AHSP - GEDUNG - Permen 28 TH 2016
AHSP - GEDUNG - Permen 28 TH 2016
AHSP - GEDUNG - Permen 28 TH 2016
No Kode
Jenis Pekerjaan
Rp 580,650.00
Rp 692,507.00
Rp 1,707,868.00
Rp 784,133.00
Rp 1,504,070.00
Rp 1,595,165.00
Rp 980,085.00
Rp 1,057,153.00
Rp 15,918.00
Rp 392,605.00
Rp 143,765.00
Rp 182,558.00
Rp 212,169.00
Rp 106,084.00
Rp 10,141.00
Rp 682,939.00
Rp 73,187.00
Rp 89,805.00
Rp 106,687.00
Rp 97,407.00
Rp 147,695.00
Rp 117,760.00
Rp 5,319.00
Rp 32,070.00
Rp 26,596.00
Rp 53,192.00
Rp 296,298.00
Rp 133,563.00
Rp 15,957.00
Rp 374,887.00
Rp 1,148,677.00
Rp 1,080,050.00
Rp 1,032,481.00
Rp 999,034.00
Rp 953,199.00
Rp 1,148,643.00
Rp 956,906.00
Rp 915,590.00
Rp 635,083.00
Rp 3,546,261.00
Rp 1,097,644.00
Rp 1,101,568.00
Rp 1,151,387.00
Rp 1,190,747.00
Rp 1,024,982.00
Err:509
Rp 1,281,636.00
Rp 1,314,192.00
Rp 1,336,938.00
Rp 1,376,074.00
Rp 1,388,245.00
Rp 1,488,041.00
Rp 1,503,987.00
Rp 1,469,334.00
Rp 98,654.00
Rp 99,815.00
Rp 152,106.00
Rp 209,947.00
Rp 204,248.00
Rp 194,696.00
Rp 170,012.00
Rp 179,087.00
Rp 429,742.00
Rp 438,817.00
Rp 640,083.00
Rp 501,302.00
Rp 408,661.00
Rp 111,003.00
Rp 5,258,113.00
Rp 6,490,120.00
Rp 11,317,770.00
Rp 8,636,766.00
Rp 8,253,440.00
Rp 7,363,701.00
Rp 8,122,448.00
Rp 177,946.00
Rp 202,742.00
Rp 98,970.00
Rp 123,729.00
Rp 134,498.00
Rp 185,602.00
Rp 321,580.00
Rp 69,781.00
Rp 66,602.00
Rp 7,695.00
Rp 12,447.00
Rp 10,071.00
Rp 60,266.00
Rp 61,974.00
Rp 55,840.00
Rp 664,456.00
Rp 659,131.00
Rp 1,283,654.00
Rp 15,975.00
Rp 15,975.00
Rp 15,975.00
Rp 8,207,779.00
Rp 12,401,604.00
Rp 53,976.00
Rp 117,719.00
Rp 71,495.00
Rp 34,852.00
Rp 32,300.00
Rp 4,733,897.00
Rp 3,308,659.00
Rp 1,027,178.00
Rp 2,614,162.00
Rp 981,118.00
Rp 617,493.00
Rp 735,915.00
Rp 779,282.00
Rp 118,016.00
Rp 1,503,044.00
Rp 532,280.00
Rp 727,521.00
Rp 3,317,871.00
Rp 1,252,516.00
Rp 528,264.00
Rp 144,309.00
Rp 92,020.00
Rp 268,266.00
Rp 320,783.00
Rp 302,989.00
Rp 291,018.00
Rp 343,194.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.4000 84,712
Tukang Kayu L.02.04 OH 0.2000 105,890
Kepala Tukang L.03.01 OH 0.0200 112,950
Mandor L.04.01 OH 0.0200 120,009
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.2500 47,805
Semen portland Kg 5.0000 1,804
Pasir beton m3 0.0050 318,181
Koral beton m3 0.0090 237,989
Kayu 5/7 m3 0.0720 5,432,350
Paku biasa Kg 0.0600 18,625
Residu Liter 0.4000 8,466
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA -
Pekerja L.01.01 OH 0.2000 84,712
Tukang Kayu L.02.04 OH 0.4000 105,890
Kepala Tukang L.03.01 OH 0.0200 112,950
Mandor L.04.01 OH 0.0200 120,009
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.2500 47,805
Semen portland Kg 2.5000 1,804
Seng gelombang Lbr 1.2000 77,605
Pasir beton m3 0.0050 318,181
Koral beton m3 0.0090 237,989
Kayu 5/7 m3 0.0720 5,432,350
Paku biasa Kg 0.0600 18,625
Meni besi Liter 0.4500 27,162
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA -
Pekerja L.01.01 OH 0.2000 84,712
Tukang Kayu L.02.04 OH 0.3000 105,890
Kepala Tukang L.03.01 OH 0.0200 112,950
Mandor L.04.01 OH 0.0200 120,009
JUMLAH TENAGA KERJA
B BAHAN -
Dolken kayu Ø 8-10/400 cm Batang 1.0000 47,805
Semen portland Kg 2.0000 1,804
Kawat duri M’ 25.0000 56,652
Pasir beton m3 0.0050 318,181
Koral beton m3 0.0090 237,989
Paku biasa 2” - 5” Kg 0.0600 18,625
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
33,884.93
21,178.08
2,259.00
2,400.18
59,722.19
59,755.85
9,020.00
1,590.90
2,141.90
391,129.20
1,117.51
3,386.40
468,141.76
-
527,863.95
52,786.39
580,650.00
meter
Jumlah Harga (Rp.)
-
16,942.46
42,356.16
2,259.00
2,400.18
63,957.80
59,755.85
4,510.00
93,126.00
1,590.90
2,141.90
391,129.20
1,117.51
12,222.79
565,594.15
-
629,551.95
62,955.20
692,507.00
169,424.64
211,780.80
98,831.04
33,884.93
6,000.46
519,921.86
-
59,755.85
977,823.00
1,490.02
67,177.53
63,140.00
34,146.20
31,818.05
35,698.30
38,026.45
19,181.63
93,475.22
-
21,846.00
5,603.08
245,648.73
-
-
1,367,336.89
136,733.69
1,504,070.00
143,414.04
910,800.00
13,037.64
116,407.50
1,183,659.18
-
-
1,450,150.02
145,015.00
1,595,165.00
84,712.32
211,780.80
22,589.95
6,000.46
325,083.53
59,755.85
613,800.00
5,587.56
32,472.00
9,545.42
11,899.43
116,407.50
126,069.32
296,393.67
-
-
961,048.90
96,104.89
1,057,153.00
8,471.23
6,000.46
14,471.69
-
-
14,471.69
1,447.17
15,918.00
84,712.32
211,780.80
22,589.95
6,000.46
325,083.53
27,500.00
4,330.36
31,830.36
-
-
356,913.89
35,691.39
392,605.00
Jumlah Harga (Rp.)
-
31,767.12
3,388.49
35,155.61
-
59,400.00
34,650.00
1,490.02
95,540.02
-
-
130,695.63
13,069.56
143,765.00
112,955.41
79,926.07
192,881.48
-
-
-
-
192,881.48
19,288.15
212,169.00
56,477.70
39,963.04
96,440.74
-
-
-
-
96,440.74
9,644.07
106,084.00
3,557.92
395.32
225.90
5,040.38
9,219.52
-
-
-
-
9,219.52
921.95
10,141.00
31,767.12
12,353.88
1,355.40
2,280.17
47,756.57
-
198,948.18
234,677.52
81,180.00
23,545.36
34,746.35
573,097.40
-
-
620,853.97
62,085.40
682,939.00
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
pekerjaan galian
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
- -
0.2500 84,712 21,178.08
0.0250 120,009 3,000.23
JUMLAH TENAGA KERJA 24,178.31
- -
JUMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 24,178.31
10% 2,417.83
- 26,596.00
127,068.48
74,123.28
8,471.23
9,000.68
218,663.68
350,774.60
90,705.24
306,680.00
77,398.05
825,557.90
-
-
1,044,221.57
104,422.16
1,148,643.00
127,068.48
74,123.28
8,471.23
9,000.68
218,663.68
350,774.60
110,044.00
78,433.36
111,999.54
651,251.49
-
-
869,915.17
86,991.52
956,906.00
127,068.48
74,123.28
8,471.23
9,000.68
218,663.68
350,774.60
73,964.00
69,896.39
119,056.42
613,691.41
-
-
832,355.09
83,235.51
915,590.00
66,075.61
38,544.11
4,405.04
4,680.36
113,705.11
350,774.60
112,868.71
463,643.31
-
-
577,348.42
57,734.84
635,083.00
PB : 3 Kr dan 40% batu belah
Jumlah Harga (Rp.)
288,021.89
84,006.38
9,600.73
20,401.55
402,030.55
140,309.84
349,976.00
99,272.32
111,378.70
2,079,000.00
41,906.70
2,821,843.55
-
-
3,223,874.10
322,387.41
3,546,261.00
203,309.57
79,064.83
9,035.98
14,281.09
305,691.47
131,540.48
349,976.00
99,272.32
111,378.70
692,167.49
-
-
997,858.95
99,785.90
1,097,644.00
puran 1SP : 3PP ( tipe S ) dengan Molen
Koefisien Harga. (Rp.) Jumlah Harga (Rp.)
- -
1.8000 84,712 152,482.18
0.9000 98,831 88,947.94
0.1800 120,009 21,601.64
UMLAH TENAGA KERJA 263,031.75
- -
1.2000 292,312 350,774.60
202.0000 1,804 364,408.00
0.4850 227,641 110,406.05
UMLAH HARGA BAHAN 825,588.65
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.4500
2 Tukang Batu L.02 OH 0.0750
4 Mandor L.04 OH 0.0450
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang pancang kayu dia 15-20 cm M.42.b m1 1.05
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 5m E.45.a sewa-hari 0.03120
2 Hammer 1 ton ( manual ) E.01.b sewa-hari 0.03120
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.0750
2 Tukang Batu L.02 OH 0.0250
4 Mandor L.04 OH 0.0080
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang pancang kayu / dolken dia 8 -10 cm M.42.b m1 1.05
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 5m E.45 sewa-hari 0.02500
2 Hammer 0,5 ton ( manual ) E.01.b sewa-hari 0.02500
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000
2 Tukang Batu L.02 OH 0.0400
3 Tukang las listrik L.02 OH 0.0400
4 Mandor L.04 OH 0.0200
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang pancang baja dia/kotak 30 cm M.92.a m1 1.02
2 Kawat las M.62 kg 0.15
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 5m E.45 sewa-hari 0.04000
2 Hammer 1 - 2 ton ( manual ) E.01.b sewa-hari 0.04000
3 Las listrik diesel ( termasuk solar ) E.22 sewa-hari 0.04000
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.4200
2 Tukang Batu L.02 OH 0.0700
3 Mandor L.04 OH 0.0420
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang pancang beton bertulang 30 cm x 30 cm M.18.c m1 1.0300
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 7 m E.45 sewa-hari 0.10000
2 Hammer 2 ton E.01.b sewa-hari 0.10000
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.4800
2 Tukang Batu L.02 OH 0.0800
3 Mandor L.04 OH 0.0480
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang pancang beton bertulang 30 cm x 30 cm M.18.c m1 1.0300
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 7 m E.45 sewa-hari 0.08000
2 Hammer 2 ton E.01.b sewa-hari 0.08000
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.5400
2 Tukang Batu L.02 OH 0.0900
3 Mandor L.04 OH 0.0540
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang pancang beton bertulang 30 cm x 30 cm M.18.c m1 1.0300
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 7 m E.45 sewa-hari 0.10000
2 Hammer 2 ton E.01.b sewa-hari 0.10000
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.4208
2 Tukang Batu L.02 OH 0.0526
3 Mandor L.04 OH 0.0421
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang pancang beton bertulang 40 cm x 40 cm M.18.f m1 1.03
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 7 m E.45 sewa-hari 0.11000
2 Hammer 2 ton E.01.b sewa-hari 0.11000
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.6000
2 Tukang Batu L.02 OH 0.1000
3 Mandor L.04 OH 0.0600
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang pancang Hollow beton diameter 40 cm M.18.f m1 1.03
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 7 m E.45 sewa-hari 0.10000
2 Hammer 2 ton E.01.b sewa-hari 0.10000
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.7500
2 Tukang Batu L.02 OH 0.2500
3 Mandor L.04 OH 0.0750
Jumlah Harga Tenaga Kerja
B Bahan
1 Kayu dolken diameter 8 - 10 cm M.31.a m1 1.05
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 5m E.45 sewa-hari 0.25000
2 Hammer 0,5 ton E.01.b sewa-hari 0.25000
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.2500
2 Tukang Batu L.02 OH 0.0500
3 Tukang las listrik L.02 OH 0.0500
4 Mandor L.04 OH 0.0250
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap baja profil larsen lebar 350 cm M.93 m1 1.05
2 Kawat las listrik kg 0.15
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 7 m E.45 sewa-hari 0.05000
2 Hammer 1 ton E.01.b sewa-hari 0.05000
3 Las listrik diesel ( termasuk solar ) E.22 sewa-hari 0.05000
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000
2 Tukang Batu L.02 OH 0.0500
3 Mandor L.04 OH 0.0300
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap beton pre-cast 30cm x 12cm M.19.a m1 1.03
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 5m E.45 sewa-hari 0.05000
2 Hammer 2 ton E.01.b sewa-hari 0.05000
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.4800
2 Tukang Batu L.02 OH 0.0800
3 Mandor L.04 OH 0.0480
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap beton pre-cast 30cm x 12cm M.19.a m1 1.03
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 5m E.45 sewa-hari 0.08000
2 Hammer 2 ton E.01.b sewa-hari 0.08000
Jumlah Harga Peralatan
D Jumlah harga tenaga kerja, bahan dan peralatan ( A + B + C )
E Overhead + Profit 10% x
F Harga Satuan ( D + E )
Harga Satuan Jumlah
( Rp ) ( Rp )
6 7
84,712.32 38,120.54
98,831.04 7,412.33
120,009.12 5,400.41
Jumlah Harga Tenaga Kerja 50,933.28
100,000.00 105,000.00
Jumlah Harga Bahan 105,000.00
-
1,000.00 31.200
Jumlah Harga Peralatan 31.20
155,964.48
Rp 155,964.48 15,596.45
171,560.93
84,712.32 6,353.42
98,831.04 2,470.78
120,009.12 960.07
Jumlah Harga Tenaga Kerja 9,784.27
24,200.00 25,410.00
Jumlah Harga Bahan 25,410.00
- -
- -
Jumlah Harga Peralatan -
35,194.27
Rp 35,194.27 3,519.43
38,713.70
84,712.32 16,942.46
98,831.04 3,953.24
98,831.04 3,953.24
120,009.12 2,400.18
Jumlah Harga Tenaga Kerja 27,249.13
-
-
Jumlah Harga Bahan -
-
-
-
Jumlah Harga Peralatan -
27,249.13
Rp 27,249.13 2,724.91
29,974.04
84,712.32 35,579.17
98,831.04 6,918.17
120,009.12 5,040.38
Jumlah Harga Tenaga Kerja 47,537.73
-
Jumlah Harga Bahan -
1,000.00 100.000
1,000.00 100.000
Jumlah Harga Peralatan 200.00
47,737.73
Rp 47,737.73 4,773.77
52,511.50
84,712.32 40,661.91
98,831.04 7,906.48
120,009.12 5,760.44
Jumlah Harga Tenaga Kerja 54,328.83
-
Jumlah Harga Bahan -
- -
- -
Jumlah Harga Peralatan -
54,328.83
Rp 54,328.83 5,432.88
59,761.72
84,712.32 45,744.65
98,831.04 8,894.79
120,009.12 6,480.49
Jumlah Harga Tenaga Kerja 61,119.94
-
Jumlah Harga Bahan -
- -
- -
Jumlah Harga Peralatan -
61,119.94
Rp 61,119.94 6,111.99
67,231.93
84,712.32 35,646.94
98,831.04 5,198.51
120,009.12 5,052.38
Jumlah Harga Tenaga Kerja 45,897.84
-
Jumlah Harga Bahan -
1,000.00 110.000
1,000.00 110.000
Jumlah Harga Peralatan 220.00
46,117.84
Rp 46,117.84 4,611.78
50,729.63
84,712.32 50,827.39
98,831.04 9,883.10
120,009.12 7,200.55
Jumlah Harga Tenaga Kerja 67,911.04
-
Jumlah Harga Bahan -
- -
- -
Jumlah Harga Peralatan -
67,911.04
Rp 67,911.04 6,791.10
74,702.15
84,712.32 63,534.24
98,831.04 24,707.76
120,009.12 9,000.68
Jumlah Harga Tenaga Kerja 97,242.68
-
Jumlah Harga Bahan -
-
-
Jumlah Harga Peralatan -
97,242.68
Rp 97,242.68 9,724.27
106,966.95
84,712.32 21,178.08
98,831.04 4,941.55
98,831.04 4,941.55
120,009.12 3,000.23
Jumlah Harga Tenaga Kerja 34,061.41
1,250.00 1,312.50
Jumlah Harga Bahan 1,312.50
1,000.00 50.000
1,000.00 50.000
750,000.00 37,500.000
Jumlah Harga Peralatan 37,600.00
72,973.91
Rp 72,973.91 7,297.39
80,271.30
84,712.32 25,413.70
98,831.04 4,941.55
120,009.12 3,600.27
Jumlah Harga Tenaga Kerja 33,955.52
-
Jumlah Harga Bahan -
-
-
Jumlah Harga Peralatan -
33,955.52
Rp 33,955.52 3,395.55
37,351.07
84,712.32 40,661.91
98,831.04 7,906.48
120,009.12 5,760.44
Jumlah Harga Tenaga Kerja 54,328.83
-
Jumlah Harga Bahan -
- -
- -
Jumlah Harga Peralatan -
54,328.83
Rp 54,328.83 5,432.88
59,761.72
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 84,712
Tukang Batu L.02.03 OH 0.2750 98,831
Kepala Tukang L.03.01 OH 0.0280 112,950
Mandor L.04.01 OH 0.0830 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 247.0000 1,804
Pasir Beton m3 0.6207 318,181
Kerikil (Maks 30 mm) m3 0.7400 237,989
Air Liter 215.0000 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.4 Membuat 1 m3 beton mutu fc’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 84,712
Tukang Batu L.02.03 OH 0.2000 98,831
Kepala Tukang L.03.01 OH 0.0200 112,950
Mandor L.04.01 OH 0.0600 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 230.0000 1,804
Pasir Beton m3 0.6379 318,181
Kerikil (Maks 30 mm) m3 0.7607 237,989
Air Liter 200.0000 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.5 Membuat 1 m3 beton mutu fc’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 84,712
Tukang Batu L.02.03 OH 0.2750 98,831
Kepala Tukang L.03.01 OH 0.0280 112,950
Mandor L.04.01 OH 0.0830 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 352.0000 1,804
Pasir Beton m3 0.5221 318,181
Kerikil (Maks 30 mm) m3 0.7637 237,989
Air Liter 215.0000 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.6 Membuat 1 m3 beton mutu fc’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 84,712
Tukang Batu L.02.03 OH 0.2750 98,831
Kepala Tukang L.03.01 OH 0.0280 112,950
Mandor L.04.01 OH 0.0830 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 371.0000 1,804
Pasir Beton m3 0.4986 318,181
Kerikil (Maks 30 mm) m3 0.7756 237,989
Air Liter 215.0000 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.7 Membuat 1 m3 beton mutu fc’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 84,712
Tukang Batu L.02.03 OH 0.2750 98,831
Kepala Tukang L.03.01 OH 0.0280 112,950
