TASK RISK ASSESSMENT

PROVISION GMS SECURITY IMPROVEMENT

DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A


PT. PUTRA NEGARA

MADURA BD FIELD DEVELOPMENT


PROVISION GMS SECURITY IMPROVEMENT

DOCUMENT TITLE :
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT

DOCUMENT NO :
HCML-GMS-HSE-PN-TRA-002.A

UNAUTORIZEDCOPYING OF THIS
THIS DOCUMENT CONSISTS OF TOTAL PAGES
DOCUMENT IS NOT PERMITED
PROJECT
REV DATE PURPOSE ORIGINATOR CHECKER COMPANY DATE
MANAGER
A 21/02/2022 IFR AL AF WSR
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

REFF. NO. LOCATION : TEAM MEMBERS :


GMS Abang Anggi, Aji, Gianti, Nidom
Refernce e.g. Procedure, GMS Risk Register, Permit to Work, Additional Information
ACTIVITY : Rectification of ROW gas metering station pipeline  Permit to Work
PROCESS :  Standart Operational & Work Instruction
EQUIPMENT :
PRODUCT :
SERVICE :
HAZARD/
ENVIRONMENTAL EXISTING CONTROL RISK ADDITIONAL CONTROL RESIDUAL RISK ALARP
HAZARD EFFECT (2) ACTION (6)
ASPECT IDENTIFIED MEASURES (3) EVALUATI MEASURES (5) (7) (8)
(1) ON (4)
Type of injury/ PERSON
ACTION
Damage of R REQUIRED RESPONS R Y N
PRIORITY
environmental Impact I
BLE
HR P R HR P R

I. PERSONIL
Kompetensi  Kecelakaan fatal  Rekrut personil  HSE Induction  HSE
 Melanggar aturan sesuai qualifikasi sebelum pelaksanaan  Supervisor
 Tidak layak bekerja  Medical Check Up C(P) 4 M(12) pekerjaan 3 E(P) 4 E(4) ✓
 Tool Box Meeting
sebelum aktifitas kerja
 Pegawasan
Covid-19  Kesehata  Vaksin dosis 1 dan dosis 2   HSE
n  Karantina 7 hari  Isolasi Pekerja  Supervisor
terganggu sebelum pelaksanaan  HSE Induction
 Penularan kerja sebelum pelaksanaan
 Pegawasan karantina pekerjaan
 Swab Test Antigen B(P) 4 I(16)  Pegawasan karantina 2 D(P) 4 M(8) ✓
dengan hasil Tidak Reaktif  Swab Test antigen
 Test PCR dengan berkala 1x/bulan
hasil negative
 Terapkan protocol
kesehatan
terutama
gunakan masker.
Kelelahan (fatigue)  Single fatality  Pengawasan waktu  Pengecekan kesehatan  HSE
 Kesehatan istirahat B(P) 3 H(12) setiap hari  Supervisor 3 E(P) 3 E(3) ✓
terganggu (mental  Istirahat yang cukup  Pengaturan waktu istirahat
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

