Boq (9.3.2022)
Boq (9.3.2022)
2022
21 Cement Sheet Slab With Parapet Bath room area Back side LS 1 8,000.00 8,000.00
22 False Ceiling LS 1 20,000.00 20,000.00
23 internet LS 1 10,000.00 10,000.00
24 item attached w quotation instructed by owner to be done LS 1 5,000.00 5,000.00
Fans, extra electr. Points and repair ceiling for room no.1, and gas works,
25 and pipe for ac drain at back side if villa, extra water supply and drain pipes LS 1 10,000.00 10,000.00
at roof,
(three hundred seventy-seven thousand five hundred twenty-eight Only Excluding VAT )
method of payment: 30% as advance payment and rest Progress basis payment