Mandor L.04.01 OH 0.0830 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 384.0000 1,804
Pasir Beton m3 0.4943 318,181
Kerikil (Maks 30 mm) m3 0.7696 237,989
Air Liter 215.0000 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.8 Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 84,712
Tukang Batu L.02.03 OH 0.2750 98,831
Kepala Tukang L.03.01 OH 0.0280 112,950
Mandor L.04.01 OH 0.0830 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 406.0000 1,804
Pasir Beton m3 0.4886 318,181
Kerikil (Maks 30 mm) m3 0.7600 237,989
Air Liter 215.0000 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.9 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 84,712
Tukang Batu L.02.03 OH 0.2750 98,831
Kepala Tukang L.03.01 OH 0.0280 112,950
Mandor L.04.01 OH 0.0830 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 413.0000 1,804
Pasir Beton m3 0.4864 318,181
Kerikil (Maks 30 mm) m3 0.7563 237,989
Air Liter 215.0000 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.10 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 84,712
Tukang Batu L.02.03 OH 0.3500 98,831
Kepala Tukang L.03.01 OH 0.0350 112,950
Mandor L.04.01 OH 0.1050 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 439.0000 1,804
Pasir Beton m3 0.4786 318,181
Kerikil (Maks 30 mm) m3 0.7452 237,989
Air Liter 215.0000 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.11 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 84,712
Tukang Batu L.02.03 OH 0.3500 98,831
Kepala Tukang L.03.01 OH 0.0350 112,950
Mandor L.04.01 OH 0.1050 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 448.0000 1,804
Pasir Beton m3 0.4764 318,181
Kerikil (Maks 30 mm) m3 0.7407 237,989
Air Liter 215.0000 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir untuk plat
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0700 84,712
Tukang Besi L.02.05 OH 0.0700 98,831
Kepala Tukang L.03.01 OH 0.0070 112,950
Mandor L.04.01 OH 0.0040 120,009
JUMLAH TENAGA KERJA
B BAHAN
Besi beton (polos/ulir) kg 10.5000 16,500
Kawat beton kg 0.1500 23,282
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
c = 0,66 Membuat 1 m3 beton mutu fc’ = 14,5 MPa (K 175) dengan Molen
Jumlah Harga (Rp.) No Uraian Kode Satuan Koefisien
A TENAGA
101,654.78 Pekerja L.01.01 OH 1.3230
19,766.21 Tukang Batu L.02.03 OH 0.1890
2,259.00 Kepala Tukang L.03.01 OH 0.0190
7,200.55 Mandor L.04.01 OH 0.1320
130,880.53 JUMLAH TENAGA KERJA
B BAHAN
414,920.00 Semen portland kg 230.0000
202,953.70 Pasir Beton m3 0.6379
181,047.67 Kerikil (Maks 30 mm) m3 0.7607
2,000.00 Air Liter 200.0000
800,921.38 JUMLAH HARGA BAHAN
- C PERALATAN
- Molen kapasitas 0,3 - 1 m3 0.2500
931,801.91 JUMLAH HARGA ALAT
93,180.19 D Jumlah (A+B+C)
1,024,982.00 E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E)
w/c = 0,61 Membuat 1 m3 beton mutu fc’ = 14,5 MPa (K 175) dengan Molen
Jumlah Harga (Rp.) No Uraian Kode Satuan Koefisien
A TENAGA
139,775.33 Pekerja L.01.01 OH 1.3230
27,178.54 Tukang Batu L.02.03 OH 0.1890
3,162.59 Kepala Tukang L.03.01 OH 0.0190
9,960.76 Mandor L.04.01 OH 0.1320
180,077.21 JUMLAH TENAGA KERJA
B BAHAN
635,008.00 Semen portland kg 352.0000
166,135.68 Pasir Beton m3 0.5221
181,752.83 Kerikil (Maks 30 mm) m3 0.7637
2,150.00 Air Liter 215.0000
985,046.50 JUMLAH HARGA BAHAN
- C PERALATAN
- Molen kapasitas 0,3 - 1 m3 0.2500
1,165,123.72 JUMLAH HARGA ALAT
116,512.37 D Jumlah (A+B+C)
1,281,636.00 E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E)
, w/c = 0,58 Membuat 1 m3 beton mutu fc’ = 19,3 MPa (K 225) dengan Molen
Jumlah Harga (Rp.) No Uraian Kode Satuan Koefisien
A TENAGA
139,775.33 Pekerja L.01.01 OH 1.3230
27,178.54 Tukang Batu L.02.03 OH 0.1890
3,162.59 Kepala Tukang L.03.01 OH 0.0190
9,960.76 Mandor L.04.01 OH 0.1320
180,077.21 JUMLAH TENAGA KERJA
B BAHAN
669,284.00 Semen portland kg 371.0000
158,635.71 Pasir Beton m3 0.4986
184,573.43 Kerikil (Maks 30 mm) m3 0.7756
2,150.00 Air Liter 215.0000
1,014,643.14 JUMLAH HARGA BAHAN
- C PERALATAN
- Molen kapasitas 0,3 - 1 m3 0.2500
1,194,720.35 JUMLAH HARGA ALAT
119,472.04 D Jumlah (A+B+C)
1,314,192.00 E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E)
w/c = 0,56 Membuat 1 m3 beton mutu fc’= 21,7 MPa (K 250) dengan Molen
Jumlah Harga (Rp.) No Uraian Kode Satuan Koefisien
A TENAGA
139,775.33 Pekerja L.01.01 OH 1.3230
27,178.54 Tukang Batu L.02.03 OH 0.1890
3,162.59 Kepala Tukang L.03.01 OH 0.0190
9,960.76 Mandor L.04.01 OH 0.1320
180,077.21 JUMLAH TENAGA KERJA
B BAHAN
692,736.00 Semen portland kg 384.0000
157,272.08 Pasir Beton m3 0.4943
183,163.13 Kerikil (Maks 30 mm) m3 0.7696
2,150.00 Air Liter 215.0000
1,035,321.21 JUMLAH HARGA BAHAN
- C PERALATAN
- Molen kapasitas 0,3 - 1 m3 0.2500
1,215,398.42 JUMLAH HARGA ALAT
121,539.84 D Jumlah (A+B+C)
1,336,938.00 E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E)
w/c = 0,53 Membuat 1 m3 beton mutu fc’= 21,7 MPa (K 250) dengan Molen
Jumlah Harga (Rp.) No Uraian Kode Satuan Koefisien
A TENAGA
139,775.33 Pekerja L.01.01 OH 1.3230
27,178.54 Tukang Batu L.02.03 OH 0.1890
3,162.59 Kepala Tukang L.03.01 OH 0.0190
9,960.76 Mandor L.04.01 OH 0.1320
180,077.21 JUMLAH TENAGA KERJA
B BAHAN
732,424.00 Semen portland kg 406.0000
155,453.90 Pasir Beton m3 0.4886
180,871.39 Kerikil (Maks 30 mm) m3 0.7600
2,150.00 Air Liter 215.0000
1,070,899.29 JUMLAH HARGA BAHAN
- C PERALATAN
- Molen kapasitas 0,3 - 1 m3 0.2500
1,250,976.50 JUMLAH HARGA ALAT
125,097.65 D Jumlah (A+B+C)
1,376,074.00 E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E)
w/c = 0,52 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300) dengan Molen
Jumlah Harga (Rp.) No Uraian Kode Satuan Koefisien
A TENAGA
139,775.33 Pekerja L.01.01 OH 1.3230
27,178.54 Tukang Batu L.02.03 OH 0.1890
3,162.59 Kepala Tukang L.03.01 OH 0.0190
9,960.76 Mandor L.04.01 OH 0.1320
180,077.21 JUMLAH TENAGA KERJA
B BAHAN
745,052.00 Semen portland kg 413.0000
154,772.09 Pasir Beton m3 0.4864
179,989.95 Kerikil (Maks 30 mm) m3 0.7563
2,150.00 Air Liter 215.0000
1,081,964.03 JUMLAH HARGA BAHAN
- C PERALATAN
- Molen kapasitas 0,3 - 1 m3 0.2500
1,262,041.25 JUMLAH HARGA ALAT
126,204.12 D Jumlah (A+B+C)
1,388,245.00 E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E)
w/c = 0,49 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325) dengan Molen
Jumlah Harga (Rp.) No Uraian Kode Satuan Koefisien
A TENAGA
177,895.87 Pekerja L.01.01 OH 1.3230
34,590.86 Tukang Batu L.02.03 OH 0.1890
3,953.24 Kepala Tukang L.03.01 OH 0.0190
12,600.96 Mandor L.04.01 OH 0.1320
229,040.94 JUMLAH TENAGA KERJA
B BAHAN
791,956.00 Semen portland kg 439.0000
152,272.10 Pasir Beton m3 0.4786
177,345.63 Kerikil (Maks 30 mm) m3 0.7452
2,150.00 Air Liter 215.0000
1,123,723.73 JUMLAH HARGA BAHAN
- C PERALATAN
- Molen kapasitas 0,3 - 1 m3 0.2500
1,352,764.66 JUMLAH HARGA ALAT
135,276.47 D Jumlah (A+B+C)
1,488,041.00 E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E)
w/c = 0,48 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350) dengan Molen
Jumlah Harga (Rp.) No Uraian Kode Satuan Koefisien
A TENAGA
177,895.87 Pekerja L.01.01 OH 1.3230
34,590.86 Tukang Batu L.02.03 OH 0.1890
3,953.24 Kepala Tukang L.03.01 OH 0.0190
12,600.96 Mandor L.04.01 OH 0.1320
229,040.94 JUMLAH TENAGA KERJA
B BAHAN
808,192.00 Semen portland kg 448.0000
151,590.28 Pasir Beton m3 0.4764
176,287.90 Kerikil (Maks 30 mm) m3 0.7407
2,150.00 Air Liter 215.0000
1,138,220.18 JUMLAH HARGA BAHAN
- C PERALATAN
- Molen kapasitas 0,3 - 1 m3 0.2500
1,367,261.12 JUMLAH HARGA ALAT
136,726.11 D Jumlah (A+B+C)
1,503,987.00 E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E)
16,942.46
2,400.18
13,553.97
32,896.62
840,216.14
-
453,004.69
45,300.47
498,305.00
16,942.46
2,400.18
19,342.65
25,593.21
-
32,139.25
3,213.93
35,353.00
n bahan tambahan sesuai Tabel berikut:
177,895.87
34,590.86
3,953.24
12,600.96
229,040.94
808,192.00
151,590.28
176,287.90
157,500.00
2,150.00
1,295,720.18
-
-
1,524,761.12
152,476.11
1,677,237.00
pasir = 20%
177,895.87
34,590.86
3,953.24
12,600.96
229,040.94
721,600.00
152,726.64
190,390.93
42,000.00
1,106,717.57
-
-
1,335,758.51
133,575.85
1,469,334.00
Jumlah Harga (Rp.)
5,082.74
2,964.93
338.85
360.03
8,746.55
80,939.30
80,939.30
-
-
89,685.85
8,968.58
98,654.00
5,929.86
3,459.09
451.80
840.06
10,680.81
80,060.89
80,060.89
-
-
90,741.70
9,074.17
99,815.00
6,776.99
3,953.24
451.80
480.04
11,662.06
126,616.67
126,616.67
-
-
138,278.73
13,827.87
152,106.00
4,235.62
4,941.55
564.75
360.03
10,101.94
173,250.00
2,328.15
175,578.15
-
-
185,680.09
18,568.01
204,248.00
Jumlah Harga (Rp.)
2,117.81
2,470.78
2,823.74
120.01
7,532.34 753.23
168,300.00
1,164.08
169,464.08
-
-
176,996.41
17,699.64
194,696.00
44,050.41
27,531.50
2,936.69
3,120.24
77,638.84
74,250.00
5,587.56
5,330.22
85,167.78
-
-
162,806.62
16,280.66
179,087.00
55,910.13
34,943.83
3,727.34
3,960.30
98,541.61
66,000.00
7,450.08
10,660.44
49,500.00
71,163.79
95,609.36
300,383.67
-
-
398,925.27
39,892.53
438,817.00
55,910.13
34,943.83
3,727.34
3,960.30
98,541.61
49,500.00
7,450.08
7,995.33
41,250.00
71,163.79
95,609.36
272,968.56
-
-
371,510.16
37,151.02
408,661.00
12,706.85
5,294.52
564.75
960.07
19,526.19
43,560.00
11,175.12
26,651.11
81,386.23
-
-
100,912.42
10,091.24
111,003.00
448,975.30
27,178.54
137,657.52
103,772.59
29,592.84
31,802.42
778,979.20
330,000.00
27,937.80
21,320.89
2,598,750.00
52,383.38
606,144.00
171,817.47
192,770.82
4,001,124.35
-
-
4,780,103.55
478,010.36
5,258,113.00
478,624.61
27,178.54
165,189.02
138,363.46
36,482.77
33,962.58
879,800.98
445,500.00
37,250.40
31,981.33
3,465,000.00
69,844.50
606,144.00
171,817.47
192,770.82
5,020,308.52
-
-
5,900,109.50
590,010.95
6,490,120.00
597,221.86
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
1,094,546.71
660,000.00
74,500.80
106,604.44
5,197,500.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
711,637.85
956,093.60
9,194,335.73
-
-
10,288,882.44
1,028,888.24
11,317,770.00
537,923.23
27,178.54
174,719.16
138,363.46
37,612.27
38,162.90
953,959.55
528,000.00
59,600.64
85,283.55
3,465,000.00
69,844.50
606,144.00
171,817.47
192,770.82
385,000.00
569,310.28
764,874.88
6,897,646.14
-
-
7,851,605.69
785,160.57
8,636,766.00
448,975.30
27,178.54
137,657.52
103,772.59
29,931.69
31,802.42
779,318.05
528,000.00
59,600.64
85,283.55
2,598,750.00
52,383.38
606,144.00
171,817.47
192,770.82
330,000.00
569,310.28
1,529,749.76
6,723,809.89
-
-
7,503,127.94
750,312.79
8,253,440.00
44,897.53
27,178.54
137,657.52
103,772.59
29,592.84
31,802.42
374,901.43
396,000.00
59,600.64
85,283.55
2,598,750.00
52,383.38
606,144.00
171,817.47
192,770.82
440,000.00
569,310.28
1,147,312.32
6,319,372.45
-
-
6,694,273.89
669,427.39
7,363,701.00
478,624.61
27,178.54
165,189.02
138,363.46
36,482.77
33,962.58
879,800.98
412,500.00
55,875.60
63,962.66
3,465,000.00
69,844.50
606,144.00
171,817.47
192,770.82
288,750.00
508,312.75
669,265.52
6,504,243.32
-
-
7,384,044.30
738,404.43
8,122,448.00
15,248.22
1,976.62
2,117.81
1,976.62
677.70
1,080.08
23,077.05
3,300.00
186.25
63,962.66
49,500.00
10,476.68
7,216.00
1,909.08
2,141.90
138,692.57
-
-
161,769.62
16,176.96
177,946.00
25,159.56
3,261.42
3,494.38
3,261.42
1,129.50
1,800.14
38,106.43
4,950.00
372.50
63,962.66
59,400.00
1,164.08
9,922.00
2,863.62
3,569.83
146,204.70
-
-
184,311.12
18,431.11
202,742.00
Harga (Rp.) Jumlah Harga (Rp.)
84,712 112,074.40
98,831 18,679.07
112,950 2,146.05
120,009 15,841.20
148,740.72
1,804 445,588.00
318,181 197,499.18
237,989 176,111.61
10 2,150.00
821,348.80
1,014,255 253,563.84
-
- 1,096,871.43
109,687.14
- 1,206,558.00
84,712 112,074.40
98,831 18,679.07
112,950 2,146.05
120,009 15,841.20
148,740.72
1,804 497,904.00
318,181 188,181.04
237,989 178,403.36
10 2,150.00
866,638.39
1,014,255 253,563.84
-
- 1,142,161.03
114,216.10
- 1,256,377.00
Harga (Rp.) Jumlah Harga (Rp.)
84,712 112,074.40
98,831 18,679.07
112,950 2,146.05
120,009 15,841.20
148,740.72
1,804 539,396.00
318,181 181,590.16
237,989 179,284.80
10 2,150.00
902,420.95
1,014,255 253,563.84
-
- 1,177,943.59
117,794.36
- 1,295,737.00
84,712 112,074.40
98,831 18,679.07
112,950 2,146.05
120,009 15,841.20
148,740.72
1,804 414,920.00
318,181 202,953.70
237,989 181,047.67
10 2,000.00
800,921.38
1,014,255 253,563.84
-
- 1,076,444.01
107,644.40
- 1,184,088.00
Harga (Rp.) Jumlah Harga (Rp.)
84,712 112,074.40
98,831 18,679.07
112,950 2,146.05
120,009 15,841.20
148,740.72
1,804 635,008.00
318,181 166,135.68
237,989 181,752.83
10 2,150.00
985,046.50
1,014,255 253,563.84
-
- 1,260,569.14
126,056.91
- 1,386,626.00
84,712 112,074.40
98,831 18,679.07
112,950 2,146.05
120,009 15,841.20
148,740.72
1,804 669,284.00
318,181 158,635.71
237,989 184,573.43
10 2,150.00
1,014,643.14
1,014,255 253,563.84
-
- 1,290,165.77
129,016.58
- 1,419,182.00
1,804 692,736.00
318,181 157,272.08
237,989 183,163.13
10 2,150.00
1,035,321.21
1,014,255 253,563.84
-
- 1,310,843.84
131,084.38
- 1,441,928.00
84,712 112,074.40
98,831 18,679.07
112,950 2,146.05
120,009 15,841.20
148,740.72
1,804 732,424.00
318,181 155,453.90
237,989 180,871.39
10 2,150.00
1,070,899.29
1,014,255 253,563.84
-
- 1,346,421.92
134,642.19
- 1,481,064.00
84,712 112,074.40
98,831 18,679.07
112,950 2,146.05
120,009 15,841.20
148,740.72
1,804 745,052.00
318,181 154,772.09
237,989 179,989.95
10 2,150.00
1,081,964.03
1,014,255 253,563.84
-
- 1,357,486.67
135,748.67
- 1,493,235.00
84,712 112,074.40
98,831 18,679.07
112,950 2,146.05
120,009 15,841.20
148,740.72
1,804 791,956.00
318,181 152,272.10
237,989 177,345.63
10 2,150.00
1,123,723.73
1,014,255 253,563.84
-
- 1,399,246.36
139,924.64
- 1,539,170.00
84,712 112,074.40
98,831 18,679.07
112,950 2,146.05
120,009 15,841.20
148,740.72
1,804 808,192.00
318,181 151,590.28
237,989 176,287.90
10 2,150.00
1,138,220.18
1,014,255 253,563.84
-
- 1,413,742.82
141,374.28
- 1,555,117.00
Harga (Rp.) Jumlah Harga (Rp.)
84,712 177,895.87
98,831 138,363.46
112,950 15,812.97
120,009 25,201.92
357,274.21
16,500 173,250.00
23,282 3,492.23
176,742.23
- -
-
- 534,016.43
53,401.64
- 587,418.00
58741.8
dengan multiflex 12 mm berikut perancah
Harga (Rp.) Jumlah Harga (Rp.)
84,712 33,884.93
105,890 21,178.08
112,950 12,424.47
120,009 2,400.18
69,887.66
255,391 32,690.05
18,625 9,312.60
53,302 10,660.44
5,432,350 124,944.05
177,607.14
- -
-
- 247,494.81
24,749.48
- 272,244.00
tiflex berikut perancah
Harga (Rp.) Jumlah Harga (Rp.)
84,712 50,827.39
105,890 31,767.12
112,950 3,388.49
120,009 7,200.55
93,183.55
- -
- -
- -
- -
-
- -
-
- 93,183.55
9,318.36
- 102,501.00
flex (K3) Pemasangan 1 m2 bekisting untuk lantai dengan floordeck
Harga (Rp.) Jumlah Harga (Rp.) No Uraian Kode Satuan
A TENAGA
84,712 16,942.46 Pekerja L.01.01 OH
105,890 10,589.04 Tukang Kayu L.02.04 OH
112,950 1,129.50 Kepala Tukang L.03.01 OH
120,009 2,400.18 Mandor L.04.01 OH
31,061.18 JUMLAH TENAGA KER
B BAHAN
255,391 32,690.05 Floordeck m2
18,625 4,097.54 Paku 5 - 12 cm kg
53,302 10,660.44 Balok 8/12 m3
5,432,350 27,161.75 Kaso 5/7 m3
74,609.79
- -
- JUMLAH HARGA BAHA
- 105,670.97 C PERALATAN
10,567.10 JUMLAH HARGA ALA
- 116,238.00 D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
84,712 50,827.39
105,890 31,767.12
112,950 3,388.49
120,009 7,200.55
93,183.55
255,391 32,690.05
18,625 8,940.10
53,302 10,660.44
5,432,350 81,485.25
133,775.84
- -
-
- 226,959.39
22,695.94
- 249,655.00
ntai dengan floordeck
Koefisien Harga (Rp.) Jumlah Harga (Rp.)