dan fisik)
II. PERSIAPAN PERALATAN
Peralatan tidak  Luka Berat  Menggunaan peralatan  Inspeksi alat berkala  HSE
layak pakai yang layak  Tool box meeting  Supervisor
 Inspeksi alat C(A) 4 H(12) 3` E(A) 4 M(4) ✓
 Sertifikat alat (jika
diutuhkan)
 Kebakaran  Menggunaan mesin  Inspeksi alat sebelum  HSE
diesel bahan bakar solar digunakan  Supervisor ✓
B(A) 3 H(12) 2 D(A) 3 M(6)
 Inspeksi alat rutin  Standby APAR
 Pengawas kebakaran
Preparation
a. Socialization, Coordination, Local Permit
Akses Jalan  Jalan Akses  Sosialisasi ke warga sekitar  Kompensasi kepada semua  Comm
material masuk  Koordinasi dengan camat, pihak yang bersinggungan Dev.
lokasi di tutup Lurah dan keamanan D(A) 4 M(8) dengan pelaksanaan proyek 3 E(A) 3 L(3) ✓
warga wilayah yang dilewati ini
jalan
akses
b. Mobilisasi dan Demobilisasi Peralatan
 Lalu lintas  Kecelakaan lalu  Driver harus orang yang  Pastikan material dan alat  HSE
padat lintas kompeten yang diangkut sudah benar  Supervisor
(kemacetan)  Kendaraan mogok  Inspeksi Kendaraan aman, terikat dan tidak
B(A) 3 M(12) 2 D(A) 3 M(6) ✓
 Kendaraan tidak  Material dan alat  Kendaraan benar-benar goyang.
layak pakai terjatuh layak jalan  Patuhi Peraturan dan rambu
lalu lintas
c. Material Delivery
Material Terjatuh  Cidera fisik  Kendaraan layak  Pastikan material dan alat  Supervisor
 Loss material pakai/jalan yang diangkut sudah benar
budget  Inspeksi Kendaraan rutin C(A) 3 H(9) aman, terikat dan tidak 3 E(A) 3 L(3) ✓
 Jalur material dipastikan rata
dan aman
Kesalahan drop off  Pekerja emosi  Koordinasi semua pihak  Penempatan personil untuk  Supervisor
material  Dua kali kerja  Survey lokasi mengarahkan.
D(A) 3 M(6) 3 E(A) 3 L(3) ✓
 Menggangu  Pastikan lokasi material aman
aktifitas pihak lain dan mudah dijangkau
1st PHASE
a. KISDAM
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

Cuaca Buruk  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan  Pengawasan waktu istirahat
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
 ERP (HCML)
Binatang beracun/  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
berbisa  Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Pengangkatan  Cidera serius  Posisi ergonomi.  Pakai alat bantu  Semua
Material  Cidera otot  Hindari Cuaca Buruk  Pasang rambu dan barricade pekerja/HS
C(P) 4 H(12) 3 E(P) 4 M(4) ✓
 Terjepit  Pakai APD lengkap  First aid kit E/
 Terjatuh  Tool box meeting supervisor
b. Civil works (EXCAVATOR)
 Alat berat  Rusak  Pengadaan alat  Penggunaan alat aman  Semua
 Patah sesuai kualifikasi  Inspeksi alat rutin dan berkala pekerja
 Tumpul  Inspeksi alat D(P) 4 M(8)  Pastikan sekitar alat berat 2 E(P) 4 M(4) ✓
 Cidera Fisik sebelum digunakan aman
 Operator  Pemasangan sign dan
berkompeten barricade
 Operator  Penggunaan APD lengkap
berpengalaman  First aid kit
 ERP (HCML)
Binatang beracun  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
 Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. D(P) 4 M(8) aktifitas jika cuaca buruk) /HSE 3 E(P) 4 M(4) ✓
 Cidera fisik (Patah  Pakai APD lengkap  Pasang rambu dan barricade
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

tulang,  Tool box meeting


pendarahan)  First aid kit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan  Pengawasan waktu istirahat
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
 ERP (HCML)
c. Land clearing
 Peralatan yang  Tergelincir  Pekerja berpengalaman  Penggunaan alat aman  Semua
digunakan  Pendarahan  Pengadaan alat  Inspeksi alat rutin dan berkala pekerja
 Benda tajam  Patah tulang sesuai kualifikasi  Housekeeping
 Posisi pekerja  Tangan tergores  Inspeksi alat  First aid kit ✓
D(P) 4 M(8) 2 E(P) 4 M(4)
yang tidak aman  Cidera fisik sebelum digunakan  ERP (HCML)
 Pasang rambu
dan barricade
 Pakai APD lengkap
Binatang beracun  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
 Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
 Kesehatan  Pengawasan waktu istirahat
terganggu (mental  Pakai APD lengkap
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

dan fisik  First aid kit


 ERP (HCML)
d. Land cutting
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan  Pengawasan waktu istirahat
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
 ERP (HCML)
Binatang beracun  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
 Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
e. Bamboo pilling
 Material tajam  Tertimpa  Pekerja berpengalaman.  Pakai alat bantu.  Semua
 Keseleo  Pasang rambu  Housekeeping pekerja
 Cidera otot dan barricade  Pasang rambu dan barricade
D(P) 4 M(8) 2 E(P) 4 M(4) ✓
 Cidera fisik  Pakai APD lengkap  Pakai APD lengkap
 First aid kit
 ERP (HCML)
Kelelahan (fatigue)  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Housekeeping hari  Supervisor
 Istirahat yang cukup  Pengawasan waktu istirahat
 Pakai APD lengkap B(P) 3 H(12)  Pasang rambu dan barricade 1 E(P) 3 E(3) ✓
 Pakai APD lengkap
 First aid kit
 ERP (HCML)
Binatang beracun  Cidera serius  Inspeksi sebelum mulai B(P) 3 H(12)  Alat penghalau binatang  Semua 2 E(P) 3 M(6) ✓
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

