Professional Documents
Culture Documents
Tube Marking
Tube Marking
Study
Tube Marking
System
• Cater for various device configurations therefore including Parts that passed all tests were cammed out of the dial plate
product recipes and into a collection bin. Failed parts were then unloaded into
a reject bin.
• Ability to for quick change over of tooling • Automatic segregation of passed and failed parts
01382 880088
sales@sp-automation.co.uk
sp-automation.co.uk