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1650 84,712
Tukang batu L.02.03 OH 0.0280 98,831
Kepala tukang L.03.01 OH 0.0030 112,950
Mandor L.04.01 OH 0.0080 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 32.6000 1,804
Pasir beton m3 0.0543 318,181
Kerikil (Maks 30 mm) m3 0.0762 237,989
Air L 21.5000 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1980 84,712
Tukang batu L.02.03 OH 0.0330 98,831
Kepala tukang L.03.01 OH 0.0030 112,950
Mandor L.04.01 OH 0.0100 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 32.1200 1,804
Pasir beton m3 0.0651 318,181
Kerikil (Maks 30 mm) m3 0.0915 237,989
Air L 25.8000 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2480 84,712
Tukang batu L.02.03 OH 0.0410 98,831
Kepala tukang L.03.01 OH 0.0040 112,950
Mandor L.04.01 OH 0.0130 120,009
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 48.9000 1,804
Pasir beton m3 0.0814 318,181
Kerikil (Maks 30 mm) m3 0.1143 237,989
Air L 32.2500 10
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 84,712
Tukang batu L.02.03 OH 0.0380 98,831
Kepala tukang L.03.01 OH 0.0040 112,950
Mandor L.04.01 OH 0.0010 120,009
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 m3 0.0050 5,432,350
Phenol film 12mm Lbr 0.0430 337,116
Minyak bekisting L 0.2000 53,302
Dynabol dia 12 x 120 mm Bh 0.6930 9,313
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 84,712
Tukang batu L.02.03 OH 0.0380 98,831
Kepala tukang L.03.01 OH 0.0040 112,950
Mandor L.04.01 OH 0.0010 120,009
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 m3 0.0040 5,432,350
Phenol film 12mm Lbr 0.0480 337,116
Minyak bekisting L 0.2000 53,302
Paku Biasa Kg 0.0460 18,625
Dynabol dia 12 x 120 mm Bh 0.6930 9,313
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0530 84,712
Tukang kayu L.02.04 OH 0.0180 105,890
Mandor L.04.01 OH 0.0050 120,009
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0890 84,712
Tukang kayu L.02.04 OH 0.0300 105,890
Mandor L.04.01 OH 0.0050 120,009
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0710 84,712
Tukang kayu L.02.04 OH 0.0240 105,890
Mandor L.04.01 OH 0.0050 120,009
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
Lantai
Indeks kenaikan lantai
ereksi Balok
1.000 1.000
2.000 1.000
3.000 1.000
4.000 1.000
5.000 1.000
6.000 1.000
7.000 1.000
8.000 1.011
9.000 1.022
10.000 1.034
11.000 1.045
12.000 1.057
13.000 1.068
14.000 1.080
15.000 1.092
16.000 1.104
17.000 1.116
18.000 1.129
19.000 1.141
20.000 1.154
21.000 1.166
22.000 1.179
23.000 1.192
24.000 1.206
Lantai
Indeks kenaikan lantai
ereksi Kolom
1.000 1.000
2.000 1.000
3.000 1.000
4.000 1.000
5.000 1.000
6.000 1.000
7.000 1.000
8.000 1.011
9.000 1.022
10.000 1.034
11.000 1.045
12.000 1.057
13.000 1.068
14.000 1.080
15.000 1.092
16.000 1.104
17.000 1.116
18.000 1.129
19.000 1.141
20.000 1.154
21.000 1.166
22.000 1.179
23.000 1.192
24.000 1.206
A.4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m)
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0190 84,712
Tukang batu L.02.03 OH 0.0380 98,831
Operator crane L.10.01 OH 0.0190 112,950
Pembantu operator crane L.10.02 OH 0.0190 84,712
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.8970
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane UH 0.0190 284,340
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
A.4.1.2.24.
Upah 1 titik Join dengan Sling
No Uraian Kode Satuan Koefisien Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2200 84,712
Tukang kayu L.02.04 OH 0.2200 105,890
Tukang besi L.02.05 OH 0.2200 98,831
Mandor L.04.01 OH 0.0110 120,009
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
(K 175) slump (120 ± 20) mm
Jumlah Harga (Rp.)
11,182.03
2,174.28
225.90
840.06
14,422.27
47,048.32
13,818.12
14,512.02
172.00
75,550.46
-
-
89,972.74
8,997.27
98,970.00
13,977.53
2,767.27
338.85
960.07
18,043.72
58,810.40
17,272.66
18,140.03
215.00
94,438.08
-
-
112,481.80
11,248.18
123,729.00
57,944.48
20,727.19
21,768.03
258.00
100,697.70
-
-
122,271.10
12,227.11
134,498.00
21,008.66
4,052.07
451.80
1,560.12
27,072.65
88,215.60
25,908.98
27,210.04
322.50
141,657.12
-
-
168,729.77
16,872.98
185,602.00
592.99
7,511.16
903.60
120.01
9,127.75
81,998.56
100,276.46
27,161.75
26,969.29
10,660.44
36,151.51
283,218.01
-
-
292,345.77
29,234.58
321,580.00
pakai)
Jumlah Harga (Rp.)
338.85
3,755.58
451.80
120.01
4,666.24
27,161.75
14,495.99
10,660.44
6,453.63
58,771.82
-
-
63,438.06
6,343.81
69,781.00
pakai)
Jumlah Harga (Rp.)
338.85
3,755.58
451.80
120.01
4,666.24
21,729.40
16,181.57
10,660.44
856.76
6,453.63
55,881.81
-
-
60,548.05
6,054.80
66,602.00
pracetak
Jumlah Harga (Rp.)
4,489.75
1,906.03
600.05
6,995.83
-
-
-
6,995.83
699.58
7,695.00
n pracetak
Jumlah Harga (Rp.)
7,539.40
3,176.71
600.05
11,316.15
-
-
-
11,316.15
1,131.62
12,447.00
n pracetak
Jumlah Harga (Rp.)
6,014.57
2,541.37
600.05
9,155.99
-
-
-
9,155.99
915.60
10,071.00
5,421.59
24,114.77
12,650.37
3,840.29
8,760.67
54,787.69
-
-
-
54,787.69
5,478.77
60,266.00
5,845.15
23,917.11
13,638.68
4,179.14
8,760.67
56,340.75
-
-
-
56,340.75
5,634.08
61,974.00
k
Jumlah Harga (Rp.)
5,167.45
21,051.01
12,057.39
3,727.34
8,760.67
50,763.86
-
50,763.86
5,076.39
55,840.00
7,567.63
5,675.73
5,675.73
6,621.68
13,243.36
7,567.63
8,040.61
41,149.01
-
-
19,050.76
550,000.00
569,050.76
604,051.06
60,405.11
664,456.00
pelat pracetak
Jumlah Harga (Rp.)
6,889.94
5,167.45
5,167.45
6,028.69
12,057.39
6,889.94
7,320.56
37,464.02
-
-
17,344.72
550,000.00
567,344.72
599,210.67
59,921.07
659,131.00
Balok pracetak
9,374.83
7,031.12
7,031.12
8,202.98
16,405.95
9,374.83
9,960.76
50,975.64
-
-
23,600.19
1,100,000.00
1,123,600.19
1,166,958.78
116,695.88
1,283,654.00
Kolom pracetak
Jumlah Harga (Rp.)
1,609.53
3,755.58
2,146.05
1,609.53
9,120.69
-
-
5,402.45
5,402.45
14,523.15
1,452.31
15,975.00
1,609.53
3,755.58
2,146.05
1,609.53
9,120.69
-
-
5,402.45
5,402.45
14,523.15
1,452.31
15,975.00
1,609.53
3,755.58
2,146.05
1,609.53
9,120.69
-
-
5,402.45
5,402.45
14,523.15
1,452.31
15,975.00
-
-
7,310,391.00
147,726.66
3,500.00
7,461,617.66
-
7,461,617.66
746,161.77
8,207,779.00
-
-
11,270,186.13
4,000.00
11,274,186.13
-
11,274,186.13
1,127,418.61
12,401,604.00
36,270.99
8,358.28
4,440.34
49,069.61
-
-
-
-
49,069.61
4,906.96
53,976.00
12,452.71
15,565.89
1,694.25
600.05
30,312.89
65,188.20
6,600.00
4,917.05
76,705.25
-
-
107,018.14
10,701.81
117,719.00
18,636.71
23,295.89
21,742.83
1,320.10
64,995.53
-
-
-
64,995.53
6,499.55
71,495.00
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1. Pemasangan 1 kg besi profil
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Las Konstruksi L.02.10 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Besi Profil Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Las L.02.11 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Besi siku L 30.30.3 Kg
Besi plat baja Kg
Kawat las Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang L.02.01 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Seng plat m
Paku Biasa kg
Besi strip kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Besi L.02.05 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40.2 mm M1
Assesoris (perkuatan, las dll) Ls
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Besi L.02.05 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai dingin C75 kg
JUMLAH HARGA BAHAN
C PERALATAN
Alat Rangka Atap Baja Canai Dingin
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Besi L.02.05 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai dingin C75 m
JUMLAH HARGA BAHAN
C PERALATAN
Alat Rangka Atap Baja Canai Dingin
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Besi L.02.05 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai dingin C75 M'
Baut (Srew driver) bh
Dynabol dia 12 x 120 mm bh
Reng Canai Dingin M'
Talang / Jurai Canai Dingin M'
JUMLAH HARGA BAHAN
C PERALATAN
Alat Rangka Atap Baja Canai Dingin
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.0000 472,989.00
MLAH HARGA BAHAN 472,989.00
- -
UMLAH HARGA ALAT -
- 561,358.07
10% 56,135.81
- 617,493.00
0.1000 11,157.66
UMLAH HARGA ALAT -
- 264,561.91
10% 26,456.19
- 291,018.00
0.1000 23,185.58
UMLAH HARGA ALAT -
- 311,994.98
10% 31,199.50
- 343,194.00
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Kapur m3
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen portland Kg
Kapur m3
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen Merah Kg
Kapur m3
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah m3
Semen Merah Kg
Kapur m3
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata rooster m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata berongga m3
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B.
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata ringan tebal 7,5 cm m3
Mortar siap pakai Kg
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata ringan tebal 7,5 cm m3
Mortar siap pakai Kg
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg
Pasir Pasang m3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
mpuran 1 SP : 3 PP
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
mpuran 1 SP : 4 PP
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
mpuran 1 SP : 5 PP
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
mpuran 1 SP : 6 PP
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
70.0000 -
11.5000 -
0.0430 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 38,226.43
10% 3,822.64
- 42,049.00
mpuran 1 SP : 5 PP
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
0.3000 84,712 25,413.70
0.1000 98,831 9,883.10
0.0100 112,950 1,129.50
0.0150 120,009 1,800.14
LAH TENAGA KERJA 38,226.43
70.0000 -
9.6800 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 38,226.43
10% 3,822.64
- 42,049.00
mpuran 1 SP : 6 PP
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
70.0000 -
8.3200 -
0.0490 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 38,226.43
10% 3,822.64
- 42,049.00
mpuran 1SP : 8 PP
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
70.0000 -
4.5000 -
0.0150 -
0.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 38,226.43
10% 3,822.64
- 42,049.00
70.0000 -
0.0180 -
0.0180 -
0.0180 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 38,226.43
10% 3,822.64
- 42,049.00
70.0000 -
0.0140 -
0.0140 -
0.0280 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 38,226.43
10% 3,822.64
- 42,049.00
12.5000 -
30.3200 -
0.7280 -
0.2800 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 48,328.38
10% 4,832.84
- 53,161.00
12.5000 -
24.2600 -
0.7720 -
0.2800 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 48,328.38
10% 4,832.84
- 53,161.00
12.5000 -
22.7400 -
0.5500 -
0.2800 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 42,243.21
10% 4,224.32
- 46,467.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
12.5000 -
18.2000 -
0.5820 -
0.2800 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 42,243.21
10% 4,224.32
- 46,467.00
12.5000 -
15.1600 -
0.3640 -
0.2800 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 38,226.43
10% 3,822.64
- 42,049.00
12.5000 -
12.1300 -
0.3880 -
0.2800 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 38,226.43
10% 3,822.64
- 42,049.00
30.0000 -
11.0000 -
0.0350 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 38,226.43
10% 3,822.64
- 42,049.00
30.0000 -
11.0000 -
0.0350 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 38,226.43
10% 3,822.64
- 42,049.00
uran 1 SP : 3 PP
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
70.0000 -
14.0000 -
0.0320 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 43,732.74
10% 4,373.27
- 48,106.00
ap pakai B.
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
0.075 -
2.772 -
MLAH HARGA BAHAN -
0.1000 - -
UMLAH HARGA ALAT -
- 44,325.72
10% 4,432.57
- 48,758.00
0.1 -
4.4 -
MLAH HARGA BAHAN -
0.1000 - -
UMLAH HARGA ALAT -
- 44,325.72
10% 4,432.57
- 48,758.00
15.5040 -
0.0160 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 43,732.74
10% 4,373.27
- 48,106.00
10.2240 -
0.0200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 43,732.74
10% 4,373.27
- 48,106.00
7.7760 -
0.0230 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 43,732.74
10% 4,373.27
- 48,106.00
6.2400 -
0.0240 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 43,732.74
10% 4,373.27
- 48,106.00
5.1840 -
0.0260 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 43,732.74
10% 4,373.27
- 48,106.00
4.4160 -
0.0270 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 43,732.74
10% 4,373.27
- 48,106.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
3.9360 -
0.0280 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 43,732.74
10% 4,373.27
- 48,106.00
3.4560 -
0.0290 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 43,732.74
10% 4,373.27
- 48,106.00
3.0000 -
0.0050 -
0.0200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 45,871.72
10% 4,587.17
- 50,458.00
0.0090 -
0.0090 -
0.0090 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 45,871.72
10% 4,587.17
- 50,458.00
0.0070 -
0.0070 -
0.0150 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 45,871.72
10% 4,587.17
- 50,458.00
13.6320 -
0.0270 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 58,550.33
10% 5,855.03
- 64,405.00
10.3680 -
0.0310 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 45,610.52
10% 4,561.05
- 50,171.00
8.3200 -
0.0320 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 58,550.33
10% 5,855.03
- 64,405.00
6.9120 -
0.0350 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 58,550.33
10% 5,855.03
- 64,405.00
5.8880 -
0.0360 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 58,550.33
10% 5,855.03
- 64,405.00
0.0090 -
0.0090 -
0.0180 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 64,141.34
10% 6,414.13
- 70,555.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
5.1840 -
0.0260 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 21,982.85
10% 2,198.28
- 24,181.00
0.5000 -
0.0130 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 51,307.43
10% 5,130.74
- 56,438.00
10.0000 -
15.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 65,715.58
10% 6,571.56
- 72,287.00
10.0000 -
15.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 65,715.58
10% 6,571.56
- 72,287.00
4.3200 -
0.0060 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 38,226.43
10% 3,822.64
- 42,049.00
3.1080 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 21,982.85
10% 2,198.28
- 24,181.00
1.6000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 10,320.78
10% 1,032.08
- 11,352.00
6.3400 -
0.0120 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 43,732.74
10% 4,373.27
- 48,106.00
3.2500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 29,155.16
10% 2,915.52
- 32,070.00
16.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 43,732.74
10% 4,373.27
- 48,106.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
3.6000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 29,155.16
10% 2,915.52
- 32,070.00
C. HARGA SATUAN DASAR BAHAN DAN MATERIAL
10 x 20 KW 1 Corak/Warna/
15 Keramik
Anti slip Mulia
buah
20 x 20 (KM) KW 1 DN
16 Keramik Corak/Warna/Anti Slip
Mulia buah
20 x 20 (KM) KW 1 DN Putih
17 Keramik
polos Mulia buah
18 Keramik 20 x 25 Dinding (KM) KW 1
DN Corak Mulia buah
30 x 30 KW 1 Dn Putih Polos
19 Keramik
Mulia buah
30 x 30 KW 1 Warna/Corak
20 Keramik
(Anti Slip) Mulia
buah
40 x 40 KW 1 DN Putih
21 Keramik Polos Mulia buah
40 x 40 KW 1 DN
22 Keramik Warna/Corak (Anti Slip)
Mulia buah
23 Keramik 10 x 20 dan 20 x 20 KW 1
DN Putih/polos Roman buah
10 x 20 KW 1 DN
24 Keramik Corak/Warna/Anti Slip
Roman buah
20 x 20 (KM) KW 1 DN
25 Keramik Corak/Warna/Anti Slip
Roman buah
20 x 20 (KM) KW 1 Dn Putih
26 Keramik Polos Roman buah
20 x 25 Dinding (KM) KW 1
27 Keramik
DN Coarak Roman buah
Keramik 30 x 30 KW 1 DN Polos
28 Roman buah
30 x 30 KW 1 DN
29 Keramik Warna/Corak (Anti Slip)
Roman buah
Keramik 40 x 40 KW 1 DN Polos
30 Roman buah
40 x 40 KW 1 DN
31 Keramik Warna/Corak (Anti Slip)
Roman buah
32 Keramik 60 x 60 (Masterina Polos) buah
Keramik
33 60 x 60 (Masterina Corak) buah
Keramik
34 60 x 60 (Masterina Muda) buah
35 Keramik 60 x 60 (Masterina Tua) buah
36 Keramik 60 x 60 (Roman Polos) buah
37 Keramik 60 x 60 (Roman Corak) buah
38 Keramik 60 x 60 (KIA Polos) buah
39 Keramik 60 x 60 (KIA Corak) buah
40 Keramik 60 x 60 (Mulia Polos) buah
41 Keramik 60 x 60 (Mulia Corak) buah
42 Plin Keramik 60 x 60 buah
10 x 60 cm (berbagai
43 Plin Ubin Granito ukuran) buah
44 Stepnosing Keramik (Berbagai
ukuran) buah
45 Stepnosing Granito (kelas Baik) buah
46 Vinyl Lantai Dasar m2
47 Karpet kelas baik LN m2
48 Karpet Kelas sedang LN m2
49 Parquet Jati m2
50 Stairnosing Keramik 10/20 buah
51 Stairnosing Fiber m
52 Taraso Kerang 30 x 30 m2
53 Plin Taraso 10 x 30 buah
54 Graniit Alam LN Ukuran Besar m2
55 Graniit Alam LN Ukuran Kecil m2
56 Graniit Alam DN Ukuran Besar m2
57 Graniit Alam DN Ukuran Kecil m2
58 Granito Tile Essenza ukuran 40 x 40 Polis m2
59 Granito Tile Essenza ukuran 30 x 30 m2
60 Granito Tile Essenza ukuran 40 x 40 Unpolis m2
61 Marmer m2
62 Marmer Alam Lampung ukuran Besar m2
63 Marmer Alam Lampung ukuran Kecil m2
64 Marmer Alam ukuran Besar m2
65 Marmer Alam ukuran Kecil m2
66 Marmer Sintesis m2
67 Granito Tile Essenza 60 x 60 Polis m2
68 Granito Tile Essenza 60 x 60 Unpolis m2
69 Batu Tempel Hitam m2
70 Bata Karawang buah
I. BAHAN KACA
1 Kaca Polos 2 mm (ASAHI) m2
2 Kaca Polos 3 mm (ASAHI) m2
3 Kaca Polos 5 mm (ASAHI) m2
4 Kaca Polos 8 mm (ASAHI) m2
5 Kaca Polos Sanblas 5 mm m2
6 Kaca Biasa 6 mm m2
7 Kaca Reyband 5 mm (ASAHI) m2
8 Kaca Reyband 6 mm m2
9 Kaca Reyband 8 mm (ASAHI) m2
10 Kaca Reyband 12 mm (ASAHI) m2
11 Kaca Es / Susu 3 mm m2
12 Kaca Es / Susu 5 mm m2
13 Kaca Cermin 5 mm m2
14 Kaca Cermin 6 mm m2
15 Kaca Cermin 8 mm m2
Kaca Patri Lokal Terpasang
16 (ASAHI) m2
Kaca Patri ex Luar Negeri
17 Terpasang m2
18 Kaca 6 mm Gravver m2
19 Kaca Lukis Terpasang m2
Glass Block DN 20 x 20
20 (Kedawung) buah
21 Glass Block DN 20 x 20 ex LN buah
22 Sealant kg
23 Jendela Nako buah
K. BAHAN PERPIPAAN
1 Besi Pipa untuk Hydrant BSP 1" btg
155 List Plafond Gypsum Polos Siku (Setara Jaya Board Panjang Btg
2 m)
156 List Plafond Gypsum Polos Siku (Setara Jaya Board Panjang Btg
5 m)
(Setara Jaya Board Panjang
157 List Plafond Gypsum Polos Siku 10 m) Btg
159 List Plafond Gypsum Polos (Setara Jaya Board Panjang Big
2 m)
(Setara Jaya Board Panjang
160 List Plafond Gypsum Polos Btg
5 m)
(Setara Jaya Board Panjang
161 List Plafond Gypsum Polos 10 m) Btg
162 List Plafond Gypsum Polos (Setara Jaya Board Panjang Btg
15 m)
(Setara Jaya Board Panjang
163 List Plafond Gypsum Ombak 2 m) Btg
(Setara Jaya Board Panjang
164 List Plafond Gypsum Ombak 5 m) Btg
166 List Plafond Gypsum Ombak (Setara Jaya Board Pandang Btg
15 m)
167 Genteng Plentong buah
168 Jabesmen gelombang 150x105 mm buah
169 Jabesmen gelombang 180x105 mm buah
170 Jabesmen gelombang 210x105 mm buah
171 Jabesmen gelombang 240x105 mm buah
172 Jabesmen gelombang 270x105 mm buah
173 Jabesmen gelombang 300x105 mm buah
N. BAHAN MEKANIKAL
O. BAHAN ELEKTRIKAL
125 - 160 A, 36 KA
80 Panel MCCB 3 Pase MCCB bh
(NS160N) MG
160 - 200 A, 36 KA
86 Panel MCCB 3 Pase MCCB bh
(NS250N) MG
64 - 80 A / 70 KA / 3 Pole
102 Panel MCCB 3 Pase MCCB bh
NS100 bN/H/L
8 Asphal RC 70 (Cilacap) Kg
T. ALAT TUKANG
1 Palu 0.5 kg bh
2 Cangkul bh
3 Singkup bh
4 Sekrop bh
5 Pengki bh
6 Linggis bh
7 Rool Meter 30 meter ( Bahan bh
Plastik )
V. BAHAN PAGAR
1 Panel Beton Pracetak lbr
2 Kolom Beton Pracetak btg
X. FIRE ALARM
1 Alarm Bell unit
2 Manual Break Glass Push Button unit
3 Sirine unit
4 Smoke Detector unit
5 Heat Detector unit
Y. BIDANG PERTAMANAN
1 Aglonema batang
2 Bambu krisik/jepang batang
3 Furadan kg
4 Kompos/pupuk kandang karung
5 M atoa (2 m) batang
Palm (botol, ekor tupai, putri, dll)
6 batang
tinggi 2 m
7 Philo batang
Pohon pelindung (angsana,
8 mahoni, kamboja dll) tinggi 2m batang
Pohon perdu (kaca piring, puring,
9 mawar, melati, dll) batang
10 Rumput gajah mini m2
Z. BIDANG PENGAIRAN
1 Batu Belah 10 - 15 cm M3
2 Batu Pecah 5 - 7 cm M3
3 Batu Pecah 0,5 - 1 cm M3
4 Batu Pecah tersaring A M3
5 Batu Pecah tersaring B M3
6 Timbunan Pilthan M3
7 Makadam M3
8 Kayu Damar Laut M3
9 Kayu Klas I M3
10 Kayu Klas III M3
11 Kayu Kano 4/6 BTG
12 Papas 2/20 x 4 LBR
13 Balok Kayu 6 - 8 - 10 /4 m BTG
14 Batang Kelapa 13TG
15 Lempengen rumput M2
16 Triplek tb. 3 mm LBR
17 Triplek tb. 4 mm LBR
18 Triplek tb. 6 mm LBR
19 Triplek tb. 9 mm LBR
20 Multiplek 12 mm LBR
21 Seng gelombang BJLS 30 LBR
22 Seng Plat 3 x 6 BWG 30 M2
23 Conblock M2
24 Batako PSPM BH
25 Pipa Beton Tidak Bertulang dia M'
0,50 m
Pipa Beton Tidak Bertulang dia
26 0,60 m M'
Bahan Pabrikasi
7 Spardek m2
8 Kayu Bekisting m3
Keterangan :
Untuk harga material di atas sudah termasuk keuntungan dan ketentuan pajak yang berlaku.