 Bengkak kerja buas/berbisa pekerja/HS


 Semprot obat  Tool box meeting E/
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
f. Geotextile
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan  Pengawasan waktu istirahat
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
 ERP (HCML)
Binatang  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
beracun  Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat  Tool box meeting E/
B(P) 3 H(12) 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang  Rujukan Rumah sakit
sesuai
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
g. Instal gabion   
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan  Pengawasan waktu istirahat
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
 ERP (HCML)
Material berat  Luka Berat  Pekerja  Menggunakan APD lengkap  HSE
 Terjepit berpengalaman dan sesuai  Supervisor
 Tertimpa  Istirahat yang  Pasang barricade
 Terjatuh cukup  Hindari berada di lokasi yang
B(P) 3 H(12) 2 D(P) 3 M(6) ✓
tidak aman

 Kebakaran  Menggunaan mesin  Menggunaan mesin  HSE


diesel bahan bakar solar diesel bahan bakar solar  Supervisor
 Inspeksi alat B(A) 3 H(12)  Inspeksi alat 2 D(A) 3 M(6) ✓
 Standby APAR  Standby APAR
 Pengawas kebakaran  Pengawas kebakaran
Binatang beracun  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
 Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
D(P) 4 M(8) 3 E(P) 4 M(4) ✓
 Cidera fisik (Patah  Pakai APD lengkap  Pasang rambu dan barricade
tulang,  Tool box meeting
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

pendarahan)  First aid kit


Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
h. Land filling
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan  Pengawasan waktu istirahat
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
 ERP (HCML)
Binatang  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
beracun  Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat  Tool box meeting E/
B(P) 3 H(12) 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang  Rujukan Rumah sakit
sesuai

Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk)  /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
 pendarahan)  First aid kit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade  /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit

 

  
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

  

   

 

  

n. Finishing)
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan  Pengawasan waktu istirahat
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
 ERP (HCML)
Binatang beracun  Cidera serius  Inspeksi sebelum mulai B(P) 3 H(12)  Alat penghalau binatang  Semua 2 E(P) 3 M(6) ✓
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

 Bengkak kerja buas/berbisa pekerja/HS


 Semprot obat  Tool box meeting E/
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
2nd PHASE
a. Civil works (Excavator)
 Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik ( Patah  Housekeeping  Pasang rambu dan barricade
tulang,  Pakai APD lengkap D(P) 4 M(8)  Tool boc meeting 3 E(P) 4 M(4) ✓
pendarahan)  First aid kit

 Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Sediakan air minum mineral.  Supervisor
 Kelelahan  Pelindung panas  Pelindung panas /HSE
 Hilang kesadaran  Pasang rambu D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
dan barricade  Pakai APD lengkap
 Pakai APD lengkap  First aid kit
 Peralatan  Kebakaran  Operator berkompeten  Pengecekan alat setiap hari  HSE
berat  Menggunakan mesin  Pastikan area aman untuk alat  Supervisor
berbahan bakar solar berat bergerak
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
 Standby APAR  Pemasangan sign dan
 Pengawasan kebakaran barricade
 First aid kit
 ERP (HCML)
 Menggunakan APD yang sesuai
 Binatang  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
beracun/  Bengkak mulai kerja buas/berbisa pekerja/HS
berbisa  Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

