRN Quantity
SI No. Material Description P O . No./Date Reference Invoice No./Challan No. MTC No. Heat/Batch No. Date of Receipt Remarks
NO. UOM Received Accepted
1
2
1.Quantity verified and found in order 2. Material condition appears to be good 3.Heat/Batch/Tag No. mentioned on the material
4.Color coding done as applicable 5. Site identification marks on material 6.Correlation w.r.t. IRN/MTC/Lab Tests report
7.TC verification w.r.t. IRN/Spec/QAP,etc. 8.Col. NO. 3,4,5,6 is not applicable (N.A.) for fabricated structurals, fabricated Reinforcement steel,Piping Spools,Heater Items
Sign :
Name:
Date:
Page 64 of 93
Format No:-9560/NBEL/FORM/MECH/052,REV.0
Sign :
Name:
Date:
Page 65 of 93
Format No:-9560/NBEL/FORM/MECH/053,REV.0
Method:
Technique :Electro Magnetic Yoke Type of Current:-
Surface condition : Surface Temperature:
Acceptance Criteria : ASME Sec-VIII Div.1 Appendix-VI Pole Spacing:
Equipment Make : GL NO:-
Joint Detail
Sl No. Line No Area Zone W.No Observation Result
NO Size Type
Abbreviations
L : Linear Indication ACC : Accept
A:Found Indications Rep : Repair
MSD :MG Significent defect CO: Cut out
Sign
Name
Date
Page 66 of 93
Format No:-9560/NBEL/FORM/MECH/054,REV.0
NAME :
DATE :
Page 67 of 93
Format No:-9560/NBEL/FORM/MECH/055,REV.0
Name of the Project :500 TPD Sulphuric Acid Plant with 5.0 MW Power Generations,EGYPT
SIGN :
NAME :
DATE :
Page 68 of 93
Format No:-9560/NBEL/FORM/MECH/056,REV.0
SIGN:
NAME:
DATE:
Page 69 of 93
Format No:-9560/NBEL/FORM/MECH/057,REV.0
Sign :
Name :
Date :
Page 70 of 93
Format No:-9560/NBEL/FORM/MECH/058,REV.0
SIGN :
NAME :
DATE :
Page 71 of 93
Format No:-9560/NBEL/FORM/MECH/059,REV.0
SIGN :
NAME :
DATE :
Page 72 of 93
Format No:-9560/NBEL/FORM/MECH/060,REV.0
SIGN :
NAME :
DATE :
Page 73 of 93
Format No:-9560/NBEL/FORM/MECH/061,REV.0
SIGN :
NAME :
DATE :
Page 74 of 93
Format No:-9560/NBEL/FORM/MECH/062,REV.0
SL.NO. Of vacuum gauge/ identification no Range Calibrated Date Calibration due date
SIGN:
NAME:
DATE:
SUBCONTRACTOR NBEL/MISR
Page 75 of 93
Format No:-9560/NBEL/FORM/MECH/063,REV.0
SL. CLEARED BY
ACTIVITY REMARKS
NO SUBCONT. NBEL
1 Dimentional Clearance
YES / NO
APPURTENANCES OF SHELL / ROOF
2
( As Per Drawing )
3 NDT CLEARANCE
a). Visual Check
b). Nozzle Pad Test Check
c). Radiography Clearance
d). L.P.T Check
e). Oil Chalk Test
f). Vaccum Box Test
SIGN :
NAME :
DATE :
Page 77 of 93
Format No:-9560/NBEL/FORM/MECH/064,REV.0
SIGN :
NAME :
DATE :
SUBCONTRACTOR NBEL/SPREA MISR
Page 78 of 93
TECHNIP INDIA LIMITED
TANK WATER FILL TEST
Name of the Project:ONSHORE TERMINAL FOR VA&S1 DEVELOPMENT PROJECT
: M/s ONGC
Client
Tank Size:-
TPI :M/s VCS QUALITY SERVICES PVT LTD
Contractor
Sub-contractor : M/s ARUN FABRICATORS
BENCH
SL.NO WATER LEVEL C1 C2 C3 C4 C5 C6 C7
MARK
BEFORE
WATER
FILL TEST
1 CLEAT
INITIAL
LEVEL
2 1 mtr
3 2 mtr
4 2.750 mtr
24 HOURS
5 HOLDING
6 3 mtr
7 4 mtr
P
8 5.55 mtr
mtr
M
9
SA
24 HOURS
10 HOLDING
11 6 mtr
12 7 mtr
8 mtr
13
14 8.25 mtr
24 HOURS
15 HOLDING
16 9 mtr
17 10 mtr
18 11 mtr
24 HOURS
19 HOLDING
Note:-Water Level & Level Cleat Nos has been changed as per API 650 &Tank Height/Circumference.
SIGN :
NAME:
DATE :
ARUN FABRICATORS TPIL
Prepared and Checked By
TPIL
CHNIP INDIA LIMITED
TER FILL TEST REPORT
TANK No:-
VCS/
C8 C9 C10 C11 DATE TIME AF TPIL REMARKS
ONGC
25%
PL E
AM
50%
75%
100%
Circumference.
VCS/ONGC
Reviewed and Approved By
VCS/ONGC
Format No:-9560/NBEL/FORM/MECH/065,REV.0
SIGN :
NAME:
DATE :
Page 84 of 93
Format No:-9560/NBEL/FORM/MECH/066,REV.0
Sign:
Name:
Date:
SUB-CONTRACTOR NBEL/SPREA MISR
Page 85 of 93
Format No:-9560/NBEL/FORM/MECH/067,REV.0
0º TO 90º
90º TO 180º
180º TO 270º
270º TO 360º
SIGN.:
NAME:
DATE:
Page 86 of 93
Format No:-9560/NBEL/FORM/MECH/068,REV.0
HORIZONTAL TYPE
REMARKS
Sign
Name
Date
SUBCONTRACTOR NBEL/SPREA MISR
Page 87 of 93
Format No:-9560/NBEL/FORM/MECH/069,REV.0
NORTH
270O
NOTE : ALL DIMESIONS ARE IN MM
270O 90O
180O
Signature :
Name :
Date :
Comments:
Sign :
Name:
Date:
SUBCONTRACTOR NBEL/SPREA MISR
Page 89 of 93
Format No:-9560/NBEL/FORM/MECH/071,REV.0
Remarks:-
Sign
Name
Date
SUBCONTRACTOR NBEL/SPREA MISR
Page 90 of 93
Format No:-9560/NBEL/FORM/MECH/072,REV.0
Sign
Name
Date
Page 91 of 93
Format No:-9560/NBEL/FORM/MECH/072,REV.0
Name of the Project :500 TPD Sulphuric Acid Plant with 5.0 MW Power Generations,EGYPT
REPORT NO:-
Client :SPREA MISR
DATE:
EPC Contractor :NUBERG ENGINEERING LIMITED
EQPT. NO. : MANUFACTURER :
EQPT. NAME : WEIGHT :
TYPE OF EQPT : VENDOR DWG NO :
LENGTH / HEIGHT :
LOCATION /
AREA/UNIT :
0
) ( ) (
)
( )
TOG ( )
Sign
Name
Date
Page 92 of 93
Format No:-9560/NBEL/FORM/MECH/073,REV.0
Face
0 0
) ( ) ( A ) (
) ( R
) ( ) (
R – Redial
ALIGNMENT WITH PIPE CONNECTION
0 A – Axial
0
) ( A ) (
) ( R ) (
) (
) (
REMARKS
Sign
Name
Date
DEE/KKSEPL TPIL/BPCL
Page 93 of 93