HARGA
SATUAN HARGA
KONTRAKTUAL
237,518.33 261,270.17
183,900.33 202,290.37
239,870.00 263,857.00
180,000.00 198,000.00
206,946.67 227,641.34
289,255.00 318,180.50
298,661.67 328,527.83
216,353.33 237,988.67
29,913.20 32,904.52
315,123.33 346,635.67
348,752.17 383,627.38
293,958.33 323,354.17
283,305.28 311,635.81
265,738.33 292,312.17
309,009.00 339,909.90
316,534.33 348,187.77
266,208.67 292,829.53
24,692.50 27,161.75
88,893.00 97,782.30
124,168.00 136,584.80
2,586.83 2,845.52
3,527.50 3,880.25
7,407.75 8,148.53
1,152.32 1,267.55
905.39 995.93
1,105.28 1,215.81
9,222.50 10,144.75
13,263.40 14,589.74
9,877.00 10,864.70
11,993.50 13,192.85
25,398.00 27,937.80
20,812.25 22,893.48
23,634.25 25,997.68
31,747.50 34,922.25
8,254.35 9,079.79
49,385.00 54,323.50
35,275.00 38,802.50
33,158.50 36,474.35
21,494.23 23,643.66
24,974.70 27,472.17
114,667.27 126,133.99
134,374.23 147,811.66
97,594.17 107,353.58
112,174.50 123,391.95
110,481.30 121,529.43
82,000.00 90,200.00
130,517.50 143,569.25
84,660.00 93,126.00
65,000.00 71,500.00
1,622,650.00 1,784,915.00
1,552,100.00 1,707,310.00
1,340,450.00 1,474,495.00
1,251,086.67 1,376,195.33
1,213,460.00 1,334,806.00
1,171,130.00 1,288,243.00
1,145,261.67 1,259,787.83
1,126,448.33 1,239,093.17
1,072,360.00 1,179,596.00
485,054.77 533,560.24
13,169.33 14,486.27
13,639.67 15,003.63
76,723.13 84,395.44
689.47 758.42
28,220.00 31,042.00
5,538.18 6,091.99
6,490.60 7,139.66
5,996.75 6,596.43
9,000.00 9,900.00
82,300.00 90,530.00
300,000.00 330,000.00
1,700.00 1,870.00
3,900.00 4,290.00
2,400.00 2,640.00
66,000.00 72,600.00
51,148.75 56,263.63
130,517.50 143,569.25
91,715.00 100,886.50
30,900.00 33,990.00
138,278.00 152,105.80
21,635.33 23,798.86
33,581.80 36,939.98
126,990.00 139,689.00
65,611.50 72,172.65
303,365.00 333,701.50
190,485.00 209,533.50
117,254.10 128,979.51
90,304.00 99,334.40
112,880.00 124,168.00
35,275.00 38,802.50
12,699.00 13,968.90
10,582.50 11,640.75
39,508.00 43,458.80
38,449.75 42,294.73
423,300.00 465,630.00
634,950.00 698,445.00
18,343.00 20,177.30
25,398.00 27,937.80
2,822.00 3,104.20
5,644.00 6,208.40
14,815.50 16,297.05
64,906.00 71,396.60
38,802.50 42,682.75
43,741.00 48,115.10
38,097.00 41,906.70
35,275.00 38,802.50
64,906.00 71,396.60
66,317.00 72,948.70
20,459.50 22,505.45
28,220.00 31,042.00
23,987.00 26,385.70
93,831.50 103,214.65
67,728.00 74,500.80
61,378.50 67,516.35
40,919.00 45,010.90
4,233.00 4,656.30
31,747.50 34,922.25
24,692.50 27,161.75
46,563.00 51,219.30
68,786.25 75,664.88
65,258.75 71,784.63
112,880.00 124,168.00
88,187.50 97,006.25
21,165.00 23,281.50
35,275.00 38,802.50
25,398.00 27,937.80
35,275.00 38,802.50
104,300.00 114,730.00
25,000.00 27,500.00
15,000.00 16,500.00
20,000.00 22,000.00
53,712.07 59,083.27
8,867,664.67 9,754,431.13
6,100,223.33 6,710,245.67
6,255,433.33 6,880,976.67
8,075,623.33 8,883,185.67
8,748,200.00 9,623,020.00
8,040,348.33 8,844,383.17
8,604,748.33 9,465,223.17
10,606,016.67 11,666,618.33
11,290,822.00 12,419,904.20
3,922,580.00 4,314,838.00
14,506,961.33 15,957,657.47
22,719,922.00 24,991,914.20
11,982,212.00 13,180,433.20
10,380,021.50 11,418,023.65
3,527,500.00 3,880,250.00
2,822,000.00 3,104,200.00
2,963,100.00 3,259,410.00
21,306.10 23,436.71
43,458.80 47,804.68
11,852.40 13,037.64
14,251.10 15,676.21
15,521.00 17,073.10
29,866.17 32,852.78
55,029.00 60,531.90
177,550.83 195,305.92
68,433.50 75,276.85
4,938,500.00 5,432,350.00
4,938,500.00 5,432,350.00
22,000.00 24,200.00
10,000.00 11,000.00
35,000.00 38,500.00
3,019,540.00 3,321,494.00
2,222,325.00 2,444,557.50
846,600.00 931,260.00
21,165.00 23,281.50
21,165.00 23,281.50
268,090.00 294,899.00
615,196.00 676,715.60
3,000,000.00 3,300,000.00
3,000,000.00 3,300,000.00
2,600,000.00 2,860,000.00
2,500,000.00 2,750,000.00
1,500,000.00 1,650,000.00
1,500,000.00 1,650,000.00
22,000.00
24,200.00
2,100,000.00 2,310,000.00
28,220.00 31,042.00
80,427.00 88,469.70
72,666.50 79,933.15
22,576.00 24,833.60
88,187.50 97,006.25
107,236.00 117,959.60
70,550.00 77,605.00
208,122.50 228,934.75
14,110.00 15,521.00
72,666.50 79,933.15
119,935.00 131,928.50
5,644.00 6,208.40
67,492.83 74,242.12
84,895.17 93,384.68
64,906.00 71,396.60
125,579.00 138,136.90
184,841.00 203,325.10
131,223.00 144,345.30
25,398.00 27,937.80
32,453.00 35,698.30
40,213.50 44,234.85
35,275.00 38,802.50
88,187.50 97,006.25
134,045.00 147,449.50
194,718.00 214,189.80
255,391.00 280,930.10
347,811.50 382,592.65
401,429.50 441,572.45
176,375.00 194,012.50
236,190.82 259,809.90
93,126.00 102,438.60
165,792.50 182,371.75
134,045.00 147,449.50
124,873.50 137,360.85
131,928.50 145,121.35
74,783.00 82,261.30
130,517.50 143,569.25
186,252.00 204,877.20
227,171.00 249,888.10
172,142.00 189,356.20
315,076.30 346,583.93
1,566.21 1,722.83
1,298.12 1,427.93
3,200.93 3,521.02
999.46 1,099.41
3,703.88 4,074.26
1,500.00 1,650.00
4,233.00 4,656.30
1,148.60 1,263.46
4,671.82 5,139.00
3,527.50 3,880.25
5,323.70 5,856.07
1,411.00 1,552.10
1,411.00 1,552.10
3,094.75 3,404.23
2,920.00 3,212.00
2,822.00 3,104.20
2,892.52 3,181.77
3,703.86 4,074.25
5,836.41 6,420.05
7,568.09 8,324.90
11,288.00 12,416.80
13,639.67 15,003.64
2,822.00 3,104.20
3,259.41 3,585.35
3,866.14 4,252.75
5,079.60 5,587.56
3,950.80 4,345.88
9,428.05 10,370.86
7,439.82 8,183.80
11,523.17 12,675.49
8,979.09 9,877.00
30,571.67 33,628.84
37,302.14 41,032.35
50,448.42 55,493.26
52,186.78 57,405.46
40,416.67 44,458.34
47,551.17 52,306.29
31,000.00 34,100.00
33,028.69 36,331.56
29,153.61 32,068.97
32,775.18 36,052.70
48,021.97 52,824.17
5,910.40 6,501.44
6,000.00 6,600.00
6,036.43 6,640.07
86,917.60 95,609.36
1,534,095.64 1,687,505.20
511,035.98 562,139.58
468,159.92 514,975.92
1,675.35 1,842.89
24,880.16 27,368.18
41,503.15 45,653.47
34,441.10 37,885.21
1,975,400.00 2,172,940.00
917,150.00 1,008,865.00
1,889,075.02 2,077,982.52
1,650,130.64 1,815,143.70
113,820.67 125,202.73
93,126.00 102,438.60
95,242.50 104,766.75
660,065.80 726,072.38
772,522.50 849,774.75
613,785.00 675,163.50
518,542.50 570,396.75
317,475.00 349,222.50
285,727.50 314,300.25
677,280.00 745,008.00
571,455.00 628,600.50
335,393.29 368,932.62
23,793.69 26,173.06
493,800.62 543,180.68
18,343.00 20,177.30
18,343.00 20,177.30
18,343.00 20,177.30
5,975.59 6,573.14
6,410.17 7,051.19
2,328.15 2,560.97
13,472.23 14,819.45
14,993.29 16,492.61
16,514.34 18,165.78
21,294.81 23,424.29
960.00 1,056.00
1,860.00 2,046.00
1,050.00 1,155.00
560.00
616.00
4,500.00 4,950.00
1,400.00
1,540.00
30,000.00 33,000.00
5,348.00 5,882.80
85,000.00
93,500.00
125,000.00 137,500.00
17,000.00 18,700.00
55,000.00 60,500.00
7,750,000.00 8,525,000.00
28,000.00 30,800.00
10,000.00 11,000.00
5,000.00 5,500.00
3,480.00 3,828.00
6,500.00 7,150.00
42,330.00 46,563.00
56,440.00 62,084.00
126,990.00 139,689.00
66,787.33 73,466.07
92,890.83 102,179.92
122,757.00 135,032.70
169,320.00 186,252.00
221,997.33 244,197.07
564,400.00 620,840.00
409,190.00 450,109.00
16,932.00 18,625.20
21,165.00 23,281.50
28,220.00 31,042.00
35,275.00 38,802.50
9,524.25 10,476.68
15,000.00 16,500.00
21,400.00 23,540.00
65,000.00 71,500.00
95,000.00 104,500.00
165,000.00 181,500.00
218,500.00 240,350.00
176,375.00 194,012.50
184,135.50 202,549.05
13,686.70 15,055.37
29,008.75 31,909.62
15,521.00 17,073.10
18,343.00 20,177.30
15,521.00 17,073.10
22,815.87 25,097.46
21,165.00 23,281.50
51,501.50 56,651.65
16,932.00 18,625.20
31,747.50 34,922.25
37,038.75 40,742.63
32,100.25 35,310.28
21,517.75 23,669.53
20,106.75 22,117.43
25,750.75 28,325.83
38,802.50 42,682.75
48,679.50 53,547.45
38,802.50 42,682.75
476,212.50 523,833.75
297,015.50 326,717.05
35,275.00 38,802.50
56,440.00 62,084.00
28,220.00 31,042.00
45,152.00 49,667.20
61,378.50 67,516.35
49,108.44 54,019.29
55,518.62 61,070.48
82,543.50 90,797.85
148,155.00 162,970.50
180,608.00 198,668.80
214,472.00 235,919.20
248,336.00 273,169.60
70,550.00 77,605.00
75,000.00 82,500.00
85,000.00 93,500.00
60,000.00 66,000.00
75,000.00 82,500.00
115,000.00 126,500.00
132,000.00 145,200.00
115,000.00 126,500.00
132,000.00 145,200.00
290,877.65 319,965.42
335,719.23 369,291.15
352,750.00 388,025.00
155,691.15 171,260.27
30,638.45 33,702.30
59,755.85 65,731.44
521,505.60 573,656.16
21,165.00 23,281.50
32,453.00 35,698.30
19,754.00 21,729.40
21,165.00 23,281.50
16,932.00 18,625.20
16,932.00 18,625.20
16,932.00 18,625.20
36,070.80 39,677.88
100,498.48 110,548.32
88,893.00 97,782.30
40,919.00 45,010.90
28,220.00 31,042.00
50,086.27 55,094.89
25,532.05 28,085.25
15,521.00 17,073.10
36,686.00 40,354.60
706,205.50 776,826.05
493,850.00 543,235.00
663,522.75 729,875.03
597,636.11 657,399.72
455,036.92 500,540.61
273,674.03 301,041.44
304,172.80 334,590.08
337,814.57 371,596.02
471,450.38 518,595.41
209,300.69 230,230.75
206,739.72 227,413.69
244,106.53 268,517.18
313,136.18 344,449.79
333,507.49 366,858.24
424,887.38 467,376.11
156,917.31 172,609.04
314,300.25 345,730.28
220,962.60 243,058.86
117,338.76 129,072.64
205,723.80 226,296.18
156,959.64 172,655.60
217,914.84 239,706.32
198,104.40 217,914.84
167,626.80 184,389.48
234,444.71 257,889.18
164,579.04 181,036.94
124,958.16 137,453.98
102,099.96 112,309.96
122,227.88 134,450.66
174,029.21 191,432.13
198,104.40 217,914.84
182,865.60 201,152.16
131,053.68 144,159.05
121,910.40 134,101.44
92,956.68 102,252.35
68,574.60 75,432.06
105,232.38 115,755.62
116,058.28 127,664.11
58,669.38 64,536.32
138,673.08 152,540.39
140,211.07 154,232.18
122,672.34 134,939.57
173,796.40 191,176.04
92,956.68 102,252.35
165,827.78 182,410.55
89,908.92 98,899.81
892,729.12 982,002.03
60,955.20 67,050.72
175,246.20 192,770.82
146,292.48 160,921.73
115,814.88 127,396.37
85,337.28 93,871.01
113,264.50 124,590.95
89,146.98 98,061.68
77,717.88 85,489.67
62,479.08 68,726.99
44,192.52 48,611.77
32,904.52 36,194.97
48,000.00 52,800.00
24,100.00 26,510.00
429,990.00 472,989.00
150,000.00 165,000.00
350,000.00 385,000.00
285,000.00 313,500.00
211,800.00 232,980.00
1,100,000.00
1,000,000.00
3,000,000.00 3,300,000.00
3,750,000.00 4,125,000.00
20,000.00
22,000.00
537,300.00
591,030.00
400,000.00 440,000.00
22,396.80 24,636.48
50,710.00 55,781.00
107,706.33 118,476.97
112,409.67 123,650.63
124,168.00 136,584.80
207,417.00 228,158.70
317,475.00 349,222.50
294,743.79 324,218.17
169,320.00 186,252.00
310,420.00 341,462.00
423,300.00 465,630.00
846,600.00 931,260.00
137,882.92 151,671.21
229,804.00 252,784.40
285,727.50 314,300.25
277,049.85 304,754.84
333,329.00 366,661.90
2,058,973.53 2,264,870.88
5,284,195.00 5,812,614.50
1,844,177.00 2,028,594.70
138,439.59 152,283.55
32,453.00 35,698.30
125,579.00 138,136.90
197,540.00 217,294.00
49,385.00 54,323.50
21,870.50 24,057.55
16,932.00 18,625.20
16,932.00 18,625.20
3,174.75 3,492.23
2,116.50 2,328.15
79,016.00 86,917.60
22,576.00 24,833.60
25,398.00 27,937.80
8,466.00 9,312.60
10,582.50 11,640.75
7,055.00 7,760.50
14,110.00 15,521.00
1,058.25 1,164.08
4,233.00 4,656.30
11,288.00 12,416.80
1,411.00 1,552.10
36,686.00 40,354.60
35,275.00 38,802.50
1,411.00 1,552.10
13,000.00 14,300.00
18,000.00 19,800.00
67,650.00 74,415.00
91,300.00 100,430.00
13,300.00 14,630.00
224,349.00 246,783.90
256,802.00 282,482.20
304,776.00 335,253.60
410,601.00 451,661.10
701,972.50 772,169.75
809,208.50 890,129.35
1,077,298.50 1,185,028.35
2,225,147.00 2,447,661.70
138,905.90 152,796.48
270,206.50 297,227.15
465,747.58 512,322.34
565,928.58 622,521.44
1,030,030.00 1,133,033.00
211,650.00 232,815.00
268,090.00 294,899.00
306,892.50 337,581.75
380,970.00 419,067.00
359,805.00 395,785.50
486,795.00 535,474.50
684,335.00 752,768.50
846,600.00 931,260.00
1,502,715.00 1,652,986.50
1,171,130.00 1,288,243.00
9,524.25 10,476.68
11,993.50 13,192.85
17,284.75 19,013.23
23,281.50 25,609.65
27,161.75 29,877.93
31,042.00 34,146.20
56,440.00 62,084.00
67,022.50 73,724.75
106,370.35 117,007.39
140,538.77 154,592.65
42,330.00 46,563.00
59,967.50 65,964.25
57,851.00 63,636.10
81,838.00 90,021.80
97,711.75 107,482.93
128,401.00 141,241.10
156,973.75 172,671.13
240,222.75 264,245.03
385,908.50 424,499.35
1,008,865.00 1,109,751.50
1,242,385.50 1,366,624.05
37,391.50 41,130.65
159,301.90 175,232.09
122,895.28 135,184.81
45,152.00 49,667.20
48,679.50 53,547.45
69,844.50 76,828.95
158,737.50 174,611.25
218,705.00 240,575.50
331,585.00 364,743.50
4,938.50 5,432.35
6,702.25 7,372.48
7,407.75 8,148.53
9,877.00 10,864.70
13,404.50 14,744.95
13,404.50 14,744.95
21,870.50 24,057.55
32,453.00 35,698.30
40,919.00 45,010.90
60,673.00 66,740.30
123,462.50 135,808.75
14,110.00 15,521.00
5,644.00 6,208.40
80,779.75 88,857.73
70,077.32 77,085.05
69,316.79 76,248.46
80,290.13 88,319.15
90,285.66 99,314.22
101,910.89 112,101.97
109,624.82 120,587.31
38,500.00 42,350.00
10,850.00 11,935.00
49,000.00 53,900.00
112,880.00 124,168.00
159,443.00 175,387.30
318,886.00 350,774.60
486,089.50 534,698.45
1,223,337.00 1,345,670.70
1,579,614.50 1,737,575.95
94,537.00 103,990.70
57,145.50 62,860.05
50,090.50 55,099.55
74,077.50 81,485.25
70,902.75 77,993.03
232,815.00 256,096.50
56,440.00 62,084.00
226,465.50 249,112.05
123,462.50 135,808.75
82,543.50 90,797.85
45,857.50 50,443.25
144,274.75 158,702.23
75,841.25 83,425.38
330,174.00 363,191.40
3,342,659.00 3,676,924.90
76,899.50 84,589.45
1,329,162.00 1,462,078.20
804,270.00 884,697.00
321,002.50 353,102.75
283,611.00 311,972.10
2,803,657.00 3,084,022.70
2,522,868.00 2,775,154.80
169,117.94 186,029.74
271,617.50 298,779.25
854,656.81 940,122.49
1,692,720.26 1,861,992.29
1,434,987.00 1,578,485.70
115,560.90 127,116.99
795,228.66 874,751.53
1,891,445.50 2,080,590.05
2,735,929.00 3,009,521.90
846,600.00 931,260.00
546,057.00 600,662.70
1,413,116.50 1,554,428.15
1,596,546.50 1,756,201.15
63,495.00 69,844.50
1,250,526.97 1,375,579.67
885,374.28 973,911.71
6,750,000.00 7,425,000.00
13,600,000.00 14,960,000.00
84,448.35 92,893.19
84,660.00 93,126.00
82,543.50 90,797.85
149,566.00 164,522.60
251,158.00 276,273.80
91,715.00 100,886.50
125,579.00 138,136.90
70,550.00 77,605.00
91,009.50 100,110.45
110,763.50 121,839.85
98,064.50 107,870.95
87,482.00 96,230.20
63,495.00 69,844.50
63,495.00 69,844.50
128,203.46 141,023.81
123,462.50 135,808.75
759,118.00 835,029.80
420,478.00 462,525.80
27,161.75 29,877.93
2,645.63 2,910.19
2,645.63 2,910.19
2,645.63 2,910.19
7,055.00 7,760.50
4,233.00 4,656.30
14,124.11 15,536.52
81,838.00 90,021.80
228,375.99 251,213.59
135,456.00 149,001.60
118,524.00 130,376.40
99,475.50 109,423.05
148,155.00 162,970.50
150,977.00 166,074.70
117,113.00 128,824.30
130,517.50 143,569.25
91,715.00 100,886.50
155,210.00 170,731.00
130,500.00 143,550.00
137,750.00 151,525.00
100,886.50 110,975.15
112,174.50 123,391.95
4,500.00 4,950.00
6,000.00 6,600.00
9,171.50 10,088.65
11,640.75 12,804.83
24,692.50 27,161.75
3,574.53 3,931.99
7,055.00 7,760.50
7,055.00 7,760.50
13,363.58 14,699.94
75,770.70 83,347.77
50,846.80 55,931.48
74,423.20 81,865.51
21,165.00 23,281.50
30,964.40 34,060.83
36,722.69 40,394.95
37,157.27 40,873.00
47,974.00 52,771.40
13,037.64 14,341.40
6,301.53 6,931.68
3,042.12 3,346.33
9,343.64 10,278.01
1,273,145.30 1,400,459.83
1,273,145.30 1,400,459.83
108,647.00 119,511.70
121,467.35 133,614.08
144,935.10 159,428.61
159,276.50 175,204.15
100,607.12 110,667.83
249,562.16 274,518.37
117,664.70 129,431.17
60,190.44 66,209.48
10,000.00 11,000.00
10,000.00 11,000.00
11,299.29 12,429.22
14,124.11 15,536.52
19,339.17 21,273.08
21,077.52 23,185.27
21,620.75 23,782.83
22,163.99 24,380.39
26,075.28 28,682.81
28,791.46 31,670.60
31,398.98 34,538.88
36,505.39 40,155.93
31,181.69 34,299.86
26,401.22 29,041.34
27,053.10 29,758.41
28,030.93 30,834.02
30,964.40 34,060.83
35,527.57 39,080.33
10,104.17 11,114.59
10,104.17 11,114.59
12,820.35 14,102.38
16,405.70 18,046.27
23,141.81 25,455.99
25,966.63 28,563.30
29,443.34 32,387.67
34,875.69 38,363.26
30,529.81 33,582.79
21,403.46 23,543.80
23,902.34 26,292.57
27,704.99 30,475.48
24,336.93 26,770.62
48,891.15 53,780.27
37,157.27 40,873.00
32,702.75 35,973.02
22,163.99 24,380.39
18,144.05 19,958.45
73,336.73 80,670.40
179,376.20 197,313.82
62,472.03 68,719.23
11,299.29 12,429.22
12,928.99 14,221.89
16,731.64 18,404.80
21,403.46 23,543.80
24,988.81 27,487.69
26,401.22 29,041.34
32,702.75 35,973.02
38,786.98 42,665.68
33,897.86 37,287.65
21,946.69 24,141.36
31,507.63 34,658.39
36,396.75 40,036.42
39,004.27 42,904.70
59,755.85 65,731.44
36,939.98 40,633.98
8,365.82 9,202.40
6,627.47 7,290.21
5,541.00 6,095.10
90,177.01 99,194.71
83,440.90 91,784.99
60,190.44 66,209.48
95,609.36 105,170.30
68,121.67 74,933.84
68,990.85 75,889.93
59,103.97 65,014.36
37,591.86 41,351.05
450,885.05 495,973.56
637,214.66 700,936.12
58,017.50 63,819.25
129,289.93 142,218.92
128,746.70 141,621.36
123,857.58 136,243.34
923,499.50 1,015,849.45
2,645,554.45 2,910,109.90
50,372.70 55,409.97
40,001.85 44,002.04
75,559.05 83,114.96
60,743.55 66,817.91
75,559.05 83,114.96
60,002.78 66,003.05
113,338.58 124,672.43
91,856.10 101,041.71
78,522.15 86,374.37
80,003.70 88,004.07
54,944.34 60,438.77
29,567.51 32,524.26
32,012.06 35,213.27
32,244.88 35,469.37
16,297.05 17,926.76
17,778.60 19,556.46
20,741.70 22,815.87
26,667.90 29,334.69
217,837.24 239,620.96
96,369.89 106,006.88
97,130.42 106,843.46
103,323.30 113,655.63
1,550.00 1,705.00