 Pengangkatan  Cidera serius  Posisi ergonomi.  Posisi ergonomi.  Semua


Material  Kecentit  Pakai alat bantu  Pakai alat bantu pekerja/HS
 Terjepit  Hindari Cuaca Buruk  Hindari Cuaca Buruk E/
 Terjatuh  Pasang rambu C(P) 4 H(12)  Pasang rambu dan barricade supervisor 3 E(P) 4 M(4) ✓
dan barricade  Pakai APD lengkap
 Pakai APD lengkap  First aid kit
 First aid kit
b. Civil works (Land clearing)
 Alat yang  Pendarahan  Pekerja berpengalaman.  Pekerja kompeten dan  Semua
digunakan  Patah tulang,  Pakai APD lengkap berpengalaman. pekerja
 Cidera fisik  Pekerja harus  Housekeeping
 Tercangkul, menggunakan hand  Pakai APD lengkap
D(P) 4 M(8) 2 E(P) 4 M(4) ✓
tergelicir, jatuh gloves  Pekerja harus menggunakan
hand gloves
 First aid kit
 ERP (HCML)
Binatang beracun  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
 Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan  Pengawasan waktu istirahat
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
 ERP (HCML)
c. Land cutting
Peralatan tidak  Luka Berat  Menggunaan peralatan D(P) 4 M(8)  Menggunaan peralatan yang  Semua 2 E(P) 3 L(3) ✓
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

layak pakai yang layak layak pekerja


 Inspeksi alat  Inspeksi alat
 Sertifikat alat (jika  Sertifikat alat (jika diutuhkan)
diutuhkan)
 Kebakaran  Menggunaan mesin  Menggunaan mesin  HSE
diesel bahan bakar solar diesel bahan bakar solar  Supervisor
 Inspeksi alat B(A) 3 H(12)  Inspeksi alat 2 D(A) 3 M(6) ✓
 Standby APAR  Standby APAR
 Pengawas kebakaran  Pengawas kebakaran
Binatang beracun  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
 Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Semua
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade pekerja 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Semua
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) pekerja
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit
d. Bamboo pilling
Peralatan yang  Tergelincir  Pekerja berpengalaman.  Pekerja kompeten dan  Semua
digunakan  Pendarahan  Pasang rambu berpengalaman. pekerja
Benda tajam  Patah tulang dan barricade  Housekeeping
D(P) 4 M(8) 2 E(P) 4 M(4) ✓
Manual Handling  Tangan tergores  Pakai APD lengkap  Pakai APD lengkap
Posisi pekerja yang  Cidera fisik  First aid kit  First aid kit
tidak aman  ERP (HCML)
Binatang beracun  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
 Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. D(P) 4 M(8) aktifitas jika cuaca buruk) /HSE 3 E(P) 4 M(4) ✓
 Cidera fisik (Patah  Pakai APD lengkap  Pasang rambu dan barricade
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

tulang,  Tool box meeting


pendarahan)  First aid kit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Semua
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade pekerja 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
e. Geotextile
 Material Berat  Tertimpa  Pekerja berpengalaman.  Pakai alat bantu.  Semua
 Keseleo  Pasang rambu  Housekeeping pekerja
 Cidera otot dan barricade  Pasang rambu dan barricade
D(P) 4 M(8) 2 E(P) 2 L(2) ✓
 Cidera fisik  Pakai APD lengkap  Pakai APD lengkap
 First aid kit
 ERP (HCML)
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan  Pengawasan waktu istirahat
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
 ERP (HCML)
Binatang beracun  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
 Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit
e. Instal gabion
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan B(P) 3 H(12)  Pengawasan waktu istirahat 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

 ERP (HCML)
Material berat  Luka Berat  Menggunaan peralatan  Hindari berada di lokasi yang  HSE
 Terjepit yang layak tidak aman  Supervisor
 Memakai APD lengkap
yang sesuai
B(P) 3 H(12) 2 D(P) 3 M(6) ✓

 Kebakaran  Menggunaan mesin  Menggunaan mesin  HSE


diesel bahan bakar solar diesel bahan bakar solar  Supervisor
 Inspeksi alat B(A) 3 H(12)  Inspeksi alat 2 D(A) 3 M(6) ✓
 Standby APAR  Standby APAR
 Pengawas kebakaran  Pengawas kebakaran
Binatang beracun  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
 Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit
f. Land filling
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan  Pengawasan waktu istirahat
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
 ERP (HCML)
Peralatan tidak  Tergores,tersayat  Menggunaan peralatan  Inspeksi alat  HSE
layak pakai  Terjepit yang layak B(P) 3 H(12)  Menggunakan APD sesuai  Supervisor 2 D(P) 3 M(6) ✓
 Inspeksi alat standar
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