40,000.00 44,000.00
46,000.00 50,600.00
52,000.00 57,200.00
60,000.00 66,000.00
68,000.00 74,800.00
76,000.00 83,600.00
84,287,552.44 92,716,307.68
353,531,037.89 388,884,141.67
883,828,303.74 972,211,134.11
51,681,014.48 56,849,115.92
9,163,471.41 10,079,818.55
7,371,049.89 8,108,154.88
7,610,701.19 8,371,771.30
8,579,232.75 9,437,156.03
1,351,406.42 1,486,547.06
30,941,028.84 34,035,131.72
17,898,535.00 19,688,388.50
4,642,190.00 5,106,409.00
19,559,620.64 21,515,582.70
158,361.23 174,197.36
241,995.91 266,195.50
7,574.72 8,332.19
9,563.76 10,520.13
12,552.73 13,808.00
15,488.55 17,037.40
8,978.19 9,876.01
7,553.08 8,308.39
18,832.15 20,715.36
25,413.99 27,955.39
13,538.55 14,892.40
17,813.88 19,595.26
29,317.76 32,249.53
22,374.23 24,611.65
29,642.29 32,606.52
32,635.02 35,898.52
44,605.94 49,066.54
13,538.55 14,892.40
20,624.12 22,686.53
30,438.09 33,481.90
13,396.03 14,735.64
26,580.42 29,238.46
27,647.13 30,411.85
23,799.34 26,179.27
32,492.51 35,741.76
50,119.66 55,131.63
63,559.91 69,915.90
1,254,096.80 1,379,506.48
2,565,198.00 2,821,717.80
213,766.50 235,143.15
267,337.47 294,071.21
327,380.22 360,118.24
672,134.55 739,348.01
71,255.50 78,381.05
86,931.71 95,624.88
766,709.18 843,380.10
26,649.09 29,314.00
29,508.71 32,459.58
29,217.11 32,138.82
121,134.35 133,247.79
205,215.84 225,737.42
119,709.24 131,680.16
179,600.00 197,560.00
13,519.73 14,871.70
45,246.07 49,770.67
62,272.13 68,499.35
67,692.73 74,462.00
71,255.50 78,381.05
35,627.75 39,190.53
42,753.30 47,028.63
7,125.55 7,838.11
4,987.89 5,486.67
178,138.75 195,952.63
413,281.90 454,610.09
178,138.75 195,952.63
149,636.55 164,600.21
171,746.92 188,921.61
541,541.80 595,695.98
285,022.00 313,524.20
1,054,581.40 1,160,039.54
135,385.45 148,924.00
57,004.40 62,704.84
598,546.20 658,400.82
256,519.80 282,171.78
1,061,372.54 1,167,509.80
1,116,999.81 1,228,699.79
43,360.03 47,696.03
58,866.92 64,753.61
91,698.07 100,867.87
115,491.76 127,040.94
155,147.92 170,662.71
31,393,254.34 34,532,579.77
31,238,580.52 34,362,438.57
31,038,670.04 34,142,537.04
32,030,419.61 35,233,461.57
55,250,752.76 60,775,828.04
56,244,971.58 61,869,468.74
31,474,344.51 34,621,778.96
60,870,271.91 66,957,299.10
4,392,795.75 4,832,075.33
4,334,422.68 4,767,864.95
1,088,149.09 1,196,964.00
790,160.00 869,176.00
6,026,254.01 6,628,879.41
3,970,060.15 4,367,066.17
3,997,616.98 4,397,378.68
2,477,250.37 2,724,975.41
397,549.25 437,304.18
405,036.02 445,539.62
344,628.28 379,091.11
319,313.53 351,244.89
159,602.44 175,562.69
87,608.99 96,369.89
3,761,260.37 4,137,386.41
3,801,558.53 4,181,714.38
585,212.25 643,733.48
549,101.94 604,012.13
583,651.68 642,016.85
560,944.46 617,038.91
564,964.40 621,460.84
569,201.63 626,121.80
549,753.82 604,729.20
639,170.30 703,087.33
651,990.65 717,189.71
1,648,718.23 1,813,590.05
2,485,082.83 2,733,591.11
560,025.90 616,028.49
571,048.63 628,153.50
401,993.90 442,193.29
396,452.90 436,098.19
260,329.50 286,362.45
260,329.50 286,362.45
591,209.00 650,329.90
260,329.50 286,362.45
311,831.00 343,014.10
591,209.00 650,329.90
302,659.50 332,925.45
301,650.64 331,815.70
302,038.66 332,242.53
301,340.22 331,474.24
285,353.59 313,888.94
262,149.69 288,364.66
283,491.07 311,840.17
130,609.22 143,670.14
62,860.05 69,146.06
55,029.00 60,531.90
55,029.00 60,531.90
62,860.05 69,146.06
64,955.39 71,450.92
65,809.04 72,389.94
71,862.23 79,048.45
65,653.83 72,219.21
65,110.60 71,621.65
65,809.04 72,389.94
65,809.04 72,389.94
65,809.04 72,389.94
65,809.04 72,389.94
158,857.44 174,743.18
156,529.29 172,182.21
656,383.09 722,021.40
451,131.98 496,245.17
460,973.70 507,071.07
184,666.98 203,133.67
1,198,722.11 1,318,594.32
257,789.70 283,568.67
408,366.92 449,203.61
198,433.63 218,277.00
260,654.03 286,719.43
94,687.51 104,156.26
78,769.08 86,645.98
771,936.94 849,130.63
93,586.93 102,945.62
118,869.70 130,756.66
113,613.72 124,975.09
60,602.45 66,662.70
533,358.00 586,693.80
75,000.00 82,500.00
42,475.80 46,723.38
13,075.27 14,382.79
88,469.70 97,316.67
22,787.65 25,066.42
32,899.82 36,189.80
43,693.97 48,063.36
34,549.75 38,004.72
30,944.64 34,039.11
24,554.22 27,009.64
15,000.00 16,500.00
35,000.00 38,500.00
14,251.10 15,676.21
20,142.03 22,156.23
3,259,410.00 3,585,351.00
646,238.00 710,861.80
675,869.00 743,455.90
265,268.00 291,794.80
88,300.00 97,130.00
88,300.00 97,130.00
21,400.17 23,540.18
25,000.00 27,500.00
123,205.70 135,526.27
70,077.32 77,085.05
103,214.65 113,536.12
69,751.37 76,726.51
71,055.14 78,160.65
132,400.00 145,640.00
150,000.00 165,000.00
63,500.00 69,850.00
47,974.00 52,771.40
13,404.50 14,744.95
16,106.55 17,717.21
18,173.68 19,991.05
1,624,815.89 1,787,297.47
1,580,320.00 1,738,352.00
1,855,465.00 2,041,011.50
15,521.00 17,073.10
1,552,100.00 1,707,310.00
1,693,200.00 1,862,520.00
1,664,980.00 1,831,478.00
22,576.00 24,833.60
19,754.00 21,729.40
1,312,230.00 1,443,453.00
1,058,250.00 1,164,075.00
1,086,470.00 1,195,117.00
1,087,175.50 1,195,893.05
1,107,635.00 1,218,398.50
1,243,443.75 1,367,788.13
1,299,389.90 1,429,328.89
1,325,493.40 1,458,042.74
1,342,284.30 1,476,512.73
1,359,039.93 1,494,943.92
1,408,530.75 1,549,383.83
1,426,450.45 1,569,095.50
1,451,742.63 1,596,916.89
1,484,089.80 1,632,498.78
1,505,572.28 1,656,129.50
1,529,538.11 1,682,491.92
1,589,511.96 1,748,463.16
1,411,000.00 1,552,100.00
1,672,035.00 1,839,238.50
1,552,100.00 1,707,310.00
1,693,200.00 1,862,520.00
1,834,300.00 2,017,730.00
270,912.00 298,003.20
499,494.00 549,443.40
1,164,187.88 1,280,606.67
1,530,935.00 1,684,028.50
2,661,851.50 2,928,036.65
8,154,451.20 8,969,896.32
12,952,133.40 14,247,346.74
51,150,866.50 56,265,953.15
23,210,950.00 25,532,045.00
202,644,236.06 222,908,659.67
6,999,971.00 7,699,968.10
1,058,250.00 1,164,075.00
1,693,200.00 1,862,520.00
3,245,300.00 3,569,830.00
1,515,414.00 1,666,955.40
1,515,414.00 1,666,955.40
1,752,462.00 1,927,708.20
1,752,462.00 1,927,708.20
1,752,462.00 1,927,708.20
1,752,462.00 1,927,708.20
3,555,720.00 3,911,292.00
5,308,182.00 5,839,000.20
17,483,475.24 19,231,822.76
20,673,139.51 22,740,453.46
2,879,145.50 3,167,060.05
3,498,433.40 3,848,276.74
4,128,586.00 4,541,444.60
5,627,914.60 6,190,706.06
4,878,250.30 5,366,075.33
6,627,467.00 7,290,213.70
9,813,787.20 10,795,165.92
13,867,308.00 15,254,038.80
906,433.46 997,076.80
906,433.46 997,076.80
1,417,067.30 1,558,774.03
1,414,245.30 1,555,669.83
1,509,064.50 1,659,970.95
1,889,329.00 2,078,261.90
2,278,059.50 2,505,865.45
2,278,059.50 2,505,865.45
2,458,526.40 2,704,379.04
2,458,526.40 2,704,379.04
3,336,450.60 3,670,095.66
4,364,349.99 4,800,784.99
4,801,350.80 5,281,485.88
6,422,872.00 7,065,159.20
83,021,829.00 91,324,011.90
10,246,569.12 11,271,226.03
24,224,824.05 26,647,306.46
2,669,456.79 2,936,402.47
4,448,883.00 4,893,771.30
7,519,219.00 8,271,140.90
1,938,714.00 2,132,585.40
3,622,037.00 3,984,240.70
6,990,094.00 7,689,103.40
8,985,248.00 9,883,772.80
1,938,714.00 2,132,585.40
3,622,037.00 3,984,240.70
6,990,094.00 7,689,103.40
8,985,248.00 9,883,772.80
16,600,415.00 18,260,456.50
352,750.00 388,025.00
70,550.00 77,605.00
203,184.00 223,502.40
90,304.00 99,334.40
97,359.00 107,094.90
90,304.00 99,334.40
97,359.00 107,094.90
21,165.00 23,281.50
97,359.00 107,094.90
128,401.00 141,241.10
36,686.00 40,354.60
2,822.00 3,104.20
60,673.00 66,740.30
28,220.00 31,042.00
98,770.00 108,647.00
8,466.00 9,312.60
8,500.00 9,500.00
9,000.00 9,900.00
56,440.00 62,084.00
56,440.00 62,084.00
173,553.00 190,908.30
148,155.00 162,970.50
98,770.00 108,647.00
17,637.50 19,401.25
48,456.56 53,302.22
27,704.99 30,475.48
41,285.86 45,414.45
10,104.17 11,114.59
10,973.35 12,070.68
35,275.00 38,802.50
183,430.00 201,773.00
406,368.00 447,004.80
714,354.03 785,789.43
214,795.12 236,274.63
695,340.80 764,874.88
46,935,504.00 51,629,054.40
3,969,309.50 4,366,240.45
209,471.42 230,418.56
7,212,284.17 7,933,512.59
289,109.67 318,020.63
573,982.10 631,380.31
473,483.63 520,831.99
310,839.07 341,922.97
170,249.85 187,274.83
63,914.86 70,306.34
63,914.86 70,306.34
28,356.87 31,192.55
32,050.87 35,255.95
44,762.56 49,238.82
135,156.87 148,672.55
96,695.83 106,365.41
29,117.40 32,029.14
16,948.93 18,643.83
21,294.81 23,424.29
216,997.69 238,697.46
282,200.00 310,420.00
292,570.85 321,827.94
241,097.57 265,207.33
233,294.74 256,624.21
198,132.62 217,945.88
114,079.35 125,487.29
7,231,248.01 7,954,372.81
5,974,794.84 6,572,274.32
2,671,333.42 2,938,466.76
72,497.18 79,746.90
91,461.02 100,607.12
399,327.11 439,259.82
576,125.41 633,737.95
48,002.22 52,802.44
67,492.83 74,242.12
84,895.17 93,384.68
64,906.00 71,396.60
125,579.00 138,136.90
177,687.23 195,455.95
33,864.00 37,250.40
49,385.00 54,323.50
53,928.42 59,321.26
5,432.35 5,975.59
151,710.72 166,881.79
183,712.20 202,083.42
261,246.65 287,371.32
339,077.41 372,985.15
160,698.79 176,768.67
205,441.60 225,985.76
399,919.73 439,911.70
265,493.76 292,043.14
125,536.67 138,090.34
287,321.93 316,054.12
366,634.24 403,297.66
228,158.70 250,974.57
130,376.40 143,414.04
167,711.46 184,482.61
266,185.15 292,803.67
336,805.70 370,486.27
380,264.50 418,290.95
103,412.19 113,753.41
135,216.13 148,737.74
201,490.80 221,639.88
270,432.26 297,475.49
366,140.39 402,754.43
475,182.47 522,700.72
77,336.91 85,070.60
36,544.90 40,199.39
82,966.80 91,263.48
115,363.36 126,899.70
244,455.75 268,901.33
461,749.75 507,924.73
597,558.50 657,314.35
26,075.28 28,682.81
29,235.92 32,159.51
16,297.05 17,926.76
22,815.87 25,097.46
309,643.95 340,608.35
543,235.00 597,558.50
706,205.50 776,826.05
87,213.91 95,935.30
125,339.13 137,873.04
54,224.73 59,647.20
66,274.67 72,902.14
71,114.40 78,225.84
45,730.51 50,303.56
1,303,764.00 1,434,140.40
54,817.35 60,299.09
30,915.01 34,006.51
14,124.11 15,536.52
119,511.70 131,462.87
9,235.00 10,158.49
554,099.70 609,509.67
1,035,702.22 1,139,272.44
1,303,764.00 1,434,140.40
1,521,058.00 1,673,163.80
2,814,945.00 3,096,439.50
4,291,556.50 4,720,712.15
1,097,758.00 1,207,533.80
1,207,533.80 1,328,287.18
2,650,704.60 2,915,775.06
3,230,766.70 3,553,843.37
83,954.50 92,349.95
105,387.59 115,926.35
146,673.45 161,340.80
239,023.40 262,925.74
2,879,145.50 3,167,060.05
706,205.50 776,826.05
59,755.85 65,731.44
157,044.30 172,748.73
31,507.63 34,658.39
11,161.01 12,277.11
40,693.24 44,762.56
34,075.65 37,483.22
51,557.94 56,713.73
53,138.26 58,452.09
5,531.12 6,084.23
651,882.00 717,070.20
543,235.00 597,558.50
41,388.86 45,527.75
19,919.09 21,911.00
7,760.50 8,536.55
62,084.00 68,292.40
2,116.50 2,328.15
260,752.80 286,828.08
232,815.00 256,096.50
70,550.00 77,605.00
7,055.00 7,760.50
190,485.00 209,533.50
132,634.00 145,897.40
174,964.00 192,460.40
261,035.00 287,138.50
119,935.00 131,928.50
63,495.00 69,844.50
56,440.00 62,084.00
49,385.00 54,323.50
84,660.00 93,126.00
90,304.00 99,334.40
97,359.00 107,094.90
100,181.00 110,199.10
132,634.00 145,897.40
42,330.00 46,563.00
2,116.50 2,328.15
6,067.30 6,674.03
5,591.09 6,150.20
10,751.82 11,827.00
8,804.64 9,685.10
1,781.39 1,959.53
296.31 325.94
2,028.31 2,231.14
5,926.20 6,518.82
5,291.25 5,820.38
9,877.00 10,864.70
14,392.20 15,831.42
1,940.13 2,134.14
3,703.88 4,074.26
9,453.70 10,399.07
57,851.00 63,636.10
24,748.94 27,223.83
21,729.40 23,902.34
21,306.10 23,436.71
289,960.50 318,956.55
162,265.00 178,491.50
6,608.18 7,269.00
8,861.08 9,747.19
5,538.18 6,091.99
9,277.33 10,205.06
18,343.00 20,177.30
99,000.00 108,900.00
350.00 385.00
140,000.00 154,000.00
450,000.00 495,000.00
42,500.00 46,750.00
190,000.00 209,000.00
110,700.00 121,770.00
1,500,000.00 1,650,000.00
A.4.4.3.11. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh
Semen portland kg
Semen Warna Kg
Pasir Pasang M3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
ubin teralux marmer ukuran 60cm x60cm Bh
Semen portland kg
Semen Warna Kg
Pasir Pasang M3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh
Semen portland kg
Semen Warna Kg
Pasir Pasang M3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
ubin teralux marmer ukuran 30cm x30cm Bh
Semen portland kg
Semen Warna Kg
Pasir Pasang M3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
keramik artistik 10cm x 10cm atau 5cm x 20cm Bh
Semen portland Kg
Pasir Pasang M3
Semen Warna Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
6.6300 -
9.8000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 36,560.43
10% 3,656.04
- 40,216.00
11.8700 -
10.0000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 36,560.43
10% 3,656.04
- 40,216.00
26.5000 -
10.4000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 39,475.94
10% 3,947.59
- 43,423.00
6.6300 -
9.8000 -
1.3000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 36,560.43
10% 3,656.04
- 40,216.00
26.5000 -
10.4000 -
1.6200 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 39,475.94
10% 3,947.59
- 43,423.00
6.6300 -
9.8000 -
1.3000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 36,560.43
10% 3,656.04
- 40,216.00
11.8700 -
10.0000 -
1.5000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 37,901.70
10% 3,790.17
- 41,691.00
6.6300 -
9.8000 -
1.3000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 36,560.43
10% 3,656.04
- 40,216.00
11.8700 -
10.0000 -
1.5000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 37,901.70
10% 3,790.17
- 41,691.00
6.6300 -
9.8000 -
1.3000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 36,560.43
10% 3,656.04
- 40,216.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
11.8700 -
10.0000 -
1.5000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 37,901.70
10% 3,790.17
- 41,691.00
3.1000 -
9.6000 -
1.5000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 34,986.19
10% 3,498.62
- 38,484.00
6.6300 -
9.8000 -
1.3000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 36,560.43
10% 3,656.04
- 40,216.00
11.8700 -
10.0000 -
1.5000 -
0.0450 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 37,901.70
10% 3,790.17
- 41,691.00
3.5300 -
1.2400 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
2.6500 -
1.2400 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
2.6500 -
1.1400 -
0.1000 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
3.5300 -
1.1400 -
0.1000 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
2.6500 -
1.1400 -
0.1000 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
3.5300 -
1.1400 -
0.1000 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 19,406.18
10% 1,940.62
- 21,346.00
2.6500 -
1.1400 -
0.1000 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
2.6500 -
1.1400 -
0.1000 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
2.6300 -
1.1400 -
0.1000 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
3.5300 -
1.1400 -
0.1000 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
1.7000 -
1.1400 -
0.1000 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
2.6500 -
1.1400 -
0.1000 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
3.5300 -
1.1400 -
0.1000 -
0.0030 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,135.50
10% 1,813.55
- 19,949.00
0.0360 -
0.1000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 52,479.28
10% 5,247.93
- 57,727.00
53.0000 -
8.1900 -
0.0450 -
2.7500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 102,043.05
10% 10,204.30
- 112,247.00
106.0000 -
8.1900 -
0.0450 -
3.2000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 102,043.05
10% 10,204.30
- 112,247.00
10.0000 -
8.1900 -
0.0450 -
1.6200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 102,043.05
10% 10,204.30
- 112,247.00
11.8700 -
10.0000 -
0.0450 -
1.5000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 102,043.05
10% 10,204.30
- 112,247.00
26.5000 -
10.4000 -
0.0450 -
1.6200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 102,043.05
10% 10,204.30
- 112,247.00
33.0000 -
9.8000 -
0.0450 -
4.3700 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 153,181.05
10% 15,318.11
- 168,499.00
11.8700 -
14.1500 -
0.0390 -
2.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 102,043.05
10% 10,204.30
- 112,247.00
5.3000 -
1.1400 -
0.0030 -
0.0250 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 21,072.19
10% 2,107.22
- 23,179.00
10.6000 -
1.1400 -
0.0030 -
0.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 21,072.19
10% 2,107.22
- 23,179.00
5.3000 -
0.5700 -
0.0015 -
0.0130 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 21,072.19
10% 2,107.22
- 23,179.00
5.3000 -
1.1400 -
0.0030 -
0.1000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 150,689.10
10% 15,068.91
- 165,758.00
1.0600 -
8.1900 -
0.0450 -
0.6500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 102,043.05
10% 10,204.30
- 112,247.00
1.0500 -
0.3500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 35,402.69
10% 3,540.27
- 38,942.00
1.0500 -
0.6000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 104,513.82
10% 10,451.38
- 114,965.00
1.0500 -
0.6000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 104,513.82
10% 10,451.38
- 114,965.00
86.0000 -
9.3000 -
0.0180 -
1.5000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 145,775.78
10% 14,577.58
- 160,353.00
53.0000 -
9.3000 -
0.0180 -
2.7500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 131,198.21
10% 13,119.82
- 144,318.00
26.0000 -
9.3000 -
0.0180 -
1.9400 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 131,198.21
10% 13,119.82
- 144,318.00
53.0000 -
9.3000 -
0.0180 -
2.7500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 131,198.21
10% 13,119.82
- 144,318.00
106.0000 -
9.3000 -
0.0180 -
2.9000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 131,198.21
10% 13,119.82
- 144,318.00
53.0000 -
9.3000 -
0.0180 -
2.7500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 131,198.21
10% 13,119.82
- 144,318.00
26.5000 -
9.3000 -
0.0180 -
1.9400 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 131,198.21
10% 13,119.82
- 144,318.00
1.0600 -
12.4400 -
0.0250 -
0.6500 -
3.0300 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 189,508.52
10% 18,950.85
- 208,459.00
63.0000 -
12.4400 -
0.0250 -
2.7500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 145,775.78
10% 14,577.58
- 160,353.00
1.1000 -
11.7500 -
0.0350 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 102,043.05
10% 10,204.30
- 112,247.00
1.1000 -
11.7500 -
0.0350 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 102,043.05
10% 10,204.30
- 112,247.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
11.8700 -
0.3500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 30,185.82
10% 3,018.58
- 33,204.00
2.2000 -
0.2500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 49,104.91
10% 4,910.49
- 54,015.00
5.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 24,100.66
10% 2,410.07
- 26,510.00
1.7600 -
0.0800 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 16,067.10
10% 1,606.71
- 17,673.00
0.0030 -
0.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 24,100.66
10% 2,410.07
- 26,510.00
1.0100 -
0.0500 -
MLAH HARGA BAHAN -
-
0.1000 - -
UMLAH HARGA ALAT -
- 50,774.45
10% 5,077.44
- 55,851.00
1.01 -
0.07 -
MLAH HARGA BAHAN -
-
0.1000 - -
UMLAH HARGA ALAT -
- 50,774.45
10% 5,077.44
- 55,851.00
1.0100 -
0.0500 -
MLAH HARGA BAHAN -
-
0.1000 - -
UMLAH HARGA ALAT -
- 50,774.45
10% 5,077.44
- 55,851.00
1.0100 -
0.0700 -
MLAH HARGA BAHAN -
-
0.1000 - -
UMLAH HARGA ALAT -
- 50,774.45
10% 5,077.44
- 55,851.00
0.3650 -
20.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 21,982.85
10% 2,198.28
- 24,181.00
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Asbes semen m2
Paku tripleks kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Tripleks Lembar
Paku tripleks kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Profil Allum"T" m
Kawat dia 4 mm kg
Ramset Buah
Akustik 60 x 120 Lembar
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
1.1000 -
0.0100 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 11,224.38
10% 1,122.44
- 12,346.00
12.0000 -
0.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 24,947.78
10% 2,494.78
- 27,442.00
5.8000 -
0.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 24,947.78
10% 2,494.78
- 27,442.00
1.5000 -
0.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,789.82
10% 2,078.98
- 22,868.00
3 mm, 4 mm & 6
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
0.3750 -
0.0300 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,789.82
10% 2,078.98
- 22,868.00
0.0150 -
0.0100 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 166,318.52
10% 16,631.85
- 182,950.00
m, tebal 9 mm
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
0.3640 -
0.1100 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 14,930.55
10% 1,493.05
- 16,423.00
3.6000 -
0.1500 -
1.0500 -
1.5000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 103,949.08
10% 10,394.91
- 114,343.00
1.0500 -
0.0100 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 10,454.91
10% 1,045.49
- 11,500.00
1.0500 -
6.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 14,930.55
10% 1,493.05
- 16,423.00
25.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,455.82
10% 2,245.58
- 24,701.00
25.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,512.30
10% 2,251.23
- 24,763.00
12.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,512.30
10% 2,251.23
- 24,763.00
5.0000 -
8.0000 -
0.0320 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 57,562.02
10% 5,756.20
- 63,318.00
4.0000 -
8.0000 -
0.0320 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 57,562.02
10% 5,756.20
- 63,318.00
0.6000 -
0.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,585.09
10% 2,058.51
- 22,643.00
0.5000 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 21,665.18
10% 2,166.52
- 23,831.00
0.6000 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 21,665.18
10% 2,166.52
- 23,831.00
0.6000 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,902.76
10% 2,090.28
- 22,993.00
0.7500 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,902.76
10% 2,090.28
- 22,993.00
0.3500 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,902.76
10% 2,090.28
- 22,993.00
0.4200 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,902.76
10% 2,090.28
- 22,993.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
0.4400 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,902.76
10% 2,090.28
- 22,993.00
0.5100 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,902.76
10% 2,090.28
- 22,993.00
0.3700 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,902.76
10% 2,090.28
- 22,993.00
0.3800 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,902.76
10% 2,090.28
- 22,993.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
0.4600 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,902.76
10% 2,090.28
- 22,993.00
0.4900 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,902.76
10% 2,090.28
- 22,993.00
0.5700 -
0.1200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,902.76
10% 2,090.28
- 22,993.00
2.4000 -
6.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,300.52
10% 2,230.05
- 24,530.00
2.1000 -
6.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,300.52
10% 2,230.05
- 24,530.00
2.0500 -
6.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,300.52
10% 2,230.05
- 24,530.00
1.2000 -
6.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,300.52
10% 2,230.05
- 24,530.00
1.2000 -
6.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,300.52
10% 2,230.05
- 24,530.00
1.2000 -
6.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,300.52
10% 2,230.05
- 24,530.00
1.1000 -
6.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 26,303.18
10% 2,630.32
- 28,933.00
1.1000 -
6.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,300.52
10% 2,230.05
- 24,530.00
11.0000 -
0.0300 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 29,861.09
10% 2,986.11
- 32,847.00
6.9000 -
0.3500 -
0.0300 -
0.5000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 50,248.52
10% 5,024.85
- 55,273.00
1.3000 -
0.2000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 28,781.01
10% 2,878.10
- 31,659.00
30.0000 -
0.2000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 44,318.66
10% 4,431.87
- 48,750.00
3.5000 -
0.0500 -
10.8000 -
0.0320 -
1.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 59,722.19
10% 5,972.22
- 65,694.00
2.0000 -
0.0500 -
0.0035 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 40,605.44
10% 4,060.54
- 44,665.00
1.1000 -
0.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 40,316.00
10% 4,031.60
- 44,347.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
0.4000 -
0.0500 -
0.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 40,605.44
10% 4,060.54
- 44,665.00
- -
0.1200 84,712 10,165.48
0.0600 105,890 6,353.42
0.0060 112,950 677.70
0.0060 120,009 720.05
LAH TENAGA KERJA 17,916.66
0.7000 -
0.0200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 17,916.66
10% 1,791.67
- 19,708.00
0.3000 -
0.0400 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 21,629.88
10% 2,162.99
- 23,792.00
1.0500 -
0.0200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 101,880.68
10% 10,188.07
- 112,068.00
1.2000 -
0.0400 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 131,657.06
10% 13,165.71
- 144,822.00
1.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 19,526.19
10% 1,952.62
- 21,478.00
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3
Paku Biasa Kg
Lem Kayu/Karet Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3
Paku Biasa Kg
Lem Kayu/Karet Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Paku Biasa Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Lem Kayu/Karet Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Lem Kayu/Karet Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Lem Kayu/Karet Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Paku Biasa kg
Lem Kayu/Karet kg
Plywood 4 mm Lembar
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
kayu Papan m3
Paku Biasa kg
Lem Kayu/Karet kg
Plywood 4 mm Lembar
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu Papan m3
Paku Biasa kg
Lem Kayu/Karet kg
Teakwood 4 mm 90 x 220 cm Lembar
Formika Lembar
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3
Besi strip kg
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu 5/7 m3
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu 5/7 m3
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu Papan m3
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kayu Papan m3
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3
Paku Biasa kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
1.1000 -
1.2500 -
1.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 3,095,882.33
10% 309,588.23
- 3,405,470.00
1.2000 -
1.2500 -
1.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 2,653,613.42
10% 265,361.34
- 2,918,974.00
0.0400 -
0.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 154,854.12
10% 15,485.41
- 170,339.00
0.0400 -
0.0500 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 154,854.12
10% 15,485.41
- 170,339.00
0.0400 -
0.5000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 442,268.90
10% 44,226.89
- 486,495.00
0.0240 -
0.3000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 353,815.12
10% 35,381.51
- 389,196.00
0.0640 -
0.5000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 442,268.90
10% 44,226.89
- 486,495.00
0.0250 -
0.0300 -
0.5000 -
1.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 309,588.23
10% 30,958.82
- 340,547.00
0.0256 -
0.0300 -
0.5000 -
1.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 353,815.12
10% 35,381.51
- 389,196.00
0.06 -
0.15 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 331,331.06
10% 33,133.11
- 364,464.00
0.025 -
0.03 -
0.3 -
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 353,815.12
10% 35,381.51
- 389,196.00
ayu kelas II
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
0.025 -
0.03 -
0.8 -
1.000 -
0.5 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 375,988.57
10% 37,598.86
- 413,587.00
1.100 -
15.000 -
5.600 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 1,769,075.62
10% 176,907.56
- 1,945,983.00
1.200 -
15.000 -
5.600 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 2,963,201.66
10% 296,320.17
- 3,259,521.00
1.100 -
15.000 -
3.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 2,963,201.66
10% 296,320.17
- 3,259,521.00
0.014 -
0.036 -
0.25 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,789.82
10% 2,078.98
- 22,868.00
0.014 -
0.057 -
0.25 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,789.82
10% 2,078.98
- 22,868.00
0.014 -
0.057 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 24,947.78
10% 2,494.78
- 27,442.00
0.0154 -
0.2 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 56,863.14
10% 5,686.31
- 62,549.00
0.0163 -
0.25 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 53,298.17
10% 5,329.82
- 58,627.00
0.0108 -
0.1 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 32,508.35
10% 3,250.84
- 35,759.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
0.011 -
0.05 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 32,508.35
10% 3,250.84
- 35,759.00
0.028 -
0.15 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 66,400.34
10% 6,640.03
- 73,040.00
0.028 -
0.15 -
0.86 -
0.56 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 88,453.78
10% 8,845.38
- 97,299.00
0.007 -
0.100 -
0.150 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 265,361.34
10% 26,536.13
- 291,897.00
0.400 -
0.050 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 11,083.20
10% 1,108.32
- 12,191.00
1.500 -
0.014 -
0.012 -
0.003 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 14,930.55
10% 1,493.05
- 16,423.00
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.1. Pemasangan 1 buah kunci tanam antik
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam antik Bh
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 75,753.99
10% 7,575.40
- 83,329.00
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 60,039.86
10% 6,003.99
- 66,043.00
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 59,376.28
10% 5,937.63
- 65,313.00
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,944.50
10% 1,894.45
- 20,838.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 12,625.67
10% 1,262.57
- 13,888.00
- -
0.100 84,712 8,471.23
0.200 105,890 21,178.08
0.020 112,950 2,259.00
0.001 120,009 60.00
LAH TENAGA KERJA 31,968.31
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 31,968.31
10% 3,196.83
- 35,165.00
- -
0.015 84,712 1,270.68
0.150 105,890 15,883.56
0.015 112,950 1,694.25
0.008 120,009 960.07
LAH TENAGA KERJA 19,808.56
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 19,808.56
10% 1,980.86
- 21,789.00
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 19,808.56
10% 1,980.86
- 21,789.00
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 63,188.33
10% 6,318.83
- 69,507.00
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 25,251.33
10% 2,525.13
- 27,776.00
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 63,188.33
10% 6,318.83
- 69,507.00
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 13,165.71
10% 1,316.57
- 14,482.00
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 75,753.99
10% 7,575.40
- 83,329.00
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 31,570.16
10% 3,157.02
- 34,727.00
1.100 -
0.050 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,944.50
10% 1,894.45
- 20,838.00
1.100 -
0.050 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 18,944.50
10% 1,894.45
- 20,838.00
1.100 -
0.070 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 21,469.63
10% 2,146.96
- 23,616.00
1.100 -
0.070 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 31,570.16
10% 3,157.02
- 34,727.00
1.100 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 19,808.56
10% 1,980.86
- 21,789.00
1.100 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,441.71
10% 2,244.17
- 24,685.00
1.100 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 19,808.56
10% 1,980.86
- 21,789.00
1.100 -
0.050 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 24,411.27
10% 2,441.13
- 26,852.00
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Soda api Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg
Plamuur Kg
Cat dasar Kayu Kg
Cat Penutup Kayu Kg
Kuas Bh
Pengencer Kg
Ampelas Lbr
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg
Plamuur Kg
Cat dasar Kayu Kg
Cat Penutup Kayu Kg
Kuas Bh
Pengencer Kg
Ampelas Lbr
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg
Cat dasar Tembok Kg
Cat Penutup Tembok Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Tembok Kg
Cat Penutup Tembok Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Cat Besi Kg
Kuas Bh
Pengencer L
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Cat Besi Kg
Pengencer L
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
0.050 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 13,066.88
10% 1,306.69
- 14,373.00
0.050 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 13,066.88
10% 1,306.69
- 14,373.00
0.050 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 13,666.92
10% 1,366.69
- 15,033.00
0.200 -
0.150 -
0.170 -
0.260 -
0.010 -
0.030 -
0.200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 7,857.07
10% 785.71
- 8,642.00
0.200 -
0.150 -
0.170 -
0.350 -
0.010 -
0.030 -
0.200 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 17,118.95
10% 1,711.89
- 18,830.00
0.360 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 17,090.71
10% 1,709.07
- 18,799.00
0.150 -
0.372 -
2.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 11,485.58
10% 1,148.56
- 12,634.00
0.350 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 9,191.29
10% 919.13
- 10,110.00
0.150 -
0.050 -
0.100 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 31,534.16
10% 3,153.42
- 34,687.00
0.100 -
0.100 -
0.260 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 8,992.21
10% 899.22
- 9,891.00
0.120 -
0.180 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 7,357.26
10% 735.73
- 8,092.00
0.100 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 7,357.26
10% 735.73
- 8,092.00
0.150 -
0.100 -
0.250 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 13,117.00
10% 1,311.70
- 14,428.00
0.300 -
0.200 -
0.250 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 4,239.15
10% 423.91
- 4,663.00
0.100 -
0.010 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 24,019.47
10% 2,401.95
- 26,421.00
0.100 -
0.010 -
0.010 -
0.002 #REF! #REF!