Binatang beracun  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
 Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit
g. Finishing
Kelelahan (fatigue)  Cidera fisik  Pekerja berpengalaman.  Pengecekan kesehatan setiap  HSE
 Single fatality  Istirahat yang cukup hari  Supervisor
 Kesehatan  Pengawasan waktu istirahat
B(P) 3 H(12) 1 E(P) 3 E(3) ✓
terganggu (mental  Pakai APD lengkap
dan fisik  First aid kit
 ERP (HCML)
Binatang beracun  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua
 Bengkak mulai kerja buas/berbisa pekerja/HS
 Semprot obat B(P) 3 H(12)  Tool box meeting E/ 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervisor
 APD lengkap yang sesuai  Rujukan Rumah sakit
Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas D(P) 4 M(8)  Pasang rambu dan barricade /HSE 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit
Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk) /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
pendarahan)  First aid kit

Binatang  Cidera serius  Inspeksi sebelum  Alat penghalau binatang  Semua


beracun  Bengkak mulai kerja buas/berbisa pekerja
 Semprot obat  Tool box meeting /HS E/
B(P) 3 H(12) 2 E(P) 3 M(6) ✓
hama/serangga  ERP (HCML) supervi
 APD lengkap yang sesuai  Rujukan Rumah sakit sor
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

Cuaca Panas  Dehidrasi  Waktu istirahat cukup  Persediaan air minum cukup.  Supervisor
 Kelelahan  Pelindung panas  Pasang rambu dan barricade  /HSE
D(P) 4 M(8) 3 E(P) 4 M(4) ✓
 Hilang kesadaran  Pakai APD lengkap  First aid kit

Cuaca Buruk,  Tergelincir  Perhatikan lokasi sekitar  Hindari Cuaca Buruk (berhenti  Supervisor
 terjepit harus kondisi aman. aktifitas jika cuaca buruk)  /HSE
 Cidera fisik (Patah  Pakai APD lengkap D(P) 4 M(8)  Pasang rambu dan barricade 3 E(P) 4 M(4) ✓
tulang,  Tool box meeting
 pendarahan)  First aid kit
TASK RISK ASSESSMENT
PROVISION GMS SECURITY IMPROVEMENT
Fences (Preparation, Foundation, Wall, Concertina) – 1ST FENCE
DOC. NO. HCML-GMS-HSE-PN-TRA-002.A REV. A PT. PUTRA NEGARA

RISK MATRIX

PROBABILITY
Action
1 2 3 4 5 Priority
Potensial Asset/ Never heard of Has Occurred in Occurrs several Occurrs several
People Environment Reputation Has Occurred in
Saverity Production in Oil & Gas Oil & Gas
HCML
times a year in times a year at
Industry Industry HCML the same area
Slight Injury (FAC, Slight damage
Slight effect (within Slight Impact
E MTC)

Slight health effects


(<$10,000 & no
disruption to
fence, no
exceedance)
(public
awareness)
1 2 3 4 5 3
operation)
HazardRatIng

Minor Injury (LTI 4 Minor effect


Minor damage Limited
days or less, (RWC) (temporary
D (<$100,000 & brief
disruption)
contamination or
Impact (local
public/ media)
2 4 6 8 10
Minor health effects single exceedance)

Major Injury (LTI, Local damage


Local effect
(recoverable
Considerable 2
Impact
C PPD > 4 days)) (<$500,000 &
partial shutdown)
environmental
loss/repeated
(region/state 3 6 9 12 15
Major health effects public/media)
exceedance)
Single Fatality National
Major damage Major effect (severe
Impact
(<$10,000,000 & damage recoverable/
B Permanent total
disability to single partial operation extended
(extensive
adverse
4 8 12 16 20
fatality loss) exceedance)
media)
Extensive
Masive effect
International 1
damage Impact
(widespread chronic
A Multiple Fatalities (>$10,000,000 &
substantial
effects/ constant high
(extensive
adverse
5 10 15 20 25
exceedance)
operation loss media)