MLAH HARGA BAHAN #REF!
- -
UMLAH HARGA ALAT -
- #REF!
10% #REF!
- #REF!
0.100 -
0.100 -
0.080 -
0.010 -
0.010 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 48,865.60
10% 4,886.56
- 53,752.00
0.300 -
0.010 -
0.010 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 12,728.03
10% 1,272.80
- 14,000.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
0.110 -
0.170 -
0.080 -
0.010 -
0.010 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 124,385.92
10% 12,438.59
- 136,824.00
0.300 -
0.010 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 113,373.32
10% 11,337.33
- 124,710.00
0.300 -
0.010 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 113,373.32
10% 11,337.33
- 124,710.00
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Closet duduk Unit
Perlengkapan %
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah M3
Semen portland Kg
Pasir pasang M3
Porselen 11x11 bh
Semen warna Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh
Semen portland Kg
Pasir pasang M3
Pasir beton M3
Kerikil M3
Baja tulangan Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh
Semen portland Kg
Pasir pasang M3
Pasir beton M3
Kerikil M3
Baja tulangan Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh
Semen portland Kg
Pasir pasang M3
Pasir beton M3
Kerikil M3
Baja tulangan Kg
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah Bh
Semen portland Kg
Pasir pasang M3
Pasir urug M3
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
1.000 -
0.060 - -
MLAH HARGA BAHAN - -
- -
UMLAH HARGA ALAT -
- 408,595.76
10% 40,859.58
- 449,455.00
1.000 -
6.000 -
0.010 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 269,102.80
10% 26,910.28
- 296,013.00
1.000 -
6.000 -
0.010 -
7.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 255,901.80
10% 25,590.18
- 281,491.00
1.000 -
6.000 -
0.010 -
30.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 200,838.79
10% 20,083.88
- 220,922.00
1.000 -
20.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 89,307.96
10% 8,930.80
- 98,238.00
1.000 -
12.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 812,532.34
10% 81,253.23
- 893,785.00
150.000 -
120.000 -
0.300 -
360.000 -
6.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 842,252.24
10% 84,225.22
- 926,477.00
1.000 -
0.120 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 812,532.34
10% 81,253.23
- 893,785.00
1.000 -
12.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 76,770.54
10% 7,677.05
- 84,447.00
1.000 -
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 37,379.31
10% 3,737.93
- 41,117.00
1.000 -
1.000 -
20.000 -
0.050 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 62,298.85
10% 6,229.89
- 68,528.00
1.000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 12,459.77
10% 1,245.98
- 13,705.00
40.000 -
44.000 -
0.070 -
0.060 -
0.070 -
1.600 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 263,589.44
10% 26,358.94
- 289,948.00
70.000 -
77.000 -
0.130 -
0.090 -
0.020 -
2.600 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 387,897.71
10% 38,789.77
- 426,687.00
123.000 -
114.000 -
0.184 -
0.120 -
0.033 -
4.850 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 387,897.71
10% 38,789.77
- 426,687.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 17,726.05
10% 1,772.61
- 19,498.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.000 -
0.025 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 45,497.58
10% 4,549.76
- 50,047.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 17,726.05
10% 1,772.61
- 19,498.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 29,571.66
10% 2,957.17
- 32,528.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 37,111.06
10% 3,711.11
- 40,822.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 37,111.06
10% 3,711.11
- 40,822.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 9,897.22
10% 989.72
- 10,886.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 9,897.22
10% 989.72
- 10,886.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 9,897.22
10% 989.72
- 10,886.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 14,845.83
10% 1,484.58
- 16,330.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 14,845.83
10% 1,484.58
- 16,330.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,208.75
10% 2,220.87
- 24,429.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,208.75
10% 2,220.87
- 24,429.00
1.200 -
35.000 - -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 22,208.75
10% 2,220.87
- 24,429.00
1.600 -
35.000 -
0.014 -
0.014 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 11,662.06
10% 1,166.21
- 12,828.00
1.600 -
0.680 -
0.013 -
0.011 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 8,746.55
10% 874.65
- 9,621.00
1.100 -
0.027 -
3.920 -
0.056 -
0.024 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 20,408.61
10% 2,040.86
- 22,449.00
1.100 -
0.550 -
10.300 -
0.061 -
0.069 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 55,394.80
10% 5,539.48
- 60,934.00
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA
A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC Ø 63 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 63 mm m
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel.
Apabila ada tambahan peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan
gambar kerja.
A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 100 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 150 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 200 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.5 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 250 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.6 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 300 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.7 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 400 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.8 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 450 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.9 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 500 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.10 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 600 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.11 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 700 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.12 (K3) Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang pipa L.02.13 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 800 mm bh
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari
Sewa Genset 1500 watt hari
Sewa Pompa Submersible 3m3/h hari
Sewa Tripot/Tackel & handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
1.000 -
MLAH HARGA BAHAN -
0.006 -
UMLAH HARGA ALAT -
- 11,873.84
10% 1,187.38
- 13,061.00
1.000 -
MLAH HARGA BAHAN -
0.008 -
UMLAH HARGA ALAT -
- 13,688.10
10% 1,368.81
- 15,056.00
1.000 -
MLAH HARGA BAHAN -
0.010 -
UMLAH HARGA ALAT -
- 15,452.94
10% 1,545.29
- 16,998.00
1.000 -
MLAH HARGA BAHAN -
0.012 -
UMLAH HARGA ALAT -
- 17,267.19
10% 1,726.72
- 18,993.00
1.000 -
MLAH HARGA BAHAN -
0.024 -
UMLAH HARGA ALAT -
- 27,679.75
10% 2,767.98
- 30,447.00
1.000 -
MLAH HARGA BAHAN -
0.034 -
UMLAH HARGA ALAT -
- 37,456.96
10% 3,745.70
- 41,202.00
1.000 -
MLAH HARGA BAHAN -
0.040 -
UMLAH HARGA ALAT -
- 42,913.85
10% 4,291.38
- 47,205.00
1.000 -
MLAH HARGA BAHAN -
0.080 -
UMLAH HARGA ALAT -
- 79,446.04
10% 7,944.60
- 87,390.00
1.000 -
MLAH HARGA BAHAN -
0.100 -
UMLAH HARGA ALAT -
- 97,821.55
10% 9,782.16
- 107,603.00
1.000 -
MLAH HARGA BAHAN -
0.122 -
UMLAH HARGA ALAT -
- 118,279.58
10% 11,827.96
- 130,107.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.000 -
MLAH HARGA BAHAN -
0.145 -
UMLAH HARGA ALAT -
- 139,930.63
10% 13,993.06
- 153,923.00
1.000 -
MLAH HARGA BAHAN -
0.250 -
UMLAH HARGA ALAT -
- 236,460.32
10% 23,646.03
- 260,106.00
1.000 -
MLAH HARGA BAHAN -
0.262 -
UMLAH HARGA ALAT -
- 247,141.13
10% 24,714.11
- 271,855.00
1.000 -
MLAH HARGA BAHAN -
0.294 -
- -
UMLAH HARGA ALAT -
- 277,023.41
10% 27,702.34
- 304,725.00
- -
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.000 -
MLAH HARGA BAHAN -
0.327 -
UMLAH HARGA ALAT -
- 306,785.67
10% 30,678.57
- 337,464.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.000 -
MLAH HARGA BAHAN -
0.359 -
UMLAH HARGA ALAT -
- 336,547.93
10% 33,654.79
- 370,202.00
1.000 -
MLAH HARGA BAHAN -
0.019 -
UMLAH HARGA ALAT -
- 5,005.09
10% 500.51
- 5,505.00
1.000 -
MLAH HARGA BAHAN -
0.019 -
UMLAH HARGA ALAT -
- 5,845.15
10% 584.52
- 6,429.00
1.000 -
MLAH HARGA BAHAN -
0.019 -
UMLAH HARGA ALAT -
- 6,685.21
10% 668.52
- 7,353.00
1.000 -
MLAH HARGA BAHAN -
0.019 -
UMLAH HARGA ALAT -
- 9,035.98
10% 903.60
- 9,939.00
1.000 -
MLAH HARGA BAHAN -
0.019 -
UMLAH HARGA ALAT -
- 14,881.13
10% 1,488.11
- 16,369.00
1.000 -
MLAH HARGA BAHAN -
0.042 -
UMLAH HARGA ALAT -
- 19,448.54
10% 1,944.85
- 21,393.00
1.000 -
MLAH HARGA BAHAN -
0.065 -
UMLAH HARGA ALAT -
- 24,841.89
10% 2,484.19
- 27,326.00
1.000 -
MLAH HARGA BAHAN -
0.152 -
UMLAH HARGA ALAT -
- 42,377.34
10% 4,237.73
- 46,615.00
1.000 -
MLAH HARGA BAHAN -
0.200 -
UMLAH HARGA ALAT -
- 52,521.64
10% 5,252.16
- 57,773.00
0.251 -
UMLAH HARGA ALAT -
- 63,188.33
10% 6,318.83
- 69,507.00
1.000 -
MLAH HARGA BAHAN -
0.307 -
UMLAH HARGA ALAT -
- 74,793.92
10% 7,479.39
- 82,273.00
1.000 -
MLAH HARGA BAHAN -
0.573 -
UMLAH HARGA ALAT -
- 130,407.56
10% 13,040.76
- 143,448.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.000 -
MLAH HARGA BAHAN -
0.883 -
UMLAH HARGA ALAT -
- 197,725.61
10% 19,772.56
- 217,498.00
1.000 -
MLAH HARGA BAHAN -
1.093 -
UMLAH HARGA ALAT -
- 242,489.02
10% 24,248.90
- 266,737.00
1.000 -
MLAH HARGA BAHAN -
1.205 -
UMLAH HARGA ALAT -
- 265,686.07
10% 26,568.61
- 292,254.00
1.000 -
MLAH HARGA BAHAN -
1.584 -
UMLAH HARGA ALAT -
- 346,325.14
10% 34,632.51
- 380,957.00
1.000 -
MLAH HARGA BAHAN -
0.038 -
UMLAH HARGA ALAT -
- 50,305.00
10% 5,030.50
- 55,335.00
1.000 -
MLAH HARGA BAHAN -
0.038 -
UMLAH HARGA ALAT -
- 58,451.50
10% 5,845.15
- 64,296.00
1.000 -
MLAH HARGA BAHAN -
0.038 -
UMLAH HARGA ALAT -
- 65,489.68
10% 6,548.97
- 72,038.00
1.000 -
MLAH HARGA BAHAN -
0.042 -
UMLAH HARGA ALAT -
- 73,989.15
10% 7,398.92
- 81,388.00
1.000 -
MLAH HARGA BAHAN -
0.042 -
UMLAH HARGA ALAT -
- 116,366.49
10% 11,636.65
- 128,003.00
1.000 -
MLAH HARGA BAHAN -
0.042 -
UMLAH HARGA ALAT -
- 138,737.60
10% 13,873.76
- 152,611.00
1.000 -
MLAH HARGA BAHAN -
0.042 -
UMLAH HARGA ALAT -
- 140,015.35
10% 14,001.53
- 154,016.00
1.000 -
MLAH HARGA BAHAN -
0.058 -
UMLAH HARGA ALAT -
- 177,084.05
10% 17,708.40
- 194,792.00
1.000 -
MLAH HARGA BAHAN -
0.058 -
UMLAH HARGA ALAT -
- 197,626.78
10% 19,762.68
- 217,389.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.000 -
MLAH HARGA BAHAN -
0.077 -
UMLAH HARGA ALAT -
- 214,724.55
10% 21,472.46
- 236,197.00
1.000 -
MLAH HARGA BAHAN -
0.077 -
UMLAH HARGA ALAT -
- 193,998.27
10% 19,399.83
- 213,398.00
1.000 -
MLAH HARGA BAHAN -
0.086 -
UMLAH HARGA ALAT -
- 340,028.19
10% 34,002.82
- 374,031.00
1.000 -
MLAH HARGA BAHAN -
0.086 -
UMLAH HARGA ALAT -
- 383,309.13
10% 38,330.91
- 421,640.00
1.000 -
MLAH HARGA BAHAN -
0.086 -
UMLAH HARGA ALAT -
- 425,418.21
10% 42,541.82
- 467,960.00
1.000 -
MLAH HARGA BAHAN -
0.086 -
UMLAH HARGA ALAT -
- 467,612.01
10% 46,761.20
- 514,373.00
1.000 -
MLAH HARGA BAHAN -
0.086 -
UMLAH HARGA ALAT -
- 243,792.17
10% 24,379.22
- 268,171.00
1.000 -
MLAH HARGA BAHAN -
0.380 -
UMLAH HARGA ALAT -
- 56,990.21
10% 5,699.02
- 62,689.00
1.000 -
MLAH HARGA BAHAN -
0.380 -
UMLAH HARGA ALAT -
- 63,710.72
10% 6,371.07
- 70,081.00
1.000 -
MLAH HARGA BAHAN -
0.380 -
UMLAH HARGA ALAT -
- 71,405.43
10% 7,140.54
- 78,545.00
1.000 -
MLAH HARGA BAHAN -
0.380 -
UMLAH HARGA ALAT -
- 99,529.92
10% 9,952.99
- 109,482.00
1.000 -
MLAH HARGA BAHAN -
0.050 -
UMLAH HARGA ALAT -
- 110,740.18
10% 11,074.02
- 121,814.00
1.000 -
MLAH HARGA BAHAN -
0.071 -
UMLAH HARGA ALAT -
- 113,338.02
10% 11,333.80
- 124,671.00
1.000 -
MLAH HARGA BAHAN -
0.023 -
0.031 -
UMLAH HARGA ALAT -
- 124,964.79
10% 12,496.48
- 137,461.00
1.000 -
MLAH HARGA BAHAN -
0.029 -
0.039 -
UMLAH HARGA ALAT -
- 150,540.85
10% 15,054.09
- 165,594.00
1.000 -
MLAH HARGA BAHAN -
0.034 -
0.045 -
UMLAH HARGA ALAT -
- 173,526.13
10% 17,352.61
- 190,878.00
1.000 -
MLAH HARGA BAHAN -
0.058 -
0.077 -
UMLAH HARGA ALAT -
- 182,124.43
10% 18,212.44
- 200,336.00
1.000 -
MLAH HARGA BAHAN -
0.084 -
0.225 -
UMLAH HARGA ALAT -
- 341,757.74
10% 34,175.77
- 375,933.00
1.000 -
MLAH HARGA BAHAN -
0.093 -
0.248 -
UMLAH HARGA ALAT -
- 437,164.99
10% 43,716.50
- 480,881.00
1.000 -
MLAH HARGA BAHAN -
0.112 -
0.298 -
UMLAH HARGA ALAT -
- 541,163.48
10% 54,116.35
- 595,279.00
1.000 -
MLAH HARGA BAHAN -
0.152 -
0.304 -
UMLAH HARGA ALAT -
- 604,683.60
10% 60,468.36
- 665,151.00
1.000 -
MLAH HARGA BAHAN -
0.180 -
0.360 -
UMLAH HARGA ALAT -
- 698,029.52
10% 69,802.95
- 767,832.00
1.000 -
MLAH HARGA BAHAN -
0.004 -
UMLAH HARGA ALAT -
- 58,155.01
10% 5,815.50
- 63,970.00
1.000 -
MLAH HARGA BAHAN -
0.004 -
UMLAH HARGA ALAT -
- 67,473.36
10% 6,747.34
- 74,220.00
1.000 -
MLAH HARGA BAHAN -
0.004 -
UMLAH HARGA ALAT -
- 75,542.21
10% 7,554.22
- 83,096.00
1.000 -
MLAH HARGA BAHAN -
0.004 -
UMLAH HARGA ALAT -
- 82,530.98
10% 8,253.10
- 90,784.00
1.000 -
MLAH HARGA BAHAN -
0.004 -
UMLAH HARGA ALAT -
- 129,645.15
10% 12,964.51
- 142,609.00
1.000 -
MLAH HARGA BAHAN -
0.004 -
UMLAH HARGA ALAT -
- 154,395.26
10% 15,439.53
- 169,834.00
1.000 -
MLAH HARGA BAHAN -
0.004 -
UMLAH HARGA ALAT -
- 164,758.40
10% 16,475.84
- 181,234.00
1.000 -
MLAH HARGA BAHAN -
0.027 -
0.039 -
UMLAH HARGA ALAT -
- 275,618.59
10% 27,561.86
- 303,180.00
1.000 -
MLAH HARGA BAHAN -
0.026 -
0.037 -
UMLAH HARGA ALAT -
- 259,833.86
10% 25,983.39
- 285,817.00
1.000 -
MLAH HARGA BAHAN -
0.029 -
0.045 -
UMLAH HARGA ALAT -
- 283,214.46
10% 28,321.45
- 311,535.00
1.000 -
MLAH HARGA BAHAN -
0.027 -
0.039 -
UMLAH HARGA ALAT -
- 257,250.14
10% 25,725.01
- 282,975.00
1.000 -
MLAH HARGA BAHAN -
0.046 -
0.098 -
UMLAH HARGA ALAT -
- 453,916.85
10% 45,391.68
- 499,308.00
1.000 -
MLAH HARGA BAHAN -
0.052 -
0.115 -
UMLAH HARGA ALAT -
- 433,797.67
10% 43,379.77
- 477,177.00
1.000 -
MLAH HARGA BAHAN -
0.058 -
0.133 -
UMLAH HARGA ALAT -
- 570,106.85
10% 57,010.69
- 627,117.00
1.000 -
MLAH HARGA BAHAN -
0.064 -
0.150 -
UMLAH HARGA ALAT -
- 627,471.21
10% 62,747.12
- 690,218.00
1.000 -
MLAH HARGA BAHAN -
0.070 -
0.167 -
UMLAH HARGA ALAT -
- 686,339.22
10% 68,633.92
- 754,973.00
1.000 -
MLAH HARGA BAHAN -
0.003 -
UMLAH HARGA ALAT -
- 681.23
10% 68.12
- 749.00
1.000 -
MLAH HARGA BAHAN -
0.003 -
UMLAH HARGA ALAT -
- 1,997.80
10% 199.78
- 2,197.00
1.000 -
MLAH HARGA BAHAN -
0.003 -
UMLAH HARGA ALAT -
- 3,190.83
10% 319.08
- 3,509.00
1.000 -
MLAH HARGA BAHAN -
0.003 -
UMLAH HARGA ALAT -
- 4,468.57
10% 446.86
- 4,915.00
1.000 -
MLAH HARGA BAHAN -
0.017 -
UMLAH HARGA ALAT -
- 11,775.01
10% 1,177.50
- 12,952.00
1.000 -
MLAH HARGA BAHAN -
0.030 -
UMLAH HARGA ALAT -
- 18,728.48
10% 1,872.85
- 20,601.00
1.000 -
MLAH HARGA BAHAN -
0.037 -
UMLAH HARGA ALAT -
- 22,540.54
10% 2,254.05
- 24,794.00
1.000 -
MLAH HARGA BAHAN -
0.086 -
UMLAH HARGA ALAT -
- 48,406.03
10% 4,840.60
- 53,246.00
1.000 -
MLAH HARGA BAHAN -
0.054 -
UMLAH HARGA ALAT -
- 43,584.49
10% 4,358.45
- 47,942.00
0.069 -
UMLAH HARGA ALAT -
- 75,718.70
10% 7,571.87
- 83,290.00
1.000 -
MLAH HARGA BAHAN -
0.086 -
UMLAH HARGA ALAT -
- 90,952.79
10% 9,095.28
- 100,048.00
1.000 -
MLAH HARGA BAHAN -
0.160 -
UMLAH HARGA ALAT -
- 159,195.63
10% 15,919.56
- 175,115.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.000 -
MLAH HARGA BAHAN -
0.168 -
UMLAH HARGA ALAT -
- 166,770.32
10% 16,677.03
- 183,447.00
1.000 -
MLAH HARGA BAHAN -
0.191 -
UMLAH HARGA ALAT -
- 187,884.87
10% 18,788.49
- 206,673.00
1.000 -
MLAH HARGA BAHAN -
0.213 -
UMLAH HARGA ALAT -
- 208,879.40
10% 20,887.94
- 229,767.00
1.000 -
MLAH HARGA BAHAN -
0.236 -
UMLAH HARGA ALAT -
- 229,873.94
10% 22,987.39
- 252,861.00
1.000 -
MLAH HARGA BAHAN -
0.004 -
UMLAH HARGA ALAT -
- 4,132.55
10% 413.25
- 4,545.00
1.000 -
MLAH HARGA BAHAN -
0.005 -
UMLAH HARGA ALAT -
- 8,944.21
10% 894.42
- 9,838.00
1.000 -
MLAH HARGA BAHAN -
0.006 -
UMLAH HARGA ALAT -
- 12,219.75
10% 1,221.98
- 13,441.00
1.000 -
MLAH HARGA BAHAN -
0.009 -
UMLAH HARGA ALAT -
- 16,052.98
10% 1,605.30
- 17,658.00
1.000 -
MLAH HARGA BAHAN -
0.017 -
UMLAH HARGA ALAT -
- 25,696.07
10% 2,569.61
- 28,265.00
1.000 -
MLAH HARGA BAHAN -
0.023 -
UMLAH HARGA ALAT -
- 34,739.11
10% 3,473.91
- 38,213.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.0000 -
MLAH HARGA BAHAN -
0.0300 -
UMLAH HARGA ALAT -
- 43,760.97
10% 4,376.10
- 48,137.00
1.0000 -
MLAH HARGA BAHAN -
0.0550 -
UMLAH HARGA ALAT -
- 67,755.74
10% 6,775.57
- 74,531.00
0.0700 -
UMLAH HARGA ALAT -
- 80,540.24
10% 8,054.02
- 88,594.00
1.0000 -
MLAH HARGA BAHAN -
0.0850 -
UMLAH HARGA ALAT -
- 93,762.42
10% 9,376.24
- 103,138.00
1.0000 -
MLAH HARGA BAHAN -
0.1010 -
UMLAH HARGA ALAT -
- 113,168.60
10% 11,316.86
- 124,485.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.0000 -
MLAH HARGA BAHAN -
0.1790 -
UMLAH HARGA ALAT -
- 174,945.06
10% 17,494.51
- 192,439.00
1.0000 -
MLAH HARGA BAHAN -
0.2700 -
UMLAH HARGA ALAT -
- 231,709.37
10% 23,170.94
- 254,880.00
1.0000 -
MLAH HARGA BAHAN -
0.3320 -
UMLAH HARGA ALAT -
- 273,959.64
10% 27,395.96
- 301,355.00
1.0000 -
MLAH HARGA BAHAN -
0.3650 -
UMLAH HARGA ALAT -
- 301,900.59
10% 30,190.06
- 332,090.00
1.0000 -
MLAH HARGA BAHAN -
0.4770 -
UMLAH HARGA ALAT -
- 368,809.20
10% 36,880.92
- 405,690.00
1.0000 -
MLAH HARGA BAHAN -
0.0170 -
UMLAH HARGA ALAT -
- 2,837.86
10% 283.79
- 3,121.00
1.0000 -
MLAH HARGA BAHAN -
0.0170 -
UMLAH HARGA ALAT -
- 8,499.47
10% 849.95
- 9,349.00
0.0340 -
UMLAH HARGA ALAT -
- 13,419.84
10% 1,341.98
- 14,761.00
1.0000 -
MLAH HARGA BAHAN -
0.0340 -
UMLAH HARGA ALAT -
- 19,180.28
10% 1,918.03
- 21,098.00
1.0000 -
MLAH HARGA BAHAN -
0.0510 -
UMLAH HARGA ALAT -
- 49,683.78
10% 4,968.38
- 54,652.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.0000 -
MLAH HARGA BAHAN -
0.0510 -
UMLAH HARGA ALAT -
- 69,301.74
10% 6,930.17
- 76,231.00
1.0000 -
MLAH HARGA BAHAN -
0.0510 -
UMLAH HARGA ALAT -
- 73,600.89
10% 7,360.09
- 80,960.00
1.0000 -
MLAH HARGA BAHAN -
0.0680 -
UMLAH HARGA ALAT -
- 107,867.02
10% 10,786.70
- 118,653.00
1.0000 -
MLAH HARGA BAHAN -
0.0680 -
UMLAH HARGA ALAT -
- 123,941.18
10% 12,394.12
- 136,335.00
1.0000 -
MLAH HARGA BAHAN -
0.0680 -
UMLAH HARGA ALAT -
- 137,544.57
10% 13,754.46
- 151,299.00
1.0000 -
MLAH HARGA BAHAN -
0.0850 -
UMLAH HARGA ALAT -
- 126,207.24
10% 12,620.72
- 138,827.00
1.0000 -
MLAH HARGA BAHAN -
0.0850 -
UMLAH HARGA ALAT -
- 228,970.34
10% 22,897.03
- 251,867.00
1.0000 -
MLAH HARGA BAHAN -
0.0850 -
UMLAH HARGA ALAT -
- 258,647.89
10% 25,864.79
- 284,512.00
1.0000 -
MLAH HARGA BAHAN -
0.1020 -
UMLAH HARGA ALAT -
- 288,410.15
10% 28,841.02
- 317,251.00
1.0000 -
MLAH HARGA BAHAN -
0.1020 -
UMLAH HARGA ALAT -
- 318,292.42
10% 31,829.24
- 350,121.00
1.0000 -
MLAH HARGA BAHAN -
0.1020 -
UMLAH HARGA ALAT -
- 348,054.69
10% 34,805.47
- 382,860.00
1.0000 -
MLAH HARGA BAHAN -
0.0030 -
UMLAH HARGA ALAT -
- 8,238.27
10% 823.83
- 9,062.00
1.0000 -
MLAH HARGA BAHAN -
0.0100 -
UMLAH HARGA ALAT -
- 12,982.16
10% 1,298.22
- 14,280.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.0000 -
MLAH HARGA BAHAN -
0.0180 -
UMLAH HARGA ALAT -
- 18,552.00
10% 1,855.20
- 20,407.00
1.0000 -
MLAH HARGA BAHAN -
0.0540 -
UMLAH HARGA ALAT -
- 42,659.71
10% 4,265.97
- 46,925.00
1.0000 -
MLAH HARGA BAHAN -
0.0730 -
UMLAH HARGA ALAT -
- 55,472.45
10% 5,547.25
- 61,019.00
1.0000 -
MLAH HARGA BAHAN -
0.0790 -
UMLAH HARGA ALAT -
- 59,573.94
10% 5,957.39
- 65,531.00
1.0000 -
MLAH HARGA BAHAN -
0.1580 -
UMLAH HARGA ALAT -
- 109,575.39
10% 10,957.54
- 120,532.00
1.0000 -
MLAH HARGA BAHAN -
0.1760 -
UMLAH HARGA ALAT -
- 132,433.59
10% 13,243.36
- 145,676.00
1.0000 -
MLAH HARGA BAHAN -
0.1920 -
UMLAH HARGA ALAT -
- 152,757.49
10% 15,275.75
- 168,033.00
1.0000 -
MLAH HARGA BAHAN -
0.1920 -
UMLAH HARGA ALAT -
- 152,503.35
10% 15,250.34
- 167,753.00
1.0000 -
MLAH HARGA BAHAN -
0.3100 -
UMLAH HARGA ALAT -
- 302,677.12
10% 30,267.71
- 332,944.00
1.0000 -
MLAH HARGA BAHAN -
0.3810 -
UMLAH HARGA ALAT -
- 392,535.71
10% 39,253.57
- 431,789.00
1.0000 -
MLAH HARGA BAHAN -
0.4410 -
UMLAH HARGA ALAT -
- 468,332.06
10% 46,833.21
- 515,165.00
1.0000 -
MLAH HARGA BAHAN -
0.5060 -
UMLAH HARGA ALAT -
- 551,032.46
10% 55,103.25
- 606,135.00
1.0000 -
MLAH HARGA BAHAN -
0.5760 -
UMLAH HARGA ALAT -
- 640,806.34
10% 64,080.63
- 704,886.00
1.0000 -
MLAH HARGA BAHAN -
0.0370 -
UMLAH HARGA ALAT -
- 3,324.96
10% 332.50
- 3,657.00
1.0000 -
MLAH HARGA BAHAN -
0.0400 -
UMLAH HARGA ALAT -
- 9,840.75
10% 984.07
- 10,824.00
0.0420 -
UMLAH HARGA ALAT -
- 15,495.30
10% 1,549.53
- 17,044.00
1.0000 -
MLAH HARGA BAHAN -
0.0450 -
UMLAH HARGA ALAT -
- 21,403.98
10% 2,140.40
- 23,544.00
1.0000 -
MLAH HARGA BAHAN -
0.0600 -
UMLAH HARGA ALAT -
- 55,472.45
10% 5,547.25
- 61,019.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.0000 -
MLAH HARGA BAHAN -
0.0680 -
UMLAH HARGA ALAT -
- 77,229.40
10% 7,722.94
- 84,952.00
1.0000 -
MLAH HARGA BAHAN -
0.0720 -
UMLAH HARGA ALAT -
- 86,717.18
10% 8,671.72
- 95,388.00
1.0000 -
MLAH HARGA BAHAN -
0.1050 -
UMLAH HARGA ALAT -
- 167,730.39
10% 16,773.04
- 184,503.00
1.0000 -
MLAH HARGA BAHAN -
0.1070 -
UMLAH HARGA ALAT -
- 162,986.50
10% 16,298.65
- 179,285.00
1.0000 -
MLAH HARGA BAHAN -
0.1070 -
UMLAH HARGA ALAT -
- 181,538.50
10% 18,153.85
- 199,692.00
1.0000 -
MLAH HARGA BAHAN -
0.1130 -
UMLAH HARGA ALAT -
- 167,377.43
10% 16,737.74
- 184,115.00
1.0000 -
MLAH HARGA BAHAN -
0.1660 -
UMLAH HARGA ALAT -
- 305,613.81
10% 30,561.38
- 336,175.00
1.0000 -
MLAH HARGA BAHAN -
0.1830 -
UMLAH HARGA ALAT -
- 346,028.65
10% 34,602.86
- 380,631.00
1.0000 -
MLAH HARGA BAHAN -
0.2010 -
UMLAH HARGA ALAT -
- 386,627.03
10% 38,662.70
- 425,289.00
1.0000 -
MLAH HARGA BAHAN -
0.2180 -
UMLAH HARGA ALAT -
- 427,126.58
10% 42,712.66
- 469,839.00
0.2360 -
UMLAH HARGA ALAT -
- 467,724.96
10% 46,772.50
- 514,497.00
1.0000 -
MLAH HARGA BAHAN -
0.1000 -
UMLAH HARGA ALAT -
- 208,879.40
10% 20,887.94
- 229,767.00
1.0000 -
MLAH HARGA BAHAN -
0.3000 -
UMLAH HARGA ALAT -
- 250,416.68
10% 25,041.67
- 275,458.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.0000 -
MLAH HARGA BAHAN -
0.4000 -
UMLAH HARGA ALAT -
- 250,416.68
10% 25,041.67
- 275,458.00
1.0000 -
MLAH HARGA BAHAN -
0.5000 -
UMLAH HARGA ALAT -
- 292,257.50
10% 29,225.75
- 321,483.00
1.0000 -
MLAH HARGA BAHAN -
1.0000 -
UMLAH HARGA ALAT -
- 501,136.91
10% 50,113.69
- 551,250.00
1.0000 -
MLAH HARGA BAHAN -
1.0000 -
UMLAH HARGA ALAT -
- 501,136.91
10% 50,113.69
- 551,250.00
1.0000 -
MLAH HARGA BAHAN -
1.0000 -
UMLAH HARGA ALAT -
- 584,515.01
10% 58,451.50
- 642,966.00
1.0000 -
MLAH HARGA BAHAN -
0.6000 -
0.3000 -
UMLAH HARGA ALAT -
- 207,686.37
10% 20,768.64
- 228,455.00
1.0000 -
MLAH HARGA BAHAN -
0.5000 -
0.5000 -
UMLAH HARGA ALAT -
- 208,879.40
10% 20,887.94
- 229,767.00
1.0000 -
MLAH HARGA BAHAN -
0.5000 -
0.5000 -
UMLAH HARGA ALAT -
- 261,033.95
10% 26,103.40
- 287,137.00
1.0000 -
MLAH HARGA BAHAN -
0.7500 -
0.7500 -
UMLAH HARGA ALAT -
- 250,416.68
10% 25,041.67
- 275,458.00
1.0000 -
MLAH HARGA BAHAN -
1.0000 -
1.0000 -
UMLAH HARGA ALAT -
- 375,734.44
10% 37,573.44
- 413,307.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.0000 -
MLAH HARGA BAHAN -
1.0000 -
1.0000 -
UMLAH HARGA ALAT -
- 438,386.26
10% 43,838.63
- 482,224.00
1.0000 -
MLAH HARGA BAHAN -
1.0000 -
1.0000 -
UMLAH HARGA ALAT -
- 438,386.26
10% 43,838.63
- 482,224.00
0.0280 -
UMLAH HARGA ALAT -
- 15,537.65
10% 1,553.77
- 17,091.00
1.0000 -
MLAH HARGA BAHAN -
0.0290 -
UMLAH HARGA ALAT -
- 31,611.81
10% 3,161.18
- 34,772.00
1.0000 -
MLAH HARGA BAHAN -
0.0390 -
UMLAH HARGA ALAT -
- 47,685.98
10% 4,768.60
- 52,454.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.0000 -
MLAH HARGA BAHAN -
0.5000 -
UMLAH HARGA ALAT -
- 63,760.14
10% 6,376.01
- 70,136.00
1.0000 -
MLAH HARGA BAHAN -
0.5000 -
UMLAH HARGA ALAT -
- 95,908.46
10% 9,590.85
- 105,499.00
1.0000 -
MLAH HARGA BAHAN -
0.5000 -
UMLAH HARGA ALAT -
- 111,982.63
10% 11,198.26
- 123,180.00
1.0000 -
MLAH HARGA BAHAN -
0.6000 -
UMLAH HARGA ALAT -
- 128,056.79
10% 12,805.68
- 140,862.00
1.0000 -
MLAH HARGA BAHAN -
0.1930 -
0.0960 -
UMLAH HARGA ALAT -
- 160,205.12
10% 16,020.51
- 176,225.00
1.0000 -
MLAH HARGA BAHAN -
0.2250 -
0.1130 -
UMLAH HARGA ALAT -
- 192,353.44
10% 19,235.34
- 211,588.00
1.0000 -
MLAH HARGA BAHAN -
0.2570 -
0.1290 -
UMLAH HARGA ALAT -
- 224,501.77
10% 22,450.18
- 246,951.00
1.0000 -
MLAH HARGA BAHAN -
0.3210 -
0.1610 -
UMLAH HARGA ALAT -
- 256,650.09
10% 25,665.01
- 282,315.00
1.0000 -
MLAH HARGA BAHAN -
0.3660 -
0.1830 -
UMLAH HARGA ALAT -
- 288,798.42
10% 28,879.84
- 317,678.00
1.0000 -
MLAH HARGA BAHAN -
0.3860 -
0.1930 -
UMLAH HARGA ALAT -
- 320,946.74
10% 32,094.67
- 353,041.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
1.0000 -
MLAH HARGA BAHAN -
0.4500 -
0.2250 -
UMLAH HARGA ALAT -
- 353,095.07
10% 35,309.51
- 388,404.00
1.0000 -
MLAH HARGA BAHAN -
0.6060 -
0.0750 -
0.9680 -
0.8650 -
UMLAH HARGA ALAT -
- 214,272.75
10% 21,427.28
- 235,700.00
1.0000 -
MLAH HARGA BAHAN -
0.6500 -
0.1590 -
1.0780 -
0.9110 -
UMLAH HARGA ALAT -
- 240,575.93
10% 24,057.59
- 264,633.00
1.0000 -
MLAH HARGA BAHAN -
0.7600 -
0.3690 -
1.3530 -
1.0260 -
UMLAH HARGA ALAT -
- 306,333.87
10% 30,633.39
- 336,967.00
1.0000 -
MLAH HARGA BAHAN -
0.8700 -
0.5790 -
1.6280 -
1.1410 -
UMLAH HARGA ALAT -
- 372,091.81
10% 37,209.18
- 409,300.00
1.0000 -
MLAH HARGA BAHAN -
0.9800 -
0.7890 -
1.9030 -
1.2560 -
UMLAH HARGA ALAT -
- 437,849.74
10% 43,784.97
- 481,634.00
1.0000 -
MLAH HARGA BAHAN -
1.0900 -
0.9990 -
2.1780 -
1.3710 -
UMLAH HARGA ALAT -
- 503,607.68
10% 50,360.77
- 553,968.00
1.0000 -
MLAH HARGA BAHAN -
1.3100 -
1.4190 -
2.7280 -
1.6010 -
UMLAH HARGA ALAT -
- 635,123.56
10% 63,512.36
- 698,635.00
1.0000 -
MLAH HARGA BAHAN -
1.4200 -
1.6290 -
3.0030 -
1.7160 -
UMLAH HARGA ALAT -
- 700,881.50
10% 70,088.15
- 770,969.00
1.0000 -
MLAH HARGA BAHAN -
1.5300 -
1.8390 -
3.2780 -
1.8310 -
UMLAH HARGA ALAT -
- 766,639.44
10% 76,663.94
- 843,303.00
1.0000 -
MLAH HARGA BAHAN -
1.7500 -
2.2590 -
3.8280 -
2.0610 -
UMLAH HARGA ALAT -
- 898,155.31
10% 89,815.53
- 987,970.00
1.0000 -
MLAH HARGA BAHAN -
1.9700 -
2.6790 -
4.3780 -
2.2910 -
UMLAH HARGA ALAT -
- 1,029,671.19
10% 102,967.12
- 1,132,638.00
1.0000 -
MLAH HARGA BAHAN -
2.1900 -
3.0990 -
4.9280 -
2.5210 -
UMLAH HARGA ALAT -
- 1,161,187.07
10% 116,118.71
- 1,277,305.00
0.0020 -
0.0600 -
0.0020 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 773.71
10% 77.37
- 851.00
0.0040 -
0.0600 -
0.0020 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 773.71
10% 77.37
- 851.00
0.0080 -
0.0600 -
0.0020 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 773.71
10% 77.37
- 851.00
0.0180 -
0.0600 -
0.0020 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 773.71
10% 77.37
- 851.00
0.0310 -
0.0600 -
0.0020 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 773.71
10% 77.37
- 851.00
0.0490 -
0.0600 -
0.0020 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 773.71
10% 77.37
- 851.00
0.0710 -
0.0600 -
0.0020 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 773.71
10% 77.37
- 851.00
0.1260 -
0.0600 -
0.0020 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 773.71
10% 77.37
- 851.00
Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
0.1580 -
0.0600 -
0.0020 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 773.71
10% 77.37
- 851.00
0.2830 -
0.0600 -
0.0020 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 773.71
10% 77.37
- 851.00
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu
No Uraian Kode Satuan
A TENAGA
Upah %
JUMLAH TENAGA KERJA
B BAHAN
Pipa listrik 5/8” btg
Kabel NYM 3x2,5 mm2 m
Tee Doos bh
L.Bow bh
Las Dop bh
Klem Pipa Listrik bh
Mongkok (Listrik) bh
Saklar (standar) bh
Fitting Lampu bh
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
1.0000 - -
LAH TENAGA KERJA -
0.2830 -
24.0000 -
3.0000 -
4.0000 -
3.0000 -
24.0000 -
1.0000 -
1.0000 -
1.0000 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- -
10% -
- -
11.00 -
11.00 -
1.00 -
2.00 -
3.00 -
6.00 -
2.00 -
0.25 -
MLAH HARGA BAHAN -
- -
UMLAH HARGA ALAT -
- 34,520.27
10% 3,452.03
- 37,972.00
Harga Satuan Upah
Suku Bunga 20 %
Rp/Jam) BIAYA OPERASI (OPERATING COST) (Rp/Jam)
G H I J
Biaya Bahan Bakar Pelumas Biaya
Pasti Ltr/HP/Jam Biaya Ltr/HP/Jam Biaya Bengkel
Per Jam 15% Rp 9,500.00 3% Rp 62,084.00 8.75%
14 15 16 17 18 19
Koef = 0.0046
Kombinasi ideal dengan DT 24 m3 = 13.8 unit
Kombinasi ideal dengan DT 8 m 3
= 43.8 unit
V = Ls x Tb2
= 12.708211 m3
Ls = { n ( L - Lo ) + Lo }
= 9.63 m